CN201433386Y - Broken-line type dam joint structure - Google Patents

Broken-line type dam joint structure Download PDF

Info

Publication number
CN201433386Y
CN201433386Y CN2009201235189U CN200920123518U CN201433386Y CN 201433386 Y CN201433386 Y CN 201433386Y CN 2009201235189 U CN2009201235189 U CN 2009201235189U CN 200920123518 U CN200920123518 U CN 200920123518U CN 201433386 Y CN201433386 Y CN 201433386Y
Authority
CN
China
Prior art keywords
concrete
dam
line type
joint structure
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201235189U
Other languages
Chinese (zh)
Inventor
扈晓雯
徐建强
熊燕梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN2009201235189U priority Critical patent/CN201433386Y/en
Application granted granted Critical
Publication of CN201433386Y publication Critical patent/CN201433386Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a broken-line type dam joint structure. The utility model solves the technical problem of providing a broken-line type which solves the difficult dam joint design problemof city drain pipes buried in the side slope, large area of residential houses, artificial stacked ballast body and small tributary importing, and reaches the requirements of dam joint force application, fundamental seepage-proofing and bypass seepage. The technical proposal for solving the problems includes that: the broken-line type dam joint structure includes dam concrete gate piers, concretepiers of the built bridge, road masonry retaining walls and built roads, and is characterized in that: the concrete retaining walls are arranged between the dam concrete gate piers and the concrete piers, and each structure seam of the concrete retaining walls adopts a water stop copper sheet for water sealing; concrete key-walls are arranged on the inner side of the road masonry retaining walls,one end of the concrete retaining walls and the built roads. The broken-line type dam joint structure is applicable to hydroelectric projects and urban control flood projects.

Description

A kind of broken line type dam joint structure
Technical field
The present invention relates to a kind of broken line type dam joint structure.Be applicable to Hydraulic and Hydro-Power Engineering, flood control works.
Background technology
The design of water conservancy and hydropower multi-purpose project dam joint structure plays crucial effect to engineering safety.Generally be that directly insert on the bedrock surface of bank on the dam joint structure basis, can satisfy dam foundation preferably and prevent blending around dam seepage flow requirement.But run near being located in city or county town and build multi-purpose project, the bank condition is extremely complicated, dam joint structure design routinely just becomes very difficult, as being embedded with urban sewage pipeline, large stretch of resident house, artificial slag body, sprout remittance etc. in the side slope, in the face of such bank and basic condition, not only constructional difficulties, and expense costliness.Therefore, press for a kind of dam joint structure and job practices that can be fit to above-mentioned geographical situation of design on the engineering, make that being located near the water conservancy and hydropower multi-purpose project of building in city or county town becomes practical.
Summary of the invention
The present invention is the difficulty that overcomes dam joint structure design under the complex slope condition, a kind of broken line type dam joint structure is proposed, to solve the difficult problem of dam joint structure designs such as being embedded with urban sewage pipeline, large stretch of resident house, artificial slag body, sprout remittance in the side slope, reach stressed, the basic anti-requirement that blends around dam seepage flow of dam joint structure.
The technical solution adopted in the present invention is: broken line type dam joint structure, have the dam concrete gate pier, build concrete pier, the highway stone-laying barricade of bridge and built highway, it is characterized in that: between dam concrete gate pier and concrete pier concrete guard wall is set, each structural joint of this concrete guard wall is by the copper seal water shutoff; In the inboard of highway stone-laying barricade, described concrete guard wall one end is provided with the concrete key-wall with an end of having built highway.
Structural joint between described concrete guard wall and the dam concrete gate pier is handled by the copper seal water shutoff.
Structural joint between described concrete pier and the concrete guard wall is handled by the frame for movement water shutoff, this frame for movement comprise smooth concrete pier the rubber filler strip, on L shaped watertight rubber and outermost steel plate press strip, above-mentioned three is fastening by expansion bolt.
Structural joint between described concrete guard wall and the concrete key-wall is handled by the copper seal water shutoff.
The structural joint of described concrete key-wall and highway stone-laying barricade one end is handled by the frame for movement water shutoff, this frame for movement comprise smooth highway stone-laying barricade the rubber filler strip, on L shaped watertight rubber and outermost steel plate press strip, above-mentioned three is fastening by expansion bolt.
The inboard backfill waste of described concrete guard wall building stones.
The consolidation grouting hole is set, array pitch 3m, hole depth 5m on the basis of concrete guard wall.
The basis of the basis of described dam concrete gate pier, the basis of concrete guard wall, concrete key-wall and the close-connected curtain grouting of the basis instrument hole of having built highway, pitch-row 2m, hole depth extends horizontally to upstream massif basement rock to relative impervious layer.
The invention has the beneficial effects as follows: the present invention arranges the dam joint structure that a kind of broken line type is provided for the water conservancy and hydropower hinge, and advantage is that structure stress is clear and definite, construction is simple, based process is effective, can prolong seepage paths, improves around the dam impervious ability; To solving a dam joint structure processing difficult problem under urban flood defence, the reservoir complex slope condition, especially solving the main flow side has the blowdown culvert in sprout remittance or the bank slope dam joint structure design challenges, benefit of the present invention is obvious.
Description of drawings
Fig. 1 is a layout plan of the present invention.
Fig. 2 is the A-A sectional drawing of Fig. 1.
Fig. 3 is the B-B sectional drawing of Fig. 1.
Fig. 4 is the partial enlarged drawing of mark A among Fig. 1.
Fig. 5 is the partial enlarged drawing of mark B among Fig. 1.
The specific embodiment
As Fig. 1, Fig. 2, shown in Figure 3, present embodiment has dam concrete gate pier 2, builds concrete pier 3, the highway stone-laying barricade 5 of bridge and built highway 14, the characteristics of present embodiment are between dam concrete gate pier 2 and concrete pier 3 concrete guard wall 1 to be set, and each structural joint of concrete guard wall is by copper seal 7 water shutoffs; In the inboard of highway stone-laying barricade 5, described concrete guard wall 1 one ends are provided with concrete key-wall 4 with an end of having built highway 14.
Aspect hermetic seal, adopt copper seal 7 water shutoffs to handle for the structural joint between concrete guard wall 1 and the dam concrete gate pier 2.Adopt the frame for movement water shutoff to handle for the structural joint of building between bridge 15 concrete piers 3 and the concrete guard wall 1, see Fig. 4, this frame for movement comprise smooth concrete pier 3 rubber filler strip 9, on L shaped watertight rubber 8 and outermost steel plate press strip 10, above-mentioned three is fastening by expansion bolt 11, frame for movement is installed earlier the sidewall of concrete pier 3 is polished flat before.Adopt copper seal 7 water shutoffs to handle for the structural joint between concrete guard wall 1 and the concrete key-wall 4.Handle for the concrete key-wall 4 and the structural joint employing frame for movement water shutoff of highway stone-laying barricade 5 one ends, see Fig. 5, this frame for movement comprise smooth highway stone-laying barricade 5 rubber filler strip 9, on L shaped watertight rubber 8 and outermost steel plate press strip 10, above-mentioned three is fastening by expansion bolt 11, equally, first sidewall with highway stone-laying barricade 5 polishes flat before frame for movement is installed.
This example is utilized 12 backfills of waste building stones in concrete guard wall 1 inboard (back), increases structural stability, to satisfy the dam joint structure force request.
See Fig. 2, on the basis of concrete guard wall 1, execute and bore consolidation grouting hole 13, hole depth 5m, array pitch 3m, and carry out consolidation grouting.
See Fig. 1, Fig. 3, on the basis of dam concrete gate pier 2, on the basis of concrete guard wall 1, on the basis of concrete key-wall 4 and built to execute on the basis of highway 14 and bored the curtain grouting hole 6 of series connection mutually, hole depth is to relative impervious layer, pitch-row 2m, up to upstream massif basement rock, and carry out curtain grouting.
The job practices of this routine broken line type dam joint structure may further comprise the steps:
9.1 at first carry out concrete guard wall 1 architecture basics excavation;
9.2 formwork erection concreting barricade 1, at the pre-buried copper seal 7 of each structural joint of barricade, (turning point) also adopts copper seal 7 water shutoffs to handle between concrete guard wall 1 and the dam concrete gate pier 2;
Polish flat 9.3 will build the sidewall of the concrete pier 3 of bridge 15, adopt fixedly watertight rubber 8 of rubber filler strip 9, steel plate press strip 10, expansion bolt 11, formwork erection is built the concrete guard wall 1 adjacent with concrete pier 3 again;
9.4 formwork erection concreting key-wall 4, joint at concrete key-wall and concrete guard wall 1 is buried copper seal 7 underground, the sidewall of highway stone-laying barricade 5 is polished flat, between concrete key-wall and highway stone-laying barricade 5, adopt fixedly watertight rubber 8 of rubber filler strip 9, steel plate press strip 10, expansion bolt 11;
9.5 earlier consolidation grouting is carried out on the basis of concrete guard wall 1; Again curtain grouting is carried out on this barricade basis;
9.6 to dam concrete gate pier 2 bases, concrete key-wall 4 bases and built highway 14 bases and carried out curtain grouting, constitute the band of curtain grouting antiseepage closely continuously with concrete guard wall 1 basis of being in the milk earlier is common;
9.7 with the described inboard that has formed antiseepage tape base plinth concrete guard wall 1 of waste building stones 12 backfills, layered rolling forms broken line type dam joint structure at last to the barricade top again.

Claims (8)

1, a kind of broken line type dam joint structure, have dam concrete gate pier (2), build concrete pier (3), the highway stone-laying barricade (5) of bridge and built highway (14), it is characterized in that: between dam concrete gate pier (2) and concrete pier (3) concrete guard wall (1) is set, each structural joint of this concrete guard wall is by copper seal (7) water shutoff; In the inboard of highway stone-laying barricade (5), described concrete guard wall (1) one end is provided with concrete key-wall (4) with an end of having built highway (14).
2, broken line type dam joint structure according to claim 1 is characterized in that: the structural joint between described concrete guard wall (1) and the dam concrete gate pier (2) is handled by copper seal (7) water shutoff.
3, broken line type dam joint structure according to claim 1 and 2, it is characterized in that: the structural joint between described concrete pier (3) and the concrete guard wall (1) is handled by the frame for movement water shutoff, this frame for movement comprise smooth concrete pier (3) rubber filler strip (9), on L shaped watertight rubber (8) and outermost steel plate press strip (10), above-mentioned three is fastening by expansion bolt (11).
4, broken line type dam joint structure according to claim 1 and 2 is characterized in that: the structural joint between described concrete guard wall (1) and the concrete key-wall (4) is handled by copper seal (7) water shutoff.
5, broken line type dam joint structure according to claim 1 and 2, it is characterized in that: described concrete key-wall (4) is handled by the frame for movement water shutoff with the structural joint of highway stone-laying barricade (5) one ends, this frame for movement comprise smooth highway stone-laying barricade (5) rubber filler strip (9), on L shaped watertight rubber (8) and outermost steel plate press strip (10), above-mentioned three is fastening by expansion bolt (11).
6, broken line type dam joint structure according to claim 1 and 2 is characterized in that: described concrete guard wall (1) inboard backfill waste building stones (12).
7, broken line type dam joint structure according to claim 1 and 2 is characterized in that: consolidation grouting hole (13) is set, array pitch 3m, hole depth 5m on the basis of concrete guard wall (1).
8, broken line type dam joint structure according to claim 1 and 2, it is characterized in that: the basis of the basis of the basis of described dam concrete gate pier (2), concrete guard wall (1), concrete key-wall (4) and the close-connected curtain grouting of the basis instrument hole (6) of having built highway (14), pitch-row 2m, hole depth extends horizontally to upstream massif basement rock to relative impervious layer.
CN2009201235189U 2009-07-02 2009-07-02 Broken-line type dam joint structure Expired - Fee Related CN201433386Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201235189U CN201433386Y (en) 2009-07-02 2009-07-02 Broken-line type dam joint structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201235189U CN201433386Y (en) 2009-07-02 2009-07-02 Broken-line type dam joint structure

Publications (1)

Publication Number Publication Date
CN201433386Y true CN201433386Y (en) 2010-03-31

Family

ID=42052195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201235189U Expired - Fee Related CN201433386Y (en) 2009-07-02 2009-07-02 Broken-line type dam joint structure

Country Status (1)

Country Link
CN (1) CN201433386Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040724A (en) * 2015-07-02 2015-11-11 中国电建集团华东勘测设计研究院有限公司 Treatment method for poor concrete dam joint foundations

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040724A (en) * 2015-07-02 2015-11-11 中国电建集团华东勘测设计研究院有限公司 Treatment method for poor concrete dam joint foundations
CN105040724B (en) * 2015-07-02 2017-03-01 中国电建集团华东勘测设计研究院有限公司 A kind of bad basic processing method of concrete dam joint

Similar Documents

Publication Publication Date Title
CN104005419B (en) The box culvert structure of sinking method construction and construction method
CN101298782A (en) Method and system for basement engineering water proof and water drain
CN103741714A (en) Full-cover excavation top-down construction method for underground engineering
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN102797241A (en) Resin panel earth-rock fill dam and panel construction method
CN108005116A (en) Assembled cast-in-place concrete structure non-dismantling formwork piping lane
CN108468347A (en) Corrugated steel outer lining concrete structure for underground pipe gallery
CN111119154A (en) River valley type debris flow ditch waste slag land-making structure and construction method
CN206457777U (en) Embankment piping lane integral structure
CN109208545B (en) Construction method of artificial landscape overflow dam with energy dissipation effect
CN104790435A (en) Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof
CN101603299B (en) Broken line type dam joint structure and construction method thereof
CN105887804A (en) High-strength prestressed concrete channel plate pile
CN106013400A (en) Integrated pipe network and water storage and drainage system for pavements
CN105839653B (en) A kind of immersed tube tunnel rebuilds the construction method of seepage prevention of cofferdam system
CN205776154U (en) A kind of high-strength prestressed concrete flute profile sheet pile
CN202450501U (en) Bricking drainage structure for stilling pool
CN201433386Y (en) Broken-line type dam joint structure
CN207714371U (en) Assembled cast-in-place concrete structure non-dismantling formwork piping lane
CN110056071A (en) A kind of municipal administration storm sewer assembling module and construction method
CN215594119U (en) Open cut riverbed type river-crossing tunnel
CN203144968U (en) Concrete slab expansion joint
CN203939008U (en) City river pile-column framework bank protection structure
CN209873485U (en) Permanent temporary combined toilet structure for gully treatment
CN102677660B (en) Quick pile-forming method and method for quickly building urban flyover by quick pile-forming method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100331

Termination date: 20130702