CN2591099Y - Municipal administration comprehensive wiring box - Google Patents

Municipal administration comprehensive wiring box Download PDF

Info

Publication number
CN2591099Y
CN2591099Y CN 03200661 CN03200661U CN2591099Y CN 2591099 Y CN2591099 Y CN 2591099Y CN 03200661 CN03200661 CN 03200661 CN 03200661 U CN03200661 U CN 03200661U CN 2591099 Y CN2591099 Y CN 2591099Y
Authority
CN
China
Prior art keywords
upper box
box
box body
lower box
connecting hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 03200661
Other languages
Chinese (zh)
Inventor
赵洪志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 03200661 priority Critical patent/CN2591099Y/en
Application granted granted Critical
Publication of CN2591099Y publication Critical patent/CN2591099Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model relates to a supplying device synthetically matched with municipal basic facilities. The supplying device has the advantages of high safety, energy saving and environmental protection. The supplying device is characterized in that the supplying device comprises an upper box body and a lower box body, wherein, a multi-ribbed beam is arranged on the inner wall of the top of the upper box body; a multi-ribbed post connected with the multi-ribbed beam is arranged on the inner wall of the side part of the upper box body; the bottom of the upper box body is provided with a connecting hole of the upper box body; the top of the lower box body is provided with a connecting hole of the lower box body; the connecting hole of the upper box body is connected with the connecting hole of the lower box body through a connecting pipe; a wiring bracket is arranged on the multi-ribbed post of the upper box body; the side part of the multi-ribbed post of the upper box body is provided with a sand box bracket; the lower box body is provided with a drainage pipeline and a rainwater pipe communicated with the drainage pipeline; an air exhaust hole, an air inlet, a maintenance port and a sewage pipe connected with the drainage pipeline of the lower box body are also arranged on the upper box body.

Description

Municipal administration comprehensive wiring case
Technical field
The utility model belongs to urban operating mechanism device field, especially municipal comprehensive wiring case.
Background technology
Dominate period in planned economy, municipal infrastructure is provided funds to drop into year by year by government finance, forms municipal infrastructure scale of today.Since the reform and opening-up, " urban development is too fast, and municipal infrastructure is not enough " is maximum present characteristics, and the conservation of historic sites is no exception.And present management mode is multidisciplinary coordinated management, be all departments' constructions respectively as required, drainage pipe and heating pipeline are laid in underground ditching, the power communication cable and wire is built on stilts to be laid, the overlapping investment of construction fund part is used, and modal is " road is opened the zip phenomenon ", and today, you ditched, my grooving tomorrow causes environmental disruption and energy dissipation.By existing job practices, each systematic pipeline of municipal administration can't launch in the alleyway, urban conservation area item by item in addition, and the use of the aboveground space in the alleyway also reaches capacity, and various cables are crisscross on electric pole, break down easily.
The utility model content
The municipal infrastructure that the purpose of this utility model provides a kind of safety, the energy-saving and environmental protection feeding mechanism of forming a complete and comprehensive system for collecting real estate fees.
The technical solution of the utility model is: municipal comprehensive wiring case, it is characterized in that comprising upper box and lower box, the top inner wall of upper box is provided with close girt strip, the sidepiece inwall of upper box is provided with the close rib post that links to each other with close girt strip, the upper box bottom is provided with the upper box connecting hole, the top of lower box is provided with the lower box connecting hole, the upper box connecting hole is connected by tube connector with the lower box connecting hole, the close rib post of upper box is provided with the wiring carriage, the close rib post sidepiece of upper box is provided with the sandbox carriage, the rainwater pipe that lower box is provided with drainage pipe and communicates with drainage pipe also is provided with steam vent on the upper box, air inlet port, access hole and the soil pipe that links to each other with the lower box drainage pipe.
The width of lower box is greater than the width of upper box, on the both ends of the surface of upper box and lower box, be respectively arranged with and be connected pin-and-hole, one end face upper edge periphery of upper box and lower box is provided with slot, and upper edge, the other end end face periphery of upper box and lower box is provided with the slotting platform that is complementary with slot.
Described steam vent is positioned at the top of upper box sidewall, and air inlet port is positioned at the bottom of upper box sidewall.
Described access hole is provided with the access hole cover plate.
Effect of the present utility model is: municipal wiring chest agent structure comprises upper box and lower box, upper box can be used as comprehensive pipeline installing zone, and lower box can be used as rain/dirty comb discharging shunting zone, when construction, as required, a plurality of casings can be linked together continuously; Upper box adopts close girt strip/post web form of structure design, can improve the weight capacity of municipal wiring chest, and the lower box width can increase municipal comprehensive wiring box foundation contact surface greater than the upper box width, improves the degree of stability of municipal comprehensive wiring case; On the both ends of the surface of upper box and lower box, be respectively arranged with and be connected pin-and-hole, one end face of upper box and lower box is provided with slot along the end face periphery, upper edge, the other end end face periphery of upper box and lower box is provided with the slotting platform that is complementary with slot, be provided with the casing end face of slot and be provided with the casing end face of inserting platform and interconnect, can strengthen the firm connection degree between the casing, thereby increase the steadiness of municipal comprehensive wiring case integral body; Adopt the municipal comprehensive wiring case of this structure can adopt unified size and standard, in member factory standardized production, the job site grooving is installed, this mode is fit to the unskilled labourer and makes surface construction, the site operation cycle is short, and the assembling form is the requirement of alleyway characteristics flexibly, can realize purpose of energy saving; Disposed access hole for rain/dirty comb maintenance in the upper box, personnel all can enter up and down, and for using the small machine maintenance to reserve import and export, the inspection hole cover plate can be set to double-deck heavy cover plate, adorn airtight adhesive tape all around, have the function of protection against the tide, anti-flavor and waterproof; Upper box is provided with stack preformed hole, air inlet port, can realize adopting the natural exhaust mode to carry out air displacement, and air inlet port in case of emergency can be converted into and rush down sudden and violent mouthful, the safety that can improve system; The dirty comb of rain can be provided with the dirty shunting exhaust pipe of rain at municipal comprehensive wiring case system pooling zone, rainwater is walked the upper strata, sewage is walked lower floor, and the sewage comb uses the inverted-siphon mode, and presets the mud delaying basin, sewage feeds intake through biochemistry and produces reaction, through the mud delaying basin, mud and foreign material stay, and discharge than clean and dirt water, mud can be taken away by pump truck and carry out buried or utilization again, thereby realizes the purpose of environmental protection.In sum, the utility model municipal administration comprehensive wiring case can be concentrated multiple pipeline and lay, and has the advantage of safe, energy-conservation and environmental protection.
Below in conjunction with drawings and Examples the utility model is further described.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is that the A of Fig. 1 is to view.
The specific embodiment
Among Fig. 1, municipal administration comprehensive wiring case, comprise upper box 1 and lower box 2, the top inner wall of upper box 1 is provided with close girt strip 3, the sidepiece inwall of upper box 1 is provided with the close rib post 4 that links to each other with close girt strip 3, upper box 1 bottom is provided with upper box connecting hole 5, the top of lower box 2 is provided with lower box connecting hole 6, upper box connecting hole 5 is connected by tube connector 7 with lower box connecting hole 6, the close rib post 4 of upper box 1 is provided with wiring carriage 8, the close rib post sidepiece of upper box is provided with sandbox carriage 9, the rainwater pipe 11 that lower box 2 is provided with drainage pipe 10 and communicates with drainage pipe 10 also is provided with steam vent 12 on the upper box 1, air inlet port 13 (referring to Fig. 2), access hole 14 and the soil pipe 15 (referring to Fig. 2) that links to each other with lower box drainage pipe 10.The width of lower box 2 is greater than the width of upper box 1, on the both ends of the surface of upper box 1 and lower box 2, be respectively arranged with and be connected pin-and-hole 16, one end face upper edge periphery of upper box 1 and lower box 2 is provided with slot 19 (referring to Fig. 2), and upper edge, the other end end face periphery of upper box and lower box is provided with the slotting platform 17 that is complementary with slot.Described steam vent 12 is positioned at the top of upper box 1 sidewall, and air inlet port 13 is positioned at the bottom of upper box 1 sidewall.Described access hole 14 is provided with access hole cover plate 18.
Among Fig. 2, the 1st, upper box, the 2nd, lower box, the 3rd, close girt strip, the 4th, close rib post, the 8th, the wiring carriage, the 9th, the sandbox carriage, the 12nd, steam vent, the 13rd, air inlet port, the 14th, access hole, the 15th, soil pipe, the 17th, insert platform, the 18th, access hole cover plate, the 19th, slot.

Claims (4)

1, municipal administration comprehensive wiring case, it is characterized in that comprising upper box and lower box, the top inner wall of upper box is provided with close girt strip, the sidepiece inwall of upper box is provided with the close rib post that links to each other with close girt strip, the upper box bottom is provided with the upper box connecting hole, the top of lower box is provided with the lower box connecting hole, the upper box connecting hole is connected by tube connector with the lower box connecting hole, the close rib post of upper box is provided with the wiring carriage, the close rib post sidepiece of upper box is provided with the sandbox carriage, the rainwater pipe that lower box is provided with drainage pipe and communicates with drainage pipe also is provided with steam vent on the upper box, air inlet port, access hole and the soil pipe that links to each other with the lower box drainage pipe.
2, municipal comprehensive wiring case according to claim 1, it is characterized in that the width of the width of lower box greater than upper box, on the both ends of the surface of upper box and lower box, be respectively arranged with and be connected pin-and-hole, one end face upper edge periphery of upper box and lower box is provided with slot, and upper edge, the other end end face periphery of upper box and lower box is provided with the slotting platform that is complementary with slot.
3, municipal comprehensive wiring case according to claim 1 is characterized in that described steam vent is positioned at the top of upper box sidewall, and air inlet port is positioned at the bottom of upper box sidewall.
4, according to claim 1 or 2 or 3 described municipal comprehensive wiring casees, it is characterized in that described access hole is provided with the access hole cover plate.
CN 03200661 2003-01-06 2003-01-06 Municipal administration comprehensive wiring box Expired - Lifetime CN2591099Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03200661 CN2591099Y (en) 2003-01-06 2003-01-06 Municipal administration comprehensive wiring box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03200661 CN2591099Y (en) 2003-01-06 2003-01-06 Municipal administration comprehensive wiring box

Publications (1)

Publication Number Publication Date
CN2591099Y true CN2591099Y (en) 2003-12-10

Family

ID=33752981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03200661 Expired - Lifetime CN2591099Y (en) 2003-01-06 2003-01-06 Municipal administration comprehensive wiring box

Country Status (1)

Country Link
CN (1) CN2591099Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101177945B (en) * 2007-08-02 2011-03-23 上海市政工程设计研究总院 Dog-house for integrated pipe ditch
CN103397662A (en) * 2013-08-12 2013-11-20 上海市城市建设设计研究总院 Comprehensive pipe gallery structure
CN104878777A (en) * 2015-06-08 2015-09-02 李伟 Pipeline connecting case and construction method for temporarily constructing pipelines of municipal foundation facilities
CN108457304A (en) * 2018-03-28 2018-08-28 合肥云智物联科技有限公司 Cable shaft based on Phase of Electric Power Projects and its monitoring system
CN105113543B (en) * 2015-09-22 2018-10-23 赵洪志 0815 type underground pipe gallery assembling combination cabin concrete structure of shallow embedding
CN109680572A (en) * 2018-11-26 2019-04-26 山东汇通建设集团有限公司 Roadbase concrete side form integrated comprehensive pipeline construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101177945B (en) * 2007-08-02 2011-03-23 上海市政工程设计研究总院 Dog-house for integrated pipe ditch
CN103397662A (en) * 2013-08-12 2013-11-20 上海市城市建设设计研究总院 Comprehensive pipe gallery structure
CN104878777A (en) * 2015-06-08 2015-09-02 李伟 Pipeline connecting case and construction method for temporarily constructing pipelines of municipal foundation facilities
CN104878777B (en) * 2015-06-08 2016-08-24 李伟 The pipeline connecting box of civilian infrastructure pipeline temporary construction and construction method
CN105113543B (en) * 2015-09-22 2018-10-23 赵洪志 0815 type underground pipe gallery assembling combination cabin concrete structure of shallow embedding
CN108457304A (en) * 2018-03-28 2018-08-28 合肥云智物联科技有限公司 Cable shaft based on Phase of Electric Power Projects and its monitoring system
CN109680572A (en) * 2018-11-26 2019-04-26 山东汇通建设集团有限公司 Roadbase concrete side form integrated comprehensive pipeline construction method

Similar Documents

Publication Publication Date Title
CN2591099Y (en) Municipal administration comprehensive wiring box
CN106013221A (en) Four-layer rectangle-like urban underground complex
CN206189462U (en) Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line
CN106013223A (en) Oval-cross-section urban underground complex
CN106436755A (en) Four-layer stair-like city underground comprehensive body
CN208605197U (en) A kind of building structure that subway driving section is built together with Urban Underground pipe gallery
CN206267314U (en) It is embedded with the house that the modularization wall of distributed pipeline builds
CN206189448U (en) Elliptical section city underground complex
CN106638682A (en) Efficient-seismic-reduction quasi-rectangular city underground architecture complex
CN204803915U (en) Synthesize piping lane and synthesize installing port
CN103362290A (en) Shaft with combined arrangement of underground powerhouse cable line outgoing system and air exhausting system
CN208072456U (en) A kind of underground pipe gallery and underground garage connecting taxiway structure based on road
CN106013222A (en) Urban underground complex with three-circle cross section
CN2830843Y (en) Fixer of high voltage cable in cable duct
CN205604295U (en) Utility tunnel dog -house structure
CN201043475Y (en) Drainage device for deep well in mine
CN208605198U (en) A kind of building structure that subway station is built together with Urban Underground pipe gallery
CN203393982U (en) Vertical shaft adopting underground powerhouse cable outlet and air exhausting system which are arranged combinedly
CN2871676Y (en) Built-in piece for building
CN207079623U (en) A kind of class rectangle Urban Underground Complex of efficiently damping
CN206110171U (en) Double circle section city underground complex
CN205557569U (en) Prestressing force divides and adds special formula underground pipe gallery in serial limit storehouse
CN106013226A (en) Urban underground complex with double-circle cross section
CN206785108U (en) The job site enclosing frame of multipurpose water tank watering is installed
CN202017494U (en) Large-diameter jacking pipe structure for power tunnel engineering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20130106

Granted publication date: 20031210