CN104947831A - Prefabricated assembly type profile steel concrete shear wall and construction method thereof - Google Patents

Prefabricated assembly type profile steel concrete shear wall and construction method thereof Download PDF

Info

Publication number
CN104947831A
CN104947831A CN201510391402.3A CN201510391402A CN104947831A CN 104947831 A CN104947831 A CN 104947831A CN 201510391402 A CN201510391402 A CN 201510391402A CN 104947831 A CN104947831 A CN 104947831A
Authority
CN
China
Prior art keywords
steel
shear wall
shaped steel
shear
wall sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510391402.3A
Other languages
Chinese (zh)
Inventor
高林
徐国强
陈海彬
陈建伟
韩建强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China University of Science and Technology
Original Assignee
North China University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China University of Science and Technology filed Critical North China University of Science and Technology
Priority to CN201510391402.3A priority Critical patent/CN104947831A/en
Publication of CN104947831A publication Critical patent/CN104947831A/en
Pending legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

本发明涉及一种预制装配式型钢混凝土剪力墙及其施工方法。剪力墙片中纵向均匀配置工字型钢,剪力墙片上、下边缘全长设置工字钢,通过工字钢将纵向布置的工字型钢连接起来,形成剪力墙结构框架;工字型钢之间布置双层钢筋网片,钢筋网片的横向分布钢筋两端与工字型钢连接,钢筋网片的纵向分布钢筋两端与工字钢连接;剪力墙片上缘工字钢上焊接预埋钢筋连接套筒和型钢连接套筒,墙体下缘工字钢上焊接预埋带锚板钢筋;剪力墙片下缘预留的工字型钢端部预设锚固件;工字型钢预留端部长度、型钢混凝土连接器的高度与楼板厚度一致。本发明融合了型钢混凝土和钢筋混凝土剪力墙的优势,增强了剪力墙的承载能力和刚度,提高了剪力墙的延性和耗能性能。

The invention relates to a prefabricated assembled steel concrete shear wall and a construction method thereof. I-shaped steel is uniformly arranged longitudinally in the shear wall, and the upper and lower edges of the shear wall are set with I-shaped steel, and the vertically arranged I-shaped steel is connected by the I-shaped steel to form a shear wall structure frame; Double-layer steel mesh sheets are arranged between them. The two ends of the horizontally distributed steel bars of the steel mesh sheet are connected with the I-shaped steel, and the two ends of the longitudinally distributed steel bars of the steel mesh sheet are connected with the I-shaped steel; the upper edge of the shear wall is welded on the I-shaped steel. Embedded steel bar connection sleeve and section steel connection sleeve, welded pre-embedded reinforcement with anchor plate on the I-shaped steel at the lower edge of the wall; preset anchors at the end of the I-shaped steel reserved at the lower edge of the shear wall; The length of the end and the height of the steel concrete connector are consistent with the thickness of the floor. The invention combines the advantages of steel concrete and reinforced concrete shear walls, enhances the bearing capacity and rigidity of the shear walls, and improves the ductility and energy dissipation performance of the shear walls.

Description

预制装配式型钢混凝土剪力墙及其施工方法Prefabricated steel concrete shear wall and its construction method

技术领域 technical field

本发明涉及剪力墙及其施工方法,具体是一种预制装配式型钢混凝土剪力墙及其施工方法。 The invention relates to a shear wall and a construction method thereof, in particular to a prefabricated assembled steel concrete shear wall and a construction method thereof.

背景技术 Background technique

由于预制装配式剪力墙结构体系的预制化率比较高,建筑结构承载能力不低于现浇结构,能够有效克服现浇结构的连接构造比较复杂、施工难度较大、现场工程量较大、人为不可控因素影响等方面的弊端,已在工程实践中被推广应用。 Due to the relatively high prefabrication rate of the prefabricated shear wall structure system, the bearing capacity of the building structure is not lower than that of the cast-in-place structure, which can effectively overcome the complex connection structure of the cast-in-place structure, the difficulty of construction, and the large amount of on-site engineering. The disadvantages of human uncontrollable factors and other aspects have been popularized and applied in engineering practice.

ZL201210054809.3公开了一种预制钢管混凝土边框剪力墙,其充分利用了钢管混凝土边框与混凝土剪力墙的优势结合,但该种剪力墙受限于钢管混凝土边框,如果建筑高度过大或剪力墙体过宽,势必导致钢管混凝土边框与混凝土墙体之间的协调受力变形过大,那么也就相应提升了协调构造措施,导致其成本效率的下降。 ZL201210054809.3 discloses a prefabricated steel tube concrete frame shear wall, which makes full use of the combination of the advantages of the steel tube concrete frame and the concrete shear wall, but this kind of shear wall is limited by the steel tube concrete frame, if the building height is too large or If the shear wall is too wide, it will inevitably lead to excessive deformation of the coordinated force between the CFST frame and the concrete wall, and then the coordinated construction measures will be improved accordingly, resulting in a decrease in its cost efficiency.

发明内容 Contents of the invention

本发明所要解决的技术问题是提供一种预制装配式型钢混凝土剪力墙及其施工方法,将现浇式型钢混凝土剪力墙实现工厂化预制、工业化施工,并保证剪力墙的延性、抗震耗能性能,同时实现现场施工作业快速化、施工质量标准化。 The technical problem to be solved by the present invention is to provide a prefabricated assembled steel concrete shear wall and its construction method, realize factory prefabrication and industrial construction of the cast-in-place steel concrete shear wall, and ensure the ductility and earthquake resistance of the shear wall Energy consumption performance, and at the same time realize the rapid construction work on site and the standardization of construction quality.

本发明解决其技术问题采用的技术方案是: The technical scheme that the present invention solves its technical problem adopts is:

一种预制装配式型钢混凝土剪力墙,包括双层的分别由横向分布钢筋和纵向分布钢筋组成的钢筋网片,双层钢筋网片之间设置拉接筋,剪力墙片中纵向均匀配置工字型钢,剪力墙片上、下边缘全长设置工字钢,通过工字钢将纵向布置的工字型钢连接起来,形成剪力墙结构框架;工字型钢之间布置所述的双层钢筋网片,钢筋网片的横向分布钢筋两端与工字型钢连接,钢筋网片的纵向分布钢筋两端与工字钢连接;剪力墙片上缘的工字钢上焊接预埋钢筋连接套筒和型钢连接套筒,剪力墙片下缘的工字钢上焊接预埋带锚板钢筋;剪力墙片下缘预留的工字型钢端部预设锚固件;工字型钢预留端部长度、型钢混凝土连接器的高度与楼板厚度一致,为现浇楼板施工预留空间。 A prefabricated prefabricated steel concrete shear wall, including double-layer reinforcement mesh sheets composed of horizontally distributed steel bars and longitudinally distributed steel bars, tension bars are arranged between the double-layer steel mesh sheets, and longitudinally evenly arranged in the shear wall sheets I-shaped steel, the upper and lower edges of the shear wall pieces are provided with I-shaped steel for the entire length, and the vertically arranged I-shaped steels are connected through the I-shaped steel to form the structural frame of the shear wall; Reinforcement mesh, the two ends of the horizontal distribution of the reinforcement mesh are connected with the I-shaped steel, and the two ends of the longitudinal distribution of the reinforcement mesh are connected with the I-shaped steel; the embedded steel connection sleeve is welded on the I-shaped steel on the upper edge of the shear wall Tube and section steel connection sleeve, welded pre-embedded reinforcement with anchor plate on the I-beam lower edge of the shear wall piece; pre-set anchors at the end of the I-shaped steel reserved at the lower edge of the shear wall piece; I-shaped steel reserved The length of the end and the height of the steel-concrete connector are consistent with the thickness of the floor slab to reserve space for the construction of the cast-in-place floor slab.

上述预制装配式型钢混凝土剪力墙的施工方法,按下述步骤进行: The construction method of the above-mentioned prefabricated assembled steel concrete shear wall is carried out according to the following steps:

A、在工厂预制剪力墙片(1),并运送至施工现场; A. Prefabricate the shear wall (1) in the factory and transport it to the construction site;

B、将剪力墙片吊装,使上层的剪力墙片下缘带锚板钢筋和工字型钢预留端部,对准下层的剪力墙片上缘预埋钢筋连接套筒和型钢连接套筒,然后落位,将上、下层剪力墙片定位、支撑、固定,并在预埋钢筋连接套筒和型钢连接套筒中浇注高强灌浆料,待同层的剪力墙片全部安装就位,且高强灌浆料强度达到要求后,依照施工工序在上、下剪力墙片中间预留空间内布现浇楼板的钢筋网并支模,然后浇注现浇楼板的混凝土,待养护完成后,撤去临时支撑; B. Hoist the shear wall piece so that the lower edge of the upper shear wall piece has the anchor plate reinforcement and the reserved end of the I-shaped steel, and align with the pre-embedded steel connection sleeve and steel connection sleeve at the upper edge of the lower shear wall piece Then place the upper and lower shear wall pieces in position, support and fix them, and pour high-strength grouting material into the pre-embedded steel bar connection sleeve and section steel connection sleeve. After all the shear wall pieces on the same layer are installed position, and the strength of the high-strength grouting material meets the requirements, according to the construction process, the reinforcement mesh of the cast-in-place floor slab is placed in the reserved space between the upper and lower shear wall pieces and the formwork is set up, and then the concrete of the cast-in-place floor slab is poured. After the curing is completed , remove the temporary support;

C、依次进行其他楼层预制装配式型钢混凝土剪力墙片的施工,最终形成整体预制装配式型钢混凝土剪力墙。 C. Carry out the construction of prefabricated steel concrete shear wall pieces on other floors in sequence, and finally form the overall prefabricated steel concrete shear wall.

采用上述技术方案的本发明,与现有技术相比,其有益效果是: Adopt the present invention of above-mentioned technical scheme, compared with prior art, its beneficial effect is:

充分融合了型钢混凝土和钢筋混凝土剪力墙的优势,增强了剪力墙的承载能力和刚度,提高了剪力墙的延性和耗能性能;与钢管混凝土边框剪力墙相比,该结构体系可以根据建筑高度和剪力墙体宽度,通过有效控制型钢配钢率,在剪力墙体内纵向均匀布置型钢,将混凝土剪力墙体按照型钢布置位置划分为多条剪力墙集合体,相应降低了型钢混凝土与混凝土剪力墙之间的协调受力变形,且墙体的抗震性能和受力特征都相对优化。 It fully integrates the advantages of steel concrete and reinforced concrete shear walls, enhances the bearing capacity and stiffness of the shear walls, and improves the ductility and energy dissipation performance of the shear walls; compared with the steel pipe concrete frame shear walls, the structural system According to the height of the building and the width of the shear wall, by effectively controlling the proportion of steel, the steel can be evenly arranged longitudinally in the shear wall, and the concrete shear wall can be divided into multiple shear wall aggregates according to the layout position of the steel. Correspondingly, the coordinated force deformation between the steel concrete and the concrete shear wall is reduced, and the seismic performance and force characteristics of the wall are relatively optimized.

附图说明 Description of drawings

图1 是本发明实施例的剪力墙片结构示意图; Fig. 1 is the structural representation of the shear wall sheet of the embodiment of the present invention;

图2是图1中A-A剖面放大示意图; Fig. 2 is the enlarged schematic view of A-A section in Fig. 1;

图3是图1中B-B剖面放大示意图; Fig. 3 is the enlarged schematic view of B-B section in Fig. 1;

图4是图1中C点剖面放大示意图; Fig. 4 is the enlarged schematic diagram of the cross-section of point C in Fig. 1;

图5是图1中D点剖面放大示意图; Fig. 5 is the enlarged schematic diagram of the cross-section of point D in Fig. 1;

图中:剪力墙片1,工字型钢2,横向分布钢筋3,纵向分布钢筋4,工字钢5,钢筋连接套筒6,型钢连接套筒7,带锚板钢筋8,锚固件9,拉接筋10。 In the figure: shear wall piece 1, I-shaped steel 2, horizontally distributed steel bar 3, longitudinally distributed steel bar 4, I-shaped steel 5, steel bar connecting sleeve 6, section steel connecting sleeve 7, steel bar with anchor plate 8, anchor piece 9 , Pull the ribs 10.

具体实施方式 Detailed ways

下面结合附图对本发明作进一步阐述,但实施例不对本发明构成任何限制。 The present invention will be further described below in conjunction with the accompanying drawings, but the embodiments do not constitute any limitation to the present invention.

参见图1至图5,剪力墙片1中纵向均匀配置工字型钢2,剪力墙片1上、下边缘全长设置工字钢5,通过工字钢5将纵向布置的工字型钢2连接起来,形成剪力墙结构框架;工字型钢2之间布置双层钢筋网片,钢筋网片的横向分布钢筋3两端与工字型钢2连接,钢筋网片的纵向分布钢筋4两端与工字钢5连接,双层钢筋网片之间设置拉接筋10;剪力墙片1上缘的工字钢5上焊接预埋钢筋连接套筒6和型钢连接套筒7,剪力墙片1下缘的工字钢5上焊接预埋带锚板钢筋8;剪力墙片1下缘预留的工字型钢2端部预设锚固件9;工字型钢2预留端部长度、型钢混凝土连接器7的高度与楼板厚度一致。 Referring to Fig. 1 to Fig. 5, the I-shaped steel 2 is evenly arranged in the longitudinal direction of the shear wall piece 1, and the I-shaped steel 5 is arranged on the entire length of the upper and lower edges of the shear wall piece 1, and the vertically arranged I-shaped steel is arranged through the I-shaped steel 5 2 are connected to form a shear wall structure frame; double-layer steel mesh sheets are arranged between the I-shaped steel sheets 2, and the two ends of the horizontally distributed steel bars 3 of the steel mesh sheets are connected with the I-shaped steel 2, and the longitudinally distributed steel bars 4 of the steel mesh sheets are two The end is connected with the I-beam 5, and the tension bar 10 is set between the double-layer steel mesh pieces; the I-beam 5 on the upper edge of the shear wall piece 1 is welded with the pre-embedded steel connection sleeve 6 and the section steel connection sleeve 7. The I-shaped steel 5 on the lower edge of the force wall piece 1 is welded with the pre-embedded steel bar 8 with an anchor plate; the end of the I-shaped steel 2 reserved at the lower edge of the shear wall piece 1 is preset with an anchor 9; the reserved end of the I-shaped steel 2 The length of the section, the height of the steel concrete connector 7 are consistent with the thickness of the floor slab.

剪力墙片1的制作方法,顺序如下: The production method of the shear wall piece 1 is as follows:

①制作剪力墙片1的钢骨框架,将工字型钢2纵向均匀布置,将工字钢5焊接在工字型钢2上下两端,要求工字型钢2下端预留端头,且长度与现浇楼板厚度一致,并在工字型钢2下端预留端头上预设锚固件9; ① Make the steel frame of the shear wall piece 1, arrange the I-shaped steel 2 evenly in the longitudinal direction, weld the I-shaped steel 5 to the upper and lower ends of the I-shaped steel 2, and reserve the end of the lower end of the I-shaped steel 2, and the length is the same as The thickness of the cast-in-place floor slab is consistent, and the anchor piece 9 is preset on the reserved end of the lower end of the I-shaped steel 2;

②将横向分布钢筋3和纵向分布钢筋4组成钢筋网片,并在钢筋网片间用拉接筋10拉接,要求横向分布钢筋4两端与工字型钢2的翼缘焊接; ② The horizontally distributed steel bars 3 and the longitudinally distributed steel bars 4 are formed into steel mesh pieces, and the tension bars 10 are used to connect the steel mesh pieces, and the two ends of the horizontally distributed steel bars 4 are required to be welded to the flange of the I-shaped steel 2;

③在剪力墙片1上缘工字钢5上焊接钢筋连接套筒6和型钢连接套筒7,在剪力墙片1下缘工字钢5上焊接带锚板钢筋8; ③ Weld the steel bar connection sleeve 6 and the section steel connection sleeve 7 on the I-beam 5 at the upper edge of the shear wall piece 1, and weld the steel bar 8 with anchor plate on the I-beam 5 at the lower edge of the shear wall piece 1;

④在剪力墙片1两侧面预留好一定的保护层厚度,支模板并浇注混凝土,经标准养护后成型为预制装配式型钢混凝土剪力墙片。 ④Reserve a certain thickness of the protective layer on both sides of the shear wall piece 1, support the formwork and pour concrete, and form a prefabricated steel concrete shear wall piece after standard curing.

采用上述剪力墙片1施工预制装配式型钢混凝土剪力墙的方法,按下述步骤进行: The method for constructing a prefabricated assembled steel concrete shear wall using the above-mentioned shear wall sheet 1 is carried out according to the following steps:

A、将工厂预制的剪力墙片1运送至施工现场; A, transport the factory prefabricated shear wall piece 1 to the construction site;

B、将剪力墙片1吊装,使上层的剪力墙片1下缘带锚板钢筋8和工字型钢2预留端部,对准下层的剪力墙片1上缘预埋钢筋连接套筒6和型钢连接套筒7,然后落位,将上、下层剪力墙片1定位、支撑、固定,并在预埋钢筋连接套筒6和型钢连接套筒7中浇注高强灌浆料,待同层的剪力墙片1全部安装就位,且高强灌浆料强度达到要求后,依照施工工序在上、下剪力墙片1中间预留空间内布现浇楼板的钢筋网并支模,然后浇注现浇楼板的混凝土,待养护完成后,撤去临时支撑; B. Hoist the shear wall piece 1 so that the lower edge of the upper shear wall piece 1 is equipped with the anchor plate steel bar 8 and the reserved end of the I-shaped steel 2, and the upper edge of the lower shear wall piece 1 is aligned with the pre-embedded steel bar connection Sleeve 6 and section steel connection sleeve 7 are then placed in position, the upper and lower layer shear wall pieces 1 are positioned, supported and fixed, and high-strength grouting material is poured into pre-embedded reinforcement connection sleeve 6 and section steel connection sleeve 7, After all the shear wall pieces 1 on the same floor are installed in place, and the strength of the high-strength grouting material meets the requirements, according to the construction process, lay the reinforcement mesh of the cast-in-place floor slab in the reserved space between the upper and lower shear wall pieces 1 and set up the formwork , and then pour the concrete of the cast-in-place floor slab, and remove the temporary support after the curing is completed;

C、依次进行其他楼层预制装配式型钢混凝土剪力墙的施工,最终形成整体预制装配式型钢混凝土剪力墙。 C. Carry out the construction of prefabricated steel concrete shear walls on other floors in sequence, and finally form the overall prefabricated steel concrete shear walls.

上述实施例仅仅是对本发明作举例说明,本发明所属技术领域的技术人员可以对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,但并不会偏离本发明的精神或者超越所附权利要求书所定义的范围。 The above-described embodiments are only examples for the present invention, and those skilled in the art to which the present invention belongs can make various modifications or supplements to the described specific embodiments or replace them in similar ways, but they will not depart from the present invention. spirit or beyond the scope defined by the appended claims.

Claims (2)

1. a prefabricated assembled steel reinforced concrete shear walls, comprise double-deck reinforced mesh be made up of transversely distributed steelbar (3) and genesis analysis reinforcing bar (4) respectively, connecting lacing wire (10) is set between double steel bar mesh sheet, it is characterized in that: in shear wall sheet (1), longitudinally evenly configure i shaped steel (2), shear wall sheet (1) upper and lower edge total length arranges i iron (5), by i iron (5), the i shaped steel (2) longitudinally arranged is coupled together, form shear wall structure framework; Arrange described double steel bar mesh sheet between i shaped steel (2), transversely distributed steelbar (3) two ends of reinforced mesh are connected with i shaped steel (2), and genesis analysis reinforcing bar (4) two ends of reinforced mesh are connected with i iron (5); The i iron (5) upper welding embedded bar branch sleeve (6) of shear wall sheet (1) upper limb and shaped steel branch sleeve (7), the pre-buried strap anchor slab reinforcing bar (8) of the upper welding of i iron (5) of shear wall sheet (1) lower edge; Anchoring piece (9) is preset in i shaped steel (2) end that shear wall sheet (1) lower edge is reserved; I shaped steel (2) reserve tip lengths, steel reinforced concrete connector (7) height consistent with slab thickness.
2. a construction method for prefabricated assembled steel reinforced concrete shear walls as claimed in claim 1, is characterized in that, carries out in the steps below:
A, be prefabricated in the factory shear wall sheet (1), and be transported to job site;
B, shear wall sheet (1) is lifted, make marginal zone anchor slab reinforcing bar (8) and the reserved end of i shaped steel (2) under the shear wall sheet (1) on upper strata, aim at shear wall sheet (1) upper limb embedded bar branch sleeve (6) and the shaped steel branch sleeve (7) of lower floor, then dropping place, by upper, lower floor's shear wall sheet (1) locates, support, fixing, and high-strength grout is poured into a mould in embedded bar branch sleeve (6) and shaped steel branch sleeve (7), treat shear wall sheet (1) all installation in position of same layer, and after high-strength grout intensity reaches requirement, according to working procedure upper, the steel mesh reinforcement of cloth cast-in-situ floor formwork in headspace in the middle of lower shear wall sheet (1), then the concrete of cast-in-situ floor is poured into a mould, after maintenance completes, remove temporary support,
C, carry out the construction of the prefabricated assembled steel reinforced concrete shear walls sheet of other floors successively, finally form integral prefabricated assembling steel reinforced concrete shear walls.
CN201510391402.3A 2015-07-07 2015-07-07 Prefabricated assembly type profile steel concrete shear wall and construction method thereof Pending CN104947831A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510391402.3A CN104947831A (en) 2015-07-07 2015-07-07 Prefabricated assembly type profile steel concrete shear wall and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510391402.3A CN104947831A (en) 2015-07-07 2015-07-07 Prefabricated assembly type profile steel concrete shear wall and construction method thereof

Publications (1)

Publication Number Publication Date
CN104947831A true CN104947831A (en) 2015-09-30

Family

ID=54162844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510391402.3A Pending CN104947831A (en) 2015-07-07 2015-07-07 Prefabricated assembly type profile steel concrete shear wall and construction method thereof

Country Status (1)

Country Link
CN (1) CN104947831A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297952A (en) * 2015-10-29 2016-02-03 苏州设计研究院股份有限公司 Prefabricated reinforced concrete shear wall
CN105804277A (en) * 2016-05-11 2016-07-27 重庆大学 Profile-steel concrete shear wall with two end root areas restrained by steel sleeves
CN106088398A (en) * 2016-08-12 2016-11-09 陶忠 A kind of combined wall board
CN106760054A (en) * 2017-03-01 2017-05-31 同济大学 Precast reinforced concrete shear wall
CN106836508A (en) * 2017-01-12 2017-06-13 江苏工程职业技术学院 A kind of prefabricated assembled board wall I-steel bolt joint construction technology
CN106968381A (en) * 2017-04-28 2017-07-21 广东省建科建筑设计院有限公司 With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection
CN106988455A (en) * 2017-04-12 2017-07-28 山东科技大学 Steel plate concrete shear wall scene splicing node and its construction method
CN107023121A (en) * 2017-04-28 2017-08-08 广东省建科建筑设计院有限公司 A kind of reinforcing bar grout sleeve connected for prefabricated concrete structure ductility
CN108643382A (en) * 2018-05-18 2018-10-12 中国二十二冶集团有限公司 The construction method that fabricated shear wall plate vertically connects
CN108643395A (en) * 2018-07-24 2018-10-12 华北理工大学 A kind of prefabricated prestressing Self-resetting shear wall structure and its construction method
CN109339245A (en) * 2018-11-21 2019-02-15 福建工程学院 A connection structure and construction method of prefabricated shear wall and laminated plate
CN109440968A (en) * 2018-12-14 2019-03-08 湖南远大建工股份有限公司 Prefabricated panel, panel wall system and its construction method
CN109707069A (en) * 2018-12-14 2019-05-03 哈尔滨工业大学(深圳) A detachable prefabricated modular shear wall based on section steel connection and its assembly method
CN110130534A (en) * 2019-05-24 2019-08-16 中国十七冶集团有限公司 A kind of novel energy-consumption precast shear wall and its processing installation method
CN112814205A (en) * 2021-02-18 2021-05-18 海南大学 Prefabricated assembly type shear wall and construction method thereof
CN115354782A (en) * 2022-08-31 2022-11-18 武汉大学 Assembled prestressed corrugated steel plate composite shear wall and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201459954U (en) * 2009-06-05 2010-05-12 陈云 Thermal-insulation shear wall with double-layer steel plate
US7716887B2 (en) * 2004-12-30 2010-05-18 Weyerhaeuser Nr Company Shear wall attachment assembly and method of use
CN202925716U (en) * 2012-12-06 2013-05-08 河北联合大学 Integrally assembled type concrete filled steel tube frame shear wall
CN103174237A (en) * 2013-03-06 2013-06-26 北京赛博思建筑设计有限公司 Sheet steel shear wall
CN204212286U (en) * 2014-11-03 2015-03-18 中建八局第一建设有限公司 A kind of reinforced steel plate-concrete combined shear wall with ribbing
CN104499608A (en) * 2014-12-19 2015-04-08 江苏鼎达建筑新技术有限公司 Method for designing and constructing prestressed section steel reinforced shear wall
CN205024882U (en) * 2015-07-07 2016-02-10 华北理工大学 Prefabricated assembled shaped steel concrete shear force wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7716887B2 (en) * 2004-12-30 2010-05-18 Weyerhaeuser Nr Company Shear wall attachment assembly and method of use
CN201459954U (en) * 2009-06-05 2010-05-12 陈云 Thermal-insulation shear wall with double-layer steel plate
CN202925716U (en) * 2012-12-06 2013-05-08 河北联合大学 Integrally assembled type concrete filled steel tube frame shear wall
CN103174237A (en) * 2013-03-06 2013-06-26 北京赛博思建筑设计有限公司 Sheet steel shear wall
CN204212286U (en) * 2014-11-03 2015-03-18 中建八局第一建设有限公司 A kind of reinforced steel plate-concrete combined shear wall with ribbing
CN104499608A (en) * 2014-12-19 2015-04-08 江苏鼎达建筑新技术有限公司 Method for designing and constructing prestressed section steel reinforced shear wall
CN205024882U (en) * 2015-07-07 2016-02-10 华北理工大学 Prefabricated assembled shaped steel concrete shear force wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吕西林等: "截面中部配置型钢的混凝土剪力墙抗震性能研究", 《地震工程与工程振动》 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297952B (en) * 2015-10-29 2018-01-09 启迪设计集团股份有限公司 A kind of precast reinforced concrete shear wall
CN105297952A (en) * 2015-10-29 2016-02-03 苏州设计研究院股份有限公司 Prefabricated reinforced concrete shear wall
CN105804277A (en) * 2016-05-11 2016-07-27 重庆大学 Profile-steel concrete shear wall with two end root areas restrained by steel sleeves
CN106088398A (en) * 2016-08-12 2016-11-09 陶忠 A kind of combined wall board
CN106836508A (en) * 2017-01-12 2017-06-13 江苏工程职业技术学院 A kind of prefabricated assembled board wall I-steel bolt joint construction technology
CN106760054A (en) * 2017-03-01 2017-05-31 同济大学 Precast reinforced concrete shear wall
CN106988455A (en) * 2017-04-12 2017-07-28 山东科技大学 Steel plate concrete shear wall scene splicing node and its construction method
CN106988455B (en) * 2017-04-12 2018-12-04 山东科技大学 Splice node and its construction method in steel plate concrete shear wall scene
CN106968381B (en) * 2017-04-28 2023-09-22 广东省建科建筑设计院有限公司 Prefabricated precast shear wall and composite panel joints connected by combined grouting sleeves
CN106968381A (en) * 2017-04-28 2017-07-21 广东省建科建筑设计院有限公司 With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection
CN107023121A (en) * 2017-04-28 2017-08-08 广东省建科建筑设计院有限公司 A kind of reinforcing bar grout sleeve connected for prefabricated concrete structure ductility
CN108643382A (en) * 2018-05-18 2018-10-12 中国二十二冶集团有限公司 The construction method that fabricated shear wall plate vertically connects
CN108643395A (en) * 2018-07-24 2018-10-12 华北理工大学 A kind of prefabricated prestressing Self-resetting shear wall structure and its construction method
CN108643395B (en) * 2018-07-24 2023-05-26 华北理工大学 Prefabricated assembly type prestress self-resetting shear wall structure and construction method thereof
CN109339245A (en) * 2018-11-21 2019-02-15 福建工程学院 A connection structure and construction method of prefabricated shear wall and laminated plate
CN109339245B (en) * 2018-11-21 2024-06-07 福建工程学院 Prefabricated shear wall and superimposed sheet connection structure and construction method
CN109440968A (en) * 2018-12-14 2019-03-08 湖南远大建工股份有限公司 Prefabricated panel, panel wall system and its construction method
CN109707069A (en) * 2018-12-14 2019-05-03 哈尔滨工业大学(深圳) A detachable prefabricated modular shear wall based on section steel connection and its assembly method
CN109707069B (en) * 2018-12-14 2020-07-17 哈尔滨工业大学(深圳) A detachable prefabricated modular shear wall based on section steel connection and its assembly method
CN110130534A (en) * 2019-05-24 2019-08-16 中国十七冶集团有限公司 A kind of novel energy-consumption precast shear wall and its processing installation method
CN112814205A (en) * 2021-02-18 2021-05-18 海南大学 Prefabricated assembly type shear wall and construction method thereof
CN115354782A (en) * 2022-08-31 2022-11-18 武汉大学 Assembled prestressed corrugated steel plate composite shear wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN104947831A (en) Prefabricated assembly type profile steel concrete shear wall and construction method thereof
CN205024882U (en) Prefabricated assembled shaped steel concrete shear force wall
CN107989231A (en) A kind of Prefabricated concrete-filled steel tube frame-shear wall and its construction method
CN105484142B (en) A kind of pin-connected panel precast segment concrete hollow slab beam structure and preparation method thereof
CN106481023B (en) Prefabricated steel-concrete composite beam structure and its implementation method
CN104727441A (en) Prestress assembled concrete beam column joint structure and construction method thereof
CN202925716U (en) Integrally assembled type concrete filled steel tube frame shear wall
CN108518003A (en) Detachable prefabricated assembled steel-concrete composite beam plate
CN103031926B (en) With the double-T compound beam and preparation method thereof of pre-stressed steel pipe concrete plug
CN106193292A (en) A kind of steel frame assembled integral reinforced concrete shear wall structure system
CN106567458A (en) Assembly type steel-concrete combined beam column frame structure system
CN102454239A (en) Precast slab construction member
CN104179249A (en) Assembled composite-structure earthquake-resistant wall and assembly method thereof
CN202990170U (en) Shear wall structure collocating cross oblique internal prestress
CN110005109A (en) A kind of open flume type prestressed concrete overlapped slab
CN113863532A (en) Vertical connecting node of concrete shear wall and manufacturing and mounting method thereof
CN201133085Y (en) Structure for enhancing external prestressing force effect
CN110748043B (en) A fully steel assembled double-legged steel tube-constrained buckling-resistance steel plate shear wall
CN219219334U (en) Prefabricated assembled ultra-high performance concrete T type roof beam
CN103046692B (en) Frame-supporting column with high strength steel bars and super high strength concrete
CN105735099B (en) Construction time uses the simple supported-to-continuous girder bridge and its construction method of external prestressing
CN108643395B (en) Prefabricated assembly type prestress self-resetting shear wall structure and construction method thereof
CN115680159A (en) Prefabricated lattice type steel reinforced concrete combined shear wall structural system
CN103924735A (en) Batten plate constraint type confined concrete column with cross steel bone with flanges and fabrication method of column
CN205804324U (en) A kind of Prefabricated pre-tensioned prestressed underground continuous wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150930

RJ01 Rejection of invention patent application after publication