CN205527401U - Open caisson is with simple and easy two hanging flower basket gantry cranes - Google Patents
Open caisson is with simple and easy two hanging flower basket gantry cranes Download PDFInfo
- Publication number
- CN205527401U CN205527401U CN201620315184.5U CN201620315184U CN205527401U CN 205527401 U CN205527401 U CN 205527401U CN 201620315184 U CN201620315184 U CN 201620315184U CN 205527401 U CN205527401 U CN 205527401U
- Authority
- CN
- China
- Prior art keywords
- open caisson
- electric block
- utility
- model
- hanging basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides an open caisson is with simple and easy two hanging flower basket gantry cranes, effectual to have solved traditional gantry crane area big, erects the trouble, influences the time limit for a project scheduling problem, the present invention has the technical scheme that bacteria, the utility model discloses a support, its characterized in that, scaffold weldment are in open caisson wall upper end, and the support upper end is connected with a plurality of crossbeams, and the crossbeam below is equipped with the KBK track, installs a plurality of electric block on the KBK track, is equipped with the dog in the middle of the KBK track, constitutes the structure that a plurality of electric block worked respectively, and the electric block below is connected with the hanging flower basket, the utility model discloses simple structure takes up an area of lessly, sets up the convenience, can accomplish in the very fast time and erect, can shorten cycle of the preparation of open caisson for the construction progress.
Description
Technical field
This utility model relates to building technique with the apparatus field, particularly relates to the simple double hanging basket gantry cranes of a kind of open caisson.
Background technology
Increasingly mature along with pipe jacking construction technique, jacking construction progressively becomes a kind of main construction method of urban drainage engineering non-excavation underground pipeline construction, because it need not large-area excavation surface layer, and can highway crossing, railway, river, above ground structure, underground structure and various underground utilities etc..Have free from environmental pollution, do not affect traffic, earth formation is destroyed little, construction safety is reliable, the cycle is short, without transport with stack the advantages such as miscellaneous soil, low cost, social benefit and remarkable in economical benefits.
When jacking construction, need to arrange an open caisson every a segment distance, to be used for carrying out the operating point of jacking construction, when making open caisson, need to dig out on-site for open caisson soil, the mode setting up gantry crane around open caisson is typically now used to carry out operation of cutting the earth, but pillar is mostly arranged on around open caisson by existing gantry crane, the working range of gantry crane is big, and floor space is big, often set up gantry crane and need long time, the construction speed of open caisson can be affected.
Utility model content
For above-mentioned situation, for overcoming the defect of prior art, the purpose of this utility model is just to provide the most double hanging basket gantry cranes of a kind of open caisson, effectively solves tradition gantry crane floor space big, sets up and bother, affect the problems such as duration.
Its technical scheme solved is, this utility model includes support, it is characterized in that, support is welded on open caisson wall upper end, and pedestal upper end connects multiple crossbeam, is provided with KBK track below crossbeam, multiple electric block is installed on KBK track, being provided with block in the middle of KBK track, constitute the structure that multiple electric block works respectively, connecting below electric block has hanging basket.
This utility model simple in construction, takes up an area less, sets up conveniently, can complete to set up, it is possible to shorten the cycle of the making of open caisson, accelerating construction progress within the time faster.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in further detail.
Be given by Fig. 1, this utility model includes support 1, it is characterized in that, support 1 is welded on open caisson wall upper end, and support 1 upper end connects multiple crossbeam 2, is provided with KBK track 3 below crossbeam 2, multiple electric block 4 is installed on KBK track 3, being provided with block 8 in the middle of KBK track, constitute the structure that multiple electric block 4 works respectively, connecting below electric block 4 has hanging basket 5.
Described electric block 4 connects through control system handle 6.
Described crossbeam 2 two ends are provided with limited block 7.
This utility model in use,
During open caisson manufacture, after concrete foundation made by the borehole wall of open caisson upper end, support 1 is welded on the borehole wall, crossbeam 2 rides upon support 1 upper end, and the KBK track below crossbeam 2 is installed multiple electric block 4, and electric block 4 block 8 separates, it is made separately to work, it does not interfere with each other, below electric block 4, connect hanging basket 5, use hanging basket 5 to carry out transport and the transfer of soil.
Operationally, when making open caisson, the soil dug out is placed in hanging basket 5, by the up and down of hanging basket 5 and moving left and right, soil can be transported and not affect the place of construction, and when a hanging basket 5 shifts, another hanging basket 5 carries out in can being placed on open caisson filling geotechnique's work, two hanging basket 5 operations alternate with each other, so that the work cut the earth persistently is carried out, do not have the phenomenon in stage casing, the progress of construction can be accelerated, shorten process time.
Crossbeam 2 two ends are provided with limited block 7, are possible to prevent electric block 4 to deviate from KBK track 3.
This utility model, compared to traditional open caisson gantry crane, reduces floor space, can improve the speed set up, and the setting of double hanging basket is so that work progress is not interrupted, and sustainable carries out, it is possible to be greatly shortened the engineering time.
This utility model simple in construction, takes up an area less, sets up conveniently, can complete to set up, it is possible to shorten the cycle of the making of open caisson, accelerating construction progress within the time faster.
Claims (3)
1. open caisson simply pair hanging basket gantry cranes, including support (1), it is characterized in that, support (1) is welded on open caisson wall upper end, and support (1) upper end connects multiple crossbeam (2), and crossbeam (2) lower section is provided with KBK track (3), multiple electric block (4) is installed on KBK track (3), being provided with block (8) in the middle of KBK track, constitute the structure that multiple electric block (4) works respectively, electric block (4) lower section connects hanging basket (5).
A kind of open caisson simply pair hanging basket gantry cranes the most according to claim 1, it is characterised in that described electric block (4) connects through control system handle (6).
A kind of open caisson simply pair hanging basket gantry cranes the most according to claim 1, it is characterised in that described crossbeam (2) two ends are provided with limited block (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620315184.5U CN205527401U (en) | 2016-04-15 | 2016-04-15 | Open caisson is with simple and easy two hanging flower basket gantry cranes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620315184.5U CN205527401U (en) | 2016-04-15 | 2016-04-15 | Open caisson is with simple and easy two hanging flower basket gantry cranes |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205527401U true CN205527401U (en) | 2016-08-31 |
Family
ID=56793035
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620315184.5U Expired - Fee Related CN205527401U (en) | 2016-04-15 | 2016-04-15 | Open caisson is with simple and easy two hanging flower basket gantry cranes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205527401U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107089603A (en) * | 2017-06-12 | 2017-08-25 | 无锡石油化工起重机有限公司 | The gantry of goods and materials storage warehouse is carried side by side |
-
2016
- 2016-04-15 CN CN201620315184.5U patent/CN205527401U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107089603A (en) * | 2017-06-12 | 2017-08-25 | 无锡石油化工起重机有限公司 | The gantry of goods and materials storage warehouse is carried side by side |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105256812B (en) | Foundation ditch prefabricated assembled concrete supporting construction and its construction method | |
CN206308569U (en) | It is a kind of to reinforce the road structure for punishing the solution cavity that underlies | |
CN206175812U (en) | Powder sandy soil stratum push pipe construction structures based on steel bushing head instrument pipe | |
CN101838988B (en) | Comprehensive construction method for extracting anchor cable | |
CN106593470A (en) | High-permeability water-rich sand shield terminal reinforcing system and construction method thereof | |
CN101851922A (en) | Method for eliminating underground anchor rope/rod by using all casing drill | |
CN107191188B (en) | Bedrock section bad aquifer positioning and targeting grouting vertical shaft wall structure, construction device and construction method | |
CN105065040B (en) | A kind of prefabricated underground space tunneling construction method of top plate | |
CN204551430U (en) | A kind of pre-buried floral tube grouting and reinforcing device on soft foundation | |
CN205527401U (en) | Open caisson is with simple and easy two hanging flower basket gantry cranes | |
CN103147435A (en) | Method for treating construction engineering foundation in gob | |
CN202273233U (en) | Deep foundation pit of three-dimensional garage | |
CN203891047U (en) | Equipment equipped with steel platform for foundation construction of land bridge | |
CN207750084U (en) | The closely connected construction supporting structure for passing through existing building of newly-built underground engineering | |
CN106241234A (en) | A kind of self-propelled for prefabricated pipe gallery transports assembly car | |
CN206477240U (en) | A kind of trestle pile foundation for deep water drift net riverbed | |
CN113338273B (en) | Stirring pile construction method based on water-rich organic matter soft soil layer river channel | |
CN203922510U (en) | A kind of simple and easy cable machine that is arranged in slope | |
CN102677671B (en) | Construction method of precast pile in thick-slag-stone-layer field | |
CN108930323A (en) | A kind of pipe jacking construction method | |
CN205134326U (en) | Prefabricated assembled concrete bearing structure of foundation ditch | |
CN203603147U (en) | Device capable of accurately positioning multi-axis deep mixing pile | |
CN209100054U (en) | It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure | |
CN207989037U (en) | Mountain area underpass of freeways roadbed combined supporting settlement Control device | |
CN208501694U (en) | A kind of prefabricated component for close to type foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160831 Termination date: 20210415 |