CN104963698A - 用于隧道衬砌混凝土的保温保湿养生装置及其施工方法 - Google Patents
用于隧道衬砌混凝土的保温保湿养生装置及其施工方法 Download PDFInfo
- Publication number
- CN104963698A CN104963698A CN201510358671.XA CN201510358671A CN104963698A CN 104963698 A CN104963698 A CN 104963698A CN 201510358671 A CN201510358671 A CN 201510358671A CN 104963698 A CN104963698 A CN 104963698A
- Authority
- CN
- China
- Prior art keywords
- layer
- lining concrete
- heat
- moisture
- steelframe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本发明提供了用于隧道衬砌混凝土的保温保湿养生装置及其施工方法,养生装置包括:在衬砌表面由内至外依次铺设的保湿层、电热层和充气隔热层;所述充气隔热层置于台车车架上;所述充气隔热层充气后,使隔热层、电热层、保湿层之间紧密贴合,且紧紧附着在所述衬砌外侧,通过保湿层和电热层的作用,达到对衬砌混凝土的保温保湿的养生功效。施工包括以下步骤:在台车的钢管上依次铺设充气隔热层、电热层和保湿层,调节台车支撑钢架的高度和弧形钢架的长度,使所述保湿层贴合所述衬砌混凝土的表面;对所述充气隔热层充气使其膨胀,将所述电热层通电加热,实行对所述衬砌混凝土的保湿保温养护;当到达设定的养护时间后,停止加热,养护完毕。
Description
技术领域
本发明属于混凝土养护技术领域,特别涉及一种用于隧道衬砌混凝土的保温保湿养生装置及其施工方法。
背景技术
隧道工程是典型的大体积混凝土工程,因为水泥水化放热的原因,会有明显的温度升高,并在温度下降过程中因体积收缩受约束而产生裂缝;另外大体积混凝土结构在浇筑后会失水收缩,也会导致明显的裂缝;又因为严寒地区的隧道由于环境温度过低,衬砌混凝土内外温度差异过大,极易因为裂缝的发生。如果在衬砌混凝土施工期就因为温度应力而产生原生裂缝,无论是隧道的渗水问题,还是因为隧道中偏压应力、环境温度等二次作用,最终必然导致原生裂缝的加大或次生裂缝的发生,不仅是对国家财产的严重损失,更留下工程安全隐患。
目前根据施工经验,隧道工程中常采用潮湿覆盖养护、浇水、掺火山灰等预防措施,此类方法在一定程度上避免了隧道衬砌混凝土的温度湿度变化过大,但其变化程度无法做到精确控制,且施工手段较为简陋,难以保证大体积衬砌混凝土温度湿度控制的整体性和稳定性。
综上可知,针对隧道衬砌混凝土这种大体积混凝土工程,主要存在以下问题:
1.水泥水化放热严重,并进而导致裂缝发生;
2.混凝土结构在浇筑后失水收缩,会导致明显的裂缝;
3.在温度过低的外部环境下,混凝土内外温差过大,导致裂缝发生;
4.隧道的衬砌绝大部分处于临空面,大面积的临空衬砌无法进行常规的地面式混凝土养护作业;
5.不同隧道具有不同的轮廓形状,没有适合各种断面形状尺寸的养护装置;
6.隧道衬砌混凝土的温度湿度变化过大,但其变化程度无法做到精确控制。
发明内容
为解决现有技术存在的上述不足,本发明提供一种用于隧道衬砌混凝土的保温保湿养生装置及其施工方法。
为实现上述目的,本发明采用如下技术方案:
用于隧道衬砌混凝土的保温保湿养生装置,包括:在衬砌表面由内至外依次铺设的保湿层、电热层和充气隔热层;所述充气隔热层置于截面外形与隧道截面轮廓相适应、且沿隧道纵向有一定长度的台车车架上;所述充气隔热层充气后,使隔热层、电热层、保湿层之间紧密贴合,且紧紧附着在所述衬砌外侧,通过保湿层和电热层的作用,达到对衬砌混凝土的保温保湿的养生功效。
利用保湿层可保持衬砌湿度,避免衬砌浇筑后失水收缩,避免了对衬砌的反复施水,节省人工和管理成本。电热层可对衬砌提供热量;通过电热层对混凝土的温度控制,可维持混凝土的温度,避免衬砌水化放热后温度下降过程中因体积收缩而产生裂缝。隔热层可避免衬砌混凝土内外温度差异过大而产生裂缝。隔热层通过充气膨胀,可使保湿层与衬砌外侧紧密附着,且保湿层、电热层、隔热层之间紧密贴合,提高衬砌的热吸收率,保养效果好,效率高。
台车车架的利用,使对大面积处于临空面的衬砌混凝土的养护成为可能,解决了无法对衬砌进行保湿保温养护的传统难题。
所述保湿层为立面型保湿养护膜,一侧环向附着在所述衬砌混凝土的外表面,另一侧与电热层紧密贴合。
立面型保湿养护膜,以新型可控高分子吸水材料为核心,以塑料薄膜为载体,此材料能吸收自身重量的200倍的水分,并且可以把液态水变为固态水。具有吸水快放水慢的特点,可以起到高倍节水,持久保湿,有效保温,促进早强,有效抑制微裂缝,提高耐磨度等作用。
所述电热层为带有自动温控器的低温辐射电热膜;所述低温辐射电热膜的边缘粘贴在所述隔热层上。
使用带有自动温控器的低温辐射电热膜,可以做到对衬砌混凝土温度的精确控制,确保养护效果。将电热膜粘贴在隔热层上,一方面起到对电热膜的固定作用,另一方面也可以减少热损失,提高热转化率。
所述充气隔热层为充气隔热垫,所述充气隔热垫充气后可膨胀,一侧与所述电热层贴合,另一侧铺设在所述台车车架上。
所述台车车架包括两个弧形钢架,在两个所述弧形钢架之间,沿隧道纵向连接有若干根用于铺设所述充气隔热层的钢管;所述弧形钢架与置于台车上的用于支撑固定所述弧形钢架的支撑钢架刚性连接。
台车车架的结构设计,可以很好的适应隧道的形状特点,为保温保湿层的铺设提供方便。利用台车便于移动的特点,方便施工。
所述支撑钢架包括竖向支撑钢架和横向支撑钢架,所述竖向支撑钢架的顶端与所述弧形钢架连接,底端固定于所述台车上;所述横向支撑钢架的一端与所述竖向支撑钢架连接,另一端与所述弧形钢架的端部连接。
所述弧形钢架由若干弧形钢架单元组成,所述弧形钢架单元之间设有用以调节所述弧形钢架长度的伸缩支架;所述竖向支撑钢架和所述横向支撑钢架上设有用以调节长度的伸缩连杆;所述伸缩支架和所述伸缩连杆配合工作,使所述弧形钢架与所述隧道轮廓相匹配,进而使置于所述钢管上的各层装置与所述衬砌混凝土紧密贴合。
在弧形钢架和支撑钢架上设置伸缩支架和伸缩杆,使台架高度可调,方便保湿保温层的铺设;此外,通过调节伸缩装置,可以适应于不同尺寸和截面形状的隧道,使用方便灵活,适用范围广泛。
用于隧道衬砌混凝土的自动保湿保温养生装置的施工方法,包括以下步骤:
步骤1:使台车的支撑钢架处于收缩状态,在所述台车的钢管上依次铺设充气隔热层、电热层和保湿层,各层的铺设面积与所需保养的衬砌混凝土面积相同;
步骤2:调节台车支撑钢架的高度和弧形钢架的长度,使所述保湿层贴合所述衬砌混凝土的表面;
步骤3:对所述充气隔热层充气使其膨胀,并使所述隔热层、所述电热层、所述保湿层、和所述钢管之间紧密接触;
步骤4:将所述电热层通电加热,实行对所述衬砌混凝土的保湿保温养护;当到达设定的养护时间后,停止电热层的加热,并收起装置,养护完毕。
支撑钢架处于收缩状态,方便对保温保湿层的铺放;利用钢管铺设保温保湿隔热层,可以很好的与衬砌混凝土面相贴合;使用充气隔热层,能使各层紧密接触,避免空气介质的干扰,提高了对衬砌混凝土的温度和湿度的控制精度。
其中,步骤1中,在铺设所述电热层时,将所述电热层的边缘粘贴在所述隔热层上,保证各幅电热层接电端压接对齐,通过导线并接,再连接到自动温控器上,所述自动温控器固定于所述台车上。
步骤4中,将所述电热层的加热温度设置在20-30℃之间,所述设定的养护时间为7天。
温度设定在20-30℃之间,使混凝土的保温保湿养护效果达到最佳,养护时间设为7天,在保湿保温的条件下,使混凝土的早期强度充分发挥,提供衬砌混凝土的早期强度。
步骤4中,在停止电热层的加热后,收缩所述支撑钢架,对所述衬砌进行质量检测;如果衬砌质量不满足规范要求,继续进行保湿保温养护2-3天;如果衬砌质量满足规范要求,则养护完毕,移动所述台车至下个工作段,开展下个工作段的衬砌养护工作。
对衬砌进行质量检测,不满足时继续养护2-3天,确保衬砌在养护条件下的质量保证。
本发明的有益效果如下:
养生台车高度可以调节,便于上覆物的铺设,隔热层通过充气膨胀,可使保湿层与衬砌外侧紧密附着,且保湿层、电热层、隔热层之间紧密贴合。电热层充电后可维持混凝土的温度,避免衬砌水化放热后温度下降过程中因体积收缩而产生裂缝。保湿层可保持衬砌湿度,避免衬砌浇筑后失水收缩。隔热层可避免衬砌混凝土内外温度差异过大而产生裂缝。
附图说明
图1是本发明实施例结构示意图;
图2是本发明保湿层、电热层、隔热层结构放大图;
图3是本发明养生台车立体图;
其中1.保湿层,2.电热层,3.隔热层,4.二次衬砌,5.钢管,6.竖向支撑支架,7.钢架,8.连杆,9.横向支撑支架
具体实施方式
下面结合附图和实施例对本发明进一步说明。
如图1~图3所示,本发明包括保湿层1、电热层2、隔热层3和养生台车,所述养生台车由钢管5、竖向支撑支架6、钢架7、连杆8和横向支撑支架9组成,竖向支撑支架6、横向支撑支架9和连杆8可以伸缩,调节钢架7作用范围,钢管5焊接在钢架7上。
收缩养生台车的支架竖向支撑支架6、横向支撑支架9和连杆8,降低养生台车高度,使钢架7与二次衬砌4之间留有一定的工作空间,在养生台车的钢管5上方沿隧道方向铺满隔热层3,在每块隔热层3上方铺设电热层2,然后在电热层2上方铺设保湿层1,伸长养生台车的竖向支撑支架6、横向支撑支架9和连杆8,提高养生台车高度,使保湿层1与二次衬砌4外表面紧密接触,向隔热层3充气,使得保湿层1、电热层2和隔热层3之间紧密贴合,向电热层2通电,实现本发明保湿保温的目的。
所述保湿层1为立面型保湿养护膜,一侧环向紧密附着在衬砌混凝土外表面,另一侧与电热层2紧密贴合,长度为20m,幅宽为1m,厚度为3mm。
所述电热层2由低温辐射电热膜、导线、自动温控器组成,低温辐射电热膜一侧与保湿层1贴合,另一侧与隔热层3贴合,电热膜边缘用耐温90℃的热熔胶粘贴型料绝缘胶带粘贴在隔热层3上,长度为20m,幅宽为1m,厚度为1mm,各幅电热膜接电端的上装有专用导线连接卡,压接时对齐并通过导线并接,再与自动温控器连接。
所述隔热层3为充气隔热垫,一侧与电热层2紧密贴合,另一侧铺设在养生台车的钢管5上方,充气后可膨胀,长度为20m,幅宽为1m,厚度为100mm。
所述养生台车长度为10m,台车顶部沿钢拱架环向均匀焊接钢管5,养生台车的支架6和连杆8可以伸缩使钢管5与隔热层3紧密接触,同时隔热层3、电热层2、保湿层1之间紧密贴合且紧密附着在衬砌外侧。
用于隧道衬砌混凝土的自动保湿保温养生装置施工方法,如下:
步骤1.根据隧道轮廓调节养生台车竖向支撑支架6、横向支撑支架9和连杆8,使钢架7远离衬砌表面,在养生台车的钢管5上方沿台车长度方向铺满隔热层3。
步骤2.在隔热层3上方铺设电热层2,电热膜边缘用耐温90℃的热熔胶粘贴型料绝缘胶带粘贴在隔热层3上,各幅电热层2接电端压接对齐,通过导线并接,再连接到自动温控器上,自动控温器固定于台车上。
步骤3.在电热层2上方铺设保湿层1。
步骤4.伸长养生台车竖向支撑支架6、横向支撑支架9和连杆8,提高钢架7高度,使得保湿层1上侧与二次衬砌4外侧紧密接触。
步骤5.向隔热层3充气使其膨胀,并使隔热层3、电热层2、保湿层1和养生台车钢管5之间紧密接触,然后把电热层2接通电源,一般设置自动温控器温度在20-30℃之间,向衬砌提供稳定的热量。
步骤6.养生台车养护时间7天后,关闭电源,缩短养生台车竖向支撑支架6、横向支撑支架9和连杆8,降低钢架7高度,对衬砌进行质量检测。若不满足规范强度,则需再次提高钢架7贴紧衬砌,开通电源继续养护2-3天;如果衬砌质量满足规范要求,则可移动养生台车至下个工作段,开展下个工作段的衬砌养护工作。
上述虽然结合附图对本发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,所属领域技术人员应该明白,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。
Claims (10)
1.用于隧道衬砌混凝土的保温保湿养生装置,其特征在于:包括在衬砌表面由内至外依次铺设的保湿层、电热层和充气隔热层;所述充气隔热层置于截面外形与隧道截面轮廓相适应、且沿隧道纵向有一定长度的台车车架上;所述充气隔热层充气后,使隔热层、电热层、保湿层之间紧密贴合,且紧紧附着在所述衬砌外侧,通过保湿层和电热层的作用,达到对衬砌混凝土的保温保湿的养生功效。
2.根据权利要求1所述的用于隧道衬砌混凝土的保温保湿养生装置,其特征在于:所述保湿层为立面型保湿养护膜,一侧环向附着在所述衬砌混凝土的外表面,另一侧与电热层紧密贴合。
3.根据权利要求1所述的用于隧道衬砌混凝土的保温保湿养生装置,其特征在于:所述电热层为带有自动温控器的低温辐射电热膜;所述低温辐射电热膜的边缘粘贴在所述隔热层上。
4.根据权利要求1所述的用于隧道衬砌混凝土的保温保湿养生装置,其特征在于:所述充气隔热层为充气隔热垫,所述充气隔热垫充气后可膨胀,一侧与所述电热层贴合,另一侧铺设在所述台车车架上。
5.根据权利要求1所述的用于隧道衬砌混凝土的保温保湿养生装置,其特征在于:所述台车车架包括两个弧形钢架,在两个所述弧形钢架之间,沿隧道纵向连接有若干根用于铺设所述充气隔热层的钢管;所述弧形钢架与置于台车上的用于支撑固定所述弧形钢架的支撑钢架刚性连接。
6.根据权利要求5所述的用于隧道衬砌混凝土的保温保湿养生装置,其特征在于:所述支撑钢架包括竖向支撑钢架和横向支撑钢架,所述竖向支撑钢架的顶端与所述弧形钢架连接,底端固定于所述台车上;所述横向支撑钢架的一端与所述竖向支撑钢架连接,另一端与所述弧形钢架的端部连接。
7.根据权利要求6所述的用于隧道衬砌混凝土的保温保湿养生装置,其特征在于:所述弧形钢架由若干弧形钢架单元组成,所述弧形钢架单元之间设有用以调节所述弧形钢架长度的伸缩支架;所述竖向支撑钢架和所述横向支撑钢架上设有用以调节长度的伸缩连杆;所述伸缩支架和所述伸缩连杆配合工作,使所述弧形钢架与所述隧道轮廓相匹配,进而使置于所述钢管上的各层装置与所述衬砌混凝土紧密贴合。
8.用于隧道衬砌混凝土的保温保湿养生装置的施工方法,其特征在于,包括以下步骤:
步骤1:使台车的支撑钢架处于收缩状态,在所述台车的钢管上依次铺设充气隔热层、电热层和保湿层,各层的铺设面积与所需保养的衬砌混凝土面积相同;
步骤2:调节台车支撑钢架的高度和弧形钢架的长度,使所述保湿层贴合所述衬砌混凝土的表面;
步骤3:对所述充气隔热层充气使其膨胀,并使所述隔热层、所述电热层、所述保湿层、和所述钢管之间紧密接触;
步骤4:将所述电热层通电加热,实行对所述衬砌混凝土的保湿保温养护;当到达设定的养护时间后,停止电热层的加热,并收起装置,养护完毕。
9.根据权利要求8所述的用于隧道衬砌混凝土的保温保湿养生装置的施工方法,其特征在于:步骤1中,在铺设所述电热层时,将所述电热层的边缘粘贴在所述隔热层上,保证各幅电热层接电端压接对齐,通过导线并接,再连接到自动温控器上,所述自动温控器固定于所述台车上。
10.根据权利要求8所述的用于隧道衬砌混凝土的保温保湿养生装置的施工方法,其特征在于:步骤4中,将所述电热层的加热温度设置在20-30℃之间,所述设定的养护时间为7天;在停止电热层的加热后,收缩所述支撑钢架,对所述衬砌进行质量检测;如果衬砌质量不满足规范要求,继续进行保湿保温养护2-3天;如果衬砌质量满足规范要求,则养护完毕,移动所述台车至下个工作段,开展下个工作段的衬砌养护工作。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510358671.XA CN104963698B (zh) | 2015-06-25 | 2015-06-25 | 用于隧道衬砌混凝土的保温保湿养生装置的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510358671.XA CN104963698B (zh) | 2015-06-25 | 2015-06-25 | 用于隧道衬砌混凝土的保温保湿养生装置的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104963698A true CN104963698A (zh) | 2015-10-07 |
CN104963698B CN104963698B (zh) | 2016-06-01 |
Family
ID=54217759
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510358671.XA Active CN104963698B (zh) | 2015-06-25 | 2015-06-25 | 用于隧道衬砌混凝土的保温保湿养生装置的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104963698B (zh) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105401963A (zh) * | 2015-12-08 | 2016-03-16 | 安徽理工大学 | 矿山隔热三维钢筋混凝土衬砌 |
CN107143356A (zh) * | 2017-07-15 | 2017-09-08 | 靳云帆 | 一种自行式隧道衬砌混凝土养护台架 |
CN107387124A (zh) * | 2017-08-23 | 2017-11-24 | 中国铁路经济规划研究院 | 隧道衬砌混凝土养护施工工艺 |
CN107435546A (zh) * | 2017-08-23 | 2017-12-05 | 中国铁路经济规划研究院 | 隧道衬砌智能养护台车 |
CN108303131A (zh) * | 2018-02-11 | 2018-07-20 | 中国铁道科学研究院铁道建筑研究所 | 充气结构支撑探头的隧道衬砌检测装置和方法 |
CN108533291A (zh) * | 2018-06-15 | 2018-09-14 | 中铁工程设计咨询集团有限公司 | 可保温的混凝土养护设备及养护方法 |
CN108756946A (zh) * | 2018-06-15 | 2018-11-06 | 中铁工程设计咨询集团有限公司 | 可保温保湿的混凝土养护设备及养护方法 |
CN108756947A (zh) * | 2018-06-15 | 2018-11-06 | 中铁工程设计咨询集团有限公司 | 隧道混凝土养护设备及养护方法 |
CN109375277A (zh) * | 2018-12-12 | 2019-02-22 | 山东大学 | 固源瞬变电磁隧道掌子面超前预报发射装置 |
CN109702873A (zh) * | 2019-01-30 | 2019-05-03 | 江苏苏博特新材料股份有限公司 | 一种磁力安装装置及大高度立面结构混凝土养护的方法 |
CN110410110A (zh) * | 2019-08-23 | 2019-11-05 | 中铁第四勘察设计院集团有限公司 | 一种大断面隧道复合式衬砌及其施工方法 |
CN110616908A (zh) * | 2019-11-06 | 2019-12-27 | 中铁隧道集团二处有限公司 | 一种混凝土冬季养护棚架及其养护方法 |
CN111706364A (zh) * | 2020-07-20 | 2020-09-25 | 甘肃路桥建设集团有限公司 | 隧道二衬混凝土养生台车 |
CN112659340A (zh) * | 2020-12-10 | 2021-04-16 | 赵佳康 | 一种混凝土养生温度自动监控及保温结构 |
CN112919929A (zh) * | 2021-02-07 | 2021-06-08 | 中国铁建重工集团股份有限公司 | 一种蒸汽式养护台车及施工方法 |
CN114656283A (zh) * | 2022-04-25 | 2022-06-24 | 洛阳市政建设集团有限公司 | 一种用于混凝土冬季养护的保湿保温装置 |
CN115233552A (zh) * | 2022-07-19 | 2022-10-25 | 中国建筑第二工程局有限公司 | 一种拼联式气囊保温加热系统及控制方法 |
CN118030126A (zh) * | 2024-04-12 | 2024-05-14 | 山西省公路局晋中分局试验室 | 一种用于隧道衬砌养护装置及其使用方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102230385A (zh) * | 2011-06-03 | 2011-11-02 | 中铁二院工程集团有限责任公司 | 高地温隧道抗防热衬砌结构 |
JP2012172353A (ja) * | 2011-02-21 | 2012-09-10 | Kajima Corp | 覆工コンクリートの養生方法、セントル台車および養生システム |
CN202964880U (zh) * | 2012-12-19 | 2013-06-05 | 中铁一局集团有限公司 | 隧道衬砌养生台车 |
CN203308471U (zh) * | 2012-11-20 | 2013-11-27 | 中铁十八局集团有限公司 | 一种开敞式tbm现浇混凝土仰拱同步衬砌台车 |
CN104196537A (zh) * | 2014-08-26 | 2014-12-10 | 广东省建筑工程机械施工有限公司 | 一种三条平行的超小净距地铁隧道施工方法 |
CN204152524U (zh) * | 2014-09-28 | 2015-02-11 | 中铁建大桥工程局集团第一工程有限公司 | 一种公路隧道全断面二衬砼整体养生台车 |
CN104712345A (zh) * | 2015-01-31 | 2015-06-17 | 夏玉军 | 一种隧道内衬混凝土保温养护施工装置 |
-
2015
- 2015-06-25 CN CN201510358671.XA patent/CN104963698B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012172353A (ja) * | 2011-02-21 | 2012-09-10 | Kajima Corp | 覆工コンクリートの養生方法、セントル台車および養生システム |
CN102230385A (zh) * | 2011-06-03 | 2011-11-02 | 中铁二院工程集团有限责任公司 | 高地温隧道抗防热衬砌结构 |
CN203308471U (zh) * | 2012-11-20 | 2013-11-27 | 中铁十八局集团有限公司 | 一种开敞式tbm现浇混凝土仰拱同步衬砌台车 |
CN202964880U (zh) * | 2012-12-19 | 2013-06-05 | 中铁一局集团有限公司 | 隧道衬砌养生台车 |
CN104196537A (zh) * | 2014-08-26 | 2014-12-10 | 广东省建筑工程机械施工有限公司 | 一种三条平行的超小净距地铁隧道施工方法 |
CN204152524U (zh) * | 2014-09-28 | 2015-02-11 | 中铁建大桥工程局集团第一工程有限公司 | 一种公路隧道全断面二衬砼整体养生台车 |
CN104712345A (zh) * | 2015-01-31 | 2015-06-17 | 夏玉军 | 一种隧道内衬混凝土保温养护施工装置 |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105401963B (zh) * | 2015-12-08 | 2017-12-08 | 安徽理工大学 | 矿山隔热三维钢筋混凝土衬砌 |
CN105401963A (zh) * | 2015-12-08 | 2016-03-16 | 安徽理工大学 | 矿山隔热三维钢筋混凝土衬砌 |
CN107143356A (zh) * | 2017-07-15 | 2017-09-08 | 靳云帆 | 一种自行式隧道衬砌混凝土养护台架 |
CN107143356B (zh) * | 2017-07-15 | 2023-10-13 | 江苏钦宇建设工程有限公司 | 一种自行式隧道衬砌混凝土养护台架 |
CN107435546B (zh) * | 2017-08-23 | 2023-07-25 | 中国铁路经济规划研究院有限公司 | 隧道衬砌智能养护台车 |
CN107387124A (zh) * | 2017-08-23 | 2017-11-24 | 中国铁路经济规划研究院 | 隧道衬砌混凝土养护施工工艺 |
CN107435546A (zh) * | 2017-08-23 | 2017-12-05 | 中国铁路经济规划研究院 | 隧道衬砌智能养护台车 |
CN108303131A (zh) * | 2018-02-11 | 2018-07-20 | 中国铁道科学研究院铁道建筑研究所 | 充气结构支撑探头的隧道衬砌检测装置和方法 |
CN108533291A (zh) * | 2018-06-15 | 2018-09-14 | 中铁工程设计咨询集团有限公司 | 可保温的混凝土养护设备及养护方法 |
CN108756946A (zh) * | 2018-06-15 | 2018-11-06 | 中铁工程设计咨询集团有限公司 | 可保温保湿的混凝土养护设备及养护方法 |
CN108756947A (zh) * | 2018-06-15 | 2018-11-06 | 中铁工程设计咨询集团有限公司 | 隧道混凝土养护设备及养护方法 |
CN109375277A (zh) * | 2018-12-12 | 2019-02-22 | 山东大学 | 固源瞬变电磁隧道掌子面超前预报发射装置 |
CN109702873A (zh) * | 2019-01-30 | 2019-05-03 | 江苏苏博特新材料股份有限公司 | 一种磁力安装装置及大高度立面结构混凝土养护的方法 |
CN110410110A (zh) * | 2019-08-23 | 2019-11-05 | 中铁第四勘察设计院集团有限公司 | 一种大断面隧道复合式衬砌及其施工方法 |
CN110616908A (zh) * | 2019-11-06 | 2019-12-27 | 中铁隧道集团二处有限公司 | 一种混凝土冬季养护棚架及其养护方法 |
CN110616908B (zh) * | 2019-11-06 | 2024-06-11 | 中铁隧道集团二处有限公司 | 一种混凝土冬季养护棚架及其养护方法 |
CN111706364A (zh) * | 2020-07-20 | 2020-09-25 | 甘肃路桥建设集团有限公司 | 隧道二衬混凝土养生台车 |
CN112659340A (zh) * | 2020-12-10 | 2021-04-16 | 赵佳康 | 一种混凝土养生温度自动监控及保温结构 |
CN112919929A (zh) * | 2021-02-07 | 2021-06-08 | 中国铁建重工集团股份有限公司 | 一种蒸汽式养护台车及施工方法 |
CN114656283A (zh) * | 2022-04-25 | 2022-06-24 | 洛阳市政建设集团有限公司 | 一种用于混凝土冬季养护的保湿保温装置 |
CN115233552A (zh) * | 2022-07-19 | 2022-10-25 | 中国建筑第二工程局有限公司 | 一种拼联式气囊保温加热系统及控制方法 |
CN118030126A (zh) * | 2024-04-12 | 2024-05-14 | 山西省公路局晋中分局试验室 | 一种用于隧道衬砌养护装置及其使用方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104963698B (zh) | 2016-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104963698A (zh) | 用于隧道衬砌混凝土的保温保湿养生装置及其施工方法 | |
CN106522229B (zh) | 可永久调控混凝土大坝温度的方法及装置 | |
CN203701506U (zh) | 一种地面辐射冷暖模块 | |
CN104652835A (zh) | 一种组合梁湿接缝冬季施工电伴热保温方法 | |
CN103195248B (zh) | 一种用于冬季浇筑高寒高海拔地区混凝土的施工方法 | |
KR101503522B1 (ko) | 혹한기 타설 콘크리트 벽체의 복합식 보온 양생 시스템 및 보온 양생 운용 방법 | |
CN104712345A (zh) | 一种隧道内衬混凝土保温养护施工装置 | |
CN208455848U (zh) | 一种双面钢丝网内嵌保温板的预制装配式墙体 | |
CN203980393U (zh) | 地板蒸汽供暖系统 | |
CN114736036A (zh) | 大体积超高性能混凝土热养护系统及热养护工艺 | |
CN204531430U (zh) | 一种混凝土局部加热养护装置 | |
CN105201201A (zh) | 智能温控电伴热保温模板及电伴热方法 | |
CN104675118B (zh) | 一种混凝土冬季施工电加热工艺 | |
CN104060612B (zh) | 用于混凝土坝严寒冬季施工的温控方法及装置 | |
CN105239677A (zh) | 寒冷地区混凝土越冬的保温方法 | |
CN105066218A (zh) | 用于空气源热泵末端的新型相变蓄热地板辐射采暖装置 | |
CN209212265U (zh) | 一种寒区铁路隧道复合加热保温层装置 | |
CN107690202A (zh) | 一种混凝土施工恒温电加热装置 | |
CN105133853A (zh) | 适用于高寒地区的混凝土裂缝修补施工工艺 | |
CN204386622U (zh) | 一种隧道离壁式保温结构 | |
CN204894186U (zh) | 一种太阳能养护窑 | |
CN207460527U (zh) | 一种混凝土施工恒温电加热装置 | |
CN201416176Y (zh) | 混凝土冬季施工保温装置 | |
CN203768876U (zh) | 一种用于混凝土坝施工的温控模板 | |
CN106759856A (zh) | 一种保温墙板的t型连接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |