CN104878777A - Pipeline connecting case and construction method for temporarily constructing pipelines of municipal foundation facilities - Google Patents

Pipeline connecting case and construction method for temporarily constructing pipelines of municipal foundation facilities Download PDF

Info

Publication number
CN104878777A
CN104878777A CN201510309029.2A CN201510309029A CN104878777A CN 104878777 A CN104878777 A CN 104878777A CN 201510309029 A CN201510309029 A CN 201510309029A CN 104878777 A CN104878777 A CN 104878777A
Authority
CN
China
Prior art keywords
pipeline
underground
casing
cabinet
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510309029.2A
Other languages
Chinese (zh)
Other versions
CN104878777B (en
Inventor
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510309029.2A priority Critical patent/CN104878777B/en
Publication of CN104878777A publication Critical patent/CN104878777A/en
Application granted granted Critical
Publication of CN104878777B publication Critical patent/CN104878777B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a pipeline connecting case and a construction method for temporarily constructing pipelines of municipal foundation facilities. The pipeline connecting case comprises cases and a pipeline matching cabinet. The pipeline matching cabinet comprises a cabinet, electric switches, a gas valve, a thermal valve and lifting water pumps, and the cabinet is butted to the cases in a conducted manner. The construction method includes arranging the pipeline connecting case on the ground on a side of a municipal foundation position when the municipal foundation position is about to be excavated and constructed; shifting the underground pipelines into the pipeline connecting case; temporarily communicating the underground pipelines with one another; shifting the underground pipelines back to the original position after the municipal foundation position is completely constructed. The underground pipelines are embedded in the municipal foundation position when the municipal foundation position is about to be excavated and constructed. The pipeline connecting case and the construction method have the advantages that the pipeline connecting case can be reused, construction requirements of projects for the municipal foundation facilities with the embedded pipelines can be met, wastage due to frequent change of laying positions during embedded pipeline shifting engineering can be reduced, and the pipeline connecting case and the construction method are quite suitable for temporarily constructing the pipelines of the municipal foundation facilities.

Description

The pipeline connecting box of civilian infrastructure pipeline temporary construction and construction method
Technical field
The present invention relates to the technical field of civilian infrastructure construction, particularly relate to a kind of pipeline connecting box and construction method of civilian infrastructure pipeline temporary construction.
Background technology
During civilian infrastructure project construction, need cut existing pipeline and change, the service function of pipeline can not be affected again simultaneously for a long time.Cut change pipeline nervous on construction ground when, both needed to meet using function, and needed again frequently to change buried pipeline and lay position, cause engineering cost higher, the deficiencies such as construction period is longer, repeated construction waste, need minimizing pipeline cutting to change engineering and frequently change the waste of laying position and causing.
In all kinds of construction project implementation process (such as subway work), all can there is the conflict of civilian infrastructure pipeline position, need migration position, rebuild pipe network, meet pipe service function.In this process, because construction plant is narrow, construction progress is nervous, needs frequent broken road, cuts and change, produce a large amount of construction costs, waste money.As in the process of constructing to the road being embedded with pipeline, then need first to construct to the first side of road, and pipeline is wherein migrated to the second side of road, after the first side construction in road, then pipeline is resetted, then constructed in the second side of road, pipeline wherein migrates in the first side of road by same needs, after the second side construction in road, then resetted by pipeline, pipeline needs the migration of at least three times altogether.
Therefore, the applicant is devoted to pipeline connecting box and the construction method of developing a kind of civilian infrastructure pipeline temporary construction, meet the civilian infrastructure project construction needs being embedded with pipeline, realize when civilian infrastructure project construction, reduce buried pipeline and cut and change engineering and frequently change the waste of laying position and causing.
Summary of the invention
Because the above-mentioned deficiency of prior art, the present invention proposes a kind of pipeline connecting box and construction method of civilian infrastructure pipeline temporary construction, meet the civilian infrastructure project construction needs being embedded with pipeline, realize when civilian infrastructure project construction, reduce buried pipeline and cut and change engineering and frequently change the waste of laying position and causing.
For achieving the above object, the invention provides a kind of pipeline connecting box of civilian infrastructure pipeline temporary construction, comprise casing, in described casing, being preset with the crane span structure for setting up pipeline.Described pipeline connecting box also comprises the supporting cabinet of pipeline, the supporting cabinet of described pipeline comprises: cabinet, for connecting the electric switch of power pipeline and cable pipeline, for connecting the burnt gas valve of gas pipeline, for connecting the heating power valve of heat distribution pipeline, and for connecting the lifting water pump of aqueduct.Described electric switch, burnt gas valve, heating power valve and lifting water pump are all arranged in described cabinet, and described cabinet docks with described casing conducting.
Preferably, described pipeline connecting box comprises a supporting cabinet of described pipeline and multiple described casing, and multiple described casing successively conducting docking forms strip casing, and the supporting cabinet of described pipeline is docked on an end of described strip casing.
Preferably, power pipe, cable communication pipeline, heat distribution pipeline, gas pipeline and aqueduct is equipped with in described strip casing, the Single port of described heat distribution pipeline is connected on described heating power valve, the Single port of described gas pipeline is connected on described burnt gas valve, the Single port of described aqueduct is connected on described lifting water pump, be docked in described strip casing on corresponding pipeline by the supporting cabinet of described pipeline after civilian infrastructure pipeline cutting changes, realize being communicated with temporarily.
Preferably, the end face of described casing is provided with the suspension hook of lifting.
Preferably, the end face of described cabinet is provided with the suspension hook of lifting.
Preferably, described casing is the square box of open at both ends.
Preferably, described cabinet is the square box of open at both ends.
The invention also discloses a kind of construction method of civilian infrastructure pipeline temporary construction, when the municipal base position being embedded with underground utilities carries out excavation construction, above-mentioned pipeline connecting box is placed on the ground, side of described municipal base position, described underground utilities are cut and is changed in described pipeline connecting box, interim connection, after described municipal base position construction completes, more described underground utilities are cut change back on origin-location.
Preferably, described underground utilities comprise underground water-supply-pipe, underground gas pipe, underground heat solenoid, underground power cable and underground communication cable, described underground water-supply-pipe is cut and is changed on described lifting water pump, the gravity current of original described underground water-supply-pipe is become pressure current, described underground gas pipe is cut and is changed on described burnt gas valve, described underground heat solenoid is cut and is changed on described heating power valve, and described underground power cable and described underground communication cable are all cut and be changed on described electric switch.
Preferably, carrying out before described underground utilities cut and change, first reconnoitring the deployment scenarios of described underground utilities, according to the concrete condition of described underground utilities, configure corresponding pipeline assembling cabinet and casing, described underground utilities are avoided exposed by described pipeline connecting box and are realized interim connection.
The beneficial effect that the pipeline connecting box of civilian infrastructure pipeline temporary construction of the present invention and construction method have is as follows:
1, the pipeline connecting box designed by the present invention is reusable, the civilian infrastructure project construction needs being embedded with pipeline can be met, realize when civilian infrastructure project construction, reduce buried pipeline to cut and change engineering and frequently change the waste of laying position and causing, be very suitable for civilian infrastructure pipeline temporary construction.
2, the pipeline connecting box designed by the present invention directly can be placed on ground and carry out site assembly connection use, and convenient construction personnel observe pipeline operating condition at any time, are convenient to timely adjustment.
3, the present invention can better meet docking and the control of all kinds of pipeline by the adaptive cabinet of pipeline, simultaneously, described lifting water pump can also overcome because raised the gravitational difference of the position generation of aqueduct temporarily, the current of aqueduct are become pressure current from gravity current, thus better realizes normal operation.
4, the construction method construction period of civilian infrastructure pipeline temporary construction of the present invention is short, can cut at underground utilities the pipeline connecting box provided in the application of the invention in journey of correcting one's mistakes to be communicated with temporarily, and invariably underground pipelines is on the ground exposed, the safety of further raising work progress, also realize the service function playing rapidly underground utilities simultaneously, avoid the problem affecting the normal operation of pipeline because of municipal foundation construction.
5, the present invention has wide range of applications, and can be applicable in the construction of civilian infrastructure pipe engineering, simultaneously can under the disaster scenarios it such as earthquake, flood, and the emergent construction dropping into rapidly infrastructure pipeline uses, and meets all kinds of pipeline using function.
6, construction method small investment of the present invention, with existing frequent broken road, cut and change compared with Pipeline approach, pipeline connecting box provided by the present invention and construction method, can reduce construction cost greatly, saves to take up an area, reduce investment outlay.
7, construction method of the present invention is safe and reliable, can be placed on ground by the underground pipeline of conventional buried-pipe laying, includes in pipeline connecting box of the present invention, is communicated with temporarily, is convenient to observation, changes, keeps in repair, and ensures that pipeline safety runs.
Be described further below with reference to the technique effect of accompanying drawing to design of the present invention, concrete structure and generation, to understand object of the present invention, characteristic sum effect fully.
Accompanying drawing explanation
Fig. 1 is the structural representation of the pipeline connecting box of specific embodiment civilian infrastructure pipeline temporary construction.
Fig. 2 is the A-A cross section structure schematic diagram of Fig. 1.
Fig. 3 is the B-B cross section structure schematic diagram of Fig. 1.
Fig. 4 waits to excavate the town road schematic cross-sectional view of building.
Optimal crosssection schematic diagram when Fig. 5 is the construction of town road pipeline temporary construction.
Layout schematic diagram when Fig. 6 is the construction of town road pipeline temporary construction.
Detailed description of the invention
The present embodiment proposes a kind of pipeline connecting box of civilian infrastructure pipeline temporary construction, and it comprises casing 1, as shown in Figure 3, is preset with the crane span structure 2 for setting up pipeline in casing 1.
Shown in composition graphs 1 and Fig. 2, the pipeline connecting box of the present embodiment also comprises the supporting cabinet 3 of pipeline, the supporting cabinet 3 of pipeline comprises: cabinet 4, for connecting the electric switch 5 of power pipeline and cable pipeline, for connecting the burnt gas valve 6 of gas pipeline, for connecting the heating power valve 7 of heat distribution pipeline, and for connecting the lifting water pump 8 of aqueduct.The electric switch 5 of the present embodiment, burnt gas valve 6, heating power valve 7 and promote water pump 8 and be arranged in cabinet 4 all as shown in Figure 2, cabinet 4 and casing 1 as shown in Figure 1 conducting dock.
Concrete, the pipeline connecting box of the present embodiment comprises a supporting cabinet of pipeline 3 and multiple casing 1, and multiple casing 1 successively conducting docking forms strip casing, and the supporting cabinet of pipeline 3 is docked on an end of described strip casing.Wherein, concrete adaptive how many casings dock, and adopt the parameters such as what size can need to adjust according to site operation.
Exemplary, power pipe 9, cable communication pipeline 10, heat distribution pipeline 11, gas pipeline 12 and aqueduct 13 is also equipped with as shown in Figure 3 in strip casing described in the present embodiment, the Single port of heat distribution pipeline 11 is connected on heating power valve 7, the Single port of gas pipeline 12 is connected on burnt gas valve 6, the Single port of aqueduct 13 is connected to and promotes on water pump 8, be docked in described strip casing on corresponding pipeline by the supporting cabinet of pipeline 3 after civilian infrastructure pipeline cutting changes, realize being communicated with temporarily.
Wherein, as shown in Figure 3, power pipe 9, cable communication pipeline 10, heat distribution pipeline 11 and gas pipeline 12 correspondence are shelved on the crane span structure 2 in casing, and aqueduct 13 can also be divided into several classes such as regeneration water pipe, water service pipe, soil pipe and rain pipe further, be configured according to construction needs.Wherein, power pipe 9 wears for power pipeline, and cable communication pipeline 10 wears for Capacitance Unbalance in Telecom Cables, and heat distribution pipeline 11, gas pipeline 12 and aqueduct 13 can directly with cut the respective lines of correcting one's mistakes and carry out conducting and dock and use.
The present embodiment conveniently transports, install, the end face of casing 1 and the end face of cabinet 4 are provided with the suspension hook of lifting respectively, and casing 1 and cabinet 4 are all made as the square box of open at both ends, the open at both ends shape of casing 1 is identical rectangle framework with the open at both ends shape of cabinet 4, can directly dock.
Market outsourcing all directly can be carried out for casing 1, crane span structure 2, cabinet 4, various pipes, valve and switch etc. involved by the pipeline connecting box described in the present embodiment, according to practice of construction needs, the technology instruction above-mentioned according to the present embodiment is carried out assembling and using, and repeats no more herein.
Shown in composition graphs 4, the present embodiment also discloses a kind of construction method of civilian infrastructure pipeline temporary construction, when carrying out excavation construction in the town road position being embedded with underground utilities 14, by on the above-mentioned pipeline connecting box ground, side being placed on described municipal base position as shown in Figure 5, underground utilities 14 cut be changed in described pipeline connecting box as shown in Figure 6 again, underground utilities 14 after described town road position construction completes, then are cut and are changeed back on origin-location by interim connection.
Concrete, the present embodiment is carrying out before underground utilities 14 cut and change, first the deployment scenarios of underground utilities 14 is reconnoitred, the concrete condition of base area underground pipelines 14, configure corresponding pipeline assembling cabinet 3 and casing 1, underground utilities 14 are avoided exposed by described pipeline connecting box as shown in Figure 6 and are realized interim connection.
As, by prospecting, the underground utilities 14 that the town road position knowing the present embodiment is buried underground as shown in Figure 4, comprise underground water-supply-pipe, underground gas pipe, underground heat solenoid, underground power cable and underground communication cable, wherein aqueduct is also divided into this four classes pipeline of regeneration water pipe, water service pipe, soil pipe and rain pipe to pass through simultaneously.
For the concrete condition of the underground utilities of adaptive town road position, as shown in Figure 2, the supporting cabinet of pipeline 3 of the present embodiment is provided with all kinds of switch, valve and water pump in correspondence, the casing 1 of configuration respective numbers forms the strip casing of corresponding length, and wear corresponding power pipe 9, cable communication pipeline 10, heat distribution pipeline 11, gas pipeline 12 and aqueduct 13, realize all kinds of underground utilities and enter in the corresponding pipeline of casing without open ground by below town road.
As shown in Figure 5 and Figure 6, described underground water-supply-pipe is cut and is changed on corresponding lifting water pump 8, the gravity current of original described underground water-supply-pipe is become pressure current, described underground gas pipe is cut and is changed on corresponding burnt gas valve 6, described underground heat solenoid is cut and is changed on corresponding heating power valve 7, described underground power cable and described underground communication cable are all cut and are changed on corresponding electric switch 5, complete interim connection.
More than describe preferred embodiment of the present invention in detail.Should be appreciated that those of ordinary skill in the art just design according to the present invention can make many modifications and variations without the need to creative work.Therefore, all technician in the art, all should by the determined protection domain of claims under this invention's idea on the basis of existing technology by the available technical scheme of logical analysis, reasoning, or a limited experiment.

Claims (7)

1. the pipeline connecting box of a civilian infrastructure pipeline temporary construction, comprise casing, the crane span structure for setting up pipeline is preset with in described casing, it is characterized in that: described pipeline connecting box also comprises the supporting cabinet of pipeline, the supporting cabinet of described pipeline comprises: cabinet, for connecting the electric switch of power pipeline and cable pipeline, for connecting the burnt gas valve of gas pipeline, for connecting the heating power valve of heat distribution pipeline, and for connecting the lifting water pump of aqueduct; Described electric switch, burnt gas valve, heating power valve and lifting water pump are all arranged in described cabinet, and described cabinet docks with described casing conducting; Described pipeline connecting box comprises a supporting cabinet of described pipeline and multiple described casing, and multiple described casing successively conducting docking forms strip casing, and the supporting cabinet of described pipeline is docked on an end of described strip casing; Power pipe, cable communication pipeline, heat distribution pipeline, gas pipeline and aqueduct is equipped with in described strip casing, the Single port of described heat distribution pipeline is connected on described heating power valve, the Single port of described gas pipeline is connected on described burnt gas valve, the Single port of described aqueduct is connected on described lifting water pump, be docked in described strip casing on corresponding pipeline by the supporting cabinet of described pipeline after civilian infrastructure pipeline cutting changes, realize being communicated with temporarily.
2. the pipeline connecting box of civilian infrastructure pipeline temporary construction as claimed in claim 1, is characterized in that: the suspension hook end face of described casing being provided with lifting.
3. the pipeline connecting box of civilian infrastructure pipeline temporary construction as claimed in claim 1 or 2, is characterized in that: described casing is the square box of open at both ends.
4. the pipeline connecting box of civilian infrastructure pipeline temporary construction as claimed in claim 1 or 2, is characterized in that: described cabinet is the square box of open at both ends.
5. the construction method of a civilian infrastructure pipeline temporary construction, when the municipal base position being embedded with underground utilities carries out excavation construction, it is characterized in that: the pipeline connecting box described in any one of claim 1-4 is placed on the ground, side of described municipal base position, described underground utilities are cut and is changed in described pipeline connecting box, interim connection, after described municipal base position construction completes, more described underground utilities are cut change back on origin-location.
6. the construction method of civilian infrastructure pipeline temporary construction as claimed in claim 5, it is characterized in that: described underground utilities comprise underground water-supply-pipe, underground gas pipe, underground heat solenoid, underground power cable and underground communication cable, described underground water-supply-pipe is cut and is changed on described lifting water pump, the gravity current of original described underground water-supply-pipe is become pressure current, described underground gas pipe is cut and is changed on described burnt gas valve, described underground heat solenoid is cut and is changed on described heating power valve, described underground power cable and described underground communication cable are all cut and are changed on described electric switch.
7. the construction method of the civilian infrastructure pipeline temporary construction as described in claim 5 or 6, it is characterized in that: carrying out before described underground utilities cut and change, first the deployment scenarios of described underground utilities is reconnoitred, according to the concrete condition of described underground utilities, configure corresponding pipeline assembling cabinet and casing, described underground utilities are avoided exposed by described pipeline connecting box and are realized interim connection.
CN201510309029.2A 2015-06-08 2015-06-08 The pipeline connecting box of civilian infrastructure pipeline temporary construction and construction method Expired - Fee Related CN104878777B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510309029.2A CN104878777B (en) 2015-06-08 2015-06-08 The pipeline connecting box of civilian infrastructure pipeline temporary construction and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510309029.2A CN104878777B (en) 2015-06-08 2015-06-08 The pipeline connecting box of civilian infrastructure pipeline temporary construction and construction method

Publications (2)

Publication Number Publication Date
CN104878777A true CN104878777A (en) 2015-09-02
CN104878777B CN104878777B (en) 2016-08-24

Family

ID=53946438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510309029.2A Expired - Fee Related CN104878777B (en) 2015-06-08 2015-06-08 The pipeline connecting box of civilian infrastructure pipeline temporary construction and construction method

Country Status (1)

Country Link
CN (1) CN104878777B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106641439A (en) * 2017-01-22 2017-05-10 高新伟 Fabricated construction method for above-ground public gas pipeline system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10121890A (en) * 1996-10-25 1998-05-12 Shimizu Corp Multi-purpose tunnel
CN2591099Y (en) * 2003-01-06 2003-12-10 赵洪志 Municipal administration comprehensive wiring box
CN1603525A (en) * 2004-11-09 2005-04-06 上海市政工程设计研究院 Integrated pipe canal
JP2010261229A (en) * 2009-05-08 2010-11-18 Koken Sangyo Kk Construction method of fireproof water tank underground laying foundation
CN202247950U (en) * 2011-08-31 2012-05-30 沈阳市政地铁管片有限公司 Quadrate culvert member
CN204238243U (en) * 2014-10-29 2015-04-01 沈晓铃 A kind of city integrated piping lane
CN204690784U (en) * 2015-06-08 2015-10-07 李伟 The pipeline connecting box of civilian infrastructure pipeline temporary construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10121890A (en) * 1996-10-25 1998-05-12 Shimizu Corp Multi-purpose tunnel
CN2591099Y (en) * 2003-01-06 2003-12-10 赵洪志 Municipal administration comprehensive wiring box
CN1603525A (en) * 2004-11-09 2005-04-06 上海市政工程设计研究院 Integrated pipe canal
JP2010261229A (en) * 2009-05-08 2010-11-18 Koken Sangyo Kk Construction method of fireproof water tank underground laying foundation
CN202247950U (en) * 2011-08-31 2012-05-30 沈阳市政地铁管片有限公司 Quadrate culvert member
CN204238243U (en) * 2014-10-29 2015-04-01 沈晓铃 A kind of city integrated piping lane
CN204690784U (en) * 2015-06-08 2015-10-07 李伟 The pipeline connecting box of civilian infrastructure pipeline temporary construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
葛以衡: "泥水平衡顶管施工对地下管线的影响", 《城市道桥与防洪》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106641439A (en) * 2017-01-22 2017-05-10 高新伟 Fabricated construction method for above-ground public gas pipeline system

Also Published As

Publication number Publication date
CN104878777B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN105113543B (en) 0815 type underground pipe gallery assembling combination cabin concrete structure of shallow embedding
US10544014B2 (en) Method for hoisting and transporting assemblies in underground nuclear power plant
CN105544605B (en) A kind of modular assembly formula pipe gallery
CN105970785B (en) Concrete road surface dell quick repairs device and method
CN106481881B (en) A kind of original pipe position no-dig technique splits the construction method that pipe repairs underground piping
CN205776342U (en) A kind of prefabricated pipe gallery tube coupling attachment structure
CN204690784U (en) The pipeline connecting box of civilian infrastructure pipeline temporary construction
CN205636848U (en) Former earthen backfill device
CN104878777A (en) Pipeline connecting case and construction method for temporarily constructing pipelines of municipal foundation facilities
CN104184097A (en) Non-migration suspension protection system and method for communication pipes and cables
CN105544606A (en) Construction method for assembled prefabricated comprehensive pipe rack
CN105569075A (en) Assembled prefabricated comprehensive pipe rack guide positioning device
CN104455889A (en) Integrated underground pipe gallery with compensation device
CN206157768U (en) Street piping lane is crossed to underground
CN106337373B (en) Construction method for obliquely penetrating existing line overhead jacking box culvert
GB2520679A (en) New house service connection chamber
CN203960901U (en) A kind of non-migrating formula of people/hand well of communicating by letter supports protection system
CN204343329U (en) A kind of Novel top pipe well
CN203452335U (en) Water and electricity installation structure for constructional engineering
CN110424517A (en) A kind of underground pipe gallery construction rain sewage in urban core region is relocated construction method
CN206616590U (en) A kind of prestressing force point plus serial side storehouse drainage type underground pipe gallery
CN204164577U (en) With the integrated form underground pipe gallery of compensation device
CN205527401U (en) Open caisson is with simple and easy two hanging flower basket gantry cranes
CN210260965U (en) Jacking trolley of pipe gallery underground excavation two-lining structure
CN204455990U (en) Flood-control wall structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20190608

CF01 Termination of patent right due to non-payment of annual fee