CN104947831A - Prefabricated assembly type profile steel concrete shear wall and construction method thereof - Google Patents
Prefabricated assembly type profile steel concrete shear wall and construction method thereof Download PDFInfo
- Publication number
- CN104947831A CN104947831A CN201510391402.3A CN201510391402A CN104947831A CN 104947831 A CN104947831 A CN 104947831A CN 201510391402 A CN201510391402 A CN 201510391402A CN 104947831 A CN104947831 A CN 104947831A
- Authority
- CN
- China
- Prior art keywords
- steel
- shear wall
- shaped steel
- shear
- wall sheet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 123
- 239000010959 steel Substances 0.000 title claims abstract description 123
- 239000004567 concrete Substances 0.000 title claims abstract description 31
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 230000002787 reinforcement Effects 0.000 claims abstract description 11
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 7
- 238000000034 method Methods 0.000 claims description 5
- 238000009415 formwork Methods 0.000 claims description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims 13
- 229910052742 iron Inorganic materials 0.000 claims 5
- 230000003014 reinforcing effect Effects 0.000 claims 4
- 239000011440 grout Substances 0.000 claims 2
- 238000011065 in-situ storage Methods 0.000 claims 2
- 210000001364 upper extremity Anatomy 0.000 claims 2
- 238000003466 welding Methods 0.000 claims 2
- 238000004873 anchoring Methods 0.000 claims 1
- 239000004744 fabric Substances 0.000 claims 1
- 238000009434 installation Methods 0.000 claims 1
- 238000012423 maintenance Methods 0.000 claims 1
- 230000021715 photosynthesis, light harvesting Effects 0.000 abstract description 2
- 239000010410 layer Substances 0.000 description 6
- 239000000463 material Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 238000009417 prefabrication Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000009439 industrial construction Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明涉及一种预制装配式型钢混凝土剪力墙及其施工方法。剪力墙片中纵向均匀配置工字型钢,剪力墙片上、下边缘全长设置工字钢,通过工字钢将纵向布置的工字型钢连接起来,形成剪力墙结构框架;工字型钢之间布置双层钢筋网片,钢筋网片的横向分布钢筋两端与工字型钢连接,钢筋网片的纵向分布钢筋两端与工字钢连接;剪力墙片上缘工字钢上焊接预埋钢筋连接套筒和型钢连接套筒,墙体下缘工字钢上焊接预埋带锚板钢筋;剪力墙片下缘预留的工字型钢端部预设锚固件;工字型钢预留端部长度、型钢混凝土连接器的高度与楼板厚度一致。本发明融合了型钢混凝土和钢筋混凝土剪力墙的优势,增强了剪力墙的承载能力和刚度,提高了剪力墙的延性和耗能性能。
The invention relates to a prefabricated assembled steel concrete shear wall and a construction method thereof. I-shaped steel is uniformly arranged longitudinally in the shear wall, and the upper and lower edges of the shear wall are set with I-shaped steel, and the vertically arranged I-shaped steel is connected by the I-shaped steel to form a shear wall structure frame; Double-layer steel mesh sheets are arranged between them. The two ends of the horizontally distributed steel bars of the steel mesh sheet are connected with the I-shaped steel, and the two ends of the longitudinally distributed steel bars of the steel mesh sheet are connected with the I-shaped steel; the upper edge of the shear wall is welded on the I-shaped steel. Embedded steel bar connection sleeve and section steel connection sleeve, welded pre-embedded reinforcement with anchor plate on the I-shaped steel at the lower edge of the wall; preset anchors at the end of the I-shaped steel reserved at the lower edge of the shear wall; The length of the end and the height of the steel concrete connector are consistent with the thickness of the floor. The invention combines the advantages of steel concrete and reinforced concrete shear walls, enhances the bearing capacity and rigidity of the shear walls, and improves the ductility and energy dissipation performance of the shear walls.
Description
技术领域 technical field
本发明涉及剪力墙及其施工方法,具体是一种预制装配式型钢混凝土剪力墙及其施工方法。 The invention relates to a shear wall and a construction method thereof, in particular to a prefabricated assembled steel concrete shear wall and a construction method thereof.
背景技术 Background technique
由于预制装配式剪力墙结构体系的预制化率比较高,建筑结构承载能力不低于现浇结构,能够有效克服现浇结构的连接构造比较复杂、施工难度较大、现场工程量较大、人为不可控因素影响等方面的弊端,已在工程实践中被推广应用。 Due to the relatively high prefabrication rate of the prefabricated shear wall structure system, the bearing capacity of the building structure is not lower than that of the cast-in-place structure, which can effectively overcome the complex connection structure of the cast-in-place structure, the difficulty of construction, and the large amount of on-site engineering. The disadvantages of human uncontrollable factors and other aspects have been popularized and applied in engineering practice.
ZL201210054809.3公开了一种预制钢管混凝土边框剪力墙,其充分利用了钢管混凝土边框与混凝土剪力墙的优势结合,但该种剪力墙受限于钢管混凝土边框,如果建筑高度过大或剪力墙体过宽,势必导致钢管混凝土边框与混凝土墙体之间的协调受力变形过大,那么也就相应提升了协调构造措施,导致其成本效率的下降。 ZL201210054809.3 discloses a prefabricated steel tube concrete frame shear wall, which makes full use of the combination of the advantages of the steel tube concrete frame and the concrete shear wall, but this kind of shear wall is limited by the steel tube concrete frame, if the building height is too large or If the shear wall is too wide, it will inevitably lead to excessive deformation of the coordinated force between the CFST frame and the concrete wall, and then the coordinated construction measures will be improved accordingly, resulting in a decrease in its cost efficiency.
发明内容 Contents of the invention
本发明所要解决的技术问题是提供一种预制装配式型钢混凝土剪力墙及其施工方法,将现浇式型钢混凝土剪力墙实现工厂化预制、工业化施工,并保证剪力墙的延性、抗震耗能性能,同时实现现场施工作业快速化、施工质量标准化。 The technical problem to be solved by the present invention is to provide a prefabricated assembled steel concrete shear wall and its construction method, realize factory prefabrication and industrial construction of the cast-in-place steel concrete shear wall, and ensure the ductility and earthquake resistance of the shear wall Energy consumption performance, and at the same time realize the rapid construction work on site and the standardization of construction quality.
本发明解决其技术问题采用的技术方案是: The technical scheme that the present invention solves its technical problem adopts is:
一种预制装配式型钢混凝土剪力墙,包括双层的分别由横向分布钢筋和纵向分布钢筋组成的钢筋网片,双层钢筋网片之间设置拉接筋,剪力墙片中纵向均匀配置工字型钢,剪力墙片上、下边缘全长设置工字钢,通过工字钢将纵向布置的工字型钢连接起来,形成剪力墙结构框架;工字型钢之间布置所述的双层钢筋网片,钢筋网片的横向分布钢筋两端与工字型钢连接,钢筋网片的纵向分布钢筋两端与工字钢连接;剪力墙片上缘的工字钢上焊接预埋钢筋连接套筒和型钢连接套筒,剪力墙片下缘的工字钢上焊接预埋带锚板钢筋;剪力墙片下缘预留的工字型钢端部预设锚固件;工字型钢预留端部长度、型钢混凝土连接器的高度与楼板厚度一致,为现浇楼板施工预留空间。 A prefabricated prefabricated steel concrete shear wall, including double-layer reinforcement mesh sheets composed of horizontally distributed steel bars and longitudinally distributed steel bars, tension bars are arranged between the double-layer steel mesh sheets, and longitudinally evenly arranged in the shear wall sheets I-shaped steel, the upper and lower edges of the shear wall pieces are provided with I-shaped steel for the entire length, and the vertically arranged I-shaped steels are connected through the I-shaped steel to form the structural frame of the shear wall; Reinforcement mesh, the two ends of the horizontal distribution of the reinforcement mesh are connected with the I-shaped steel, and the two ends of the longitudinal distribution of the reinforcement mesh are connected with the I-shaped steel; the embedded steel connection sleeve is welded on the I-shaped steel on the upper edge of the shear wall Tube and section steel connection sleeve, welded pre-embedded reinforcement with anchor plate on the I-beam lower edge of the shear wall piece; pre-set anchors at the end of the I-shaped steel reserved at the lower edge of the shear wall piece; I-shaped steel reserved The length of the end and the height of the steel-concrete connector are consistent with the thickness of the floor slab to reserve space for the construction of the cast-in-place floor slab.
上述预制装配式型钢混凝土剪力墙的施工方法,按下述步骤进行: The construction method of the above-mentioned prefabricated assembled steel concrete shear wall is carried out according to the following steps:
A、在工厂预制剪力墙片(1),并运送至施工现场; A. Prefabricate the shear wall (1) in the factory and transport it to the construction site;
B、将剪力墙片吊装,使上层的剪力墙片下缘带锚板钢筋和工字型钢预留端部,对准下层的剪力墙片上缘预埋钢筋连接套筒和型钢连接套筒,然后落位,将上、下层剪力墙片定位、支撑、固定,并在预埋钢筋连接套筒和型钢连接套筒中浇注高强灌浆料,待同层的剪力墙片全部安装就位,且高强灌浆料强度达到要求后,依照施工工序在上、下剪力墙片中间预留空间内布现浇楼板的钢筋网并支模,然后浇注现浇楼板的混凝土,待养护完成后,撤去临时支撑; B. Hoist the shear wall piece so that the lower edge of the upper shear wall piece has the anchor plate reinforcement and the reserved end of the I-shaped steel, and align with the pre-embedded steel connection sleeve and steel connection sleeve at the upper edge of the lower shear wall piece Then place the upper and lower shear wall pieces in position, support and fix them, and pour high-strength grouting material into the pre-embedded steel bar connection sleeve and section steel connection sleeve. After all the shear wall pieces on the same layer are installed position, and the strength of the high-strength grouting material meets the requirements, according to the construction process, the reinforcement mesh of the cast-in-place floor slab is placed in the reserved space between the upper and lower shear wall pieces and the formwork is set up, and then the concrete of the cast-in-place floor slab is poured. After the curing is completed , remove the temporary support;
C、依次进行其他楼层预制装配式型钢混凝土剪力墙片的施工,最终形成整体预制装配式型钢混凝土剪力墙。 C. Carry out the construction of prefabricated steel concrete shear wall pieces on other floors in sequence, and finally form the overall prefabricated steel concrete shear wall.
采用上述技术方案的本发明,与现有技术相比,其有益效果是: Adopt the present invention of above-mentioned technical scheme, compared with prior art, its beneficial effect is:
充分融合了型钢混凝土和钢筋混凝土剪力墙的优势,增强了剪力墙的承载能力和刚度,提高了剪力墙的延性和耗能性能;与钢管混凝土边框剪力墙相比,该结构体系可以根据建筑高度和剪力墙体宽度,通过有效控制型钢配钢率,在剪力墙体内纵向均匀布置型钢,将混凝土剪力墙体按照型钢布置位置划分为多条剪力墙集合体,相应降低了型钢混凝土与混凝土剪力墙之间的协调受力变形,且墙体的抗震性能和受力特征都相对优化。 It fully integrates the advantages of steel concrete and reinforced concrete shear walls, enhances the bearing capacity and stiffness of the shear walls, and improves the ductility and energy dissipation performance of the shear walls; compared with the steel pipe concrete frame shear walls, the structural system According to the height of the building and the width of the shear wall, by effectively controlling the proportion of steel, the steel can be evenly arranged longitudinally in the shear wall, and the concrete shear wall can be divided into multiple shear wall aggregates according to the layout position of the steel. Correspondingly, the coordinated force deformation between the steel concrete and the concrete shear wall is reduced, and the seismic performance and force characteristics of the wall are relatively optimized.
附图说明 Description of drawings
图1 是本发明实施例的剪力墙片结构示意图; Fig. 1 is the structural representation of the shear wall sheet of the embodiment of the present invention;
图2是图1中A-A剖面放大示意图; Fig. 2 is the enlarged schematic view of A-A section in Fig. 1;
图3是图1中B-B剖面放大示意图; Fig. 3 is the enlarged schematic view of B-B section in Fig. 1;
图4是图1中C点剖面放大示意图; Fig. 4 is the enlarged schematic diagram of the cross-section of point C in Fig. 1;
图5是图1中D点剖面放大示意图; Fig. 5 is the enlarged schematic diagram of the cross-section of point D in Fig. 1;
图中:剪力墙片1,工字型钢2,横向分布钢筋3,纵向分布钢筋4,工字钢5,钢筋连接套筒6,型钢连接套筒7,带锚板钢筋8,锚固件9,拉接筋10。 In the figure: shear wall piece 1, I-shaped steel 2, horizontally distributed steel bar 3, longitudinally distributed steel bar 4, I-shaped steel 5, steel bar connecting sleeve 6, section steel connecting sleeve 7, steel bar with anchor plate 8, anchor piece 9 , Pull the ribs 10.
具体实施方式 Detailed ways
下面结合附图对本发明作进一步阐述,但实施例不对本发明构成任何限制。 The present invention will be further described below in conjunction with the accompanying drawings, but the embodiments do not constitute any limitation to the present invention.
参见图1至图5,剪力墙片1中纵向均匀配置工字型钢2,剪力墙片1上、下边缘全长设置工字钢5,通过工字钢5将纵向布置的工字型钢2连接起来,形成剪力墙结构框架;工字型钢2之间布置双层钢筋网片,钢筋网片的横向分布钢筋3两端与工字型钢2连接,钢筋网片的纵向分布钢筋4两端与工字钢5连接,双层钢筋网片之间设置拉接筋10;剪力墙片1上缘的工字钢5上焊接预埋钢筋连接套筒6和型钢连接套筒7,剪力墙片1下缘的工字钢5上焊接预埋带锚板钢筋8;剪力墙片1下缘预留的工字型钢2端部预设锚固件9;工字型钢2预留端部长度、型钢混凝土连接器7的高度与楼板厚度一致。 Referring to Fig. 1 to Fig. 5, the I-shaped steel 2 is evenly arranged in the longitudinal direction of the shear wall piece 1, and the I-shaped steel 5 is arranged on the entire length of the upper and lower edges of the shear wall piece 1, and the vertically arranged I-shaped steel is arranged through the I-shaped steel 5 2 are connected to form a shear wall structure frame; double-layer steel mesh sheets are arranged between the I-shaped steel sheets 2, and the two ends of the horizontally distributed steel bars 3 of the steel mesh sheets are connected with the I-shaped steel 2, and the longitudinally distributed steel bars 4 of the steel mesh sheets are two The end is connected with the I-beam 5, and the tension bar 10 is set between the double-layer steel mesh pieces; the I-beam 5 on the upper edge of the shear wall piece 1 is welded with the pre-embedded steel connection sleeve 6 and the section steel connection sleeve 7. The I-shaped steel 5 on the lower edge of the force wall piece 1 is welded with the pre-embedded steel bar 8 with an anchor plate; the end of the I-shaped steel 2 reserved at the lower edge of the shear wall piece 1 is preset with an anchor 9; the reserved end of the I-shaped steel 2 The length of the section, the height of the steel concrete connector 7 are consistent with the thickness of the floor slab.
剪力墙片1的制作方法,顺序如下: The production method of the shear wall piece 1 is as follows:
①制作剪力墙片1的钢骨框架,将工字型钢2纵向均匀布置,将工字钢5焊接在工字型钢2上下两端,要求工字型钢2下端预留端头,且长度与现浇楼板厚度一致,并在工字型钢2下端预留端头上预设锚固件9; ① Make the steel frame of the shear wall piece 1, arrange the I-shaped steel 2 evenly in the longitudinal direction, weld the I-shaped steel 5 to the upper and lower ends of the I-shaped steel 2, and reserve the end of the lower end of the I-shaped steel 2, and the length is the same as The thickness of the cast-in-place floor slab is consistent, and the anchor piece 9 is preset on the reserved end of the lower end of the I-shaped steel 2;
②将横向分布钢筋3和纵向分布钢筋4组成钢筋网片,并在钢筋网片间用拉接筋10拉接,要求横向分布钢筋4两端与工字型钢2的翼缘焊接; ② The horizontally distributed steel bars 3 and the longitudinally distributed steel bars 4 are formed into steel mesh pieces, and the tension bars 10 are used to connect the steel mesh pieces, and the two ends of the horizontally distributed steel bars 4 are required to be welded to the flange of the I-shaped steel 2;
③在剪力墙片1上缘工字钢5上焊接钢筋连接套筒6和型钢连接套筒7,在剪力墙片1下缘工字钢5上焊接带锚板钢筋8; ③ Weld the steel bar connection sleeve 6 and the section steel connection sleeve 7 on the I-beam 5 at the upper edge of the shear wall piece 1, and weld the steel bar 8 with anchor plate on the I-beam 5 at the lower edge of the shear wall piece 1;
④在剪力墙片1两侧面预留好一定的保护层厚度,支模板并浇注混凝土,经标准养护后成型为预制装配式型钢混凝土剪力墙片。 ④Reserve a certain thickness of the protective layer on both sides of the shear wall piece 1, support the formwork and pour concrete, and form a prefabricated steel concrete shear wall piece after standard curing.
采用上述剪力墙片1施工预制装配式型钢混凝土剪力墙的方法,按下述步骤进行: The method for constructing a prefabricated assembled steel concrete shear wall using the above-mentioned shear wall sheet 1 is carried out according to the following steps:
A、将工厂预制的剪力墙片1运送至施工现场; A, transport the factory prefabricated shear wall piece 1 to the construction site;
B、将剪力墙片1吊装,使上层的剪力墙片1下缘带锚板钢筋8和工字型钢2预留端部,对准下层的剪力墙片1上缘预埋钢筋连接套筒6和型钢连接套筒7,然后落位,将上、下层剪力墙片1定位、支撑、固定,并在预埋钢筋连接套筒6和型钢连接套筒7中浇注高强灌浆料,待同层的剪力墙片1全部安装就位,且高强灌浆料强度达到要求后,依照施工工序在上、下剪力墙片1中间预留空间内布现浇楼板的钢筋网并支模,然后浇注现浇楼板的混凝土,待养护完成后,撤去临时支撑; B. Hoist the shear wall piece 1 so that the lower edge of the upper shear wall piece 1 is equipped with the anchor plate steel bar 8 and the reserved end of the I-shaped steel 2, and the upper edge of the lower shear wall piece 1 is aligned with the pre-embedded steel bar connection Sleeve 6 and section steel connection sleeve 7 are then placed in position, the upper and lower layer shear wall pieces 1 are positioned, supported and fixed, and high-strength grouting material is poured into pre-embedded reinforcement connection sleeve 6 and section steel connection sleeve 7, After all the shear wall pieces 1 on the same floor are installed in place, and the strength of the high-strength grouting material meets the requirements, according to the construction process, lay the reinforcement mesh of the cast-in-place floor slab in the reserved space between the upper and lower shear wall pieces 1 and set up the formwork , and then pour the concrete of the cast-in-place floor slab, and remove the temporary support after the curing is completed;
C、依次进行其他楼层预制装配式型钢混凝土剪力墙的施工,最终形成整体预制装配式型钢混凝土剪力墙。 C. Carry out the construction of prefabricated steel concrete shear walls on other floors in sequence, and finally form the overall prefabricated steel concrete shear walls.
上述实施例仅仅是对本发明作举例说明,本发明所属技术领域的技术人员可以对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,但并不会偏离本发明的精神或者超越所附权利要求书所定义的范围。 The above-described embodiments are only examples for the present invention, and those skilled in the art to which the present invention belongs can make various modifications or supplements to the described specific embodiments or replace them in similar ways, but they will not depart from the present invention. spirit or beyond the scope defined by the appended claims.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510391402.3A CN104947831A (en) | 2015-07-07 | 2015-07-07 | Prefabricated assembly type profile steel concrete shear wall and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510391402.3A CN104947831A (en) | 2015-07-07 | 2015-07-07 | Prefabricated assembly type profile steel concrete shear wall and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104947831A true CN104947831A (en) | 2015-09-30 |
Family
ID=54162844
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510391402.3A Pending CN104947831A (en) | 2015-07-07 | 2015-07-07 | Prefabricated assembly type profile steel concrete shear wall and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104947831A (en) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105297952A (en) * | 2015-10-29 | 2016-02-03 | 苏州设计研究院股份有限公司 | Prefabricated reinforced concrete shear wall |
CN105804277A (en) * | 2016-05-11 | 2016-07-27 | 重庆大学 | Profile-steel concrete shear wall with two end root areas restrained by steel sleeves |
CN106088398A (en) * | 2016-08-12 | 2016-11-09 | 陶忠 | A kind of combined wall board |
CN106760054A (en) * | 2017-03-01 | 2017-05-31 | 同济大学 | Precast reinforced concrete shear wall |
CN106836508A (en) * | 2017-01-12 | 2017-06-13 | 江苏工程职业技术学院 | A kind of prefabricated assembled board wall I-steel bolt joint construction technology |
CN106968381A (en) * | 2017-04-28 | 2017-07-21 | 广东省建科建筑设计院有限公司 | With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection |
CN106988455A (en) * | 2017-04-12 | 2017-07-28 | 山东科技大学 | Steel plate concrete shear wall scene splicing node and its construction method |
CN107023121A (en) * | 2017-04-28 | 2017-08-08 | 广东省建科建筑设计院有限公司 | A kind of reinforcing bar grout sleeve connected for prefabricated concrete structure ductility |
CN108643382A (en) * | 2018-05-18 | 2018-10-12 | 中国二十二冶集团有限公司 | The construction method that fabricated shear wall plate vertically connects |
CN108643395A (en) * | 2018-07-24 | 2018-10-12 | 华北理工大学 | A kind of prefabricated prestressing Self-resetting shear wall structure and its construction method |
CN109339245A (en) * | 2018-11-21 | 2019-02-15 | 福建工程学院 | A connection structure and construction method of prefabricated shear wall and laminated plate |
CN109440968A (en) * | 2018-12-14 | 2019-03-08 | 湖南远大建工股份有限公司 | Prefabricated panel, panel wall system and its construction method |
CN109707069A (en) * | 2018-12-14 | 2019-05-03 | 哈尔滨工业大学(深圳) | A detachable prefabricated modular shear wall based on section steel connection and its assembly method |
CN110130534A (en) * | 2019-05-24 | 2019-08-16 | 中国十七冶集团有限公司 | A kind of novel energy-consumption precast shear wall and its processing installation method |
CN112814205A (en) * | 2021-02-18 | 2021-05-18 | 海南大学 | Prefabricated assembly type shear wall and construction method thereof |
CN115354782A (en) * | 2022-08-31 | 2022-11-18 | 武汉大学 | Assembled prestressed corrugated steel plate composite shear wall and construction method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201459954U (en) * | 2009-06-05 | 2010-05-12 | 陈云 | Thermal-insulation shear wall with double-layer steel plate |
US7716887B2 (en) * | 2004-12-30 | 2010-05-18 | Weyerhaeuser Nr Company | Shear wall attachment assembly and method of use |
CN202925716U (en) * | 2012-12-06 | 2013-05-08 | 河北联合大学 | Integrally assembled type concrete filled steel tube frame shear wall |
CN103174237A (en) * | 2013-03-06 | 2013-06-26 | 北京赛博思建筑设计有限公司 | Sheet steel shear wall |
CN204212286U (en) * | 2014-11-03 | 2015-03-18 | 中建八局第一建设有限公司 | A kind of reinforced steel plate-concrete combined shear wall with ribbing |
CN104499608A (en) * | 2014-12-19 | 2015-04-08 | 江苏鼎达建筑新技术有限公司 | Method for designing and constructing prestressed section steel reinforced shear wall |
CN205024882U (en) * | 2015-07-07 | 2016-02-10 | 华北理工大学 | Prefabricated assembled shaped steel concrete shear force wall |
-
2015
- 2015-07-07 CN CN201510391402.3A patent/CN104947831A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7716887B2 (en) * | 2004-12-30 | 2010-05-18 | Weyerhaeuser Nr Company | Shear wall attachment assembly and method of use |
CN201459954U (en) * | 2009-06-05 | 2010-05-12 | 陈云 | Thermal-insulation shear wall with double-layer steel plate |
CN202925716U (en) * | 2012-12-06 | 2013-05-08 | 河北联合大学 | Integrally assembled type concrete filled steel tube frame shear wall |
CN103174237A (en) * | 2013-03-06 | 2013-06-26 | 北京赛博思建筑设计有限公司 | Sheet steel shear wall |
CN204212286U (en) * | 2014-11-03 | 2015-03-18 | 中建八局第一建设有限公司 | A kind of reinforced steel plate-concrete combined shear wall with ribbing |
CN104499608A (en) * | 2014-12-19 | 2015-04-08 | 江苏鼎达建筑新技术有限公司 | Method for designing and constructing prestressed section steel reinforced shear wall |
CN205024882U (en) * | 2015-07-07 | 2016-02-10 | 华北理工大学 | Prefabricated assembled shaped steel concrete shear force wall |
Non-Patent Citations (1)
Title |
---|
吕西林等: "截面中部配置型钢的混凝土剪力墙抗震性能研究", 《地震工程与工程振动》 * |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105297952B (en) * | 2015-10-29 | 2018-01-09 | 启迪设计集团股份有限公司 | A kind of precast reinforced concrete shear wall |
CN105297952A (en) * | 2015-10-29 | 2016-02-03 | 苏州设计研究院股份有限公司 | Prefabricated reinforced concrete shear wall |
CN105804277A (en) * | 2016-05-11 | 2016-07-27 | 重庆大学 | Profile-steel concrete shear wall with two end root areas restrained by steel sleeves |
CN106088398A (en) * | 2016-08-12 | 2016-11-09 | 陶忠 | A kind of combined wall board |
CN106836508A (en) * | 2017-01-12 | 2017-06-13 | 江苏工程职业技术学院 | A kind of prefabricated assembled board wall I-steel bolt joint construction technology |
CN106760054A (en) * | 2017-03-01 | 2017-05-31 | 同济大学 | Precast reinforced concrete shear wall |
CN106988455A (en) * | 2017-04-12 | 2017-07-28 | 山东科技大学 | Steel plate concrete shear wall scene splicing node and its construction method |
CN106988455B (en) * | 2017-04-12 | 2018-12-04 | 山东科技大学 | Splice node and its construction method in steel plate concrete shear wall scene |
CN106968381B (en) * | 2017-04-28 | 2023-09-22 | 广东省建科建筑设计院有限公司 | Prefabricated precast shear wall and composite panel joints connected by combined grouting sleeves |
CN106968381A (en) * | 2017-04-28 | 2017-07-21 | 广东省建科建筑设计院有限公司 | With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection |
CN107023121A (en) * | 2017-04-28 | 2017-08-08 | 广东省建科建筑设计院有限公司 | A kind of reinforcing bar grout sleeve connected for prefabricated concrete structure ductility |
CN108643382A (en) * | 2018-05-18 | 2018-10-12 | 中国二十二冶集团有限公司 | The construction method that fabricated shear wall plate vertically connects |
CN108643395A (en) * | 2018-07-24 | 2018-10-12 | 华北理工大学 | A kind of prefabricated prestressing Self-resetting shear wall structure and its construction method |
CN108643395B (en) * | 2018-07-24 | 2023-05-26 | 华北理工大学 | Prefabricated assembly type prestress self-resetting shear wall structure and construction method thereof |
CN109339245A (en) * | 2018-11-21 | 2019-02-15 | 福建工程学院 | A connection structure and construction method of prefabricated shear wall and laminated plate |
CN109339245B (en) * | 2018-11-21 | 2024-06-07 | 福建工程学院 | Prefabricated shear wall and superimposed sheet connection structure and construction method |
CN109440968A (en) * | 2018-12-14 | 2019-03-08 | 湖南远大建工股份有限公司 | Prefabricated panel, panel wall system and its construction method |
CN109707069A (en) * | 2018-12-14 | 2019-05-03 | 哈尔滨工业大学(深圳) | A detachable prefabricated modular shear wall based on section steel connection and its assembly method |
CN109707069B (en) * | 2018-12-14 | 2020-07-17 | 哈尔滨工业大学(深圳) | A detachable prefabricated modular shear wall based on section steel connection and its assembly method |
CN110130534A (en) * | 2019-05-24 | 2019-08-16 | 中国十七冶集团有限公司 | A kind of novel energy-consumption precast shear wall and its processing installation method |
CN112814205A (en) * | 2021-02-18 | 2021-05-18 | 海南大学 | Prefabricated assembly type shear wall and construction method thereof |
CN115354782A (en) * | 2022-08-31 | 2022-11-18 | 武汉大学 | Assembled prestressed corrugated steel plate composite shear wall and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104947831A (en) | Prefabricated assembly type profile steel concrete shear wall and construction method thereof | |
CN205024882U (en) | Prefabricated assembled shaped steel concrete shear force wall | |
CN107989231A (en) | A kind of Prefabricated concrete-filled steel tube frame-shear wall and its construction method | |
CN105484142B (en) | A kind of pin-connected panel precast segment concrete hollow slab beam structure and preparation method thereof | |
CN106481023B (en) | Prefabricated steel-concrete composite beam structure and its implementation method | |
CN104727441A (en) | Prestress assembled concrete beam column joint structure and construction method thereof | |
CN202925716U (en) | Integrally assembled type concrete filled steel tube frame shear wall | |
CN108518003A (en) | Detachable prefabricated assembled steel-concrete composite beam plate | |
CN103031926B (en) | With the double-T compound beam and preparation method thereof of pre-stressed steel pipe concrete plug | |
CN106193292A (en) | A kind of steel frame assembled integral reinforced concrete shear wall structure system | |
CN106567458A (en) | Assembly type steel-concrete combined beam column frame structure system | |
CN102454239A (en) | Precast slab construction member | |
CN104179249A (en) | Assembled composite-structure earthquake-resistant wall and assembly method thereof | |
CN202990170U (en) | Shear wall structure collocating cross oblique internal prestress | |
CN110005109A (en) | A kind of open flume type prestressed concrete overlapped slab | |
CN113863532A (en) | Vertical connecting node of concrete shear wall and manufacturing and mounting method thereof | |
CN201133085Y (en) | Structure for enhancing external prestressing force effect | |
CN110748043B (en) | A fully steel assembled double-legged steel tube-constrained buckling-resistance steel plate shear wall | |
CN219219334U (en) | Prefabricated assembled ultra-high performance concrete T type roof beam | |
CN103046692B (en) | Frame-supporting column with high strength steel bars and super high strength concrete | |
CN105735099B (en) | Construction time uses the simple supported-to-continuous girder bridge and its construction method of external prestressing | |
CN108643395B (en) | Prefabricated assembly type prestress self-resetting shear wall structure and construction method thereof | |
CN115680159A (en) | Prefabricated lattice type steel reinforced concrete combined shear wall structural system | |
CN103924735A (en) | Batten plate constraint type confined concrete column with cross steel bone with flanges and fabrication method of column | |
CN205804324U (en) | A kind of Prefabricated pre-tensioned prestressed underground continuous wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150930 |
|
RJ01 | Rejection of invention patent application after publication |