CN104947692B - Raised path through fields bank protection remodeling method - Google Patents

Raised path through fields bank protection remodeling method Download PDF

Info

Publication number
CN104947692B
CN104947692B CN201510094496.8A CN201510094496A CN104947692B CN 104947692 B CN104947692 B CN 104947692B CN 201510094496 A CN201510094496 A CN 201510094496A CN 104947692 B CN104947692 B CN 104947692B
Authority
CN
China
Prior art keywords
fields
raised path
bank protection
earth
bank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510094496.8A
Other languages
Chinese (zh)
Other versions
CN104947692A (en
Inventor
杨朝现
王琳
魏朝富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest University
Original Assignee
Southwest University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest University filed Critical Southwest University
Priority to CN201510094496.8A priority Critical patent/CN104947692B/en
Publication of CN104947692A publication Critical patent/CN104947692A/en
Application granted granted Critical
Publication of CN104947692B publication Critical patent/CN104947692B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of raised path through fields bank protection remodeling method provided by the invention, methods described comprise the following steps:B. slope trimming:The side slope of the target raised path through fields of transformation is repaired, the surface of the side slope of the plain raised path through fields;C. the low bank of earth between fields is built:The low bank of earth between fields is filled using the raw-soil without debris, and compaction in layers is carried out to the low bank of earth between fields;D. foundation trench is excavated:Excavate foundation trench in side slope lower edge, and to foundation trench bottom, side slope is crippled and the domatic smooth compacting of carry out of the toe wall place of building loosening;E. toe wall is built by laying bricks or stones:Toe wall is built by laying bricks or stones using paving slurry processes;F. revetment brick is laid:I-shaped interlocking bank protection brick is laid on the bank protection of the target raised path through fields of transformation;G. after revetment brick laying, perforate and gap to revetment brick carry out soil backfill;It after the construction of raised path through fields bank protection is completed, can will not change the ecological balance of transformation target area local microenvironment, beneficial to the growth being used as, and the structural strength of bank protection can be ensured, reduce construction costs and difficulty of construction.

Description

Raised path through fields bank protection remodeling method
Technical field
The present invention relates to a kind of land reclamation method, more particularly to a kind of raised path through fields bank protection remodeling method.
Background technology
At present in land leveling project, the bank protection construction for the raised path through fields typically uses laid dry or cemented rock, the rectangular slab of stone Etc., the raised path through fields bank protection built up in this way has larger negative effect, such as isolation to environment and ecoscape Mutual UNICOM between the biology of upper and lower field part and microorganism, the ecological balance of the regional area of transformation target is destroyed, no Beneficial to the growth of crop, and construction costs is high, and difficulty of construction is big.
It is, therefore, desirable to provide a kind of new raised path through fields bank protection remodeling method, can be after the construction of raised path through fields bank protection be completed, no The ecological balance of transformation target area local microenvironment can be changed, beneficial to the growth being used as, and the structure of bank protection can be ensured Intensity, reduce construction costs and difficulty of construction.
The content of the invention
In view of this, a kind of raised path through fields bank protection remodeling method provided by the invention, can complete raised path through fields bank protection construction it Afterwards, the ecological balance of transformation target area local microenvironment will not be changed, beneficial to the growth being used as, and bank protection can be ensured Structural strength, reduce construction costs and difficulty of construction.
A kind of raised path through fields bank protection remodeling method provided by the invention, methods described comprise the following steps:
B. slope trimming:The side slope of the target raised path through fields of transformation is repaired, the surface of the side slope of the plain raised path through fields;
C. the low bank of earth between fields is built:The low bank of earth between fields is filled using the raw-soil without debris, and compaction in layers is carried out to the low bank of earth between fields;
D. foundation trench is excavated:Excavate foundation trench in side slope lower edge, and to foundation trench bottom, side slope is crippled and the loosening of the toe wall place of building The domatic smooth compacting of carry out;
E. toe wall is built by laying bricks or stones:Toe wall is built by laying bricks or stones using paving slurry processes;
F. revetment brick is laid:I-shaped interlocking bank protection brick is laid on the bank protection of the target raised path through fields of transformation;
G. after revetment brick laying, perforate and gap to revetment brick carry out soil backfill.
Further, before step b, in addition to step a:The construction line-putting:Carried out according to the design of the target raised path through fields of transformation The construction line-putting, unwrapping wire include:Slope excavating line, foundation trench excavation line and build low bank of earth between fields line.
Further, in stepb, construction site is cleared up before slope trimming, side slope surface is removed and the low bank of earth between fields builds area Weeds, the debris such as tree root, and repaired according to the side slope of setting than excavating, to cavity and recess fill compaction.
Further, in step c, before building the low bank of earth between fields, the thorough cleaning low bank of earth between fields builds bubble soil, afrodite, weeds and the tree in area Root is until expose hard substratum.
Further, in step c, when being filled to the low bank of earth between fields, each layer of thickness is 18-23cm, each after compacting The thickness of layer is 14-16cm, and compactness is more than 90%.
Further, in step e, toe wall is built by laying bricks or stones by following paving slurry processes:M7.5 cement bonded sands are laid in the bottom land of foundation trench The screed-coat of slurry, using shale brick masonry toe wall, and first row shale brick uses header, and second row shale brick uses facing bond.
Beneficial effects of the present invention:The present invention raised path through fields bank protection remodeling method, can complete raised path through fields bank protection construction it Afterwards, the ecological balance of transformation target area local microenvironment will not be changed, beneficial to the growth being used as, and bank protection can be ensured Structural strength, reduce construction costs and difficulty of construction.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is the flow chart of the present invention.
Fig. 2 is the protective slope structure schematic diagram of the present invention.
Embodiment
Fig. 1 is the flow chart of the present invention, and Fig. 2 is the protective slope structure schematic diagram of the present invention, as illustrated, provided by the invention A kind of raised path through fields bank protection remodeling method, methods described comprise the following steps:
B. slope trimming:The side slope of the target raised path through fields of transformation is repaired, the surface of the side slope of the plain raised path through fields;
C. the low bank of earth between fields is built:The low bank of earth between fields is filled using the raw-soil without debris, and compaction in layers is carried out to the low bank of earth between fields;
D. foundation trench is excavated:Excavate foundation trench in side slope lower edge, and to foundation trench bottom, side slope is crippled and the loosening of the toe wall place of building The domatic smooth compacting of carry out, and when foundation trench excavates, do not transport the soil of excavation, but pile up on the spot, wait revetment brick Laying carries out soil backfill after finishing;
E. toe wall is built by laying bricks or stones:Toe wall is built by laying bricks or stones using paving slurry processes;
F. revetment brick is laid:I-shaped interlocking bank protection brick is laid on the bank protection of the target raised path through fields of transformation, wherein, revetment brick It is more than 20% I-shaped interlocking bank protection brick using perforate degree, the amount of soil after soil backfill can be ensured, is subsequently in bank protection Vegetation is planted to keep transforming the ecological balance of the subenvironment in region, strengthens the intensity of bank protection, and beneficial to the growth of crop, and And I-shaped interlocking bank protection brick selects long 404mm, the revetment brick that wide 303mm and thickness are 100mm is most advisable, beneficial to laying, Strong adaptability, cutting can be reduced under the conditions of different bank protections, so as to save material;
G. after revetment brick laying, perforate and gap to revetment brick carry out soil backfill, after backfilling soil, Neng Gou Vegetation is planted on bank protection, keeps the ecological balance of the subenvironment in transformation region, strengthens the intensity of bank protection, and beneficial to the life of crop It is long.
In the present embodiment, before step b, in addition to step a:The construction line-putting:According to the design of the target raised path through fields of transformation The construction line-putting is carried out, unwrapping wire includes:Slope excavating line, foundation trench excavation line and build low bank of earth between fields line.
In the present embodiment, in stepb, construction site is cleared up before slope trimming, remove side slope surface and the low bank of earth between fields is repaiied The debris such as weeds, the tree root in area are built, and are repaired according to the side slope of setting than excavating, to cavity and recess fill compaction, side After the finishing of slope, the surfacing of side slope should be made closely knit, and ensured after being compacted without depression and surface loose phenomenon, so that it is guaranteed that Construction quality.
In the present embodiment, in step c, before building the low bank of earth between fields, the thorough cleaning low bank of earth between fields build the bubble soil in area, afrodite, weeds with And tree root avoids influence of the above-mentioned debris to construction quality, it is ensured that improved construction quality up to exposing hard substratum.
In the present embodiment, in step c, when being filled to the low bank of earth between fields, each layer of thickness is 18-23cm, after compacting Each layer of thickness is 14-16cm, and compactness is more than 90%, it is ensured that construction quality.
In the present embodiment, in step e, toe wall is built by laying bricks or stones by following paving slurry processes:M7.5 water is laid in the bottom land of foundation trench The screed-coat of cement mortar, using shale brick masonry toe wall, and first row shale brick uses header, and second row shale brick is using suitable Build, revetment brick should be brought into close contact with domatic.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with The present invention is described in detail good embodiment, it will be understood by those within the art that, can be to the skill of the present invention Art scheme is modified or equivalent substitution, and without departing from the objective and scope of technical solution of the present invention, it all should cover at this Among the right of invention.

Claims (4)

  1. A kind of 1. raised path through fields bank protection remodeling method, it is characterised in that:Methods described comprises the following steps:
    B. slope trimming:The side slope of the target raised path through fields of transformation is repaired, the surface of the side slope of the plain raised path through fields;
    C. the low bank of earth between fields is built:The low bank of earth between fields is filled using the raw-soil without debris, and compaction in layers is carried out to the low bank of earth between fields;
    D. foundation trench is excavated:Excavate foundation trench in side slope lower edge, and to foundation trench bottom, side slope is crippled and the slope of the toe wall place of building loosening Face carries out smooth compacting;
    E. toe wall is built by laying bricks or stones:Toe wall is built by laying bricks or stones using paving slurry processes;
    F. revetment brick is laid:I-shaped interlocking bank protection brick is laid on the bank protection of the target raised path through fields of transformation;
    G. after revetment brick laying, perforate and gap to revetment brick carry out soil backfill;Wherein, revetment brick uses perforate degree I-shaped interlocking bank protection brick more than 20%, I-shaped interlocking bank protection brick select long 404mm, and wide 303mm and thickness are 100mm Revetment brick;
    Before building the low bank of earth between fields, the thorough cleaning low bank of earth between fields builds bubble soil, afrodite, weeds and the tree root in area until exposing hard subsoil Layer;
    In step c, when being filled to the low bank of earth between fields, each layer of thickness is 18-23cm, and each layer of thickness is after compacting 14-16cm, and compactness is more than 90%.
  2. 2. raised path through fields bank protection remodeling method according to claim 1, it is characterised in that:Before step b, in addition to step a:Apply Work unwrapping wire:The construction line-putting is carried out according to the design of the target raised path through fields of transformation, unwrapping wire includes:Slope excavating line, foundation trench excavation line with And build low bank of earth between fields line.
  3. 3. raised path through fields bank protection remodeling method according to claim 1, it is characterised in that:In stepb, it is clear before slope trimming Construction site is managed, side slope surface is removed and the low bank of earth between fields builds the weeds in area, tree root debris, and repaiied according to the side slope of setting than excavation It is whole, to cavity and recess fill compaction.
  4. 4. raised path through fields bank protection remodeling method according to claim 1, it is characterised in that:In step e, pass through following paving slurry processes Build toe wall by laying bricks or stones:The screed-coat of M7.5 cement mortar is laid in the bottom land of foundation trench, using shale brick masonry toe wall, and first row page Rock brick uses header, and second row shale brick uses facing bond.
CN201510094496.8A 2015-03-03 2015-03-03 Raised path through fields bank protection remodeling method Active CN104947692B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510094496.8A CN104947692B (en) 2015-03-03 2015-03-03 Raised path through fields bank protection remodeling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510094496.8A CN104947692B (en) 2015-03-03 2015-03-03 Raised path through fields bank protection remodeling method

Publications (2)

Publication Number Publication Date
CN104947692A CN104947692A (en) 2015-09-30
CN104947692B true CN104947692B (en) 2017-12-05

Family

ID=54162710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510094496.8A Active CN104947692B (en) 2015-03-03 2015-03-03 Raised path through fields bank protection remodeling method

Country Status (1)

Country Link
CN (1) CN104947692B (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100401173B1 (en) * 2000-09-27 2003-10-10 주식회사 월테크 Block for breast wall
KR100750703B1 (en) * 2006-05-30 2007-08-22 중앙콘크리트(주) A vegetation block and a method for constructing the cut ground using
CN102174817A (en) * 2011-03-08 2011-09-07 中国科学院水利部成都山地灾害与环境研究所 Method for constructing artificially natural slope-type terrace land in Three Gorges reservoir area
CN102392453B (en) * 2011-09-14 2014-06-04 重庆师范大学 Terrace bank construction method for changing slope farmland into level terrace in reservoir area of Three Gorges
KR101313863B1 (en) * 2011-10-10 2013-09-30 송도희 Planting life block a combined use fishway
CN102587324A (en) * 2012-03-29 2012-07-18 黄河勘测规划设计有限公司 Self-embedded type ecological slope protection building block
CN103088835B (en) * 2013-02-16 2015-07-22 重庆师范大学 Three gorge reservoir region slope cropland bank building method and slope cropland bank

Also Published As

Publication number Publication date
CN104947692A (en) 2015-09-30

Similar Documents

Publication Publication Date Title
CN106978843B (en) Municipal drainage pipeline construction technology
CN102383413B (en) Method for constructing strengthened saturated-flow plastic silt soft soil foundation
CN103790166B (en) Method for treating foundation of loess area saturated zone slope filling and digging joint part
CN103806432B (en) Method for treating foundations in slope filling and digging joint part of wet and soft zone in loess region
CN108221861A (en) A kind of ecological slope protection structure to prevent erosion and its construction method
CN105569058A (en) Expansive soil cutting structure and construction method thereof
CN104264680B (en) The method for processing foundation of Tian Wa joint portion, a kind of collapsible loess slope
CN110512892B (en) Construction method for repairing existing ancient city wall
CN107100227A (en) A kind of pergola on the city road LID biologies are detained ditch construction method
CN105544576A (en) Foundation ditch dewatering and drainage excavation structure and application method
CN110424421A (en) Abandoned mine raised fields goes along with sb. to guard him ecological restoring method
CN108222026A (en) The restorative procedure of coal mine small-sized hillock
CN110565577A (en) Ecological restoration method for channel renovation project
CN109594442A (en) Garden path construction technology
CN104904469A (en) Greening method for controlling salt elimination area by area in coastal saline area
CN104164883B (en) A kind of loose unsaturated soil side slope superficial again compacting in conjunction with vegetative coverage means of defence
CN110804994B (en) Reservoir dam construction method
CN102704437A (en) Coal mining subsidence area cultivation water source reconstruction method suitable for complex mountain area
CN105178134B (en) Green road reconstruction method
CN104947692B (en) Raised path through fields bank protection remodeling method
CN211395577U (en) Ecological interlocking grass planting brick slope protection structure
CN211472454U (en) Structure is administered to soil crack
CN211037008U (en) Comprehensive treatment system for slope slag-adhering under plateau area road
CN210315653U (en) Cover plate ditch for laying underground buried pipe
CN108411851B (en) construction method of concrete slab facing structure for slope dike of river and sea reclamation area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant