CN104806247A - 露天矿采场中间搭建纵向组合桥运输方法 - Google Patents
露天矿采场中间搭建纵向组合桥运输方法 Download PDFInfo
- Publication number
- CN104806247A CN104806247A CN201510209695.9A CN201510209695A CN104806247A CN 104806247 A CN104806247 A CN 104806247A CN 201510209695 A CN201510209695 A CN 201510209695A CN 104806247 A CN104806247 A CN 104806247A
- Authority
- CN
- China
- Prior art keywords
- bridge
- stripping
- casting
- sub
- longitudinal combination
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title abstract description 6
- 239000002131 composite material Substances 0.000 title abstract 4
- 239000000463 material Substances 0.000 claims abstract description 25
- 239000003245 coal Substances 0.000 claims abstract description 10
- 238000005065 mining Methods 0.000 claims abstract description 9
- 238000005266 casting Methods 0.000 claims description 38
- 230000005484 gravity Effects 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 abstract description 2
- 230000032258 transport Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 229910052500 inorganic mineral Inorganic materials 0.000 description 2
- 239000011707 mineral Substances 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C47/00—Machines for obtaining or the removal of materials in open-pit mines
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Bridges Or Land Bridges (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明公开了一种露天矿下部剥离物运输方法——露天矿采场中间搭建纵向组合桥运输方法。纵向组合桥搭桥方式有:线性叠桥;扇形叠桥。在露天开采的过程中,由于工作线长,物料剥离运距大,在采场内部剥离物料重心处搭建垂直于工作线中间桥,可减少桥体上下物料的垂直运距。在单桥的基础上建立子桥,则可增加桥体所能服务剥离台阶。本发明露天矿采场中间搭建纵向组合桥运输方法,适用于水平或近水平露天煤矿采用单斗挖掘机,卡车开采工艺的内排露天矿山,可减少下部剥离物汽车运距、降低运输成本,增加经济效益,具有广泛的实用性。
Description
技术领域
本发明涉及露天矿采场中间搭建纵向组合桥运输方法,尤其适用于大型近水平露天矿内排时下部剥离物运输,以减少运距,节省运输成本。
背景技术
露天开采作为采矿行业的一个重要分支,承担着越来越重要的煤炭开采任务,其本质即剥离矿体上覆岩层,获得有用矿物。大型近水平内排的露天矿,由于开采强度大,工作线长,传统环端帮内排运输,不仅难以回收端帮残煤,而且剥离台阶中部物料运距较大,运输成本占生产成本较高。
发明内容
技术问题:本发明的目的是克服已有技术中的不足之处,提供一种减小露天矿汽车运距、实现等标高排弃、回收端帮残煤、提高矿山整体效益的露天矿采场中间搭建纵向组合桥运输方法。
技术方案:本发明的露天矿下部中间搭建纵向组合桥运输方法,包括剥离表土,直至煤层底部,形成露天矿坑,包括如下步骤:
a.利用采掘机械在坑底中部面向煤层方向采掘出一条1/3-1/2年推进度长的沟槽,然后用剥离物料回填沟槽并压实;
b.在工作帮和排土帮中间建立纵向组合桥,先从沟槽处向排土帮方向用剥离物料建立基桥,将工作帮连通排土帮,再在基桥上方搭建子桥,子桥的高度与现场剥离台阶的相同;第一剥离台阶的剥离物料通过基桥运至排土帮,第二剥离台阶的剥离物料通过子桥运至排土帮,第三剥离台阶及以上剥离台阶经斜坡道从子桥至排土帮,进行多通道排土工作;
c.随着采剥作业的进行,纵向组合桥逐渐向前延伸,直至回填沟槽尽头时,挖断纵向组合桥体;
d.重复步骤a、b、c,继续下一段中间搭建纵向组合桥的采剥作业,直到完成整个采剥作业。
所述采场内部搭建中间纵向组合桥为扇形叠桥或线性叠桥;依据现场实际需要可在子桥靠近排土帮侧搭建倾斜子桥。
有益效果:由于在大型内排露天矿开采过程中,工作帮和排土帮均沿推进方向向前平移。于工作帮煤层上部剥离台阶重心O处,本发明在现有的露天矿山运输理论的基础上衍生而来,搭建同煤层厚度H1相同高度的基桥,再于基桥上搭建同剥离台阶相同高度H2的子桥。本发明包括扇形叠桥、线性叠桥两种露天矿采场中间搭建纵向组合桥的方式。扇形叠桥连接工作帮和排土帮,桥体于工作帮处窄,至排土帮逐渐加宽,而线性叠桥连接工作帮和排土帮,桥体宽度不变。工作帮下部剥离台阶中部物料通过中间纵向组合桥运输至内排土场,减少该部分物料内排运输的运距,降低运输成本。能够在保证矿山正常生产的情况下,减少运输距离、降低运输成本、提高经济效益,具有推广价值。
附图说明
图1为露天矿搭建纵向组合桥的方式一示意图;
图2为露天矿搭建纵向组合桥的方式二示意图;
图3为露天矿扇形叠桥俯视图;
图4为图3的A-A剖面示意图。
图5为图3的B-B处桥体纵剖面示意图。
图6为图3的B-B处桥体侧视三维立体图。
图中:1、工作帮,2、排土帮,3、基桥,4、第一子桥,5、第二子桥,6、第一剥离台阶,7、第二剥离台阶,8、第三剥离台阶,9、沟槽,10、端帮,11、端帮运输通道。
具体实施方式
下面将结合附图对本发明的实施例作进一步的描述:
实例1、本发明的露天矿下部中间搭建纵向组合桥运输方法,包括剥离表土,直至煤层底部,形成露天矿坑,步骤如下:
a.利用采掘机械在坑底中部面向煤层方向采掘出一条1/3-1/2年推进度长的沟槽9,然后用剥离物料回填沟槽9并压实;
b.在工作帮1和排土帮2中间建立纵向组合桥,先从沟槽9处向排土帮方向用剥离物料建立基桥3,将工作帮1连通排土帮2,再在基桥3上方搭建子桥4,子桥4的高度与现场剥离台阶的相同;第一剥离台阶6的剥离物料通过基桥3运至排土帮2,第二剥离台阶7的剥离物料通过子桥4运至排土帮2,第三剥离台阶8及以上剥离台阶经斜坡道从子桥4至排土帮2,进行多通道排土工作;所述采场内部搭建中间纵向组合桥为扇形叠桥;依据现场实际需要可在子桥4靠近排土帮2侧搭建倾斜子桥5。
c.随着采剥作业的进行,纵向组合桥逐渐向前延伸,直至回填沟槽9尽头时,挖断纵向组合桥体;
d.重复步骤a、b、c,继续下一段中间搭建纵向组合桥的采剥作业,直到完成整个采剥作业。
如图1-6所示:在工作帮1剥离物料重心处,向内挖掘一沟槽9,预先采出其中煤炭资源,利用剥离物料将其填充,并垂直于工作帮1向排土帮2呈扇形延伸,与排土帮底部台阶对接,完成基桥3建设;基桥贯通后,于其上部搭建同剥离台阶高度等同的子桥4,在子桥靠近排土场处,则于子桥上继续搭建倾斜子桥5。第一剥离台阶6中部物料通过基桥3运输至排土帮2等标高排土,第二剥离台阶7中部物料通过子桥4运输至排土帮等标高排土,第三剥离台阶8及以上剥离台阶中部物料,下降至子桥4运输,再通过倾斜子桥5爬坡运输至排土帮2相应台阶排土。与绕端帮10运输相比较,减少了物料在工作帮和排土帮的横向运距。
实施例2、与实施例1其本相同,相同之处略。不同之外在于:所述采场内部搭建中间纵向组合桥为线性叠桥,贯通采场的基桥宽度不变。
Claims (3)
1.一种露天矿下部中间搭建纵向组合桥运输方法,包括剥离表土,直至煤层底部,形成露天矿坑,其特征是包括如下步骤:
a.利用采掘机械在坑底中部面向煤层方向采掘出一条1/3-1/2年推进度长的沟槽(9),然后用剥离物料回填沟槽(9)并压实;
b.在工作帮(1)和排土帮(2)中间建立纵向组合桥,先从沟槽(9)处向排土帮方向用剥离物料建立基桥(3),将工作帮(1)连通排土帮(2),再在基桥(3)上方搭建子桥(4),子桥(4)的高度与现场剥离台阶的相同;第一剥离台阶(6)的剥离物料通过基桥(3)运至排土帮(2),第二剥离台阶(7)的剥离物料通过子桥(4)运至排土帮(2),第三剥离台阶(8)及以上剥离台阶经斜坡道从子桥(4)至排土帮(2),进行多通道排土工作;
c.随着采剥作业的进行,纵向组合桥逐渐向前延伸,直至回填沟槽(9)尽头时,挖断纵向组合桥体;
d.重复步骤a、b、c,继续下一段中间搭建纵向组合桥的采剥作业,直到完成整个采剥作业。
2.根据权利要求1所述的露天矿中间搭桥运输方法,其特征是:所述采场内部搭建中间纵向组合桥为扇形叠桥或线性叠桥。
3.根据权利要求1所述的露天矿中间搭桥运输方法,其特征是:依据现场实际需要可在子桥(4)靠近排土帮(2)侧搭建倾斜子桥(5)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510209695.9A CN104806247B (zh) | 2015-04-28 | 2015-04-28 | 露天矿采场中间搭建纵向组合桥运输方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510209695.9A CN104806247B (zh) | 2015-04-28 | 2015-04-28 | 露天矿采场中间搭建纵向组合桥运输方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104806247A true CN104806247A (zh) | 2015-07-29 |
CN104806247B CN104806247B (zh) | 2017-03-08 |
Family
ID=53691399
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510209695.9A Expired - Fee Related CN104806247B (zh) | 2015-04-28 | 2015-04-28 | 露天矿采场中间搭建纵向组合桥运输方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104806247B (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971609A (zh) * | 2016-06-03 | 2016-09-28 | 华能伊敏煤电有限责任公司 | 电铲采掘的坡道置换方式 |
CN108716402A (zh) * | 2018-05-21 | 2018-10-30 | 中国矿业大学 | 一种露天煤矿半连续工艺中间桥布置方式 |
CN109630121A (zh) * | 2019-01-30 | 2019-04-16 | 新疆天池能源有限责任公司 | 一种露天矿采区转向开拓运输系统 |
CN110107299A (zh) * | 2019-06-17 | 2019-08-09 | 王建鑫 | 露天煤矿采剥台阶与运输道路布置系统及方法及开采方法 |
CN110331651A (zh) * | 2019-07-24 | 2019-10-15 | 辽宁工程技术大学 | 一种用于连接露天矿采场和内排土场的自移式行车桥 |
CN110939446A (zh) * | 2019-07-29 | 2020-03-31 | 中国矿业大学 | 一种巨厚倾斜煤层采区转向方法 |
CN110984991A (zh) * | 2019-12-12 | 2020-04-10 | 神华准格尔能源有限责任公司 | 露天采场中间桥移设方法 |
CN112030773A (zh) * | 2020-09-17 | 2020-12-04 | 王建鑫 | 一种露天煤矿采场与排土场之间搭桥施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1811129A (zh) * | 2005-10-15 | 2006-08-02 | 中国矿业大学 | 露天煤矿迈步式搭桥贯通内排运输通路 |
CN101418690A (zh) * | 2008-11-21 | 2009-04-29 | 平朔煤炭工业公司 | 近水平露天矿端帮运输工艺方法 |
CN103133003A (zh) * | 2013-02-25 | 2013-06-05 | 中国矿业大学 | 露天矿端帮靠帮开采方法 |
CN104405396A (zh) * | 2014-12-05 | 2015-03-11 | 辽宁工程技术大学 | 一种过无煤区的露天煤矿留岛搭桥开采方法 |
-
2015
- 2015-04-28 CN CN201510209695.9A patent/CN104806247B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1811129A (zh) * | 2005-10-15 | 2006-08-02 | 中国矿业大学 | 露天煤矿迈步式搭桥贯通内排运输通路 |
CN101418690A (zh) * | 2008-11-21 | 2009-04-29 | 平朔煤炭工业公司 | 近水平露天矿端帮运输工艺方法 |
CN103133003A (zh) * | 2013-02-25 | 2013-06-05 | 中国矿业大学 | 露天矿端帮靠帮开采方法 |
CN104405396A (zh) * | 2014-12-05 | 2015-03-11 | 辽宁工程技术大学 | 一种过无煤区的露天煤矿留岛搭桥开采方法 |
Non-Patent Citations (2)
Title |
---|
刘福明等: "露天煤矿中间搭桥适用条件与关键参数的确定", 《煤炭学报》 * |
周伟等: "大型近水平露天煤矿转向期间开拓运输系统优化研究", 《采矿与安全工程学报》 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971609A (zh) * | 2016-06-03 | 2016-09-28 | 华能伊敏煤电有限责任公司 | 电铲采掘的坡道置换方式 |
CN108716402A (zh) * | 2018-05-21 | 2018-10-30 | 中国矿业大学 | 一种露天煤矿半连续工艺中间桥布置方式 |
CN109630121A (zh) * | 2019-01-30 | 2019-04-16 | 新疆天池能源有限责任公司 | 一种露天矿采区转向开拓运输系统 |
CN110107299A (zh) * | 2019-06-17 | 2019-08-09 | 王建鑫 | 露天煤矿采剥台阶与运输道路布置系统及方法及开采方法 |
CN110107299B (zh) * | 2019-06-17 | 2020-12-25 | 王建鑫 | 露天煤矿采剥台阶与运输道路布置系统及方法及开采方法 |
CN110331651A (zh) * | 2019-07-24 | 2019-10-15 | 辽宁工程技术大学 | 一种用于连接露天矿采场和内排土场的自移式行车桥 |
CN110939446A (zh) * | 2019-07-29 | 2020-03-31 | 中国矿业大学 | 一种巨厚倾斜煤层采区转向方法 |
CN110939446B (zh) * | 2019-07-29 | 2020-11-03 | 中国矿业大学 | 一种巨厚倾斜煤层采区转向方法 |
CN110984991A (zh) * | 2019-12-12 | 2020-04-10 | 神华准格尔能源有限责任公司 | 露天采场中间桥移设方法 |
CN110984991B (zh) * | 2019-12-12 | 2021-06-29 | 神华准格尔能源有限责任公司 | 露天采场中间桥移设方法 |
CN112030773A (zh) * | 2020-09-17 | 2020-12-04 | 王建鑫 | 一种露天煤矿采场与排土场之间搭桥施工方法 |
CN112030773B (zh) * | 2020-09-17 | 2021-12-14 | 王建鑫 | 一种露天煤矿采场与排土场之间搭桥施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104806247B (zh) | 2017-03-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104806247A (zh) | 露天矿采场中间搭建纵向组合桥运输方法 | |
CN103133003B (zh) | 露天矿端帮靠帮开采方法 | |
CN103470262A (zh) | 一种露天煤田近水平矿床倒堆内排的开采方法 | |
CA2883015C (en) | A system for the reduction in applied energy, improved efficiencies and reduced costs in open pit mining | |
CN101899976A (zh) | 露天煤矿的连续采煤工艺方法 | |
ZA200506698B (en) | Fully mechanized mining technique of longwall mining method | |
CN110424966B (zh) | 一种超高水材料充填工作面矸石泵送留巷无煤柱开采方法 | |
CN105781554A (zh) | 一种露天煤矿拉斗铲无运输倒堆工艺开采方法 | |
CN103216238A (zh) | 一种露天煤矿开采工艺 | |
CN104790956A (zh) | 遥控掘进机巷道式或综采放顶煤开采端帮煤工艺 | |
CN104405437A (zh) | 一种固体充填与综采混合式工作面开采方法 | |
CN106368706A (zh) | 一种抛掷爆破拉斗铲倒堆开采程序 | |
CN109458181A (zh) | 一种金属矿沿走向一次采全高的充填采矿方法 | |
US20210310356A1 (en) | Zero-gangue-discharge short-wall face pillar-free mining method | |
CN101892843A (zh) | 固体充填物料多孔底卸式输送机 | |
CN103388478B (zh) | 露天煤矿应用吊斗铲的运输道路形成方法 | |
CN102877848A (zh) | 采煤与矸石胶结条带充填同步进行方法 | |
AU2015100065A4 (en) | A System for the Reduction in Applied Energy, Improved Efficiencies and Reduced Costs in Open Pit Mining | |
CN105626068B (zh) | 露天煤矿端帮桥的拆除方法 | |
CN110388210B (zh) | 适于缓倾斜中厚矿体组合分段开采的采场结构布置方式 | |
RU2543765C2 (ru) | Способ открытой разработки месторождений полезных ископаемых с созданием отвала большой емкости и высоты в сложных условиях | |
CN110984991B (zh) | 露天采场中间桥移设方法 | |
CN111022054B (zh) | 紧邻同向异步开采露天矿及其开采方法 | |
AU2014100343B4 (en) | A System for the Reduction in Applied Energy, Improved Efficiencies and Reduced Costs in Open Pit Mining | |
CN110107299B (zh) | 露天煤矿采剥台阶与运输道路布置系统及方法及开采方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 221116 Research Institute of China University of Mining and Technology,, Jiangsu Applicant after: China Mining Technology Univ. Address before: 221116 Research Institute, China University of Mining and Technology, Xuzhou University, Jiangsu, China, Applicant before: China Mining Technology Univ. |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170308 Termination date: 20180428 |
|
CF01 | Termination of patent right due to non-payment of annual fee |