CN104184097A - Non-migration suspension protection system and method for communication pipes and cables - Google Patents
Non-migration suspension protection system and method for communication pipes and cables Download PDFInfo
- Publication number
- CN104184097A CN104184097A CN201410332352.7A CN201410332352A CN104184097A CN 104184097 A CN104184097 A CN 104184097A CN 201410332352 A CN201410332352 A CN 201410332352A CN 104184097 A CN104184097 A CN 104184097A
- Authority
- CN
- China
- Prior art keywords
- communication line
- original communication
- suspension
- nest
- tubes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention provides a non-migration suspension protection system and method for communication pipes and cables. The method includes the following steps: digging a pipe suspension construction passageway at the position of original communication pipes and cables; positioning and binding the original communication pipes and cables through positioning frames; excavating holes under a pipe cluster of the original communication pipes and cables and using earth layers, which are not excavated, at the two sides as support points to install suspension cradles over the original communication pipes and cables; building a drilling pile at each of the two sides of the pipe cluster and preparing to prefabricate pile supporting stands on site; excavating temporary support walls at the two ends of the line cluster, and a base and the earth layers at the lower part to an appropriate depth and manufacturing the pile supporting stands through casting so as to support the original communication pipes and cables; and packaging the original communication pipes and cables. The system has the characteristics that a non-migration and in-situ protection scheme is implemented on the original communication pipes and cables which pass through a deep foundation pit of a planned subway station so that construction of the deep foundation pit of the planned subway station is not affected; at the same time, the system also has the characteristics of uninterrupted communication, high protectiveness, short construction time, high efficiency, low cost, and easy popularization and application and the like.
Description
Technical field
The present invention relates to the field of underground structure (as underground railway, road tunnel, underground parking and underground street, shop and the underground substation etc.) construction of communication pipe engineering construction and municipal works, relate in particular to the non-migrating formula suspension protection system and method for a kind of communication pipe and cable.
Background technology
Along with upgrading and the transformation of Chinese Urbanization, the infrastructure construction of China's urbanization, the particularly construction of city underground track traffic have more been accelerated.But, work progress situation from underground railway track traffic engineering construction, communication accident frequently occurs, as communication pipe obstruction, communication pipe serious damage, communication cable partly or entirely interrupt etc., these accidents cause damage not only to communication user with the property right unit that communicates by letter, also cause communications peripheral pipe network maintenance and constructional difficulties afterwards simultaneously.
In order to prevent the generation of this type of accident, often adopt and plan to build interim pipeline route 03, will pass through former communication line 02 cutover of planning to build subway station deep basal pit 01 and migrate in the interim pipeline route 03 of new construction (as shown in Figure 1).
Former communication line 02 cutover is removed and is passed through the former communication line 02 of planning to build subway station deep basal pit 01 after migrating in the interim pipeline route 03 of new construction, and subway station deep basal pit 01 starts to build (as shown in Figure 2).
Until subway station deep basal pit 01, build complete and in its 01 main body after earthing, again on the former communication line 02 route position of covering thereon, newly-built (recovery) original communication line 02, and by after in interim pipeline 03 route, cable cutover is moved back, remove again interim pipeline 03, recover original appearance (as shown in Figure 3).
This kind of solution is migration formula.Although can solve the Construction Problems of subway station deep basal pit 01, it has also brought the blocking communication of repetition (secondary) property simultaneously; Change move, cutover amount is large, difficulty of construction is large; Communication failure rate is high; Investment is large, and cost is high; Poor stability; Efficiency of construction is low, and the engineering time, long grade was the more very important problem of principal character.
Summary of the invention
The object of the present invention is to provide the non-migrating formula suspension protection system and method for a kind of communication pipe and cable; adopt non-migrating mode to keep communication unimpeded; preserve the original subject form of communication line and position simultaneously and its nest of tubes done to suspension protection and process, realizing non-migrating and do not affect and plan to build the object that subway station deep basal pit is built.
The object of the invention is to be achieved through the following technical solutions.
A non-migrating formula suspension protection system for communication pipe and cable, comprising: m posting, a n suspension, drilled pile, stake bear responsibility platform, on seal, described m >=1, n >=1;
Described posting, is spaced along the length direction of original communication line, is installed in the nest of tubes bottom of original communication line, and original communication line is positioned to colligation;
Described suspension, is spaced along the length direction of original communication line, is installed in the nest of tubes bottom of original communication line, and the original communication line through location colligation suspend and maked somebody a mere figurehead;
Described drilled pile, comprises at least two, is located at respectively the nest of tubes two bottom sides of original communication line;
The described stake platform of bearing responsibility, is formed on the nest of tubes bottom and drilled pile of original communication line, for usining the temporary supporting wall at pipeline two ends, as the strong point, original communication line is supported;
On described, seal, be formed at the top of original communication line, agree with the stake platform of bearing responsibility, for original communication line is protected.
Preferably, described posting is specially square or rectangle, and its angle steel by 4 two ends band strip screw holes and 4 cover bolts form.
Preferably, described suspension comprises: above suspend beam, lower suspention beam in midair and be connected in suspention beam and lower suspention beam between suspention pull bar;
Described lower suspention beam is positioned at the nest of tubes bottom of original communication line, and described upper suspention beam is usingd soil layer that original communication line both sides do not excavate as the strong point, under the mating reaction of lower suspention beam and suspention pull bar, pipeline is suspended in midair.
Preferably, the described stake platform of bearing responsibility comprises: the longitudinal bracing beam arranging along the Width of original communication line and the cross-brace beam arranging along the length direction of original communication line;
Described longitudinal bracing beam, builds and is integral with cross-brace beam, between described two drilled piles and the bottom of cross-brace beam; Described cross-brace beam, is groove type, and it covers the bottom of lower suspention beam and the suspention pull bar of the bottom of described posting, described suspension.
Preferably, the spacing of adjacent positioned frame is 2 meters, and the spacing of adjacent suspension is 3 meters.
A non-migrating formula suspension protection method for communication pipe and cable, comprising:
In original communication line position of planning to build on deep basal pit, excavation conduit wiring suspension construction passage;
Posting is installed in nest of tubes bottom at original communication line, by posting, original communication line is positioned to colligation;
In the nest of tubes bottom of original communication line, burrow and using soil layer that conduit wiring suspension construction passage both sides do not excavate as the strong point, suspension being installed, to make somebody a mere figurehead original communication line;
In the nest of tubes both sides of original communication line, respectively build a drilled pile in nest of tubes bottom, prepare the in-situ precast stake platform of bearing responsibility;
The basis of excavation nest of tubes two ends temporary supporting wall and bottom and soil layer be in appropriate depth, and build and make the stake platform of bearing responsibility, and completes the support to original communication line;
On being carried out, seals original communication line.
Preferably, said method also comprises: making before stake bears responsibility after platform, seals on original communication line is carried out, described suspension is removed.
Preferably, in the process that described suspension is removed, only remove the upper suspention beam of described suspension and exceed suspention pull bar more than the nest of tubes top preset height of original communication line.
Preferably, said method also comprises: when the diaphram wall in deep basal pit and body supports beam are built complete and loadable, by the drilled pile amputation of the bottom of body supports beam.
Preferably, in said method, the installing space of described posting is 2 meters, and the installing space of described suspension is 3 meters.
Compared with prior art, the present invention's embodiment of the present invention has the following advantages:
The present invention has and plans to build original communication pipe of subway station deep basal pit and cable is implemented non-migrating, original place protection scheme to passing through; do not affect the construction of planning to build subway station deep basal pit, also possess uninterrupted communication, the characteristic such as protectiveness is strong, the engineering time is short, efficiency is high, cost is low, easy promotion and application simultaneously.
Accompanying drawing explanation
Fig. 1 existingly migrates to the schematic diagram in interim pipeline route by former communication line cutover;
Fig. 2 is the schematic diagram of the former communication line of existing dismounting;
Fig. 3 is existing by the schematic diagram that in interim pipeline route, cable cutover is moved back;
Fig. 4 is non-migrating formula suspension protection method flow diagram provided by the invention;
Fig. 5 is the schematic diagram to former nest of tubes location colligation in the embodiment of the present invention;
Fig. 6 is the scheme of installation of posting in the embodiment of the present invention;
Fig. 7 is to the built on stilts schematic diagram of former nest of tubes suspention in the embodiment of the present invention;
Fig. 8 is embodiment of the present invention Central Plains nest of tubes suspension schematic diagram;
Fig. 9 builds drilled pile schematic diagram in the embodiment of the present invention;
Figure 10 is the bear responsibility schematic perspective view of platform of in-situ precast drilled pile in the embodiment of the present invention;
Figure 11 is the bear responsibility generalized section of platform of in-situ precast drilled pile in the embodiment of the present invention;
Figure 12 removes suspension schematic perspective view afterwards in the embodiment of the present invention;
Figure 13 removes suspension generalized section afterwards in the embodiment of the present invention;
Figure 14 seals schematic perspective view afterwards on nest of tubes in the embodiment of the present invention;
Figure 15 seals generalized section afterwards on nest of tubes in the embodiment of the present invention;
Figure 16 cuts the schematic perspective view of stake in the embodiment of the present invention;
Figure 17 cuts the generalized section of stake in the embodiment of the present invention;
Figure 18 cuts stake schematic perspective view afterwards in the embodiment of the present invention;
Figure 19 cuts stake generalized section afterwards in the embodiment of the present invention.
Embodiment
In order to make object of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not intended to limit the present invention.
Refer to Fig. 4, the present invention's application said system realizes and to the non-migrating formula suspension protection method of pipeline to be: location colligation 100, suspention are built on stilts 101, building drilled pile 102, building stake are born responsibility platform 103, remove on suspension 104, nest of tubes, seal 105, cut stake 106, scheme completes 107.
To describe in detail respectively each step below.
Fig. 5 shows the former communication line location colligation of the present invention 100 schematic diagrames.
Step 100: determine and pass through behind original communication line 2 positions of planning to build on subway station deep basal pit 1 according to subway main body construction drawing, excavation conduit wiring suspension construction passage 3 (determining depending on nest of tubes width and length); Bottom the nest of tubes of original communication line 2, after two meters of punchings, identical posting 4 is installed and is positioned colligation.The quantity of posting 4 is determined by passing through the length of planning to build the original communication line 2 on subway station deep basal pit 1.
Fig. 6 shows the scheme of installation of posting 4 of the present invention.
Posting 4 of the present invention is that (two lead screw diameters are long by 4 two ends band strips, be convenient to adjust distance and colligation nest of tubes) angle steel of screw hole and 4 cover bolts form, it can be combined into square or rectangular, look the nest of tubes subject form of original communication line 2 and determine.
Fig. 7 shows built on stilts 101 schematic diagrames of the former communication line suspention of the present invention.
Step 101: complete after the location colligation 100 of original communication line 2, in the nest of tubes bottom of original communication line 2 every 3 meters of soil layers of planning to build subway station deep basal pit 1 that burrow and do not excavate with construction passage 3 both sides as the strong point, suspension 5 is installed, the whole original communication line 2 planned to build on subway station deep basal pit 1 that passes through is maked somebody a mere figurehead.
Fig. 8 shows former nest of tubes suspension 5 schematic diagrames of the present invention.
Suspension 5 of the present invention is comprised of the suspention pull bar (reinforcing bar) that contains thread with upper and lower suspention beam (channel-section steel) and the two ends of two screw holes (spacing is determined by the nest of tubes width of original communication line 2) respectively and nut, pad etc.
Fig. 9 shows the present invention and builds drilled pile 102 schematic diagrames.
Step 102: respectively build a drilled pile 6 in nest of tubes bottom in the nest of tubes both sides of original communication line 2, prepare the in-situ precast stake platform of bearing responsibility.
Figure 10,11 shows in-situ precast drilled pile of the present invention platform 103 schematic diagrames of bearing responsibility.
Step 103: first excavate the basis of nest of tubes two ends temporary supporting wall 7 and bottom and soil layer in appropriate depth, make the stake platform cast-in-situ template of bearing responsibility, the cast-in-situ steel reinforced concrete stake platform of bearing responsibility, completes the support to original communication line 2.
The reinforced concrete pile of the present invention platform of bearing responsibility is bipartite cross brace summer.A part is two brace summers 8 between top, and another part is the groove type brace summer 9 of original communication line 2 nest of tubes bottoms.The groove depth of groove type brace summer 9 be more than 150mm or original communication line 2 nest of tubes bottom 150mm, nest of tubes height is with interior all sizes, depending on concrete condition, determine.
Armored concrete groove type brace summer 9 of the present invention is when cast-in-situ steel reinforced concrete, lower suspention beam (channel-section steel) in posting 4, suspension 5 and bottom suspention pull bar (reinforcing bar) and nut, pad etc. are all embedded in armored concrete, can not be removed.
Figure 12,13 shows the present invention and removes suspension 104 schematic diagrames.
Step 104: removing suspension 104 is could remove after platform 103 stands under load are born responsibility in stake, it is only removed the upper suspention beam (channel-section steel) of suspension 5 and exceeds more than original communication line 2 nest of tubes top 150mm suspention pull bar (reinforcing bar) and nut, pad etc.
Figure 14,15 shows and on nest of tubes of the present invention, seals 105 schematic diagrames.
Step 105: carry out sealing 10 on armored concrete after sealing cast-in-situ template on making nest of tubes.
On nest of tubes of the present invention, seal in 105, the groove type brace summer 9 groove mouths (upward) of sealing 10 groove mouth down and original communication line 2 nest of tubes bottoms on armored concrete agree with and build in one.
Now, the present invention plans to build subway station deep basal pit 1 original communication line 2 to passing through carries out suspension protection scheme to be completed substantially, can carry out excavation and the corresponding construction operation of subway station deep basal pit 1.
Figure 16,17 shows the present invention and cuts stake 106 schematic diagrames.
Step 106: when the diaphram wall 11 in subway station deep basal pit 1 and body supports beam 12 are built complete and loadable, utilize construction method and the technique of cutting stake 13 of Pile Underpinning Technology, by lower boreholes stake 6 amputation of body supports beam 12.
When subway station diaphram wall 11 of the present invention and body supports beam 12 built complete and loadable, bear responsibility groove type brace summer 9 two ends of the original communication line 2 nest of tubes bottoms in platform of stake are supported and are converted into subway station diaphram wall 11 and support by temporary supporting wall 7; The stake platform 103 of bearing responsibility is supported to transform by subway station body supports beam 12 by drilled pile 6 and supports.
Of the present invention the platform of bearing responsibility supported to transform by subway body supports beam 12 by drilled pile 6 and supports, and is when building subway body supports beam 12,, in drilled pile 6 and subway body supports Liang12 intersection, both reinforcing bars be welded and built in one.
Figure 18,19 shows the present invention program and completes 107 schematic diagrames.
This figure is the end result of the preferred embodiment of technical solution of the present invention, it implement to pass through on the nest of tubes of original communication line 2 of planning to build subway station deep basal pit 1, seal 10 and loadable after, can construct to subway station deep basal pit 1.After implementing section stake 13, whole scheme completes, can be to Implement Construction in whole subway station.
On the nest of tubes of original communication line 2 of the present invention, seal in 10, the cable in pipeline is not done any moving and is changed, and keeps original state and is subject in the protection of the nest of tubes of original communication line 2.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any modifications of doing within the spirit and principles in the present invention, be equal to and replace and improvement etc., within all should being included in protection scope of the present invention.
Claims (10)
1. a non-migrating formula suspension protection system for communication pipe and cable, is characterized in that, this system comprises: m posting, a n suspension, drilled pile, stake bear responsibility platform, on seal, described m >=1, n >=1;
Described posting, is spaced along the length direction of original communication line, is installed in the nest of tubes bottom of original communication line, and original communication line is positioned to colligation;
Described suspension, is spaced along the length direction of original communication line, is installed in the nest of tubes bottom of original communication line, and the original communication line through location colligation suspend and maked somebody a mere figurehead;
Described drilled pile, comprises at least two, is located at respectively the nest of tubes two bottom sides of original communication line;
The described stake platform of bearing responsibility, is formed on the nest of tubes bottom and drilled pile of original communication line, for usining the temporary supporting wall at pipeline two ends, as the strong point, original communication line is supported;
On described, seal, be formed at the top of original communication line, agree with the stake platform of bearing responsibility, for original communication line is protected.
2. non-migrating formula suspension protection system as claimed in claim 1, is characterized in that, described posting is specially square or rectangle, and its angle steel by 4 two ends band strip screw holes and 4 cover bolts form.
3. non-migrating formula suspension protection system as claimed in claim 1 or 2, is characterized in that, described suspension comprises: above suspend beam, lower suspention beam in midair and be connected in suspention beam and lower suspention beam between suspention pull bar;
Described lower suspention beam is positioned at the nest of tubes bottom of original communication line, and described upper suspention beam is usingd soil layer that original communication line both sides do not excavate as the strong point, under the mating reaction of lower suspention beam and suspention pull bar, pipeline is suspended in midair.
4. non-migrating formula suspension protection system as claimed in claim 3, is characterized in that, the described stake platform of bearing responsibility comprises: the longitudinal bracing beam arranging along the Width of original communication line and the cross-brace beam arranging along the length direction of original communication line;
Described longitudinal bracing beam, builds and is integral with cross-brace beam, between described two drilled piles and the bottom of cross-brace beam; Described cross-brace beam, is groove type, and it covers the bottom of lower suspention beam and the suspention pull bar of the bottom of described posting, described suspension.
5. non-migrating formula suspension protection system as claimed in claim 1, is characterized in that, the spacing of adjacent positioned frame is 2 meters, and the spacing of adjacent suspension is 3 meters.
6. a non-migrating formula suspension protection method for communication pipe and cable, is characterized in that, the method comprises:
In original communication line position of planning to build on deep basal pit, excavation conduit wiring suspension construction passage;
Posting is installed in nest of tubes bottom at original communication line, by posting, original communication line is positioned to colligation;
In the nest of tubes bottom of original communication line, burrow and using soil layer that conduit wiring suspension construction passage both sides do not excavate as the strong point, suspension being installed, to make somebody a mere figurehead original communication line;
In the nest of tubes both sides of original communication line, respectively build a drilled pile in nest of tubes bottom, prepare the in-situ precast stake platform of bearing responsibility;
The basis of excavation nest of tubes two ends temporary supporting wall and bottom and soil layer be in appropriate depth, and build and make the stake platform of bearing responsibility, and completes the support to original communication line;
On being carried out, seals original communication line.
7. the non-migrating formula suspension protection method of communication pipe as claimed in claim 6 and cable, is characterized in that, the method also comprises: making before stake bears responsibility after platform, seals on original communication line is carried out, described suspension is removed.
8. the non-migrating formula suspension protection method of communication pipe as claimed in claim 7 and cable; it is characterized in that; in the process that described suspension is removed, only remove the upper suspention beam of described suspension and exceed suspention pull bar more than the nest of tubes top preset height of original communication line.
9. the non-migrating formula suspension protection method of communication pipe as claimed in claim 6 and cable; it is characterized in that; the method also comprises: when the diaphram wall in deep basal pit and body supports beam are built complete and loadable, by the drilled pile amputation of the bottom of body supports beam.
10. the non-migrating formula suspension protection method of communication pipe as claimed in claim 6 and cable, is characterized in that, in the method, the installing space of described posting is 2 meters, and the installing space of described suspension is 3 meters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410332352.7A CN104184097B (en) | 2014-09-02 | 2014-09-02 | Non-migration suspension protection system and method for communication pipes and cables |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410332352.7A CN104184097B (en) | 2014-09-02 | 2014-09-02 | Non-migration suspension protection system and method for communication pipes and cables |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104184097A true CN104184097A (en) | 2014-12-03 |
CN104184097B CN104184097B (en) | 2017-01-25 |
Family
ID=51964942
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410332352.7A Active CN104184097B (en) | 2014-09-02 | 2014-09-02 | Non-migration suspension protection system and method for communication pipes and cables |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104184097B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108565781A (en) * | 2018-03-21 | 2018-09-21 | 上海宝冶集团有限公司 | A kind of in-situ conservation method and device of original cable and pipeline |
CN111463741A (en) * | 2020-04-14 | 2020-07-28 | 中天建设集团有限公司 | Suspension protection structure suitable for parcel and construction method |
CN112467664A (en) * | 2020-11-18 | 2021-03-09 | 济南城建集团有限公司 | Foundation pit cable protection device for stretching in foundation pit |
CN113073683A (en) * | 2021-04-07 | 2021-07-06 | 陕西华山路桥集团有限公司 | Temporary suspension device for existing pipeline and construction method |
CN113932063A (en) * | 2021-09-26 | 2022-01-14 | 上海电信工程有限公司 | Underground pipeline construction process and moving and modifying method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006012550A2 (en) * | 2004-07-23 | 2006-02-02 | Smart Structures, Inc. | Monitoring system for concrete pilings and method of installation |
CN103603368A (en) * | 2013-11-26 | 2014-02-26 | 中铁第四勘察设计院集团有限公司 | Construction method for reverse construction of continuous wall encountering underground pipeline |
CN204131065U (en) * | 2014-09-02 | 2015-01-28 | 广东南方电信规划咨询设计院有限公司 | The non-migrating formula suspension protection system of a kind of communication pipe and cable |
-
2014
- 2014-09-02 CN CN201410332352.7A patent/CN104184097B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006012550A2 (en) * | 2004-07-23 | 2006-02-02 | Smart Structures, Inc. | Monitoring system for concrete pilings and method of installation |
CN103603368A (en) * | 2013-11-26 | 2014-02-26 | 中铁第四勘察设计院集团有限公司 | Construction method for reverse construction of continuous wall encountering underground pipeline |
CN204131065U (en) * | 2014-09-02 | 2015-01-28 | 广东南方电信规划咨询设计院有限公司 | The non-migrating formula suspension protection system of a kind of communication pipe and cable |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108565781A (en) * | 2018-03-21 | 2018-09-21 | 上海宝冶集团有限公司 | A kind of in-situ conservation method and device of original cable and pipeline |
CN111463741A (en) * | 2020-04-14 | 2020-07-28 | 中天建设集团有限公司 | Suspension protection structure suitable for parcel and construction method |
CN112467664A (en) * | 2020-11-18 | 2021-03-09 | 济南城建集团有限公司 | Foundation pit cable protection device for stretching in foundation pit |
CN112467664B (en) * | 2020-11-18 | 2022-02-01 | 济南城建集团有限公司 | Foundation pit cable protection device for stretching in foundation pit |
CN113073683A (en) * | 2021-04-07 | 2021-07-06 | 陕西华山路桥集团有限公司 | Temporary suspension device for existing pipeline and construction method |
CN113932063A (en) * | 2021-09-26 | 2022-01-14 | 上海电信工程有限公司 | Underground pipeline construction process and moving and modifying method |
CN113932063B (en) * | 2021-09-26 | 2023-08-15 | 上海电信工程有限公司 | Underground pipeline construction process and migration and modification method |
Also Published As
Publication number | Publication date |
---|---|
CN104184097B (en) | 2017-01-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20210130725A (en) | Reinforcement device and method for local freezing reinforcement in deep pits in gravel strata containing large amounts of water | |
CN102094649B (en) | Method for constructing underground space by shield-shallow buried covered excavation composite method | |
CN109137998B (en) | Existing electric power pipe gallery protection structure crossing tunnel foundation pit and construction method thereof | |
CN104184097B (en) | Non-migration suspension protection system and method for communication pipes and cables | |
CN101509263A (en) | Digging method foundation pit structure of steel cover and plate cover, and construction method | |
CN113482044B (en) | Power pipeline relocation method for invading subway station structure | |
CN102864946A (en) | Process for supporting existing buildings through structural steel and horizontal rachel rod member and additionally adding multilayer basement | |
CN108915698A (en) | A kind of complex condition large diameter pipe curtain construction method | |
CN109488314A (en) | Pipe curtain construction method | |
CN104612056B (en) | The overall quickly pushing tow method for traversing of a kind of frame bridge | |
CN103174132A (en) | Construction method of minor diameter pile inside city underground construction underground excavation pilot tunnel | |
CN109989407B (en) | Roadbed pile tube curtain supporting structure behind newly-added two-line platform of railway | |
CN110994523B (en) | Method and system for protecting cable | |
CN206448293U (en) | A kind of reverse construction ground prop structure | |
CN113005918A (en) | Method for constructing large-span frame bridge by high filling of multi-strand railway in protective railway station | |
CN108797760A (en) | The construction method of rail yard drainage pipeline temporary support structure | |
CN209941754U (en) | High-voltage power pipe culvert in-situ protection structure | |
CN209760299U (en) | light and shade of avoiding house to tear open and move is dug and is combined subway station structure | |
CN203960901U (en) | A kind of non-migrating formula of people/hand well of communicating by letter supports protection system | |
KR101427812B1 (en) | Open cut method for constructing an underground structure | |
CN204131065U (en) | The non-migrating formula suspension protection system of a kind of communication pipe and cable | |
CN111764374A (en) | Construction method of underground continuous wall in low-clearance environment | |
CN108978709B (en) | Urban comprehensive pipe gallery branch construction method in space-limited environment | |
CN208106458U (en) | A kind of support construction of ultra-shallow earth-covered rectangle big cross section | |
CN104120738A (en) | Non-migration-type supporting and protecting system and method of communication man/hand hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |