CN203547763U - High backfilling anti-sliding open cut tunnel structure - Google Patents

High backfilling anti-sliding open cut tunnel structure Download PDF

Info

Publication number
CN203547763U
CN203547763U CN201320655961.7U CN201320655961U CN203547763U CN 203547763 U CN203547763 U CN 203547763U CN 201320655961 U CN201320655961 U CN 201320655961U CN 203547763 U CN203547763 U CN 203547763U
Authority
CN
China
Prior art keywords
bored pile
pile
cut tunnel
tunnel structure
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320655961.7U
Other languages
Chinese (zh)
Inventor
匡亮
高扬
谭永杰
陈赤坤
郑宗溪
赵万强
陶伟明
熊祥雪
马青
罗禄森
杨雄
邓子军
赖新军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201320655961.7U priority Critical patent/CN203547763U/en
Application granted granted Critical
Publication of CN203547763U publication Critical patent/CN203547763U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A high backfilling anti-sliding open cut tunnel structure does not relay on anchoring measures such as a large-sized anti-sliding pile and an anchor cable, can singly bear the horizontal sliding force generated by the sliding of peripheral backfilling soil, ensures a stable structure, meets the demand of a high backfilling soil load above an arch top on a base, prevents lining from being subjected to overlarge or uneven settlement, and ensures driving safety and the bearing force of a structural foundation is improved. The high backfilling anti-sliding open cut tunnel structure comprises a reinforced concrete liner formed by an arch ring section (3), side wall sections (4) and a bottom plate section (5); drilling pouring piles are arranged on the bottom plate section (5) along the horizontal and length directions at intervals; each drilling pouring pile and the bottom plate section (5) are integrally poured and a poured pile main rib (10) of each drilling pouring pile extends into the bottom plate section (5) to form an integral stress structure.

Description

High backfill antiskid moves open-cut tunnel structure
Technical field
The utility model relates to railway tunnel, and particularly a kind of high backfill antiskid moves open cut tunnel liner structure.
Background technology
Tunnel open-cut tunnel structure type mainly contains cutting symmetric form, bias voltage type, side-hill fill bias voltage type, single die mould open cut tunnel at present, be applicable to the open cut tunnel tunnel of building by cut and cover method under cutting or side-hill fill orographic condition, one side of open cut tunnel or bilateral are cut slope, general falling rocks, avalanche, mud-rock flow etc. can be defendd after banketing in top, hole, and under the condition of stability of slope, open cut tunnel is not considered horizontal direction sliding force conventionally.At the anti-skid-type open cut tunnel of landslide location design normally in conjunction with measures such as antislide pile, anchor cables, shared landslide horizontal thrust effect together with open cut tunnel.The Tunnel Design regulation and stipulation open cut tunnel top thickness that bankets is not less than 1.5m, has only considered that structure can bear limit, face upward caving on a small quantity of slope, pushes up maximum backfill thickness do not do requirement for open cut tunnel.Along with the railway that passes through city is on the increase, be subject to the factor controllings such as urban planning, for reserved planned land use and road, conventionally need to take the scheme of passing through with open cut tunnel pattern, open cut tunnel lining side wall both sides are usually located in backfill, and backfill highly continues to increase, be subject to the domatic impact of former landform and backfill, open-cut tunnel structure is except bearing backfill pressure, during as soil body generation slippage, open cut tunnel will bear larger horizontal slip power, stable and safety to open-cut tunnel structure impacts, because open cut tunnel both sides are backfill, antislide pile, the anchor measures such as anchor cable cannot be used, therefore need open-cut tunnel structure to bear separately soil body sliding force, make open cut tunnel tunnel tradition build technology and theoretical face new problem.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of high backfill antiskid and moves open-cut tunnel structure, this structure does not rely on the anchor measures such as large-scale antislide pile, anchor cable, can bear separately the horizontal slip power that backfill slippage around produces, guarantee Stability Analysis of Structures, and can improve structure foundation bearing capacity, meet the requirement for bearing capacity of the high backfill heavy load in vault top to substrate, prevent that lining cutting from excessive or differential settlement occurring, and guarantees traffic safety.
The technical scheme that the purpose of this utility model adopts is comprised of reinforced concrete bored pile under the lining cutting of steel concrete arch, the oblique side wall lining of steel concrete, reinforced concrete lining layer base plate, Concrete Filled, lining cutting base plate, lining cutting base plate is connected by reinforcing bar with bored pile, subdrilling stake hole after excavation foundation, colligation pile foundation reinforcing bar, and main muscle in stake is stretched in base plate lining cutting, bottom pile foundation is built together with the underplate concrete of top, and lining concrete successively rams and bankets stone to the backfill face of planning after having built and having applied waterproofing course.
The utility model, bored pile is determined according to backfill soil body lateral pressure calculating to arrangement pitch, radical and stake are long in length and breadth along tunnel, for preventing formation perforation slide surface in ground, the non-isometric setting of the long employing of stake of transversely every row's castinplace pile.
The beneficial effects of the utility model are: can effectively play the effect that stops open cut tunnel slippage, guarantee the stable of structure; At the bottom of tunnel, drilled pile not only can antiskid, and can form simple and easy pile-raft foundation together with base plate, improve bearing capacity of foundation soil, meet the requirement for bearing capacity of the super thick backfill heavy load in vault top to substrate, and meet railway settlement after construction and deformation requirements, prevent that lining cutting from excessive or differential settlement occurring, and guarantees train operation safety; After backfill, top, hole can be used as city planning earth and planning road occupation, can produce huge economic benefit and significant social benefit; Structure is lighter and handier, and anti-seismic performance improves greatly, compared with the anti-skid-type open cut tunnel of large-scale antislide pile, anchor cable is set, can save significantly pile concrete, reinforcing bar, and construction costs is greatly reduced.
Accompanying drawing explanation
This manual comprises following three width accompanying drawings:
Fig. 1 is the profile that the high backfill antiskid of the utility model moves open-cut tunnel structure;
Fig. 2 is that the high backfill antiskid of the utility model moves the layout plan of bored pile in floor section in open-cut tunnel structure;
Fig. 3 is the zoomed-in view of local A in Fig. 1;
Toponym and corresponding mark in figure: planning backfill face 1, backfill stone 2, arch ring section 3, abutment wall section 4, floor section 5, filling 6, left side bored pile 7, middle bored pile 8, right side bored pile 9, the main muscle 10 of castinplace pile, spiral stirrup 11, the main muscle 12 of floor section
The specific embodiment
Below in conjunction with accompanying drawing and example, the utility model is further illustrated.
With reference to Fig. 1, Fig. 2 and Fig. 3, the high backfill antiskid of the utility model moves open-cut tunnel structure, comprises the reinforced concrete lining layer consisting of arch ring section 3, abutment wall section 4 and floor section 5.Described floor section 5 times along its laterally and length direction interval bored pile is set, each bored pile and floor section 5 one are watered, the main muscle 10 of its castinplace pile extends in floor section 5, forms overall force structure.The bored pile being arranged at the bottom of tunnel can play the effect that stops open cut tunnel slippage effectively, guarantee the stable of structure, can form simple and easy pile-raft foundation simultaneously together with lining cutting floor section 5, improve bearing capacity of foundation soil, meet the requirement for bearing capacity of the super thick backfill heavy load in vault top to substrate, and meet railway settlement after construction and deformation requirements, prevent that lining cutting from excessive or differential settlement occurring, and guarantees train operation safety.After backfill, top, hole can be used as city planning earth and planning road occupation, can produce huge economic benefit and significant social benefit.Compared with the anti-skid-type open cut tunnel of large-scale antislide pile, anchor cable is set, the utility model structure is lighter and handier, and anti-seismic performance improves greatly, and can save significantly the constructional materialss such as pile concrete, reinforcing bar, and construction costs is greatly reduced.
See figures.1.and.2, Pile layout adopts square cloth, and the vertical horizontal spacing of stake, radical and stake are long according to calculative determination, the transversely non-isometric setting of the long employing of stake, and reinforced concrete lining layer successively rams the stone 2 that bankets to planning backfill face 1 after having built.With reference to Fig. 3, subdrilling stake hole after excavation foundation, colligation bored pile reinforcing bar, and main castinplace pile muscle 10 is stretched in floor section 5 to bored pile and floor section 5 formed by integrally casting.As the typical arrangement of one, bored pile laterally comprises left side bored pile 7, middle bored pile 8 and right side bored pile 9 in floor section 5, wherein the length of left side bored pile 7 and right side bored pile 9 is greater than the length of middle bored pile 8, and left side bored pile 7, middle bored pile 8 and right side bored pile 9 all adopt circular cross section.
With reference to Fig. 1, for improving structure stress, with reference to the culvert wall construction of high embankment arch culvert, described abutment wall section 4 adopts hypotenuse wall pattern, strengthens the ability of opposing vertical force.
The above the utility model that just explains through diagrams-a kind of high backfill antiskid moves some principles of open-cut tunnel structure, be not the utility model to be confined to shown in and in described concrete structure and the scope of application, therefore the corresponding modify being likely utilized every and equivalent, all belong to the scope of the claims that the utility model is applied for.

Claims (4)

1. high backfill antiskid moves open-cut tunnel structure, comprise the reinforced concrete lining layer being formed by arch ring section (3), abutment wall section (4) and floor section (5), it is characterized in that: under described floor section (5) along its laterally and length direction interval bored pile is set, each bored pile and floor section (5) formed by integrally casting, the main muscle of its castinplace pile (10) extends in floor section (5), forms overall force structure.
2. high backfill antiskid moves open-cut tunnel structure as claimed in claim 1, it is characterized in that: described bored pile laterally comprises left side bored pile (7), middle bored pile (8) and right side bored pile (9) in floor section (5), wherein the length of left side bored pile (7) and right side bored pile (9) is greater than the length of middle bored pile (8).
3. high backfill antiskid moves open-cut tunnel structure as claimed in claim 2, it is characterized in that: described left side bored pile (7), middle bored pile (8) and right side bored pile (9) all adopt circular cross section.
4. high backfill antiskid moves open-cut tunnel structure as claimed in claim 1, it is characterized in that: described abutment wall section (4) adopts hypotenuse wall pattern.
CN201320655961.7U 2013-10-23 2013-10-23 High backfilling anti-sliding open cut tunnel structure Expired - Fee Related CN203547763U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320655961.7U CN203547763U (en) 2013-10-23 2013-10-23 High backfilling anti-sliding open cut tunnel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320655961.7U CN203547763U (en) 2013-10-23 2013-10-23 High backfilling anti-sliding open cut tunnel structure

Publications (1)

Publication Number Publication Date
CN203547763U true CN203547763U (en) 2014-04-16

Family

ID=50465892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320655961.7U Expired - Fee Related CN203547763U (en) 2013-10-23 2013-10-23 High backfilling anti-sliding open cut tunnel structure

Country Status (1)

Country Link
CN (1) CN203547763U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193082A (en) * 2016-07-14 2016-12-07 中铁五局集团有限公司 Stake raft construction technology in a kind of Shallow-buried soft plastomer Karst Tunnel
CN108560568A (en) * 2018-02-09 2018-09-21 兰州交通大学 A kind of high roadbed tunnel off-load safeguard structure and its construction method
CN108843341A (en) * 2018-06-20 2018-11-20 昆明理工大学 A kind of the cut-and-cover tunnel structure and its construction method of mixture of piles and concrete wall formula
CN111926856A (en) * 2020-07-01 2020-11-13 中铁二院重庆勘察设计研究院有限责任公司 Tunnel entering construction method based on longitudinal anti-skid open cut tunnel structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193082A (en) * 2016-07-14 2016-12-07 中铁五局集团有限公司 Stake raft construction technology in a kind of Shallow-buried soft plastomer Karst Tunnel
CN108560568A (en) * 2018-02-09 2018-09-21 兰州交通大学 A kind of high roadbed tunnel off-load safeguard structure and its construction method
CN108560568B (en) * 2018-02-09 2023-11-21 兰州交通大学 High-fill tunnel load shedding protection structure and construction method thereof
CN108843341A (en) * 2018-06-20 2018-11-20 昆明理工大学 A kind of the cut-and-cover tunnel structure and its construction method of mixture of piles and concrete wall formula
CN111926856A (en) * 2020-07-01 2020-11-13 中铁二院重庆勘察设计研究院有限责任公司 Tunnel entering construction method based on longitudinal anti-skid open cut tunnel structure

Similar Documents

Publication Publication Date Title
CN203960700U (en) The closed road structure of stake holder U-lag
CN103321260B (en) Interval boring cuts stake inclination correction method
CN101476466B (en) Giant heavy laver land slide pre-stress anchor cable antiskid tunnel construction method and novel prevention structure
CN201962558U (en) High-steepness side slope subgrade structure for mountainous area
CN103924602B (en) Deep Thick Soft Ground foundation ditch construction method
CN104389320B (en) Construction method of pile foundation anchor rope prestress high retaining wall
CN205116217U (en) Height is filled and is prefabricated cast -in -place combination formula stake siding wall protective structure
CN102425082A (en) Subgrade strengthening structure for highly karstified station turnout zone on high-speed railway
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
CN203547763U (en) High backfilling anti-sliding open cut tunnel structure
CN102322266A (en) Tunnel excavating and constructing method
CN107503362A (en) A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability
CN109750571A (en) A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method
CN112878193A (en) Suspension bridge channel type anchorage foundation and construction method
CN101838957B (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN105926391A (en) Method for widening shoulder of existing railway subgrade
CN105804097A (en) Cantilever structure way for treating landslides in cooperation with h-shaped anti-sliding piles and construction method of cantilever structure way
CN205502063U (en) Combined type retaining structure
CN107841908A (en) For eliminating the road structure of the high embankment lateral variation sedimentation in high-speed railway abrupt slope
CN108487234B (en) Construction method of cast-in-situ pile plate type platform wall
CN204753261U (en) Light -duty road bed of a doublestage shelves structure
CN203284795U (en) Buttressed retaining wall with anchor board
CN110205982B (en) Channel structure for improving flood control standard of existing river levee and construction method thereof
CN209669613U (en) A kind of road structure with pile foundation bent cap
CN204491683U (en) A kind of ruggedized construction to municipal piping lane existing within the scope of deep pit digging

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416

CF01 Termination of patent right due to non-payment of annual fee