CN205502063U - Combined type retaining structure - Google Patents
Combined type retaining structure Download PDFInfo
- Publication number
- CN205502063U CN205502063U CN201620270631.XU CN201620270631U CN205502063U CN 205502063 U CN205502063 U CN 205502063U CN 201620270631 U CN201620270631 U CN 201620270631U CN 205502063 U CN205502063 U CN 205502063U
- Authority
- CN
- China
- Prior art keywords
- retaining
- reinforced concrete
- pile
- pile foundation
- retaining wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本实用新型提供一种复合式支挡结构,其特征在于:包括钢筋混凝土桩基,钢筋混凝土承台置于钢筋混凝土桩基顶端形成高桩承台,钢筋混凝土承台上设有刚性挡土墙,在钢筋混凝土桩基之间设有挡土板。该结构的桩基内力和位移较埋置桩更大,但施工不需要开挖深基坑使该类支护可应用于稳定性较差的临时边坡。同时该支挡结构可以降低挡土墙的高度,在实现土压力分段后,可达到减少总土压力的效果,而且还具有施工质量易控制和完工后效果美观的优点。
The utility model provides a compound retaining structure, which is characterized in that it includes a reinforced concrete pile foundation, a reinforced concrete cap is placed on the top of the reinforced concrete pile foundation to form a high pile cap, and a rigid retaining wall is arranged on the reinforced concrete cap , A retaining board is provided between the reinforced concrete pile foundations. The internal force and displacement of the pile foundation of this structure are larger than that of the buried pile, but the construction does not require the excavation of a deep foundation pit, so this type of support can be applied to temporary slopes with poor stability. At the same time, the retaining structure can reduce the height of the retaining wall. After the earth pressure is segmented, it can achieve the effect of reducing the total earth pressure. It also has the advantages of easy control of construction quality and beautiful effect after completion.
Description
技术领域technical field
本实用新型涉及一种支挡结构,特别涉及一种复合式支挡结构。The utility model relates to a retaining structure, in particular to a composite retaining structure.
背景技术Background technique
支挡结构包括挡土墙、抗滑桩、预应力锚索等支撑和锚固结构,是用来支撑、加固填土或山坡体,防止其坍滑,以保持稳定的一种建筑物结构,主要用于承受土体侧向土压力。在水利工程、交通工程、土木工程建设中,为了确保工程安全,必须采用支挡结构进行加固处理。在铁路、公路路基工程中,用于稳定路基、路堑、隧道洞口、桥梁两端的路基边坡等,在水利、矿场、房屋建筑工程中,主要用于加固山坡,基坑边坡和河流岸壁。当以上工程或其他岩土工程遇到滑坡、崩塌、岩堆体、落石、泥石流等不良地质灾害时,支挡结构主要用于加固或拦挡不良地质体。The retaining structure includes supporting and anchoring structures such as retaining walls, anti-slide piles, and prestressed anchor cables. Used to bear the lateral earth pressure of the soil. In the construction of water conservancy projects, traffic engineering and civil engineering, in order to ensure the safety of the project, the retaining structure must be used for reinforcement. In railway and highway subgrade projects, it is used to stabilize roadbeds, road cuttings, tunnel openings, subgrade slopes at both ends of bridges, etc. In water conservancy, mines, and housing construction projects, it is mainly used to reinforce hillsides, foundation pit slopes and river banks. . When the above projects or other geotechnical projects encounter unfavorable geological disasters such as landslides, collapses, rock piles, falling rocks, and debris flows, the supporting structure is mainly used to reinforce or block unfavorable geological bodies.
抗滑桩是穿过滑坡体深入于滑床的桩柱,用以支挡滑体的滑动力,起稳定边坡的作用,适用于浅层和中厚层的滑坡,是一种抗滑处理的主要措施。但对正在活动的滑坡打桩阻滑需要慎重,以免因扰动和开挖而引起滑动。Anti-slide piles are piles that pass through the landslide body and go deep into the slide bed to support the sliding force of the slide body and stabilize the slope. It is suitable for shallow and medium-thick landslides and is an anti-slide treatment. main measures. However, it is necessary to be cautious in piling anti-slip on active landslides, so as to avoid sliding caused by disturbance and excavation.
挡土墙又称挡墙,可以用来防止崩塌、小规模滑坡及大规模滑坡前缘的再次滑动,它的构造有重力式、半重力式、悬臂式、扶壁式、支垛式、桩板式和框架式等。对于坡脚较坚固、允许承载力较大的滑坡与崩塌体采用重力式挡土墙效果较好,它又可分为片石垛、浆砌石挡土墙、混凝土挡土墙等。当滑动面出露在斜坡上较高位置,坡角基底较坚固时,一般采用空心挡土墙(明洞)。当滑坡体较薄且具有多个滑动面时,则可采用分级支挡的办法。其他几种类型的挡土墙一般采用钢筋混凝土修筑。The retaining wall, also known as the retaining wall, can be used to prevent collapse, small-scale landslides and large-scale landslides from sliding again. Its structure includes gravity type, semi-gravity type, cantilever type, buttress type, buttress type, pile Plate and frame, etc. For landslides and collapses with strong slope toe and large allowable bearing capacity, the effect of gravity retaining wall is better. It can be divided into rubble piles, masonry masonry retaining walls, concrete retaining walls, etc. When the sliding surface is exposed at a higher position on the slope and the base of the slope angle is relatively solid, a hollow retaining wall (open hole) is generally used. When the landslide body is thin and has multiple sliding surfaces, the method of graded support can be used. Several other types of retaining walls are generally constructed of reinforced concrete.
上述两种支挡结构单独使用时均有限制性,因此,现阶段,在很多建筑工程多采用桩、挡土墙结合的结构,如:The above two retaining structures have limitations when used alone. Therefore, at this stage, many construction projects use a combination of piles and retaining walls, such as:
桩基托梁挡土墙:桩基与托梁、挡土墙整体受力,支挡墙后土体侧压力,通过明挖开挖出沟槽后施工桩基,然后施工托梁,最后施工挡土墙。但施工开挖工程量大、环境破坏大,临时边坡暴露过长、一旦失稳将造成重大的安全和质量事故,在某些特殊地质条件下也不允许采用明挖方式,如滑坡地段、红黏土地段、昔格达地段或上硬下软的土层。在某些情况下挡土墙的高度大于12米后超过国家规范规定也不应采用,实际产生的土压力也远大于现有理论计算值,安全隐患大。Pile foundation joist retaining wall: The pile foundation, joist, and retaining wall are under overall force, and the lateral pressure of the soil behind the retaining wall is excavated through open excavation. After the trench is constructed, the pile foundation is constructed, then the joist is constructed, and finally the construction is carried out. retaining wall. However, the amount of construction and excavation is large, the environment is damaged, and the temporary slope is exposed for too long. Once it loses stability, it will cause major safety and quality accidents. Under some special geological conditions, open-cut methods are not allowed, such as landslides, landslides, etc. Red clay section, Xigeda section or soil layer with upper hard and lower soft. In some cases, if the height of the retaining wall is greater than 12 meters, it should not be used if it exceeds the national standard. The actual earth pressure is also far greater than the existing theoretical calculation value, and the safety hazard is great.
桩板式挡土墙:通过桩支挡墙后土体侧压力,桩间设置挡土板。原地面人工开挖形成桩基,非覆土地段采用模板浇筑。但在工程边坡高度差较大的情况下,该结构的桩基的自由端过长,桩基的横向变形过大,对桩基的安全性及上部建筑场地稳定不利。Pile-slab retaining wall: After the lateral pressure of the soil passes through the pile-supported retaining wall, a retaining plate is set between the piles. The pile foundation is formed by manual excavation on the original ground, and the non-covered soil section is poured with formwork. However, in the case of a large height difference of the engineering slope, the free end of the pile foundation of this structure is too long, and the lateral deformation of the pile foundation is too large, which is unfavorable to the safety of the pile foundation and the stability of the upper construction site.
如何解决上述问题,成为工程人员有待研究的课题。How to solve the above problems has become a subject to be studied by engineers.
发明内容Contents of the invention
本实用新型提供一种复合式支挡结构,目的是解决现有技术问题,提供一种可以不采用明挖或少挖、开挖工程量小的支挡结构,该支挡结构可以降低挡土墙的高度,在实现土压力分段后,可达到减少总土压力的效果,而且还具有施工质量易控制和完工后效果美观的优点。The utility model provides a composite retaining structure, which aims to solve the problems in the prior art, and provides a retaining structure which can not use open excavation or less excavation, and has a small amount of excavation work. The retaining structure can reduce soil retaining The height of the wall can achieve the effect of reducing the total earth pressure after the earth pressure is segmented, and it also has the advantages of easy control of construction quality and beautiful effect after completion.
本实用新型解决问题采用的技术方案是:The technical solution adopted by the utility model to solve the problem is:
一种复合式支挡结构,包括钢筋混凝土桩基,钢筋混凝土承台置于钢筋混凝土桩基顶端形成高桩承台,钢筋混凝土承台上设有刚性挡土墙,在钢筋混凝土桩基之间设有挡土板。A composite retaining structure, including reinforced concrete pile foundations, reinforced concrete pile caps are placed on the top of the reinforced concrete pile foundations to form high pile caps, and rigid retaining walls are arranged on the reinforced concrete pile foundations, between the reinforced concrete pile foundations With retaining board.
所述钢筋混凝土桩基垂直于土体滑动的方向设置为至少一排。The reinforced concrete pile foundations are arranged in at least one row perpendicular to the sliding direction of the soil body.
挡土板设置于前排钢筋混凝土桩基间。挡土板与钢筋混凝土桩基连接的方式可后植筋锚固、剥除桩基表面混凝土后刚性连接,除了将挡土板设置在前排桩基间,还可将挡土板设置于桩基和土间。The soil retaining board is set between the front row of reinforced concrete pile foundations. The method of connection between the soil retaining board and the reinforced concrete pile foundation can be post-planted and anchored, and the surface concrete of the pile foundation can be removed for rigid connection. In addition to setting the soil retaining board between the front row of pile foundations, the soil retaining board can also be placed on the pile foundation and Doma.
钢筋混凝土桩基可以采用方形桩基、圆形桩基或者椭圆桩基。The reinforced concrete pile foundation can adopt square pile foundation, circular pile foundation or ellipse pile foundation.
所述刚性挡土墙为重力式挡土墙或悬壁式挡土墙或扶壁式挡土墙。The rigid retaining wall is a gravity retaining wall, a cantilever retaining wall or a buttress retaining wall.
本实用新型的有益效果:The beneficial effects of the utility model:
1.该支挡结构中钢筋混凝土桩基和承台通过用浇筑的方法形成,该结构的桩基内力和位移较埋置桩更大,施工不需要开挖深基坑降低了临时边坡开挖高度。解决了明开挖、特殊地质情况施工可能造成的次生灾害问题,有效的保证了施工人员、机械设备的安全。且通过先施工的桩基和承台达到对不稳定地层的预加固效果,进一步有效保证了施工的安全。1. The reinforced concrete pile foundation and the cap in the retaining structure are formed by pouring. The internal force and displacement of the pile foundation of this structure are larger than that of the buried pile, and the construction does not need to dig deep foundation pits to reduce the temporary slope opening. dig height. It solves the problem of secondary disasters that may be caused by open excavation and construction under special geological conditions, and effectively guarantees the safety of construction personnel and machinery and equipment. Moreover, the pre-reinforcement effect on the unstable ground can be achieved through the pile foundation and cap platform constructed first, which further effectively guarantees the safety of construction.
2.该支挡结构减少了作用于支挡结构的侧土压力荷载,降低了挡土墙高度,使得挡土墙的截面尺寸和土石方开挖量大大减少,可以节约工程造价,经济效益更好。同时降低高挡土墙施工难度,避免大体积混凝土水化热,从而可以提高工程的施工质量和缩短施工工期。2. The retaining structure reduces the lateral earth pressure load acting on the retaining structure, reduces the height of the retaining wall, greatly reduces the cross-sectional size of the retaining wall and the excavation volume of earthwork, which can save engineering cost and achieve better economic benefits . At the same time, it reduces the construction difficulty of high retaining walls and avoids the heat of hydration of large-volume concrete, thereby improving the construction quality of the project and shortening the construction period.
3.挡土墙高度的降低,避免了由于挡土墙高度超过规范而带来的不安全性,同时避免了高挡土墙施工容易出现的质量问题。3. The reduction of the height of the retaining wall avoids the insecurity caused by the height of the retaining wall exceeding the specification, and at the same time avoids the quality problems that are easy to occur in the construction of high retaining walls.
附图说明Description of drawings
图1是本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
图2是本实用新型的俯视图。Fig. 2 is a top view of the utility model.
图中:1.桩基、2.承台、3.挡土墙、4.挡土板。In the figure: 1. pile foundation, 2. cap, 3. retaining wall, 4. retaining board.
具体实施方式detailed description
以下结合附图和具体实施例对本实用新型做进一步详细说明。The utility model will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
如图1、图2中所示的一种复合式支挡结构,包括钢筋混凝土桩基1,钢筋混凝土承台2置于钢筋混凝土桩基1顶端形成高桩承台,钢筋混凝土承台2上设有刚性挡土墙3,在钢筋混凝土桩基1之间设有挡土板4。As shown in Figure 1 and Figure 2, a composite retaining structure includes a reinforced concrete pile foundation 1, and a reinforced concrete cap 2 is placed on the top of the reinforced concrete pile foundation 1 to form a high pile cap, on which the reinforced concrete cap 2 A rigid retaining wall 3 is provided, and an earth retaining board 4 is provided between the reinforced concrete pile foundations 1 .
其中钢筋混凝土桩基1垂直于土体滑动的方向设置为至少一排。本实施例中设有两排钢筋混凝土桩基,挡土板4设置在前排钢筋混凝土桩基1间,即挡土板4设置在外侧钢筋混凝土桩基间。Wherein the reinforced concrete pile foundation 1 is arranged in at least one row perpendicular to the sliding direction of the soil body. In this embodiment, there are two rows of reinforced concrete pile foundations, and the soil retaining board 4 is arranged between one reinforced concrete pile foundation in the front row, that is, the soil retaining board 4 is arranged between the outer reinforced concrete pile foundations.
挡土板4与钢筋混凝土桩基1连接的方式可后植筋锚固、剥除桩基表面混凝土后刚性连接,除了将挡土板设置在前排桩基间,还可将挡板设置于桩基和土间,特殊情况下也可置于后排桩基。The method of connecting the soil retaining board 4 to the reinforced concrete pile foundation 1 can be post-planted for anchorage and rigidly connected after stripping the surface concrete of the pile foundation. Between the foundation and the soil, it can also be placed in the back row of pile foundations under special circumstances.
钢筋混凝土桩基1可以采用方形桩基、圆形桩基或者椭圆桩基。The reinforced concrete pile foundation 1 can adopt a square pile foundation, a circular pile foundation or an ellipse pile foundation.
所述刚性挡土墙3可以选用重力式挡土墙或悬壁式挡土墙或扶壁式挡土墙。The rigid retaining wall 3 can be a gravity retaining wall, a cantilever retaining wall or a buttress retaining wall.
上述支挡结构的施工流程如下所述:桩基平台整理→钻(挖)孔桩孔→将加工好的桩基钢筋笼放入孔中→浇筑桩基混凝土,待混凝土强度达85%后凿桩头→安装承台底模及侧模、绑扎钢筋并浇筑承台混凝土→混凝土强度达85%后开挖桩前土体达到所需要的设计场地高程(视土质情况采用临时挡板支撑桩间土)→剥除桩基混凝土至设计深度,安装桩基间挡土板模板并绑扎钢筋,浇筑混凝土→施工承台上的挡土墙并分层回填土石方至设计场地标高。The construction process of the above support and retaining structure is as follows: pile foundation platform arrangement→drilling (digging) the pile hole→put the processed pile foundation reinforcement cage into the hole→pour the pile foundation concrete, and chisel after the concrete strength reaches 85%. Pile head→Install cap bottom formwork and side formwork, bind steel bars and pour cap concrete→After the concrete strength reaches 85%, excavate the soil in front of the pile to reach the required design site elevation (depending on the soil condition, use temporary baffles to support the piles) Soil) → Strip the pile foundation concrete to the design depth, install the soil retaining plate formwork between the pile foundations and bind the steel bars, pour concrete → construct the retaining wall on the cap platform and backfill the earth and stone in layers to the design site elevation.
本实用新型由桩基、挡土板、承台、挡土墙组合后形成的一种复合式支挡结构,通过设置钢筋混凝土桩基,向下延伸至稳定地层以支撑承台挡土墙重力和支挡侧土压力荷载,在钢筋混凝土桩基中部设置挡土板来支挡桩基间土体,通过在钢筋混凝土桩基上固定设置钢筋混凝土承台形成高桩承台,这样就组成了桩基、挡土板、承台支挡结构抵抗侧土压力荷载和支撑挡土墙,在钢筋混凝土承台放置刚性挡土墙,利用刚性挡土墙支挡侧土压力荷载。The utility model is a composite retaining structure formed by the combination of pile foundation, soil retaining board, cap and retaining wall. By setting the reinforced concrete pile foundation, it extends downward to the stable stratum to support the gravity of the cap retaining wall. To support and retain the lateral earth pressure load, a retaining plate is set in the middle of the reinforced concrete pile foundation to support the soil between the pile foundations, and a high pile cap is formed by fixing a reinforced concrete cap on the reinforced concrete pile foundation, thus forming a The pile foundation, soil retaining board, and cap retaining structure resist the lateral earth pressure load and support the retaining wall, place a rigid retaining wall on the reinforced concrete cap, and use the rigid retaining wall to support the lateral earth pressure load.
本实用新型的复合式支挡结构与桩-承台-挡土墙组合支挡结构相比,显著减小了作用于支挡结构上的侧土压力荷载、降低了挡土墙的高度,使得挡土墙的截面尺寸和土石方开挖量大大减少,可以节约工程造价,降低高挡土墙施工难度,避免大体积混凝土水化热,从而可以提高工程的施工质量和缩短施工工期。Compared with the combined retaining structure of pile-cap-retaining wall, the composite retaining structure of the utility model significantly reduces the lateral earth pressure load acting on the retaining structure and reduces the height of the retaining wall, so that The cross-sectional size of the retaining wall and the excavation volume of earth and stone are greatly reduced, which can save the project cost, reduce the construction difficulty of high retaining wall, and avoid the heat of hydration of large-volume concrete, thereby improving the construction quality of the project and shortening the construction period.
本实用新型的复合式支挡结构将承台适当提高后降低了临时边坡的开挖高度或者基本不开挖,通过先施工的桩基和承台做为临时挡土墙,达到预加固的效果,保证桩基间土体不滑动,后开挖桩基前的土体施做挡板,最后施工承台上的挡土墙后回填土形成场地,整个施工工艺和施工流程的过程称之半逆作法,解决了施工明开挖带来的一系列工程问题和环境问题。可用于不良地质地质的施工,如滑坡地段、红黏土地段、昔格达地段或上硬下软的土层。The composite retaining structure of the utility model lowers the excavation height of the temporary slope after properly raising the cap, or basically does not excavate, and uses the pile foundation and the cap that were constructed earlier as a temporary retaining wall to achieve pre-reinforcement. The effect is to ensure that the soil between the pile foundations does not slide, the soil before the excavation of the pile foundation is used as a baffle, and finally the retaining wall on the cap platform is backfilled to form a site. The entire construction process and construction process are called The semi-reverse method solves a series of engineering and environmental problems caused by open excavation. It can be used in the construction of unfavorable geology and geology, such as landslide section, red clay section, Xigeda section or soil layer with hard top and soft bottom.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620270631.XU CN205502063U (en) | 2016-04-01 | 2016-04-01 | Combined type retaining structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620270631.XU CN205502063U (en) | 2016-04-01 | 2016-04-01 | Combined type retaining structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205502063U true CN205502063U (en) | 2016-08-24 |
Family
ID=56735047
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620270631.XU Expired - Lifetime CN205502063U (en) | 2016-04-01 | 2016-04-01 | Combined type retaining structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205502063U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105735345A (en) * | 2016-04-01 | 2016-07-06 | 自贡市城市规划设计研究院有限责任公司 | Composite type supporting and retaining structure and construction method adopting supporting and retaining structure |
| CN108487303A (en) * | 2018-04-02 | 2018-09-04 | 山东建筑大学 | A kind of Complex retaining wall and construction method of support pile and counterfort wall |
| CN108952752A (en) * | 2018-08-31 | 2018-12-07 | 中铁隧道局集团有限公司 | A kind of combined type highway Tunnel Portal Structures suitable for big bias landform |
| CN114411802A (en) * | 2021-12-24 | 2022-04-29 | 湖北省交通规划设计院股份有限公司 | Combined pile-joist retaining wall and construction method |
-
2016
- 2016-04-01 CN CN201620270631.XU patent/CN205502063U/en not_active Expired - Lifetime
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105735345A (en) * | 2016-04-01 | 2016-07-06 | 自贡市城市规划设计研究院有限责任公司 | Composite type supporting and retaining structure and construction method adopting supporting and retaining structure |
| CN108487303A (en) * | 2018-04-02 | 2018-09-04 | 山东建筑大学 | A kind of Complex retaining wall and construction method of support pile and counterfort wall |
| CN108952752A (en) * | 2018-08-31 | 2018-12-07 | 中铁隧道局集团有限公司 | A kind of combined type highway Tunnel Portal Structures suitable for big bias landform |
| CN114411802A (en) * | 2021-12-24 | 2022-04-29 | 湖北省交通规划设计院股份有限公司 | Combined pile-joist retaining wall and construction method |
| CN114411802B (en) * | 2021-12-24 | 2024-04-26 | 湖北省交通规划设计院股份有限公司 | Combined pile joist retaining wall and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102518135B (en) | Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method | |
| CN107313431B (en) | Close on not contour foundation pit method for synchronously constructing | |
| CN102094425B (en) | Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam | |
| CN104264688B (en) | Manually digging hole non-uniform pile support construction process | |
| CN103774675B (en) | Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof | |
| US8898996B2 (en) | Method for forming a retaining wall, and corresponding retaining wall | |
| CN105735345A (en) | Composite type supporting and retaining structure and construction method adopting supporting and retaining structure | |
| CN105756091B (en) | A Construction Method of Subway Station Foundation Pit Controlling the Deformation of Adjacent Buildings | |
| CN106759461A (en) | Resist grand supporting construction | |
| CN103321234B (en) | Constructing method of load-bearing structure built on high slope or geological complex area | |
| CN104389315B (en) | Consolidation grouting drilled pile wall and construction method thereof | |
| CN206034454U (en) | Supporting construction | |
| CN105604065A (en) | Foundation fit support and peat-soil deep-foundation-pit-support high-pressure jet grouting anchoring method | |
| CN205502063U (en) | Combined type retaining structure | |
| CN101838957B (en) | Integral type T-shaped outer cantilever roads and construction method thereof | |
| CN109610473A (en) | A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration | |
| Godavarthi et al. | Contiguous pile wall as a deep excavation supporting system | |
| CN109577322A (en) | A kind of constructing device for inside soil body existing pile foundation pile extension | |
| CN115506382A (en) | Construction method for pile plate wall of island building platform | |
| CN214832582U (en) | Underground continuous wall is at punching lamination construction pre-reinforcement structure | |
| CN106087996B (en) | Manual digging pile construction method based on self leveling backpressure device | |
| CN210421152U (en) | Anchor road shoulder retaining wall | |
| CN112507424A (en) | Construction method for shield tunneling of expansive soil stratum to pass through railway track downwards | |
| CN115217114B (en) | Construction method of foundation pit rescue back pressure platform | |
| CN204959793U (en) | Soil layer stake board counterfort combination formula retaining wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160824 |