CN204343329U - A kind of Novel top pipe well - Google Patents
A kind of Novel top pipe well Download PDFInfo
- Publication number
- CN204343329U CN204343329U CN201420778209.6U CN201420778209U CN204343329U CN 204343329 U CN204343329 U CN 204343329U CN 201420778209 U CN201420778209 U CN 201420778209U CN 204343329 U CN204343329 U CN 204343329U
- Authority
- CN
- China
- Prior art keywords
- pipe
- jacking
- well
- pipe jacking
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
本实用新型公开了一种新型顶管井,包括设置在顶管井内的顶管段,在所述顶管段的下部至少设置有一与其连通且延伸出地面的排水管,所述排水管的上部设置检修阀门,在所述顶管段上部还设置有至少一进排气阀。在顶管井检修时,可以打开检修阀门,将潜水泵沉入排水管的底部,通过潜水泵的抽水有效将顶管中的水排出,且顶管井为干井,实现干湿分离,无需再另外设置湿井,大大减小了顶管井的尺寸,减少投资成本,且还能通过进排气阀平衡顶管内部的气压。
The utility model discloses a novel pipe-jacking well, which comprises a pipe-jacking section arranged in the pipe-jacking well, at least one drainage pipe communicating with it and extending out of the ground is arranged at the lower part of the pipe-jacking section, and an inspection valve is arranged on the upper part of the drainage pipe , At least one intake and exhaust valve is also arranged on the upper part of the pipe jacking section. During the maintenance of the pipe jacking well, the maintenance valve can be opened, the submersible pump can be sunk into the bottom of the drainage pipe, and the water in the pipe jacking can be effectively discharged through the pumping of the submersible pump, and the pipe jacking well is a dry well, which realizes the separation of dry and wet, without additional Setting the wet well greatly reduces the size of the pipe jacking well, reduces investment costs, and can also balance the air pressure inside the pipe jacking through the intake and exhaust valves.
Description
技术领域technical field
本实用新型涉及给水管网领域,特别涉及一种新型顶管井。The utility model relates to the field of water supply pipe networks, in particular to a novel pipe-jacking well.
背景技术Background technique
顶管施工就是非开挖施工方法,是一种不开挖或者少开挖的管道埋设施工技术。顶管法施工就是在工作坑内借助于顶进设备产生的顶力,克服管道与周围土壤的摩擦力,将管道按设计的坡度顶入土中,并将土方运走。一节管子完成顶入土层之后,再下第二节管子继续顶进。其原理是借助于主顶油缸及管道间、中继间等推力,把工具管或掘进机从工作坑内穿过土层一直推进到接收坑内吊起。管道紧随工具管或掘进机后,埋设在两坑之间。Pipe jacking construction is a non-excavation construction method, and it is a pipeline burying construction technology that does not excavate or excavates less. Pipe jacking construction is to use the jacking force generated by the jacking equipment in the working pit to overcome the friction between the pipeline and the surrounding soil, push the pipeline into the soil according to the designed slope, and transport the earth away. After one section of pipe has been jacked into the soil layer, the second section of pipe will continue to be jacked. Its principle is to push the tool pipe or roadheader from the working pit through the soil layer to the receiving pit by means of the thrust of the main top oil cylinder, the pipeline room, and the relay room. The pipeline is buried between the two pits immediately after the tool pipe or the roadheader.
非开挖工程技术彻底解决了管道埋设施工中对城市建筑物的破坏和道路交通的堵塞等难题,在稳定土层和环境保护方面凸显其优势。这对交通繁忙、人口密集、地面建筑物众多、地下管线复杂的城市是非常重要的,它将为城市创造一个洁净、舒适和美好的环境。Trenchless engineering technology has completely solved the problems of damage to urban buildings and road traffic congestion during pipeline burying construction, and has highlighted its advantages in terms of stabilizing soil layers and environmental protection. This is very important for cities with heavy traffic, dense population, numerous ground buildings and complicated underground pipelines. It will create a clean, comfortable and beautiful environment for the city.
而目前的顶管井为干井,为了方便检修,一般会在干井一侧设置一座湿井,以便在检修时将顶管中的水排出,但是这种结构的顶管井具有较大的尺寸,增加了投资,且操作不方便。The current pipe jacking well is a dry well. In order to facilitate maintenance, a wet well is generally installed on one side of the dry well to discharge the water in the pipe jacking during maintenance. However, the pipe jacking well with this structure has a relatively large size. Increased investment, and inconvenient operation.
实用新型内容Utility model content
本实用新型的目的在于针对现有技术的不足和缺陷,提供一种新型顶管井,该新型顶管井能够在检修时有效排出顶管中的水,且无需另外再设置湿井,可以解决上述问题。The purpose of this utility model is to provide a new type of pipe jacking well for the deficiencies and defects of the prior art. The new type of pipe jacking well can effectively discharge the water in the pipe jacking during maintenance, and there is no need to set up a wet well, which can solve the above problems .
本实用新型所解决的技术问题可以采用以下技术方案来实现:The technical problem solved by the utility model can be realized by adopting the following technical solutions:
一种新型顶管井,包括设置在顶管井内的顶管段,其特征在于,在所述顶管段的下部至少设置有一与其连通且延伸出地面的排水管,所述排水管延伸出地面,并在排水管的上部设置检修阀门,,在所述顶管段上部还设置有至少一进排气阀。A new type of pipe jacking well, comprising a pipe jacking section arranged in the pipe jacking well, characterized in that at least one drainage pipe communicating with it and extending out of the ground is arranged at the lower part of the pipe jacking section, and the drainage pipe extends out of the ground and An inspection valve is arranged on the upper part of the drain pipe, and at least one inlet and exhaust valve is arranged on the upper part of the pipe jacking section.
在本实用新型的一个优选实施例中,所述顶管井顶部还设置有一操作平台,工作人员通过所述操作平台控制所述检修阀门以及所述进排气阀工作。In a preferred embodiment of the present utility model, an operation platform is provided on the top of the pipe jacking well, through which the staff can control the operation of the maintenance valve and the intake and exhaust valves.
在本实用新型的一个优选实施例中,所述操作平台的顶部设置有供工作人员进入的人孔。In a preferred embodiment of the present invention, the top of the operating platform is provided with a manhole for workers to enter.
由于采用了如上的技术方案,本实用新型的有益效果在于:在顶管井检修时,可以通过排水管有效将顶管中的水排出,且顶管井为干井,实现干湿分离,无需再另外设置湿井,大大减小了顶管井的尺寸,减少投资成本,且还能通过进排气阀平衡顶管内部的气压。Due to the adoption of the above technical scheme, the beneficial effect of the utility model is that: during the inspection and maintenance of the pipe jacking well, the water in the pipe jacking can be effectively discharged through the drain pipe, and the pipe jacking well is a dry well, so that dry and wet separation can be realized without additional Setting the wet well greatly reduces the size of the pipe jacking well, reduces investment costs, and can also balance the air pressure inside the pipe jacking through the intake and exhaust valves.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the accompanying drawings that need to be used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the accompanying drawings in the following description These are only some embodiments of the present utility model, and those skilled in the art can also obtain other drawings according to these drawings without creative work.
图1是本实用新型一种实施例的结构示意图。Fig. 1 is a schematic structural view of an embodiment of the utility model.
具体实施方式Detailed ways
为了使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体图示,进一步阐述本实用新型。In order to make the technical means, creative features, goals and effects achieved by the utility model easy to understand, the utility model will be further elaborated below in conjunction with specific illustrations.
参见图1所示的一种新型顶管井,包括设置在顶管井100内的顶管段200,在顶管段200的下部设置有一与其连通的排水管300,当然,排水管300的数量可以根据需要而设置。排水管300的顶端延伸出地面,排水管300的顶端通过闷板320封堵,在排水管300的上部设置检修阀门310。在顶管段200上部还设置有至少一进排气阀210。Referring to a new type of pipe jacking well shown in Fig. 1, it includes a pipe jacking section 200 arranged in the pipe jacking well 100, and a drainage pipe 300 communicating with it is arranged at the bottom of the pipe jacking section 200. Of course, the number of drainage pipes 300 can be adjusted according to needs. set up. The top of the drainpipe 300 extends out of the ground, and the top of the drainpipe 300 is blocked by a blind plate 320 , and an inspection valve 310 is set on the top of the drainpipe 300 . At least one intake and exhaust valve 210 is also provided on the upper part of the pipe jacking section 200 .
为了便于工作人员的操作,顶管井100顶部还设置有一操作平台400,工作人员通过操作平台400控制检修阀门310以及进排气阀210工作。操作平台400的顶部设置有供工作人员进入的人孔410。为了保障工作人员下井施工的安全,本实施例中的操作平台400的顶部设置有护栏420。In order to facilitate the operation of the staff, an operation platform 400 is provided on the top of the pipe jacking well 100, and the staff controls the maintenance valve 310 and the intake and exhaust valve 210 through the operation platform 400 to work. The top of the operating platform 400 is provided with a manhole 410 for staff to enter. In order to ensure the safety of the workers going down the well, the top of the operating platform 400 in this embodiment is provided with a guardrail 420 .
本实用新型的工作原理如下:The working principle of the utility model is as follows:
在顶管井100检修时,可以打开检修阀门310,将潜水泵沉入排水管300的底部,通过潜水泵的抽水有效将顶管中的水排出,且顶管井100为干井,实现干湿分离,无需再另外设置湿井,大大减小了顶管井的尺寸,减少投资成本,且还能通过进排气阀210平衡顶管内部的气压。When the pipe jacking well 100 is overhauled, the maintenance valve 310 can be opened, the submersible pump can be sunk into the bottom of the drainage pipe 300, and the water in the pipe jacking can be effectively discharged through the pumping of the submersible pump, and the pipe jacking well 100 is a dry well to realize dry-wet separation , there is no need to set another wet well, which greatly reduces the size of the pipe jacking well, reduces the investment cost, and can also balance the air pressure inside the pipe jacking through the intake and exhaust valves 210 .
以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles and main features of the present utility model and the advantages of the present utility model have been shown and described above. Those skilled in the industry should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model The new model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model. The scope of protection required by the utility model is defined by the appended claims and their equivalents.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420778209.6U CN204343329U (en) | 2014-12-10 | 2014-12-10 | A kind of Novel top pipe well |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420778209.6U CN204343329U (en) | 2014-12-10 | 2014-12-10 | A kind of Novel top pipe well |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204343329U true CN204343329U (en) | 2015-05-20 |
Family
ID=53226607
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420778209.6U Expired - Fee Related CN204343329U (en) | 2014-12-10 | 2014-12-10 | A kind of Novel top pipe well |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204343329U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107504315A (en) * | 2017-08-07 | 2017-12-22 | 上海公路桥梁(集团)有限公司 | A kind of construction method that Jiang Guandao is got over using baric systerm reparation seepage |
| CN110924440A (en) * | 2019-12-17 | 2020-03-27 | 辽宁省水利水电勘测设计研究院有限责任公司(原名称为辽宁省水利水电勘测设计研究院) | A kind of multifunctional drainage well of water transmission pipeline and using method thereof |
-
2014
- 2014-12-10 CN CN201420778209.6U patent/CN204343329U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107504315A (en) * | 2017-08-07 | 2017-12-22 | 上海公路桥梁(集团)有限公司 | A kind of construction method that Jiang Guandao is got over using baric systerm reparation seepage |
| CN107504315B (en) * | 2017-08-07 | 2020-06-12 | 上海公路桥梁(集团)有限公司 | Construction method for repairing leaked river-crossing pipeline by using air pressure system |
| CN110924440A (en) * | 2019-12-17 | 2020-03-27 | 辽宁省水利水电勘测设计研究院有限责任公司(原名称为辽宁省水利水电勘测设计研究院) | A kind of multifunctional drainage well of water transmission pipeline and using method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204530719U (en) | A kind of quick assembled type suspension device for Support of Foundation Pit Excavation | |
| CN102635402A (en) | Siphon drainage method for tunnel wall water seepage disposal by using dipping borehole | |
| CN207131450U (en) | Hole construction by the diversion of region of FuShui tunnel | |
| CN101550701B (en) | Method and facilities for dealing with local water gushing in foundation pit | |
| CN201620915U (en) | Constant pressure controlled drainage device for reverse slope drainage of karst tunnel | |
| CN106836285A (en) | One kind guards waterproof construction based on architecture information underground pipe gallery | |
| CN206034620U (en) | Siphon drainage system | |
| CN108825247A (en) | A kind of flare sidewall horizontal for 8 pilot tunnel PBA engineering methods makes bottom basin shape and freezes sealing engineering method | |
| CN102705006B (en) | Method for governing operating tunnel flood by adopting wellpoint dewatering method | |
| CN206448286U (en) | It is a kind of to be used to reduce the radial system of grey field dam seepage line | |
| CN206143899U (en) | Crossover node structure suitable for sewer line incorporates utility tunnel in | |
| CN204343329U (en) | A kind of Novel top pipe well | |
| CN203729314U (en) | Anti-floating relief well | |
| CN206592151U (en) | A kind of stifled row's integrated structure of rich water karst tunnel | |
| CN205637180U (en) | Waterproof structure of basement | |
| CN205530388U (en) | Forced induction water pressure control system for underground works | |
| CN103615014A (en) | Water-lowering device of soft-soil foundation pit and using method of water-lowering device | |
| CN102720266A (en) | Siphon type dredging device for water storage and drainage tunnel | |
| CN105569162A (en) | Method for blocking bilge wells | |
| CN107165673B (en) | Mine method deep buried underwater traffic tunnel wastewater sectional collection and grading lifting structure | |
| CN109487886A (en) | The siphon drainge system of underground garage | |
| CN206111238U (en) | Prevent that tunnel from just propping up structure of seepage and drainage system thereof | |
| CN204898831U (en) | Novel plastic check well | |
| CN205502044U (en) | Be applied to precipitation structure in grittiness water -bearing stratum under building | |
| CN203757177U (en) | Mud sand sludge area manual pipe jacking construction device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150520 Termination date: 20201210 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |