CN208106458U - A kind of support construction of ultra-shallow earth-covered rectangle big cross section - Google Patents

A kind of support construction of ultra-shallow earth-covered rectangle big cross section Download PDF

Info

Publication number
CN208106458U
CN208106458U CN201820355220.XU CN201820355220U CN208106458U CN 208106458 U CN208106458 U CN 208106458U CN 201820355220 U CN201820355220 U CN 201820355220U CN 208106458 U CN208106458 U CN 208106458U
Authority
CN
China
Prior art keywords
curtain structure
rectangular tube
vertical
pipe
vertical rectangular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820355220.XU
Other languages
Chinese (zh)
Inventor
纪新博
夏云朋
卢彦军
张效铭
赵吕平
李柠君
刘路涛
王磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Fifth Engineering Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Fifth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Fifth Engineering Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201820355220.XU priority Critical patent/CN208106458U/en
Application granted granted Critical
Publication of CN208106458U publication Critical patent/CN208106458U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a kind of support constructions of ultra-shallow earth-covered rectangle big cross section, belong to project dug underground technical field, including the multiple vertical rectangular tube curtain structures being generally aligned in the same plane and vertical spacing is arranged, multiple vertical rectangular tube curtain structure passes through bolt respectively and connect at least one layer of turbulent flow in horizontal rectangular duct curtain structure, and rectangular tube curtain structure is to be made of rectangular steel pipe and equal concrete perfusion in rectangular tube curtain structure vertically.The pipe curtain structure that the utility model is formed by using rectangular steel pipe, compared with the pipe curtain structure of round steel pipe composition, the mutual contact area of single steel pipe is increased, and then reduces influence of the bearing capacity to single steel pipe jacking deviation, the safety on ground when ensure that excavation.

Description

A kind of support construction of ultra-shallow earth-covered rectangle big cross section
Technical field
The utility model relates to project dug underground technical field, in particular to a kind of support knot of ultra-shallow earth-covered rectangle big cross section Structure.
Background technique
With the fast development of urbanization process, urban ground traffic congestion situation is at the world for restricting urban development Property problem.In order to cope with the traffic above-ground of city increasingly congestion, ground lower rail is greatly developed in more and more cities and area one after another Road traffic.
Since in bustling location, traffic above-ground cannot be interrupted, generally use shallow embedding dark when building tunneling subway station Digging method usually first will carry out pre-reinforcement or pre support to bottom before excavation, and the self-stable ability in hole week after being excavated with raising guarantees The safety of excavation.Pre support system is broadly divided into stratum consolidation slip casting, freezing process, Shed-pipe Advanced Support, pipe-roof method etc..Wherein pipe curtain The advantages that method can almost form any tunnel cross-section shape because its section is flexible, and geology is adaptable has become big disconnected A kind of common construction method of face bored tunnel.
But current pipe-roof method uses the Pipe curtain fore-poling system being made of round steel pipe, since round steel pipe forms Pipe curtain bearing capacity it is larger by single steel pipe jacking deviation effects, large area be easy to cause surface subsidence when excavating, or even influences Road environment, traffic and pipeline.
Utility model content
The purpose of this utility model is to provide a kind of support constructions of ultra-shallow earth-covered rectangle big cross section, are applied with improving underground The safety and accuracy of work.
In order to achieve the above object, the utility model uses a kind of support construction of ultra-shallow earth-covered rectangle big cross section, including position In multiple vertical rectangular tube curtain structures that same plane and vertical spacing are arranged, multiple vertical rectangular tube curtain structure passes through respectively Bolt connect at least one layer of turbulent flow in horizontal rectangular duct curtain structure, and rectangular tube curtain structure is to be made of rectangular steel pipe and rectangular tube curtain vertically Equal concrete perfusion in structure.
Preferably, the multiple vertical rectangular tube curtain structure includes successively being spaced the first vertical rectangular tube curtain structure, second Vertical rectangular tube curtain structure and the vertical rectangular tube curtain structure of third, the first vertical rectangular tube curtain structure, the second vertical rectangular tube curtain Structure and the vertical rectangular tube curtain structure of third pass through bolt respectively and connect with upper and lower two layers of turbulent flow in horizontal rectangular duct curtain structure, upper water The equal concrete perfusion of flat rectangular pipe curtain structure.
Preferably, the upper layer turbulent flow in horizontal rectangular duct curtain structure and the first vertical rectangular tube curtain structure, second are connected to The upper end of vertical rectangular tube curtain structure and third vertical pipe curtain structure.
Preferably, the first vertical rectangular tube curtain structure, the second vertical rectangular tube curtain structure, the vertical rectangular tube of third Rectangle in four rectangular box that curtain structure is divided by upper and lower two layers of turbulent flow in horizontal rectangular duct curtain structure along pipe curtain wall body arrangement is rigid Ring frame.
Preferably, the perpendicular of both sides is arranged in the described first vertical rectangular tube curtain structure and the vertical rectangular tube curtain structure of third The lower end of straight rectangular tube curtain structure is connect with buried pipe curtain.
Preferably, steel plate is connected between two arm of angle of the rectangle rigid ring circle angle.
Compared with prior art, there are following technical effects for the utility model:The utility model is by using rectangular steel pipe The pipe curtain structure of composition increases the mutual contact area of single steel pipe compared with the pipe curtain structure of round steel pipe composition, And then reduce influence of the bearing capacity to single steel pipe jacking deviation, the safety on ground when ensure that excavation.
Detailed description of the invention
With reference to the accompanying drawing, specific embodiment of the present utility model is described in detail:
Fig. 1 is a kind of structural schematic diagram of the support construction of ultra-shallow earth-covered rectangle big cross section;
Fig. 2 is the rectangular tube curtain structure schematic diagram for being marked with concrete;
Fig. 3 is the schematic diagram of working procedure one;
Fig. 4 is the schematic diagram of working procedure two;
Fig. 5 is the schematic diagram of working procedure three;
Fig. 6 is the schematic diagram of working procedure four;
Fig. 7 is the schematic diagram of working procedure five;
Fig. 8 is the schematic diagram of working procedure six;
Fig. 9 is the schematic diagram of working procedure seven;
Figure 10 is the schematic diagram of working procedure eight;
Figure 11 is the schematic diagram of working procedure nine;
Figure 12 is the schematic diagram of working procedure ten;
Figure 13 is the schematic diagram of working procedure 11;
Figure 14 is the schematic diagram of working procedure 12;
Figure 15 is the schematic diagram of working procedure 13.
Specific embodiment
In order to further explain the feature of the utility model, please refer to detailed description below in connection with the utility model with Attached drawing.Institute's attached drawing is only for reference and purposes of discussion, is not used to limit the protection scope of the utility model.
As shown in Figure 1, present embodiment discloses a kind of support constructions of ultra-shallow earth-covered rectangle big cross section, including it is located at same Plane and vertical spacing arrangement multiple vertical rectangular tube curtain structures, multiple vertical rectangular tube curtain structure pass through respectively bolt with At least one layer of turbulent flow in horizontal rectangular duct curtain structure connection, rectangular tube curtain structure are made of rectangular steel pipe and in vertical rectangular tube curtain structure Equal concrete perfusion.
Wherein, multiple vertical rectangular tube curtain structures in the present embodiment include at least three, and each vertical rectangular tube curtain What is be spaced between structure is equidistant, and the lower end of multiple vertical rectangular tube curtain structure is connect with buried pipe curtain structure, upper end is logical It crosses lateral connection bolt to connect at least one layer turbulent flow in horizontal rectangular duct curtain structure, in the application, which is mainly It constructs to be formed using rectangular pipe jacking machine.And in multiple vertical rectangular tube curtain structures and the turbulent flow in horizontal rectangular duct curtain structure of top layer Concrete perfusion.
It should be noted that the present embodiment removes middle layer horizontal tube curtain not concrete perfusion in entire pipe curtain system, Remaining horizontal and vertical duct curtain concrete perfusion.Pipe curtain structure can be increased substantially after horizontal and vertical duct curtain concrete perfusion Bearing capacity, and middle layer horizontal tube curtain reduces the excavation height of the soil body, does not need primarily to form small pilot drive Concrete perfusion improves its bearing capacity, and the non-concrete perfusion of middle layer horizontal tube curtain, avoids and generates to bottom part ring frame Excessive pressure ensure that the stability of entire big cross section support construction.
By using the Pipe curtain fore-poling system of rectangular steel pipe composition and the pipe curtain being made of round steel pipe in the present embodiment Pre support system is compared, and is face contact between single rectangular steel pipe in the Pipe curtain fore-poling system of rectangular steel pipe composition, and round It is point contact between single round just extension in the Pipe curtain fore-poling system of steel pipe composition.Therefore, the pipe formed using rectangular steel pipe In curtain pre support system, the contact area between single steel pipe is larger, reduces single steel pipe jacking deviation to Pipe curtain fore-poling The influence of system bearing capacity, the stability of big cross section when ensure that excavation, when large area being avoided to excavate caused by surface subsidence.
As further preferred scheme, as shown in Figure 1 to Figure 2, three vertical rectangular tube curtain knots are chosen in the present embodiment Structure is successively spaced the first vertical rectangular tube curtain structure 10, the second vertical rectangular tube curtain structure 11 and the vertical rectangular tube curtain knot of third Structure 12, the first vertical rectangular tube curtain structure 10, the second vertical rectangular tube curtain structure 11 and the vertical rectangular tube curtain structure 12 of third divide Not Tong Guo cross bolts 40 connect with upper layer turbulent flow in horizontal rectangular duct curtain structure 20, lower layer's turbulent flow in horizontal rectangular duct curtain structure 21, first is vertical Rectangular tube curtain structure 10, the second vertical rectangular tube curtain structure 11, the vertical rectangular tube curtain structure 12 of third and upper layer horizontal rectangular The equal concrete perfusion of pipe curtain structure 20.In practical construction process, when being excavated by the pipe curtain structure that rectangular steel pipe is formed for station Pre support system is provided.
It should be noted that lower layer's turbulent flow in horizontal rectangular duct curtain structure 21 in the present embodiment includes two sections of turbulent flow in horizontal rectangular duct curtain knots Structure, one section of two sections of faces pass through cross bolts and the first vertical rectangular tube curtain structure 10, the second vertical rectangular tube curtain structure respectively The connection of 11 pipe shafts, another section of two sections of faces pass through cross bolts and the second vertical rectangular tube curtain structure 11 and the vertical square of third respectively The pipe shaft of shape pipe curtain structure 12 connects.
As further preferred scheme, the height of multiple vertical rectangular tube curtain structures in the vertical direction in the present embodiment Identical, the length of two layers of turbulent flow in horizontal rectangular duct curtain structure in the horizontal direction is identical.Lower layer's turbulent flow in horizontal rectangular duct curtain structure position level in The lower section of upper layer turbulent flow in horizontal rectangular duct curtain, and upper layer turbulent flow in horizontal rectangular duct curtain structure by lateral connection bolt respectively with three vertical squares The upper end of shape pipe curtain structure connects, and the lower end of the vertical rectangular tube curtain structure on both sides is arranged in three vertical rectangular tube curtain structures It is connect with buried pipe curtain.
It should be noted that in the big cross section support construction, the vertical rectangular tube curtain structure and lower tube curtain of the left and right sides Connection, center vertical rectangular tube curtain do not need setting lower tube curtain, because intermediate vertical rectangular tube curtain is temporary structure, construct It needs to remove in journey, and left and right sides pipe curtain number can be used as permanent structure, will not remove after work.In addition, intermediate vertical Pipe curtain is primarily subjected to vertical force, and two sides vertical duct curtain needs to bear top vertical force and horizontal earth pressure, in arranged on left and right sides Vertical rectangular tube curtain lower end setting lower tube curtain can make it have more high stability, guarantee construction safety.
As further preferred scheme, three vertical rectangular tube curtain structures are by two layers of turbulent flow in horizontal rectangular duct curtain in the present embodiment For segmentation of structures at four rectangular box, each rectangular box is interior to arrange the rigid ring frame of rectangle along pipe curtain wall body.
Pipe curtain fore-poling system combination ring frame body provided in this embodiment system avoids and uses round steel pipe push pipe at this stage When forming the disadvantages of junction shearing resistance of pipe curtain bring is insufficient, while improving by the steel loop frame of erection station lining construction Safety.The surface subsidence in digging process is considerably reduced, it can be achieved that large area excavation, improves equipment driving and slag tap Efficiency.And then improve construction efficiency, shorten construction period, reduce construction cost.
As further preferred scheme, as shown in Figure 1, being connected between two arm of angle of rectangle steel loop circle angle in the present embodiment There is steel plate, two arms of angle at the steel plate and ring circle angle form triangle, play the role of reinforcing rectangle steel loop frame stability.
Specifically, in practical applications, it can be all connected with steel plate in four frame angles of rectangle steel loop frame, it can also be several wherein Junction steel plate in a frame angle.
As shown in Fig. 3-Figure 15, it is using the process that the big cross section support construction in the present embodiment is constructed:
(1)It is successively constructed rectangle steel push pipe from centre to both sides using rectangular pipe jacking machine, forms first layer turbulent flow in horizontal rectangular duct Curtain, and be bolted, which uses M27 bolt;
(2)It is successively constructed rectangle steel push pipe using rectangular pipe jacking machine from top to bottom, forms vertical rectangular tube curtain, and carry out spiral shell It tethers and connects;
(3)It is successively constructed rectangle steel push pipe from centre to both sides using rectangular pipe jacking machine, forms second layer turbulent flow in horizontal rectangular duct Curtain, and be bolted;
(4)In addition to second layer horizontal tube curtain, pipe curtain perfusion C30 auto dense concrete is formed by other;
(5)Bottom rectangle ring frame in side is installed, it is longitudinal to excavate the soil body, one of straight-flanked ring frame is set up until perforation every 6m;
(6)Top rectangular ring frame in side is installed, it is longitudinal to excavate the soil body, one of straight-flanked ring frame is set up until perforation every 6m;
(7)Gradually remove the position ring frame, plate in construction side bottom plate, bottom girder, bottom side wall and part;
(8)The segment section pipe curtain of the position ring frame and second layer turbulent flow in horizontal rectangular duct curtain is gradually removed, side remaining side of constructing Wall and top plate;
(9)Bottom rectangle ring frame in the other side is installed, it is longitudinal to excavate the soil body, one of straight-flanked ring frame is set up every 6m until passing through It is logical;
(10)Top rectangular ring frame in the other side is installed, it is longitudinal to excavate the soil body, one of straight-flanked ring frame is set up every 6m until passing through It is logical;
(11)Gradually remove the position ring frame, plate in construction other side bottom plate, bottom girder, bottom side wall and part;
(12)Another part section pipe curtain of the position ring frame and remaining second layer turbulent flow in horizontal rectangular duct curtain is gradually removed, construction is another Side residue side wall and top plate;
(13)Vertical rectangular tube curtain structure is successively removed from top to bottom, applies remaining top plate, middle plate and bottom plate.
It should be noted that the result as above-mentioned steps are constructed is as shown in figure 15, the present embodiment is by combining rectangle Pipe curtain structure and steel loop mount structure are constructed, and road pavement traffic and neighbouring existing pipeline influence smaller, and effective solution is super The big problem of shallow earthing rectangle big cross section metro station construction difficulty.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model Within the scope of shield.

Claims (6)

1. a kind of support construction of ultra-shallow earth-covered rectangle big cross section, which is characterized in that including being generally aligned in the same plane and vertical spacing Multiple vertical rectangular tube curtain structures of arrangement, multiple vertical rectangular tube curtain structure pass through bolt and at least one layer of horizontal square respectively The connection of shape pipe curtain structure, rectangular tube curtain structure are to be made of rectangular steel pipe and equal concrete perfusion in vertical rectangular tube curtain structure.
2. the support construction of ultra-shallow earth-covered rectangle big cross section as described in claim 1, which is characterized in that the multiple vertical square Shape pipe curtain structure includes successively being spaced the first vertical rectangular tube curtain structure, the second vertical rectangular tube curtain structure and the vertical rectangle of third Pipe curtain structure, the first vertical rectangular tube curtain structure, the second vertical rectangular tube curtain structure and the vertical rectangular tube curtain structure difference of third It is connect by bolt with upper and lower two layers of turbulent flow in horizontal rectangular duct curtain structure, the equal concrete perfusion of upper layer turbulent flow in horizontal rectangular duct curtain structure.
3. the support construction of ultra-shallow earth-covered rectangle big cross section as claimed in claim 2, which is characterized in that the horizontal square in upper layer Shape pipe curtain structure and it is connected to the first vertical rectangular tube curtain structure, the second vertical rectangular tube curtain structure and third vertical pipe The upper end of curtain structure.
4. the support construction of ultra-shallow earth-covered rectangle big cross section as claimed in claim 2, which is characterized in that described first is vertical Rectangular tube curtain structure, the second vertical rectangular tube curtain structure, the vertical rectangular tube curtain structure of third are by upper and lower two layers of turbulent flow in horizontal rectangular duct curtain Along the rigid ring frame of rectangle of pipe curtain wall body arrangement in four rectangular box that structure is divided into.
5. the support construction of ultra-shallow earth-covered rectangle big cross section as claimed in claim 2, which is characterized in that the first vertical square The lower end of the vertical rectangular tube curtain structure on both sides is arranged in shape pipe curtain structure and the vertical rectangular tube curtain structure of third and underground The connection of pipe curtain.
6. the support construction of ultra-shallow earth-covered rectangle big cross section as claimed in claim 4, which is characterized in that the rigid ring frame of rectangle Steel plate is connected between two arm of angle of frame angle.
CN201820355220.XU 2018-03-15 2018-03-15 A kind of support construction of ultra-shallow earth-covered rectangle big cross section Active CN208106458U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820355220.XU CN208106458U (en) 2018-03-15 2018-03-15 A kind of support construction of ultra-shallow earth-covered rectangle big cross section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820355220.XU CN208106458U (en) 2018-03-15 2018-03-15 A kind of support construction of ultra-shallow earth-covered rectangle big cross section

Publications (1)

Publication Number Publication Date
CN208106458U true CN208106458U (en) 2018-11-16

Family

ID=64126618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820355220.XU Active CN208106458U (en) 2018-03-15 2018-03-15 A kind of support construction of ultra-shallow earth-covered rectangle big cross section

Country Status (1)

Country Link
CN (1) CN208106458U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593881A (en) * 2019-09-17 2019-12-20 中铁第六勘察设计院集团有限公司 Method for realizing large-section underground space excavation by using small-section combined jacking pipe
CN111485893A (en) * 2019-10-10 2020-08-04 上海申通地铁集团有限公司 Earth excavation construction method for pipe curtain channel with oversized cross section in saturated soft soil area

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593881A (en) * 2019-09-17 2019-12-20 中铁第六勘察设计院集团有限公司 Method for realizing large-section underground space excavation by using small-section combined jacking pipe
CN111485893A (en) * 2019-10-10 2020-08-04 上海申通地铁集团有限公司 Earth excavation construction method for pipe curtain channel with oversized cross section in saturated soft soil area

Similar Documents

Publication Publication Date Title
US9322137B2 (en) Method for building structures, particularly passages under operating railways or the like
CN1837506B (en) Construction method for excavating box-shape structure over an operating tunnel
CN101761068A (en) Box-raft pressure-bearing type foundation underpinning and construction reinforcing method for tunnel across pile foundation of bridge above river
CN109914456A (en) A kind of bridge and subway tunnel adjoin newly-built or with design and construction method when building
CN104131565B (en) A kind of against making the construction method that the earthwork is just made to excavate
CN105804119A (en) Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN109723443A (en) Method for tunnel construction
CN113565133A (en) Semi-covered excavation sequential urban tunnel structure next to subway and construction method
CN105201516A (en) Subway station body structure and four-joint-arch PBA underground excavation construction method thereof
CN113062354A (en) Assembly method for prefabricated subway station of open-cut pile support system
JP7394252B1 (en) Protruding type wind duct structure perpendicular to the vertical direction and construction method at deep subway station
CN208106458U (en) A kind of support construction of ultra-shallow earth-covered rectangle big cross section
CN111365005A (en) Reinforcing structure and method for shield tunnel lower-penetrating elevated bridge foundation
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN113005918A (en) Method for constructing large-span frame bridge by high filling of multi-strand railway in protective railway station
CN104895100B (en) Building close quarters builds underground space Caisson method
CN205036388U (en) Block of four encircles knot hunch construction structures that PBA secretly dug subway station
KR100509707B1 (en) None open cut tunnelling of arch type with hume pipe and con'c rib
CN113898007B (en) Semi-inverse construction method for long-span corridor structure along street
CN215165817U (en) Semi-covered excavation sequential city tunnel structure next to subway
CN206036408U (en) Span pipeline normal position of foundation ditch and suspend protection architecture in midair
CN113529830A (en) Shallow tunnel adjacent building isolation-underpinning combined reinforcement structure and construction process thereof
CN209636858U (en) A kind of short underpass structure of newly-built basement and existing subway station
CN113389218A (en) Retaining wall structure for entrance and exit of road bridge and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: Wangjiang Road in Baohe District of Hefei city of Anhui Province, No. 96 230023

Co-patentee after: THE FIFITH CONSTRUCTION LTD.OF CHINA TIESIJU CIVIL ENGINEERING Group

Patentee after: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd.

Address before: 230023 technical center of China Railway four Bureau, No. 96 Wangjiang East Road, Anhui, 618, Hefei

Co-patentee before: THE FIFITH CONSTRUCTION LTD.OF CHINA TIESIJU CIVIL ENGINEERING Group

Patentee before: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd.

CP02 Change in the address of a patent holder