CN104822882B - Railway roadbed is ploughed - Google Patents

Railway roadbed is ploughed Download PDF

Info

Publication number
CN104822882B
CN104822882B CN201380031920.3A CN201380031920A CN104822882B CN 104822882 B CN104822882 B CN 104822882B CN 201380031920 A CN201380031920 A CN 201380031920A CN 104822882 B CN104822882 B CN 104822882B
Authority
CN
China
Prior art keywords
broken stone
railway roadbed
stone metaling
discharging
conveyer belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201380031920.3A
Other languages
Chinese (zh)
Other versions
CN104822882A (en
Inventor
G.布克伯杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Prasy-Tao Yier Railway Export Ltd Co
Original Assignee
Prasy-Tao Yier Railway Export Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Prasy-Tao Yier Railway Export Ltd Co filed Critical Prasy-Tao Yier Railway Export Ltd Co
Publication of CN104822882A publication Critical patent/CN104822882A/en
Application granted granted Critical
Publication of CN104822882B publication Critical patent/CN104822882B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/02Placing the ballast; Making ballastway; Redistributing ballasting material; Machines or devices therefor; Levelling means
    • E01B27/023Spreading, levelling or redistributing ballast already placed

Abstract

The broken stone metaling hopper (14) of railway roadbed plough (1) is connected with mechanical framework (3) by hinge (22) in rear end relative to operating direction (5).In order to the hinge axes (24) extended perpendicular to the direction of mechanical longitudinal direction (23) for surrounding hinge (22) rotate broken stone metaling hopper (14), steering driving mechanism (25) is provided with.The discharging with hinge (22) separately of base plate conveyer belt (16) is thrown in end (18) and is equipped with handing-over conveyer belt (28), ploughs on (1) neighbouring storage compartment or transverse onveyer (30) with railway roadbed for being optionally transported to the broken stone metaling (12) of storage.

Description

Railway roadbed is ploughed
The present invention relates to a kind of railway roadbed plough, which has the mechanical framework that can be travelled in rail walking mechanism, for track The plough filled out ballasting and arrange and the broken stone metaling hopper for being designed for storage broken stone metaling.
This railway roadbed plough is known by WO 2010/139381.By swingable broken stone metaling hopper, storage it is broken Stone ballast aggregate can be fed back on track as needed or is transported to thoroughly empty optionally through chute On adjacent storage compartment.
By known to US 5 094 018, railway roadbed plough fills out paving with what the ballast bed profile for meeting regulation was used for track Ballast aggregate.Need the broken stone metaling is stored in the rail section with unnecessary broken stone metaling for this, and as needed from rubble road Quarrel hopper discharging is rendered on track.
Here, the technical problem to be solved is to provide a kind of railway roadbed plough of aforementioned type, can make whereby broken Stone ballast bin has wider purposes.
The technical problem ploughs to solve according to the present invention by such a railway roadbed, and which has in rail walking mechanism The mechanical framework that can be travelled, the plough arranged for track fills out ballasting and be designed for store broken stone metaling broken stone metaling Hopper, the railway roadbed plough tool have following characteristics:
A) the broken stone metaling hopper has the base plate conveyer belt along mechanical Longitudinal extending, and exists relative to operating direction Rear end is connected with the mechanical framework by hinge,
B) in order to the hinge axes extended perpendicular to mechanical longitudinal direction for surrounding the hinge rotate the rubble road Quarrel hopper, is provided with steering driving mechanism,
C) discharging with the hinge separately of the base plate conveyer belt is thrown in end and is equipped with device for discharging, for depositing The broken stone metaling of storage is transported to is ploughed on neighbouring storage compartment with the railway roadbed,
D) discharging is thrown in end and is additionally equipped with discharge chute, for the broken stone metaling discharging of storage is rendered to institute State on track,
It is proposed that, be mounted with before the discharge chute along operating direction unnecessary rubble is thrown in for discharging The transverse onveyer of ballast aggregate, the transverse onveyer is with the conveying direction of the angle α extension of relative mechanical longitudinal direction.
By features described above, when compartment is not stored, broken stone metaling hopper can also as needed by complete emptying. In such a case, it is possible to pass through transverse onveyer realize emptying in the region adjacent with ballast bed side slope.Thus, also may be used To facilitate and economically admirably process the rail section with a large amount of residue broken stone metalings.
According to an expedients of the present invention, the transverse onveyer is designed to along conveying direction relative to the machinery Framework can be moved.According to another expedients of the present invention, the transverse onveyer is made up of part conveyer belt, the part Conveyer belt can stackedly be positioned and as needed can be along conveying direction relative movement.According to further preferably setting Meter, is provided with Height Adjustable ballast bed flattening device before the discharge chute along operating direction.More preferably , the ballast bed flattening device be designed to plough.
Additional advantages of the present invention are obtained by description of the drawings.
The present invention is expanded on further below in conjunction with embodiment shown in the accompanying drawings.In the accompanying drawings:
Fig. 1 illustrates the side view of the plough of the railway roadbed with broken stone metaling hopper, and Fig. 2 illustrates regarding in detail for broken stone metaling hopper Figure, Fig. 3,4 zoomed-in views and Fig. 5 that railway roadbed plough front end is shown respectively illustrate variant of the invention scheme.
Railway roadbed plough 1 shown in Fig. 1 has the mechanical framework 3 being bearing in rail walking mechanism 2, and railway roadbed plough is logical Cross travel-driving mechanism 4 to travel on track 6 along operating direction 5.Traveling and operation cabin 7 are equipped with control device 8.
Height Adjustable plough 9 and clearing apparatus 10 are mounted between two rail walking mechanisms 2.The clearing apparatus has There is rotatable broom 11, allow unnecessary broken stone metaling 12 on track 6 to pass through steep angle conveyer belt 13 by broom 11 It is transported in broken stone metaling hopper 14.
Broken stone metaling hopper 14 is extended by the casing 15 and the machinery longitudinal direction of the edge as bottom surface 23 for storing broken stone metaling Base plate conveyer belt 16 constitute.The base plate conveyer belt 16 has on the front end relative to operating direction 5 of broken stone metaling hopper 14 There is discharging to throw in end 18, and there is on rear end 19 collecting terminal 20.The positioned beneath that end 18 is thrown in discharging has discharge chute 21, for 12 discharging of broken stone metaling of storage is rendered to track 6 as needed.
Especially as shown in Fig. 2 broken stone metaling hopper 14 is connected with mechanical framework 3 by hinge 22 on rear end 19.For The hinge axes 24 extended perpendicular to the direction of mechanical longitudinal direction 23 around hinge 22 rotate broken stone metaling hopper 14, are provided with Steering driving mechanism 25.The discharging with hinge 22 separately of base plate conveyer belt 16 is thrown in end 18 and is equipped with device for discharging 26, uses It is transported in the broken stone metaling 12 by storage and ploughs on 1 neighbouring storage compartment 27 with railway roadbed.
It is defeated that device for discharging 26 is designed to handing-over that is extending along machinery longitudinal direction 23 and being placed in below base plate conveyer belt 16 Send band 28.The handing-over conveyer belt 28 can pass through displacement drive mechanism 29 and be adjusted to from the discharging input end of base plate conveyer belt 16 On 15 delivery positions for outwards stretching out.On the delivery position, as shown in Fig. 2 being stored in broken in broken stone metaling hopper 14 Stone ballast aggregate 12 can be transported on handing-over conveyer belt 28 by base plate conveyer belt 16 and be subsequently conveyed to store in compartment 27.
Once broken stone metaling hopper 14 is cleared, then joins conveyer belt 28 and be withdrawn into using a little below base plate conveyer belt 16 On the position of line sign, and broken stone metaling hopper 14 declines (referring to Fig. 1).On the position, can as needed will be many Remaining broken stone metaling 12 is rendered on track 6 by 21 discharging of discharge chute.
Especially as shown in Figures 3 and 4, transverse onveyer 30 is mounted with before discharge chute 21 along operating direction 5, it is described Transverse onveyer 30 is with the conveying direction 31 extended with the angle [alpha] (preferably 90 °) of relative mechanical longitudinal direction 23.Transverse onveyer 30 are designed to may move relative to mechanical framework 3 along conveying direction 31.The transverse onveyer 30 is by 32 structure of part conveyer belt Into the part conveyer belt 32 can stackedly be positioned and as needed can relative movement along conveying direction 31.Thus, it is unnecessary Broken stone metaling 12 rendered in region 33 by discharging, the region 33 along conveying direction 31 be located at track 6 lateral side.
Railway roadbed plough 1 shown in Fig. 5 is before discharge chute 21, Height Adjustable broken with being arranged on along operating direction 5 Stone railway roadbed flattening device 34.The ballast bed flattening device 34 is designed to plough 35, is made due to uneven by the plough 35 The accumulation of the broken stone metaling 12 that discharging is thrown in and produced becomes smooth.

Claims (4)

1. a kind of railway roadbed ploughs (1), fills out with the mechanical framework (3) that can be travelled in rail walking mechanism (2), for track (6) Ballasting and the plough (9) that arranges and it is designed for storing the broken stone metaling hopper (14) of broken stone metaling (12), the railway roadbed plough (1) with following characteristics:
A) the base plate conveyer belt (16) that the broken stone metaling hopper (14) extends with edge machinery longitudinal direction (23), and relative to work Industry direction (5) is connected with the mechanical framework (3) by hinge (22) in rear end (19),
B) in order to the hinge axes (24) extended perpendicular to the direction of mechanical longitudinal direction (23) for surrounding the hinge (22) rotate institute Broken stone metaling hopper (14) is stated, steering driving mechanism (25) is provided with,
C) discharging with the hinge (22) separately of the base plate conveyer belt (16) is thrown in end (18) and is equipped with device for discharging (26), (1) neighbouring storage compartment (27) is ploughed with the railway roadbed for the broken stone metaling (12) of storage is transported to,
D) discharging is thrown in end (18) and is additionally equipped with discharge chute (21), for the broken stone metaling discharging of storage is thrown in To on the track,
Characterized in that, along operating direction (5) be mounted with before the discharge chute (21) for discharging throw in it is unnecessary The transverse onveyer (30) of broken stone metaling (12), the transverse onveyer (30) is with the angle [alpha] of relative mechanical longitudinal direction (23) The conveying direction (31) of extension, wherein, the transverse onveyer (30) is made up of part conveyer belt (32), the part conveyer belt (32) stackedly can be positioned and as needed can be along conveying direction (31) relative movement.
2. railway roadbed as claimed in claim 1 is ploughed, it is characterised in that the transverse onveyer (30) is designed to along conveying direction (31) can move relative to the mechanical framework (3).
3. railway roadbed as claimed in claim 1 or 2 is ploughed, it is characterised in that along operating direction (5) in the discharge chute (21) Height Adjustable ballast bed flattening device (34) is provided with above.
4. railway roadbed as claimed in claim 3 is ploughed, it is characterised in that the ballast bed flattening device (34) is designed to plough (35)。
CN201380031920.3A 2012-06-22 2013-05-28 Railway roadbed is ploughed Active CN104822882B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
AT7042012A AT512914B1 (en) 2012-06-22 2012-06-22 ballast plow
ATA704/2012 2012-06-22
PCT/EP2013/001569 WO2013189564A1 (en) 2012-06-22 2013-05-28 Ballast plow

Publications (2)

Publication Number Publication Date
CN104822882A CN104822882A (en) 2015-08-05
CN104822882B true CN104822882B (en) 2017-03-29

Family

ID=48607199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201380031920.3A Active CN104822882B (en) 2012-06-22 2013-05-28 Railway roadbed is ploughed

Country Status (7)

Country Link
EP (1) EP2880219B1 (en)
JP (1) JP6177322B2 (en)
CN (1) CN104822882B (en)
AT (1) AT512914B1 (en)
EA (1) EA024485B1 (en)
ES (1) ES2606863T3 (en)
WO (1) WO2013189564A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT515699B1 (en) * 2014-07-01 2015-11-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Loading carriage
CA2857903A1 (en) 2014-07-28 2016-01-28 Can American Stone Spreader Sales Ltd. Apparatus for discharge of bulk materials
AT519784B1 (en) * 2017-03-17 2019-11-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Machine and method for profiling and distributing gravel of a track
AT520268B1 (en) * 2017-08-11 2020-01-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Storage carts for bulk goods

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5289648A (en) * 1991-09-03 1994-03-01 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Machine arrangement for receiving, storing and distributing track ballast
US5364221A (en) * 1991-02-27 1994-11-15 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track-bound freight car
CN2522460Y (en) * 2002-01-21 2002-11-27 中国铁道建筑总公司昆明机械厂 Easy-to-combine slop clearing-screening mashine
CN2535435Y (en) * 2002-04-03 2003-02-12 中国铁道建筑总公司昆明机械厂 Machine for cleaning and screening road dregs under sleeper
CN2846472Y (en) * 2005-09-21 2006-12-13 昆明中铁大型养路机械集团有限公司 Ballast distributing and shaping wagon
CN101892616A (en) * 2010-08-02 2010-11-24 昆明中铁大型养路机械集团有限公司 Road bed full-section broken stone sieve cleaning machine
CN102459761A (en) * 2009-06-03 2012-05-16 弗兰茨普拉塞铁路机械工业股份有限公司 Ballast plow for ballasting a track

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT378940B (en) * 1982-09-23 1985-10-25 Plasser Bahnbaumasch Franz SCHUETTGUTLADWAGEN, ESPECIALLY FOR THE WASTE LOADING OF A GRAVEL BED CLEANING MACHINE
AT398213B (en) * 1989-10-31 1994-10-25 Plasser Bahnbaumasch Franz MACHINE FOR RECEIVING AND DISTRIBUTING THE BEDGING BALL
EP0665331B1 (en) * 1994-01-26 1996-10-30 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Ballast tamping machine for railways
EP1077288B1 (en) * 1999-08-18 2005-03-02 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Railway vehicle for placing the ballast of a railway track

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5364221A (en) * 1991-02-27 1994-11-15 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track-bound freight car
US5289648A (en) * 1991-09-03 1994-03-01 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Machine arrangement for receiving, storing and distributing track ballast
CN2522460Y (en) * 2002-01-21 2002-11-27 中国铁道建筑总公司昆明机械厂 Easy-to-combine slop clearing-screening mashine
CN2535435Y (en) * 2002-04-03 2003-02-12 中国铁道建筑总公司昆明机械厂 Machine for cleaning and screening road dregs under sleeper
CN2846472Y (en) * 2005-09-21 2006-12-13 昆明中铁大型养路机械集团有限公司 Ballast distributing and shaping wagon
CN102459761A (en) * 2009-06-03 2012-05-16 弗兰茨普拉塞铁路机械工业股份有限公司 Ballast plow for ballasting a track
CN101892616A (en) * 2010-08-02 2010-11-24 昆明中铁大型养路机械集团有限公司 Road bed full-section broken stone sieve cleaning machine

Also Published As

Publication number Publication date
ES2606863T3 (en) 2017-03-28
AT512914A4 (en) 2013-12-15
EA201401071A1 (en) 2015-03-31
AT512914B1 (en) 2013-12-15
WO2013189564A1 (en) 2013-12-27
EA024485B1 (en) 2016-09-30
EP2880219A1 (en) 2015-06-10
CN104822882A (en) 2015-08-05
JP2015520314A (en) 2015-07-16
JP6177322B2 (en) 2017-08-09
EP2880219B1 (en) 2016-09-21

Similar Documents

Publication Publication Date Title
CN104822882B (en) Railway roadbed is ploughed
KR101222219B1 (en) Maschine for renewing a railway track
US7931221B2 (en) Mobile crusher unit
PL199479B1 (en) Railway track renovating machine
CN106460346B (en) Carrier loader with individually controllable device for discharging
US6477960B2 (en) Machine for removing an old track and laying a new track
CN102459761B (en) Ballast plow for ballasting a track
CN105358254B (en) Movable crusher system for lump material
ITMI942350A1 (en) DEVICE OF MACHINES FOR THE TREATMENT OF STONE MASS OF A TRACK
RU2228983C2 (en) Rail track repair machine
PL170072B1 (en) Set of machines for removing, collecting and spreading track subgrade aggregate
CN102430475A (en) Mine track type dressing equipment and dressing method thereof
CN103403255B (en) For ballast bed method and the machinery of cleaning track
US10363947B2 (en) Storage wagon for bulk material
SU1505446A3 (en) Mobile gravel-cleaning machine
CN1165890A (en) Machine and method for ballasting track
CN107435290A (en) The road construction machine of paving machine or charger type
CN104968859B (en) The method of broken stone metaling and machinery for cleaning track
US779043A (en) Excavating apparatus.
CN101939486B (en) Ballast plow for applying ballast to a track
EP3282054A1 (en) Railway wagon
US20170009403A1 (en) Method for controlling the ballast supply during renovation of a ballast bed
EA037186B1 (en) Ballast-sweeping installation for receiving and distributing ballast situated on a track
RU2352708C1 (en) Railway ballast distribution machine

Legal Events

Date Code Title Description
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant