CN105569264A - Double-faced superposed beam and construction method thereof - Google Patents

Double-faced superposed beam and construction method thereof Download PDF

Info

Publication number
CN105569264A
CN105569264A CN201610100585.3A CN201610100585A CN105569264A CN 105569264 A CN105569264 A CN 105569264A CN 201610100585 A CN201610100585 A CN 201610100585A CN 105569264 A CN105569264 A CN 105569264A
Authority
CN
China
Prior art keywords
precast concrete
sided superposed
superposed beam
concrete plank
stirrup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610100585.3A
Other languages
Chinese (zh)
Other versions
CN105569264B (en
Inventor
刘家文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Zhongsheng Green Building Industry Development Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610100585.3A priority Critical patent/CN105569264B/en
Publication of CN105569264A publication Critical patent/CN105569264A/en
Application granted granted Critical
Publication of CN105569264B publication Critical patent/CN105569264B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention relates to a double-faced superposed beam and a construction method thereof. At the present stage, the state energetically develops housing industrialization, but in an existing prefabricated building mode, a prefabricated beam is limited by the beam length, a production environment, transportation and installation conditions and the like. The double-faced superposed beam comprises a steel bar framework (6) and prefabricated concrete slabs (1), the prefabricated concrete slabs are poured on the two vertical sides of the steel bar framework, the steel bar framework comprises truss bars (4), a set of beam stirrups (2) are installed in the truss bars, the two vertical sides of the one set of beam stirrups are fixed with the truss bars, the two vertical sides of the one set of beam stirrups are fixed with a set of constructional steel bars (3), beam main bars (5) are arranged at the circular arc positions of four corners of the one set of beam stirrups in a penetrating mode respectively, and the inner sides of the prefabricated concrete slabs are provided with smoothly-reduced cross sections.

Description

Two-sided superposed beam and construction method thereof
technical field:
the present invention relates to a kind of two-sided superposed beam and construction method thereof.
background technology:
present stage, country greatly develops housing industrialization, but in existing pre-cast building mode, precast beam is by restrictions such as beam length, production environment, transport and mounting conditions.Cause beam prefabricate, beam main tendon is embedded in precast concrete, and position is fixing can not rotate, and causes traditional beam main tendon connected mode not use, method of attachment is few, and connect difficulty, quality of connection not easily ensures, link position needs to stay to establish ater-casting, complex procedures, the development of restriction housing industrialization.
summary of the invention:
the object of this invention is to provide a kind of two-sided superposed beam and construction method thereof.
above-mentioned object is realized by following technical scheme:
a kind of two-sided superposed beam, its composition comprises: cage of reinforcement, precast concrete plank, described precast concrete plank is built in the vertical both sides of described cage of reinforcement, described cage of reinforcement comprises girder rib, one group of beam stirrup is installed in described girder rib, beam stirrup both sides vertical edge described in one group and described girder rib are fixed, beam stirrup both sides vertical edge described in one group and a set constructor reinforcing bar are fixed, beam stirrup foursquare arc position described in one group is installed with beam main tendon respectively, has the cross section of level and smooth reduction inside described precast concrete plank.
described two-sided superposed beam, be arranged in parallel between beam stirrup described in one group, described beam stirrup is that the closed circular that connects of butt welding or end are bent into the form of 135 degree of crotches, it is U-shaped that described crotch forms closed circular or forms that one is long and the other is short, and the precast concrete plank surface that described two-sided superposed beam is used for outdoor side arranges insulation layer or arranges insulation layer and decorative layer simultaneously.
a construction method for two-sided superposed beam, the method comprises the steps:
first be according to the actual use location of two-sided superposed beam, be that installing space reserved by floor on precast concrete plank top, both sides or bottom, the described two-sided superposed beam precast concrete plank surface be used for described in outdoor side is arranged insulation layer or arranges insulation layer and decorative layer simultaneously, after as requested two-sided superposed beam being completed, be transported to job site, reach mounting condition, support is set, fixing bed die, lift two-sided superposed beam, adjust its position and absolute altitude, colligation beam main tendon, after described beam main tendon colligation completes, described beam stirrup is bent into closed circular, described beam main tendon is connected by butt welding, tie up bar to be welded to connect, the mode connecting lengths such as overlap joint connection and mechanical connection, after floor installation, the sealing gap, position such as precast concrete plank and bottom template, build, vibrated concrete maintenance, complete the construction of two-sided superposed beam.
beneficial effect:
1. the present invention is a kind of two-sided superposed beam, beam reinforcement cages is made up of beam stirrup, distributing bar and girder rib, described beam reinforcement cages both sides are precast concrete plank, there is inside described precast concrete plank the cross section of level and smooth reduction, cross section after reduction does not affect the colligation of beam main tendon, without the need to installing beam two side template during concreting, saves consumptive material, cost-saving, the reduction of erection time.
beam stirrup of the present invention is the form that end is bent into 135 degree of crotches, it is U-shaped to form that one is long and the other is short, beam hooping structure form described in two kinds, it is U-shaped that beam stirrup is that one is long and the other is short, after beam main tendon colligation completes, be bent into closed ring-type, the beam main tendon after bending forming can be made directly to penetrate in two-sided superposed beam, the inconvenience bent again after saving colligation.
girder rib section of the present invention is right-angled triangle, article one, bottom level right angle limit and beam stirrup, minor face and two sides form statically determinate structrue, described girder rib section is triangle, intensity can ensure that beam reinforcement cages is stablized, and stacks and lifts indeformable, due to the existence of girder rib, make the statically determinate structrue that two-sided superimposed beam reinforcement cages is formed, not yielding, can ensure that product is in transport and the stability of hoisting process, the beam section size after guarantee survives.
the precast concrete plank surface that two-sided superposed beam of the present invention is used for outdoor side can arrange insulation layer or arrange insulation layer and decorative layer simultaneously, after two-sided superposed beam completes, be transported to job site, mounting condition to be achieved, support is set, fixing bed die, lift two-sided superposed beam, adjust its position and absolute altitude, colligation beam main tendon, beam main tendon is connected by butt welding, tie up bar to be welded to connect, the mode spreadings such as overlap joint connection and mechanical connection, after floor installation, the sealing gap, position such as precast concrete plank and bottom template, build, vibrated concrete maintenance, complete the construction of two-sided superposed beam, can realize once surviving, reduce operation.
the invention solves nine-squares beam and primary-secondary beam intersection can not the difficult problem of precast assembly, and colligation after Nodes beam main tendon, ensures node security.
be cavity in the middle of the precast concrete plank of both sides of the present invention, beam main tendon can after prefabricated units installation, penetrate and colligation, the modes such as beam main tendon can utilize traditional reinforcement welding to connect, overlap joint connection, straight screw sleeve connection, taper thread sleeve connection, compression sleeve connection, beam main tendon colligation is convenient, and quality of connection easily ensures.
two-sided superposed beam inside of the present invention is cast-in-situ concrete, and form T-type structure with plate cast-in-place concrete, overall performance is strong.
two-sided superposed beam of the present invention, can according to the Specific construction situation of two-sided superposed beam, precast concrete plank lower inside or upper design are become the cross section of level and smooth reduction, also can be turned upside down in the cross section of the level and smooth reduction inside precast concrete plank placement, to solve the problem that precast beam falls plate node and above returns girder connection difficult treatment.
accompanying drawing illustrates:
accompanying drawing 1 is structural representation of the present invention.
accompanying drawing 2 is structural representations of cage of reinforcement in accompanying drawing 1.
accompanying drawing 3 is structural representations of girder rib in accompanying drawing 1.
accompanying drawing 4 is A direction view of accompanying drawing 1.
accompanying drawing 5 is crotches of beam stirrup of the present invention is U-shaped structural representations that one is long and the other is short.
accompanying drawing 6 is structural representations of cage of reinforcement in accompanying drawing 5.
accompanying drawing 7 is A direction view of accompanying drawing 5.
accompanying drawing 8 is structural representations of spreading after beam prefabricate of the present invention.
accompanying drawing 9 is nine-squares beam splicing structure schematic diagrames of the present invention.
accompanying drawing 10 is Vierendeel girder mounting structure schematic diagrames of the present invention.
accompanying drawing 11 is primary-secondary beam crossed node splicing structure schematic diagrames one of the present invention.
accompanying drawing 12 is primary-secondary beam crossed node splicing structure schematic diagrames two of the present invention.
accompanying drawing 13 is that plate node splicing structure schematic diagram falls in beam position of the present invention.
accompanying drawing 14 be of the present invention on return girder connection splicing structure schematic diagram.
detailed description of the invention:
embodiment 1:
a kind of two-sided superposed beam, its composition comprises: cage of reinforcement 6, precast concrete plank 1, described precast concrete plank is built in the vertical both sides of described cage of reinforcement, described cage of reinforcement comprises girder rib 4, one group of beam stirrup 2 is installed in described girder rib, beam stirrup both sides vertical edge described in one group and described girder rib are fixed, beam stirrup both sides vertical edge described in one group and a set constructor reinforcing bar 3 are fixed, beam stirrup foursquare arc position described in one group is installed with beam main tendon 5 respectively, has the cross section of level and smooth reduction inside described precast concrete plank.
embodiment 2:
two-sided superposed beam described in embodiment 1, be arranged in parallel between beam stirrup described in one group, described beam stirrup is that the closed circular that connects of butt welding or end are bent into the form of 135 degree of crotches, it is U-shaped that described crotch forms closed circular or forms that one is long and the other is short, and the precast concrete plank surface that described two-sided superposed beam is used for outdoor side arranges insulation layer or arranges insulation layer and decorative layer simultaneously.
embodiment 3:
a kind of construction method of two-sided superposed beam, first this method is according to the actual use location of two-sided superposed beam, be that installing space reserved by floor on precast concrete plank top, both sides or bottom, the described two-sided superposed beam precast concrete plank surface be used for described in outdoor side is arranged insulation layer or arranges insulation layer and decorative layer simultaneously, after as requested two-sided superposed beam being completed, be transported to job site, reach mounting condition, support is set, fixing bed die, lift two-sided superposed beam, adjust its position and absolute altitude, colligation beam main tendon, after described beam main tendon colligation completes, described beam stirrup is bent into closed circular, described beam main tendon is connected by butt welding, tie up bar to be welded to connect, the mode connecting lengths such as overlap joint connection and mechanical connection, after floor installation, the sealing gap, position such as precast concrete plank and bottom template, build, vibrated concrete maintenance, complete the construction of two-sided superposed beam,
described two-sided superposed beam is in work progress, precast concrete plank lower inside or inside upper part are all designed to the cross section of level and smooth reduction, also can be turned upside down in the cross section of the level and smooth reduction inside precast concrete plank placement, this set solves the problem that precast beam falls plate node and above returns girder connection difficult treatment.

Claims (3)

1. a two-sided superposed beam, its composition comprises: cage of reinforcement, precast concrete plank, it is characterized in that: described precast concrete plank is built in the vertical both sides of described cage of reinforcement, described cage of reinforcement comprises girder rib, one group of beam stirrup is installed in described girder rib, beam stirrup both sides vertical edge described in one group and described girder rib are fixed, beam stirrup both sides vertical edge described in one group and a set constructor reinforcing bar are fixed, beam stirrup foursquare arc position described in one group is installed with beam main tendon respectively, has the cross section of level and smooth reduction inside described precast concrete plank.
2. two-sided superposed beam according to claim 1, it is characterized in that: be arranged in parallel between the beam stirrup described in a group, described beam stirrup is that the closed circular that connects of butt welding or end are bent into the form of 135 degree of crotches, it is U-shaped that described crotch forms closed circular or forms that one is long and the other is short, and the precast concrete plank surface that described two-sided superposed beam is used for outdoor side arranges insulation layer or arranges insulation layer and decorative layer simultaneously.
3. a construction method for the two-sided superposed beam utilizing one of claim 1-2 described, is characterized in that: the method comprises the steps:
First be according to the actual use location of two-sided superposed beam, be that installing space reserved by floor on precast concrete plank top, both sides or bottom, the described two-sided superposed beam precast concrete plank surface be used for described in outdoor side is arranged insulation layer or arranges insulation layer and decorative layer simultaneously, after as requested two-sided superposed beam being completed, be transported to job site, reach mounting condition, support is set, fixing bed die, lift two-sided superposed beam, adjust its position and absolute altitude, colligation beam main tendon, after described beam main tendon colligation completes, described beam stirrup is bent into closed circular, described beam main tendon is connected by butt welding, tie up bar to be welded to connect, the mode connecting lengths such as overlap joint connection and mechanical connection, after floor installation, the sealing gap, position such as precast concrete plank and bottom template, build, vibrated concrete maintenance, complete the construction of two-sided superposed beam.
CN201610100585.3A 2016-02-24 2016-02-24 Two-sided composite beam and its construction method Active CN105569264B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610100585.3A CN105569264B (en) 2016-02-24 2016-02-24 Two-sided composite beam and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610100585.3A CN105569264B (en) 2016-02-24 2016-02-24 Two-sided composite beam and its construction method

Publications (2)

Publication Number Publication Date
CN105569264A true CN105569264A (en) 2016-05-11
CN105569264B CN105569264B (en) 2019-11-08

Family

ID=55879835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610100585.3A Active CN105569264B (en) 2016-02-24 2016-02-24 Two-sided composite beam and its construction method

Country Status (1)

Country Link
CN (1) CN105569264B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107143076A (en) * 2017-07-04 2017-09-08 上海宝悦房地产开发有限公司 A kind of Prefabricated stacking floor with side flanging and its construction method for being used to drop plate region
CN107152112A (en) * 2017-07-04 2017-09-12 上海宝岳住宅工业有限公司 A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region
CN107268888A (en) * 2017-07-31 2017-10-20 中民筑友建筑科技(昆山)有限公司 A kind of precast beam structure
CN108049572A (en) * 2018-01-25 2018-05-18 万保金 Prefabricated composite beam shell
CN109518858A (en) * 2019-01-03 2019-03-26 中国建筑第五工程局有限公司 Fabricated Beam-Slab connection structure and its construction method
CN110792207A (en) * 2019-12-06 2020-02-14 安微省建筑设计研究总院股份有限公司 Prefabricated partition wall top node of self-heat-preservation beam-free formwork and construction method of prefabricated partition wall top node
CN112983465A (en) * 2021-03-16 2021-06-18 中铁第四勘察设计院集团有限公司 Fully-prefabricated internal structure of shield tunnel and construction method
CN113123527A (en) * 2021-04-20 2021-07-16 黄均贤 Concrete beam skeleton structure and manufacturing method of concrete beam
CN113309290A (en) * 2020-02-27 2021-08-27 南京绿色增材智造研究院有限公司 Novel 3D prints coincide roof beam system
CN114045750A (en) * 2021-11-10 2022-02-15 中冶交通建设集团有限公司 Construction method of high pier column tie beam
CN114059712A (en) * 2021-10-19 2022-02-18 山东艾科福建筑科技有限公司 Precast beam, superposed beam and building structure
CN114718245A (en) * 2022-04-22 2022-07-08 华南理工大学 Recycled block/aggregate concrete prefabricated superposed beam and construction method thereof
CN115288433A (en) * 2022-08-25 2022-11-04 中国能源建设集团陕西省电力设计院有限公司 Self-bearing type reinforced concrete beam template arrangement mode with built-in angle steel bar trusses
CN115596151A (en) * 2022-10-26 2023-01-13 中建五局第三建设有限公司(Cn) An assembled membrane beam composite structure
CN117266190A (en) * 2022-06-15 2023-12-22 杭州悦为科技有限公司 Prefabricated assembly type overlapped lattice beam ecological slope protection structure and construction method
CN119663990A (en) * 2025-02-20 2025-03-21 上海结奕建筑科技有限公司 Modularized combined reinforced concrete building unit and production method and installation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101424114A (en) * 2008-12-12 2009-05-06 北京工业大学 Layering stacking beam of general concrete and regeneration concrete and method for producing the same
CN201738443U (en) * 2010-05-29 2011-02-09 中山市快而居房屋预制件有限公司 Prefabricated concrete double-overlapping beam
CN203270890U (en) * 2013-04-27 2013-11-06 杨众 Heavy-load superposed overhead terrace
CN103498524A (en) * 2013-10-15 2014-01-08 南京工业大学 Superimposed plate/beam with enhanced steel bar truss and support connecting method thereof
CN204356996U (en) * 2014-12-05 2015-05-27 西安建筑科技大学 The U-shaped beam of prefabricated reinforced concrete with horizontal steel diaphragm
CN205369709U (en) * 2016-02-24 2016-07-06 刘家文 Two -sided composite beam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101424114A (en) * 2008-12-12 2009-05-06 北京工业大学 Layering stacking beam of general concrete and regeneration concrete and method for producing the same
CN201738443U (en) * 2010-05-29 2011-02-09 中山市快而居房屋预制件有限公司 Prefabricated concrete double-overlapping beam
CN203270890U (en) * 2013-04-27 2013-11-06 杨众 Heavy-load superposed overhead terrace
CN103498524A (en) * 2013-10-15 2014-01-08 南京工业大学 Superimposed plate/beam with enhanced steel bar truss and support connecting method thereof
CN204356996U (en) * 2014-12-05 2015-05-27 西安建筑科技大学 The U-shaped beam of prefabricated reinforced concrete with horizontal steel diaphragm
CN205369709U (en) * 2016-02-24 2016-07-06 刘家文 Two -sided composite beam

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152112A (en) * 2017-07-04 2017-09-12 上海宝岳住宅工业有限公司 A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region
CN107143076A (en) * 2017-07-04 2017-09-08 上海宝悦房地产开发有限公司 A kind of Prefabricated stacking floor with side flanging and its construction method for being used to drop plate region
CN107268888A (en) * 2017-07-31 2017-10-20 中民筑友建筑科技(昆山)有限公司 A kind of precast beam structure
CN108049572A (en) * 2018-01-25 2018-05-18 万保金 Prefabricated composite beam shell
CN109518858B (en) * 2019-01-03 2024-04-09 中国建筑第五工程局有限公司 Assembled beam plate connecting structure and construction method thereof
CN109518858A (en) * 2019-01-03 2019-03-26 中国建筑第五工程局有限公司 Fabricated Beam-Slab connection structure and its construction method
CN110792207A (en) * 2019-12-06 2020-02-14 安微省建筑设计研究总院股份有限公司 Prefabricated partition wall top node of self-heat-preservation beam-free formwork and construction method of prefabricated partition wall top node
CN113309290A (en) * 2020-02-27 2021-08-27 南京绿色增材智造研究院有限公司 Novel 3D prints coincide roof beam system
CN112983465A (en) * 2021-03-16 2021-06-18 中铁第四勘察设计院集团有限公司 Fully-prefabricated internal structure of shield tunnel and construction method
CN112983465B (en) * 2021-03-16 2024-11-12 中铁第四勘察设计院集团有限公司 A fully prefabricated internal structure of a shield tunnel and a construction method thereof
CN113123527A (en) * 2021-04-20 2021-07-16 黄均贤 Concrete beam skeleton structure and manufacturing method of concrete beam
CN114059712A (en) * 2021-10-19 2022-02-18 山东艾科福建筑科技有限公司 Precast beam, superposed beam and building structure
CN114045750B (en) * 2021-11-10 2023-11-28 中冶交通建设集团有限公司 Construction method of high pier column tie beam
CN114045750A (en) * 2021-11-10 2022-02-15 中冶交通建设集团有限公司 Construction method of high pier column tie beam
CN114718245B (en) * 2022-04-22 2023-11-10 华南理工大学 A kind of recycled block/aggregate concrete prefabricated composite beam and its construction method
CN114718245A (en) * 2022-04-22 2022-07-08 华南理工大学 Recycled block/aggregate concrete prefabricated superposed beam and construction method thereof
CN117266190A (en) * 2022-06-15 2023-12-22 杭州悦为科技有限公司 Prefabricated assembly type overlapped lattice beam ecological slope protection structure and construction method
CN115288433A (en) * 2022-08-25 2022-11-04 中国能源建设集团陕西省电力设计院有限公司 Self-bearing type reinforced concrete beam template arrangement mode with built-in angle steel bar trusses
CN115596151A (en) * 2022-10-26 2023-01-13 中建五局第三建设有限公司(Cn) An assembled membrane beam composite structure
CN119663990A (en) * 2025-02-20 2025-03-21 上海结奕建筑科技有限公司 Modularized combined reinforced concrete building unit and production method and installation method thereof

Also Published As

Publication number Publication date
CN105569264B (en) 2019-11-08

Similar Documents

Publication Publication Date Title
CN105569264A (en) Double-faced superposed beam and construction method thereof
CN105649360A (en) Integral assembling type building system and installing method
CN104594561A (en) Prefabricated reinforced concrete column with high-performance concrete frame and construction method
CN108360712A (en) A kind of assembled steel reinforced concrete shear force wall and its construction method
CN106193623B (en) A kind of prefabricated concrete structure construction method
CN108571071A (en) Prefabricated PC beams of concrete column connected node and construction method
CN107476470A (en) Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method
CN105256713A (en) Semi-assembly type steel concrete composite beam and construction method thereof
CN108867860A (en) A kind of precast reinforced concrete beam plate body system and prefabricated rod structure entirety assembling constructing method
CN108589982A (en) A kind of assembled composite wall structure and its construction method being welded to connect indirectly based on reinforcing bar
CN108252407A (en) A building with prefabricated reinforced concrete supports
CN107905424A (en) Full prefabricated band splicing groove unidirectional harden structure, making and assembly method
CN110241915A (en) An integral connection node of prefabricated concrete beam-column L-shaped reinforcement and its application method
CN206189590U (en) Full precast prestressed assembly structure
CN115434425A (en) Lattice type steel reinforced concrete prefabricated beam column joint and method
CN203905214U (en) Assembled type blend coupled wall system
CN113898102A (en) A ribbed concrete laminate
CN105040823A (en) Partition plate and floor beam connecting structure for scissors staircase and construction method of partition plate and floor beam connecting structure
CN205153530U (en) Structure is assembled to integral template of reinforced concrete floor
CN205369709U (en) Two -sided composite beam
CN104047381B (en) Assembled integral rare-reinforcement concrete shear wall structure
CN108571065A (en) The assembled steel tendon concrete frame structure of connector is connected to based on steel plate
CN207110035U (en) Assembled steel tendon concrete frame structure based on steel plate connection joint
CN217461119U (en) A prefabricated panel with a concrete rib truss
CN216276374U (en) Ribbed concrete laminated slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191129

Address after: 150000 business service, no.6, building S3, wutongwan community, Shiji Road North, Tianjin Street West, Limin Development Zone, Harbin City, Heilongjiang Province

Patentee after: Zhonghong Shengyuan (Heilongjiang) Green Building Industry Co., Ltd

Address before: 102, room 1, unit 39, block Tree Street, Nangang District, Heilongjiang, Harbin, 150000

Patentee before: Liu Jiawen

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 150000 business service, no.6, building S3, wutongwan community, Shiji Road North, Tianjin Street West, Limin Development Zone, Harbin City, Heilongjiang Province

Patentee after: Heilongjiang Zhongsheng Green Building Industry Development Co., Ltd

Address before: 150000 business service, no.6, building S3, wutongwan community, Shiji Road North, Tianjin Street West, Limin Development Zone, Harbin City, Heilongjiang Province

Patentee before: Zhonghong Shengyuan (Heilongjiang) Green Building Industry Co., Ltd

CP01 Change in the name or title of a patent holder