CN104164883B - A kind of loose unsaturated soil side slope superficial again compacting in conjunction with vegetative coverage means of defence - Google Patents
A kind of loose unsaturated soil side slope superficial again compacting in conjunction with vegetative coverage means of defence Download PDFInfo
- Publication number
- CN104164883B CN104164883B CN201410329055.7A CN201410329055A CN104164883B CN 104164883 B CN104164883 B CN 104164883B CN 201410329055 A CN201410329055 A CN 201410329055A CN 104164883 B CN104164883 B CN 104164883B
- Authority
- CN
- China
- Prior art keywords
- slope
- soil
- loose
- layer
- compacted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本发明公开了一种松散非饱和土边坡浅层再压实结合植被覆盖防护方法。对坡面以下2-3m厚的松散残积土或坡积土实施开挖,自坡脚向上1/3-1/2的坡面长度,等间距设置多条顺坡向排水盲沟,盲沟均与坡脚挡土墙的泄水孔连通;将开挖的松散残积土或坡积土分层压实至90%以上压实度,即形成再压实覆盖层;再压实覆盖层上面铺设厚度为0.15-0.3m的营养土,并种植矮小植被。本发明可有效减少降雨入渗,控制坡下部浸润线高度,保持非饱和土中吸力,提高土体抗剪强度,增强边坡整体稳定性,有效防治松散非饱和土边坡的浅层滑动。本发明涉及的边坡防护方法可就地取材、易施工、造价低、实用性强,并具有良好的生态修复效果。
The invention discloses a protective method for re-compacting the shallow layer of loose unsaturated soil slope combined with vegetation covering. Excavate the 2-3m thick loose residual soil or slope accumulation soil below the slope surface, and set up a number of drainage blind ditches along the slope at equal intervals for 1/3-1/2 of the slope length from the slope foot. They are all connected to the drain holes of the retaining wall at the foot of the slope; the excavated loose residual soil or slope accumulation soil is layered and compacted to a compaction degree of more than 90%, that is, the re-compacted covering layer is formed; the top of the re-compacted covering layer Lay nutrient soil with a thickness of 0.15-0.3m, and plant dwarf vegetation. The invention can effectively reduce rainfall infiltration, control the height of the soaking line at the bottom of the slope, maintain the suction in unsaturated soil, increase the shear strength of the soil, enhance the overall stability of the slope, and effectively prevent shallow sliding of the loose unsaturated soil slope. The slope protection method involved in the invention can obtain local materials, is easy to construct, has low cost, strong practicability, and has good ecological restoration effect.
Description
技术领域 technical field
本发明涉及土质边坡的坡面防护方法,尤其是涉及一种松散非饱和土边坡浅层再压实结合植被覆盖防护方法。 The invention relates to a slope surface protection method for soil slopes, in particular to a protection method for loose unsaturated soil slope shallow layer recompaction combined with vegetation coverage.
背景技术 Background technique
火成岩风化残积,西南地区强地震,尾矿排土及工程建设挖方倾倒形成大量松散非饱和土边坡,在每年夏季受强降雨入渗影响,滑坡时有发生,该类降雨诱发滑坡具有浅层滑动,量大面广的特点。现行国家规范针对土质边坡的坡面防护措施主要包括:砌体护坡和护面墙、框格、捶面等。砌体护坡和护面墙主要材料为片石或块石,分干砌,浆砌两种工法,适用于盛产石料地区,易受地表水冲刷的土质边坡。框格防护采用混凝土、浆砌片(块)石、卵(砾)石等作骨架,框格内宜种植植物或采用其他辅助防护措施。捶面防护是将三合土、四合土或水泥炉渣混合土等摊铺于坡面,人工夯实形成封闭的防渗层,适用于易受雨水冲刷的坡度缓于1:0.5的土质边坡。上述防护措施需要大量石材、水泥等外源材料,所形成的坡面难以进行绿化和生态修复,而且随时间推移,浆砌体、混凝土、三合土等易受雨淋风化作用而老化,甚至破坏,后期维护整治费用高。因此工程上需要绿色环保、更加耐久的防护技术,特别是对于大量松散土坡。 The weathered residues of igneous rocks, strong earthquakes in Southwest China, dumping of tailings and excavation of engineering construction have formed a large number of loose unsaturated soil slopes, which are affected by the infiltration of heavy rainfall in summer, and landslides occur from time to time. This type of rainfall-induced landslide has a shallow layer Sliding, large quantity and wide range of features. The slope protection measures of the current national standards for soil slopes mainly include: masonry slope protection and face protection wall, sash, hammer face, etc. The main material of masonry slope protection and face protection wall is flake or block stone, which can be divided into two construction methods: dry laying and mortar laying. It is suitable for soil slopes that are prone to surface water erosion in areas rich in stone. The frame protection adopts concrete, mortar block (block) stone, egg (gravel) stone, etc. as the skeleton, and plants should be planted in the frame or other auxiliary protection measures should be adopted. Surface hammering protection is to spread the compound soil, tetra compound soil or cement slag mixed soil on the slope surface, and manually compact it to form a closed anti-seepage layer. It is suitable for soil slopes with a slope less than 1:0.5 that are easy to be washed by rain. The above protection measures require a large amount of external materials such as stone and cement, and the formed slopes are difficult to be greened and ecologically restored. Moreover, as time goes by, mortar masonry, concrete, and composite soil are susceptible to aging and even damage due to rain and weathering. Later maintenance and remediation costs are high. Therefore, environmental protection and more durable protection technology is required in engineering, especially for a large number of loose soil slopes.
发明内容 Contents of the invention
为了克服现有技术中存在的不足,本发明目的在于提供一种松散非饱和土边坡浅层再压实结合植被覆盖防护方法。通过浅层再压实来改良松散土的防渗性能以减少降雨时渗入边坡的水量,植被层在晴天的蒸发蒸腾作用有助于疏干入渗的水分,通过顺坡向排水盲沟控制坡下部浸润线高度。上述三项措施联合作用能有效保持边坡非饱和土吸力和抗剪强度,维护坡体稳定性和坡面耐久性,并达到良好的绿化效果。 In order to overcome the deficiencies in the prior art, the purpose of the present invention is to provide a method for recompacting the shallow layer of loose unsaturated soil slope combined with vegetation coverage protection method. Improve the anti-seepage performance of loose soil by shallow recompaction to reduce the amount of water infiltrated into the slope during rainfall. The evapotranspiration of the vegetation layer in sunny days helps to drain the infiltrated water, and control it through the blind drainage ditch along the slope The height of the infiltration line at the lower part of the slope. The combination of the above three measures can effectively maintain the unsaturated soil suction and shear strength of the slope, maintain the stability of the slope and the durability of the slope, and achieve a good greening effect.
本发明采用的技术方案步骤如下: The technical scheme step that the present invention adopts is as follows:
步骤1)对坡面以下2-3m厚的松散残积土或坡积土实施开挖,自坡脚向上1/3-1/2的坡面长度,等间距设置多条顺坡向排水盲沟,盲沟均与坡脚挡土墙的泄水孔连通; Step 1) Excavate the 2-3m thick loose residual soil or slope accumulation soil below the slope surface, and set up multiple drainage blind ditches along the slope direction at equal intervals for 1/3-1/2 of the slope surface length from the slope foot , the blind ditches are connected with the drain holes of the retaining wall at the foot of the slope;
步骤2)是将步骤1)开挖的松散残积土或坡积土分层压实至90%以上压实度,即形成再压实覆盖层; Step 2) is to compact the loose residual soil or slope soil excavated in step 1) layer by layer to a compaction degree of more than 90%, that is, to form a re-compacted covering layer;
步骤3)是在步骤2)的再压实覆盖层上面铺设厚度为0.15-0.3m的植被层。 Step 3) is to lay a vegetation layer with a thickness of 0.15-0.3m on the re-compacted covering layer of step 2).
所述多条顺坡向排水盲沟,每条厚度为0.3-0.5m,宽度为0.5-1 m,相邻两顺坡向排水盲沟间距为5-10m,盲沟内部填充粒径为20-60mm的卵石或碎石,含泥量小于1%,外衬有纺土工织物。 The multiple blind drainage ditches along the slope are each 0.3-0.5m in thickness and 0.5-1m in width, the distance between two adjacent blind drainage ditches along the slope is 5-10m, and the filling particle size inside the blind ditch is 20 - 60mm pebbles or crushed stones with a mud content of less than 1%, lined with woven geotextiles.
所述松散残积土或坡积土分层压实时每层虚铺厚度为0.3-0.4m。 The virtual paving thickness of each layer is 0.3-0.4m when the loose residual soil or slope soil is compacted in layers.
所述坡脚挡土墙的泄水孔孔径为0.05-0.1m。 The diameter of the drain hole of the retaining wall at the foot of the slope is 0.05-0.1m.
本发明具有的有益效果是: The beneficial effects that the present invention has are:
1、通过浅层再压实,植被覆盖、顺坡向排水盲沟三个措施的联合作用,可有效减少降雨入渗,控制坡下部浸润线高度,保持非饱和土体吸力和抗剪强度,有效防治松散土边坡的浅层滑动。 1. Through the combined effects of shallow recompaction, vegetation coverage, and drainage blind ditch along the slope, rainfall infiltration can be effectively reduced, the height of the infiltration line at the lower slope can be controlled, and the suction and shear strength of the unsaturated soil can be maintained. Effectively prevent shallow sliding of loose soil slopes.
2、再压实覆盖层,植被层和顺坡向排水盲沟三部分的组成材料绝大多数可就地取材,所使用的天然材料耐久性好。 2. Most of the materials for the re-compacted cover layer, vegetation layer and blind drainage ditch along the slope can be obtained locally, and the natural materials used have good durability.
3、该技术易施工、造价低、实用性强。 3. The technology is easy to construct, low in cost and strong in practicability.
4、该边坡防护方法符合绿化环保的理念,具有良好的生态修复效果。 4. The slope protection method conforms to the concept of greening and environmental protection, and has a good ecological restoration effect.
附图说明 Description of drawings
图1是本发明的具体结构剖面示意图。 Fig. 1 is a schematic cross-sectional view of a specific structure of the present invention.
图2是图1的A向视图。 Fig. 2 is a view along the direction A of Fig. 1 .
图3是本发明间隔分区的施工次序。 Fig. 3 is the construction sequence of the partition partition of the present invention.
图中:1、坡顶截水沟,2、松散残积土或坡积土,3、再压实覆盖层,4、顺坡向排水盲沟,5、外衬有纺土工织物,6、植被层,7、坡脚挡土墙的泄水孔。 In the figure: 1. Water intercepting ditch at the top of the slope, 2. Loose residual soil or slope accumulation soil, 3. Re-compacted covering layer, 4. Drainage blind ditch along the slope direction, 5. Lined with textile geotextile, 6. Vegetation Layer, 7. The weep hole of the retaining wall at the foot of the slope.
具体实施方式 Detailed ways
下面结合附图和实施例对本发明作进一步的说明。 The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
如图1、图2所示,本发明对坡面以下2-3m厚的松散残积土或坡积土2开挖后,自坡底向上1/3-1/2的坡面长度,等间距设置多条顺坡向排水盲沟4,盲沟4均与坡脚挡土墙的泄水孔7连通,坡顶上设有与坡脚挡土墙平行的一条坡顶截水沟1; As shown in Fig. 1 and Fig. 2, after the present invention excavates the loose residual soil or slope accumulation soil 2 below the slope surface 2-3m thick, the slope surface length of 1/3-1/2 upwards from the bottom of the slope is equally spaced. A plurality of drainage blind ditches 4 along the slope are set, and the blind ditches 4 are all connected with the discharge holes 7 of the retaining wall at the slope foot, and a slope top intercepting ditch 1 parallel to the slope foot retaining wall is provided on the top of the slope;
步骤2)是将步骤1)开挖的松散残积土或坡积土2分层压实至90%以上压实度,即形成再压实覆盖层3; Step 2) is to compact the loose residual soil or slope accumulation soil 2 excavated in step 1) layer by layer to a compaction degree of more than 90%, that is, to form a re-compacted covering layer 3;
步骤3)是在步骤2)的再压实覆盖层3上面铺设厚度为0.15-0.3m的营养土并种植矮小植物,形成植被层6,植被层6种植适应当地气候条件并具有良好抗冲刷能力的草或矮小灌木。 Step 3) is to lay nutritious soil with a thickness of 0.15-0.3m on the re-compacted cover layer 3 of step 2) and plant dwarf plants to form a vegetation layer 6, which is suitable for local climate conditions and has good erosion resistance grass or dwarf shrubs.
所述多条顺坡向排水盲沟4,每条厚度为0.3-0.5m,宽度为0.5-1m,相邻两顺坡向排水盲沟4间距为5-10m,盲沟内部填充粒径为20-60mm的卵石或碎石,含泥量小于1%,外衬有纺土工织物5; The plurality of drainage blind ditches 4 along the slope are each 0.3-0.5m in thickness and 0.5-1m in width, and the distance between two adjacent blind drainage ditches 4 along the slope is 5-10m, and the filling particle size inside the blind ditches is 20-60mm pebbles or crushed stones with a mud content of less than 1%, lined with woven geotextiles5;
所述松散残积土或坡积土2分层压实时每层虚铺厚度为0.3-0.4m。 The virtual paving thickness of each layer is 0.3-0.4m when the loose residual soil or slope accumulation soil is compacted in two layers.
所述坡脚挡土墙的泄水孔7孔径为0.05-0.1m。 The diameter of the drain hole 7 of the retaining wall at the foot of the slope is 0.05-0.1m.
本发明防护方法原理是这样的: Protection method principle of the present invention is such:
通过将坡面以下2-3m的松散残积土或坡积土2开挖再压实,提高密实度,降低了浅层松散残积土或坡积土2的孔隙率。再压实处理的效果包括两个方面:一是降低了浅层松散土的渗透系数,再压实覆盖层3的渗透系数要比原松散残积土或坡积土2低至少一个数量级,因此显著减少降雨时雨水渗入坡体,大部分降雨转化为地表径流,降雨入渗的减少有助于保持边坡非饱和土中吸力和抗剪强度,有效减少降雨对边坡浅层土体稳定性的不利影响;二是通过开挖再压实提高了浅层松散土的整体性和抗剪强度,进一步提高了边坡浅层土体的稳定性。坡面植被层6在降雨时起到保持水土,避免坡面过分冲刷的作用;降雨停止后,植被层6通过蒸发蒸腾作用不断疏干雨天入渗的水分,使降雨入渗造成浅层土体的吸力损失得到恢复,从而消除降雨对边坡浅层土体稳定性的不利影响。顺坡向排水盲沟4将坡脚累积的水分侧向导排至坡脚挡土墙的泄水孔7排出,控制了坡下部浸润线高度,有效解决坡脚局部失稳问题。通过上述三个措施的联合作用有效减少降雨时渗入边坡的水量,保持边坡土体的吸力大于吸水软化破坏对应的临界吸力,维护坡体稳定性和坡面耐久性,并达到良好的绿化效果。 By excavating and compacting the loose residual soil or slope accumulation soil 2 2-3m below the slope surface, the compactness is increased and the porosity of the shallow loose residual soil or slope accumulation soil 2 is reduced. The effects of recompaction treatment include two aspects: one is to reduce the permeability coefficient of the shallow loose soil, and the permeability coefficient of the recompacted cover layer 3 is at least an order of magnitude lower than that of the original loose residual soil or slope accumulation soil 2, so it is significantly When reducing rainfall, rainwater infiltrates into the slope, and most of the rainfall is converted into surface runoff. The reduction of rainfall infiltration helps to maintain the suction and shear strength of the unsaturated soil of the slope, and effectively reduces the impact of rainfall on the stability of the shallow soil of the slope. Adverse effects; Second, the integrity and shear strength of the shallow loose soil are improved through excavation and re-compaction, and the stability of the shallow soil of the slope is further improved. The slope vegetation layer 6 plays the role of maintaining water and soil during rainfall and avoiding excessive scouring of the slope; after the rainfall stops, the vegetation layer 6 continuously dries up the water infiltrated in rainy days through evapotranspiration, so that the rainfall infiltrates to form shallow soil The suction loss is restored, thereby eliminating the adverse effects of rainfall on the stability of the slope's shallow soil. The blind drainage ditch 4 along the slope direction laterally drains the water accumulated at the foot of the slope to the weep hole 7 of the retaining wall at the foot of the slope, controls the height of the infiltration line at the bottom of the slope, and effectively solves the problem of local instability at the foot of the slope. Through the combined effect of the above three measures, the amount of water infiltrated into the slope during rainfall can be effectively reduced, and the suction of the slope soil can be kept greater than the critical suction corresponding to water absorption and softening damage, so as to maintain the stability of the slope and the durability of the slope, and achieve good greening Effect.
如图1、图2、图3所示,本发明的实施方式:选择在旱季施工,沿坡面自左向右间隔分区施工,单个施工片区内自上而下开挖,自下而上压实,如图3所示。对坡面较长边坡,单个片区分段施工,相邻段间设置马道。在选定施工片区中具体施工方法:(1)坡顶上设有与坡脚挡土墙平行的一条坡顶截水沟1;(2)将开挖施工区坡面以下2-3m松散残积土或坡积土2自上而下挖出,堆积在临时堆土区备用;(3)平整开挖施工区的开挖底面,在顺坡向排水盲沟4位置进一步下挖0.3-0.5m深的沟槽,沟槽内填充粒径为20-60mm的卵石或碎石,外衬有纺土工织物5,即形成顺坡向排水盲沟4;(4)将(1)中挖出的松散残积土或坡积土2重新回填,自下而上分层压实至90%以上压实度,即形成再压实覆盖层3;(5)按(1)中要求开挖临时堆土区,挖出的松散残积土或坡积土2堆积在开挖施工区的再压实覆盖层3之上;(6)临时堆土区按(3),(4)要求施工,同时在开挖施工区的再压实覆盖层3上面铺设营养土并种植草或矮小灌木,即形成植被层6;(7)按(1)中要求开挖未开挖区,挖出的松散残积土或坡积土2堆积在临时堆土区的再压实覆盖层3之上,后续施工按上述要求逐步推进,不再赘述。 As shown in Fig. 1, Fig. 2 and Fig. 3, the implementation mode of the present invention: select construction in dry season, construct in intervals along the slope from left to right, excavate from top to bottom in a single construction area, and press from bottom to top Real, as shown in Figure 3. For side slopes with long slopes, a single block shall be constructed in sections, and horse trails shall be set between adjacent sections. Specific construction methods in the selected construction area: (1) A slope top intercepting ditch 1 parallel to the retaining wall at the slope foot is provided on the slope top; Soil or slope accumulation soil 2 shall be excavated from top to bottom and accumulated in the temporary soil accumulation area for standby; (3) Level the excavation bottom surface of the excavation construction area, and further dig down 0.3-0.5m at the position of drainage blind ditch 4 along the slope Deep trenches, filled with pebbles or gravels with a particle size of 20-60mm, and lined with woven geotextiles 5, that is, to form blind drainage ditch 4 along the slope; (4) the excavated in (1) Backfill loose residual soil or slope accumulation soil 2, and compact layer by layer from bottom to top to a compaction degree above 90%, forming a re-compacted covering layer 3; (5) Excavate temporary soil piles according to the requirements in (1) area, the excavated loose residual soil or slope accumulation soil 2 is accumulated on the re-compacted cover layer 3 in the excavation construction area; (6) the temporary soil accumulation area shall be constructed according to the requirements of (3) and (4), Lay nutrient soil and plant grass or dwarf shrubs on the re-compacted cover layer 3 in the construction area to form the vegetation layer 6; (7) excavate the unexcavated area according to the requirements in (1), and the loose residual soil or The slope accumulation soil 2 is accumulated on the re-compacted overburden layer 3 in the temporary soil accumulation area, and the follow-up construction will be carried out gradually according to the above requirements, and will not be repeated here.
下面根据附图和实施例详细描述本发明,本发明的目的和效果将变得更加明显。 The purpose and effects of the present invention will become more apparent by describing the present invention in detail according to the accompanying drawings and embodiments.
实施例1Example 1
位于京福高速公路南平段内一残积土高填方路堤,该路堤边坡坡面以下土层依次为:5 m厚松散亚粘土、2.6 m 厚碎石土、2.6 m 厚砂质粘性土、1.8 m厚碎块状强风化细砂岩、1.8 m 厚弱风化细砂岩。该残积土路堤填筑施工质量差,压实度低,边坡浅层填土处于松散状态。该工程位于湿润气候区,夏季强降雨已造成部分路段路堤边坡失稳滑塌,严重影响路堤安全。 A residual soil high-fill embankment located in the Nanping section of the Beijing-Fuzhou Expressway. The soil layers below the slope of the embankment are: 5 m thick loose loamy soil, 2.6 m thick gravel soil, 2.6 m thick sandy cohesive soil, 1.8 m thick fragmented strongly weathered fine sandstone and 1.8 m thick weakly weathered fine sandstone. The construction quality of the residual soil embankment is poor, the degree of compaction is low, and the shallow fill of the slope is in a loose state. The project is located in a humid climate zone, and the heavy rainfall in summer has caused the embankment slopes of some road sections to become unstable and slide, seriously affecting the safety of the embankment.
采用本发明防治方法治理该残积土路堤边坡。将坡面以下3m厚松散亚粘土沿坡面自上而下挖除,在开挖过程将石块捡出单独堆放,备用于排水盲沟填料。沿道路方向按10m间距设置顺坡向排水盲沟,盲沟自坡脚向上开挖建设,长度为坡面长度的1/2,深度0.5m,宽度1m,内部填充开挖过程中捡出的石块,对于粒径大于60mm的石块经破碎后再填,控制含泥量小于1%,盲沟填充完毕后外衬有纺土工布作为反滤层。坡脚建设2m高浆砌石挡土墙,挡土墙下部设置泄水孔并与顺坡向排水盲沟连通,泄水孔直径0.1m。将挖出的松散亚粘土分层回填压实,控制压实度不小于90 %,分层压实时每层虚铺厚度为0.3m。再压实覆盖层上面摊铺0.15m营养土并种植狗牙根草形成植被层。治理后路堤边坡稳定性显著提高,已经受多年夏季强降雨考验,未发生失稳破坏。 The control method of the present invention is used to control the side slope of the residual soil embankment. The 3m thick loose loamy soil below the slope surface shall be excavated from top to bottom along the slope surface, and the stones shall be picked out and stacked separately during the excavation process for filling the drainage blind ditch. Along the road direction, set up-slope drainage blind ditches at intervals of 10m. The blind ditches are excavated upward from the foot of the slope. The length is 1/2 of the slope length, the depth is 0.5m, and the width is 1m. For stones, stones with a particle size greater than 60mm are crushed and then filled, and the mud content is controlled to be less than 1%. After the blind ditch is filled, it is lined with a woven geotextile as a reverse filter layer. A 2m high masonry retaining wall is built at the foot of the slope, and the lower part of the retaining wall is provided with a drain hole which is connected with the drainage blind ditch along the slope. The diameter of the drain hole is 0.1m. The excavated loose loamy soil shall be backfilled and compacted layer by layer, and the degree of compaction shall not be less than 90%, and the virtual paving thickness of each layer shall be 0.3m during layer compaction. On top of the compacted covering layer, 0.15m of nutrient soil is spread and Bermudagrass is planted to form a vegetation layer. After the treatment, the stability of the embankment slope has been significantly improved. It has been tested by many years of heavy summer rainfall, and no instability or damage has occurred.
实施例2:Example 2:
位于大庆-广州高速公路江西里仁-龙南段内一花岗岩残积土路堑。路堑边坡土层自上而下分别为:0.5m厚的耕殖土、2m厚的花岗岩风化残积而成的含砾粉质粘土、厚度较大的破碎全强风化花岗岩。边坡浅层耕殖土与含砾粉质粘土为松散非饱和土,透水性强,在强降雨条件下易发生失稳滑坡。 It is located in a granite residual soil road cutting in the Jiangxi Liren-Longnan section of the Daqing-Guangzhou Expressway. From top to bottom, the cutting slope soil layers are: 0.5m thick cultivated soil, 2m thick gravel-containing silty clay formed by weathering of granite, and thicker crushed fully weathered granite. The shallow cultivated soil and gravel-containing silty clay of the slope are loose and unsaturated soil with strong water permeability, and unstable landslides are prone to occur under heavy rainfall conditions.
采用本发明防治方法处理该残积土路堑边坡。将浅层2.5m耕殖土与含砾粉质粘土沿坡面自上而下全部挖除,挖出的耕殖土单独堆放备用于营养土层铺设。在开挖过程将石块捡出单独堆放,备用于排水盲沟填料。沿道路方向按5m等间距设置顺坡向排水盲沟,盲沟自坡脚向上开挖建设,长度为坡面长度的1/3,深度0.3m,宽0.5m,内部填充开挖过程中捡出的石块,控制粒径在35-60m之间,含泥量小于1%,盲沟填充完毕后外衬有纺土工布作为反滤层。坡脚建设1.5m高混凝土挡墙,挡墙下部设置泄水孔并与顺坡向排水盲沟连通,泄水孔直径0.05m。将挖出的粉质粘土分层回填压实,控制压实度不小于90%,分层压实时每层虚铺厚度为0.4m。然后再回填挖出的耕殖土,压实后厚度为0.3m,在回填耕殖土上种植结缕草形成植被层。通过上述浅层再压实结合植被覆盖防护处理,该路堑边坡稳定性显著提高,并具有良好的绿化效果,运行多年未发生失稳。 The control method of the present invention is used to treat the residual soil cutting slope. The shallow 2.5m cultivated soil and gravel-containing silty clay are excavated from top to bottom along the slope, and the excavated cultivated soil is piled up separately for laying the nutrient soil layer. During the excavation process, the stones will be picked out and stacked separately for filling in the drainage blind ditch. Along the road direction, blind drains along the slope are set at equal intervals of 5m. The blind drains are excavated upwards from the foot of the slope. The length is 1/3 of the slope length, the depth is 0.3m, and the width is 0.5m. The stones produced should be controlled to have a particle size between 35-60m and a mud content of less than 1%. After the blind ditch is filled, it is lined with a woven geotextile as a reverse filter layer. A 1.5m high concrete retaining wall shall be built at the foot of the slope, and a drain hole shall be set at the lower part of the retaining wall and shall be connected with the drainage blind ditch along the slope. The diameter of the drain hole shall be 0.05m. Backfill and compact the excavated silty clay layer by layer, control the degree of compaction to not less than 90%, and the virtual paving thickness of each layer during layer compaction is 0.4m. Then backfill the excavated cultivated soil to a thickness of 0.3m after compaction, and plant Zoysia grass on the backfilled cultivated soil to form a vegetation layer. Through the above-mentioned shallow layer recompaction combined with vegetation cover protection treatment, the stability of the cutting slope is significantly improved, and it has a good greening effect, and has not been unstable for many years of operation.
上述实施例用来解释说明本发明,而不是对本发明进行限制,在本发明的精神和权利要求的保护范围内,对本发明作出的任何修改和改变,都落入本发明的保护范围。 The above-mentioned embodiments are used to illustrate the present invention, rather than to limit the present invention. Within the spirit of the present invention and the protection scope of the claims, any modification and change made to the present invention will fall into the protection scope of the present invention.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410329055.7A CN104164883B (en) | 2014-07-11 | 2014-07-11 | A kind of loose unsaturated soil side slope superficial again compacting in conjunction with vegetative coverage means of defence |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410329055.7A CN104164883B (en) | 2014-07-11 | 2014-07-11 | A kind of loose unsaturated soil side slope superficial again compacting in conjunction with vegetative coverage means of defence |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104164883A CN104164883A (en) | 2014-11-26 |
| CN104164883B true CN104164883B (en) | 2015-10-07 |
Family
ID=51908856
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410329055.7A Active CN104164883B (en) | 2014-07-11 | 2014-07-11 | A kind of loose unsaturated soil side slope superficial again compacting in conjunction with vegetative coverage means of defence |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104164883B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104823675B (en) * | 2015-05-19 | 2017-03-22 | 上海交通大学 | Production method for pure turf without culture substrate |
| CN113068570A (en) * | 2021-04-08 | 2021-07-06 | 西北农林科技大学 | Vegetation configuration method for controlling water and soil loss of alpine slope |
| CN115007633B (en) | 2022-06-14 | 2023-03-14 | 贵州大学 | In-situ repair method for lead-zinc waste residue storage yard |
| CN115012455B (en) * | 2022-06-30 | 2023-04-14 | 福州大学 | Capillary-blocking overburden that promotes even distribution of intercepted drainage and landfill gas |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100419883B1 (en) * | 2002-09-14 | 2004-02-26 | 케이지건설(주) | Method for constructing green reinforcement slope; R, S Green |
| CN1632240A (en) * | 2004-11-23 | 2005-06-29 | 陈永烽 | Method for treating slope slide through modified reinforcement soil blind grids |
| CN101148886A (en) * | 2007-11-13 | 2008-03-26 | 中冶长天国际工程有限责任公司 | Drainage and treatment structure for groundwater on slopes of unbuilt or under-constructed landfills |
| CN103572765A (en) * | 2013-11-19 | 2014-02-12 | 成军 | Treatment and construction method of bridge site river bank expansive soil landslide positions |
-
2014
- 2014-07-11 CN CN201410329055.7A patent/CN104164883B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100419883B1 (en) * | 2002-09-14 | 2004-02-26 | 케이지건설(주) | Method for constructing green reinforcement slope; R, S Green |
| CN1632240A (en) * | 2004-11-23 | 2005-06-29 | 陈永烽 | Method for treating slope slide through modified reinforcement soil blind grids |
| CN101148886A (en) * | 2007-11-13 | 2008-03-26 | 中冶长天国际工程有限责任公司 | Drainage and treatment structure for groundwater on slopes of unbuilt or under-constructed landfills |
| CN103572765A (en) * | 2013-11-19 | 2014-02-12 | 成军 | Treatment and construction method of bridge site river bank expansive soil landslide positions |
Non-Patent Citations (1)
| Title |
|---|
| 柔性处治新技术在膨胀土松散堆积体开挖边坡治理中的应用;杨伟新;《中外公路》;20101031(第05期);第67-70页 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104164883A (en) | 2014-11-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101343852B (en) | Method for filling highroad roadbed by waste steel slags | |
| CN102383413B (en) | Method for constructing strengthened saturated-flow plastic silt soft soil foundation | |
| CN111851505B (en) | Construction method and structure of filling type anti-seepage core wall earth-rock dam | |
| CN113445396B (en) | High-fill road foundation filling construction method for high liquid limit soil road section | |
| CN103283335B (en) | Filling reclamation method for reclaiming coal mining subsidence lands by Yellow River sediment | |
| CN106149625B (en) | A kind of ecological self-purification type landscape revetment reconstruction structure and its construction method | |
| CN113265924B (en) | Construction method for using red bed mudstone blocks as high-fill dynamic compaction roadbed filling | |
| CN110924254A (en) | A kind of construction technology of carbonaceous shale roadbed filling | |
| CN104234061A (en) | Reinforced ecological concrete revetment and construction method thereof | |
| CN110374054A (en) | A kind of ecological slope protection consolidates soil structure and method | |
| CN116377780A (en) | Construction Method of High Fill Subgrade in Mountainous Highway | |
| CN106193066A (en) | A kind of Loess landslide administering method based on restoration of the ecosystem | |
| CN110424421A (en) | Abandoned mine raised fields goes along with sb. to guard him ecological restoring method | |
| CN107152012A (en) | Sluice construction technique | |
| CN107288120A (en) | A kind of stabilization by drainage structure of new and old roadbed in the firm splicing of watersplash | |
| CN204212018U (en) | A kind of road structure preventing and treating the soft soil roadbed freeze thawing disease of high and cold mountain area cheuch section | |
| CN114508013A (en) | Granite residual soil half-fill and half-dig roadbed structure in rainy region and construction method thereof | |
| CN106703053A (en) | Construction method for reinforced soil drainage composite revetment structure | |
| CN104164883A (en) | Recompaction and plant covering combined protection method for loose unsaturated soil slope shallow layer | |
| CN102518136A (en) | Flexible reinforced combined protection structure for preventing and treating humidifying damage of soft rock strongly weathered zone | |
| CN218667574U (en) | High excavation side slope supporting construction of inflation soil that waterproof drainage combined together | |
| CN110804994B (en) | Reservoir dam construction method | |
| CN106544987B (en) | A kind of anti-seepage of channels construction method storing flooded wetland | |
| CN109113045A (en) | A kind of soft-soil foundation treatment method | |
| CN104674782A (en) | Foundation processing method based on sand well dynamic compaction composition of muddy soft soil |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C53 | Correction of patent for invention or patent application | ||
| CB03 | Change of inventor or designer information |
Inventor after: Zhan Liangtong Inventor after: Liu Xiaochuan Inventor after: Qiu Qingwen Inventor after: Chen Yunmin Inventor before: Zhan Liangtong Inventor before: Liu Xiaochuan Inventor before: Chen Yunmin |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: ZHAN LIANGTONG LIU XIAOCHUAN CHEN YUNMIN TO: ZHAN LIANGTONG LIU XIAOCHUAN QIU QINGWEN CHEN YUNMIN |
|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |