CN102877848A - 采煤与矸石胶结条带充填同步进行方法 - Google Patents

采煤与矸石胶结条带充填同步进行方法 Download PDF

Info

Publication number
CN102877848A
CN102877848A CN2012103853168A CN201210385316A CN102877848A CN 102877848 A CN102877848 A CN 102877848A CN 2012103853168 A CN2012103853168 A CN 2012103853168A CN 201210385316 A CN201210385316 A CN 201210385316A CN 102877848 A CN102877848 A CN 102877848A
Authority
CN
China
Prior art keywords
filling
machine
coal
coal mining
pick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103853168A
Other languages
English (en)
Other versions
CN102877848B (zh
Inventor
文志杰
汤建泉
张帅
陈连军
朱祝武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201210385316.8A priority Critical patent/CN102877848B/zh
Publication of CN102877848A publication Critical patent/CN102877848A/zh
Application granted granted Critical
Publication of CN102877848B publication Critical patent/CN102877848B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本发明公开了一种采煤与矸石胶结条带充填同步进行方法,首先当工作面推进到一定距离时,将挖掘机和充填设备运至充填支架下组装、调试;采煤机采煤的同时,掘底机同时掘底,掘底机掘出的底板岩石经充填系统输送至充填包中;凝固定型后形成支护采空区顶板的第一个充填条带;第一条充填条带充填完毕后,进行第二条充填条带的充填作业;如此循环,边采煤边充填,直至采煤工作面进行采完。本发明不仅将充填机械设备转移至井下,减少了地面场地布置,而且充分利用了井下掘底板的矸石,解决了充填材料来源问题,并减少了充填材料的运输环节,形成了与工作面同时移动的充填系统,井下充填更为快捷有效,同时可实现边采煤边充填的高效作业流程。

Description

采煤与矸石胶结条带充填同步进行方法
技术领域
本发明涉及煤矿开采,尤其涉及充填开采技术。
背景技术
所谓充填开采,是利用充填材料将采空区充满,支撑采场上覆岩层,减少覆岩垮落变形,实现煤炭安全开采的一种采煤方法。充填开采是实现煤矿绿色开采的重要途径,在消化井下矸石、维护地面环境、防治采场重大灾害事故发生方面有突出贡献。充填开采在煤矿与金属矿领域均有应用。充填方法多种多样,按充填料浆的性质,可分为胶结充填、非胶结充填。胶结充填就是以粉碎的废弃矸石为充填材料,以水泥浆或砂浆作为胶结介质,以不脱水的似膏体状充填采空区。非胶结充填就是完全以废弃矸石为充填材料充填采空区。由于胶结充填易于输送,充填密实,所以以胶结充填应用居多。按充填地域可分为全采空区充填和带状充填。带状充填就是在全部开采的采空区内,间隔一定距离建立条带状充填包,充一条,留一条,已达到节约充填成本,控制采场矿山压力的目的。胶结充填和带状充填的组合就是矸石胶结条带充填。
矸石胶结条带充填又区分为地面充填和井下充填。地面充填是在井上布置充填系统,由井上通过管道将矸石充填料输送到井下采空区;井下充填是井下的矸石不上井,在井下建立充填工作站布置充填系统,在井下直接将矸石充填料充填采空区。
在井下建立充填工作站,虽然解决了矸石不上井问题,但井下矸石一般来自掘进巷道,需要通过多个运输环节运到充填工作站,从充填工作站到采空区再布置充填管路,所以仍带来许多麻烦,也无法实现充填与工作面推进同步化。目前这种方法耗费时间、资金成本较大,且不利于煤矿高产高效的要求。
发明内容
本发明的目的是提出一种采煤与矸石胶结条带充填同步进行方法,以及用于该方法的充填系统。
技术方案是,一种采煤与矸石胶结条带充填同步进行方法,采取以下步骤:
第一步,首先,采煤机按常规方法由开切眼进刀推进,当采煤工作面推进后的采空区为设计的冒落带的宽度时,此时为充填条带的位置,将充填支架移动到充填位置,在充填支架的保护下由人工放置充填包;同时工作面继续推进;
第二步,当工作面再推进一定距离,且该距离达到能够布置挖掘机和充填系统的宽度时,将挖掘机和充填设备运至充填支架下组装,调试;所述的挖掘机是能够挖出底板岩石的机械,亦称掘底机;所述的充填系统为移动式,拖拉在掘底机后面,由掘底机牵引一起行进;充填系统包括依次布置的刮板运输机、粉碎机、搅拌机和注浆机。
第三步,采煤机采煤的同时,掘底机同时掘底,掘底机掘出的底板岩石由刮板输送机输送至粉碎机,粉碎机按要求粉碎成一定粒度,然后输送到搅拌机,同时向搅拌机中加入的一定比例的胶结料,搅拌成均匀的混合充填材料,混合充填材料进入注浆机,注浆机加压经管道输送至充填包中;凝固定型后形成稳固的第一个充填条带,支护采空区顶板;
第四步,第一条充填条带充填完毕后,将掘底机和充填系统牵引至巷道内暂时停放,此时工作面继续向前推进,当推进距离为基本顶垮落步距时,将掘底机和充填系统重新牵引至充填支架下,进行第二条充填条带的充填作业;如此循环,边采煤边充填,直至采煤工作面进行采完。
为实现本方法,本发明提出了一种井下移动式掘底矸石胶结条带充填系统,其特征在于,它是在井下采煤工作面液压支架的后探梁下面布置有掘底机和拖板车,拖板车拖挂在掘底机后面,拖板车上布置有充填系统,充填系统包括依次布置的刮板输送机、粉碎机、搅拌机和注浆机,注浆机与充填胶结条带之间布置有输送管路。
本发明与已有技术相比,优点是:
1、充填系统与生产、支护系统形成了整体的工作系统。充填与生产能够同时进行,大大提高了充填效率。
2、掘底机、粉碎机、搅拌机、注浆机等充填机械设备均在井下布置,充填的矸石材料直接来源于掘底板,免去了将矸石运至地面粉碎搅拌后运至井下或者从地面寻找矸石来源的所带来的费用以及运输问题。
3、掘底机牵引粉碎机、搅拌机、注浆机,各设备通过车轮实现前后移动转弯,这样可充填系统始终处于支护系统的保护之下。
4、充填条带由一个个的充填包组成,充填包在充填支架移动到充填位置时由人工在充填支架的保护下放置,操作简单,大大降低了工人的劳动强度,既灵活快捷又安全高效。
本发明不仅将充填机械设备转移至井下,减少了地面场地布置,而且充分利用了井下掘底板的矸石,解决了充填材料来源问题,并减少了充填材料的运输环节,形成了与工作面同时移动的充填系统,井下充填更为快捷有效,同时可实现边采煤边充填的高效作业流程。
附图说明
图1是本发明的矸石胶结条带布置示意图。
图2是实施例主视图示意图。
图3是实施例侧视图示意图。
图例说明:1-掘底机,2-刮板运输机,3-粉碎机,4-搅拌机,5-注浆机,6-注浆输送管路,7-拖板车,8-液压支架。
L代表冒落带的宽度。
具体实施方式
参照附图,进一步说明本发明实施例的方法。
本发明矸石胶结条带布置如图1、图3所示,它是在采空区每间隔一定距离布置一条矸石胶结条带,具体施工步骤如下:
第一步,首先,采煤机按常规方法由开切眼进刀推进,当采煤工作面推进后的采空区为设计的冒落带的宽度时,此时为充填条带的位置,将充填支架移动到充填位置,在充填支架的保护下由人工放置充填包;同时工作面继续推进;
其中,冒落带的宽度L为:抗压强度超过60MPa的坚硬顶板冒落带的宽度L=20m;抗压强度介于30~60MPa的中等坚硬顶板冒落带的宽度L=10m;抗压强度小于30MPa的软弱顶板冒落带的宽度L=5m。
第二步,当工作面再推进一定距离,且该距离达到能够布置掘底机1和充填系统的宽度时,将掘底机1和充填设备运至充填支架下组装,调试;所述的充填系统包括依次布置的刮板运输机2、粉碎机3、搅拌机4和注浆机5,充填系统为移动式,拖拉在掘底机1后面,由掘底机1牵引一起行进;充填系统的布置如图2所示;
第三步,采煤机采煤的同时,掘底机1同时掘底,掘底机1掘出的底板岩石由刮板输送机2输送至粉碎机,粉碎机3按要求粉碎成一定粒度,然后输送到搅拌机4,同时向搅拌机4中加入的一定比例的胶结料和水,搅拌成均匀的混合充填材料,混合充填材料进入注浆机5,注浆机加压经管道输送至充填包中;凝固定型后形成稳固的第一条充填条带,支护采空区顶板;
上述混合充填材料的煤矸石∶胶结材料=6∶1(重量比),加水后,应混合成浓度为60wt%的膏体料浆。
第四步,第一条充填条带充填完毕后,将掘底机1和充填系统牵引至巷道内暂时停放,此时工作面继续向前推进,当推进距离为基本顶垮落步距时,将掘底机1和充填系统重新牵引至充填支架下,进行第二条充填条带的充填作业;如此循环,边采煤边充填,直至采煤工作面进行采完。
为实现上述方法,本发明提出了一种井下移动式掘底矸石胶结条带充填系统,该系统如图2所示;它是在井下采煤工作面液压支架8的后探梁下面布置有掘底机1和拖板车7,拖板车7拖挂在掘底机1后面,拖板车7上布置有充填系统,充填系统包括依次布置的刮板输送机2、粉碎机3、搅拌机4和注浆机5,注浆机5与充填胶结条带之间布置有注浆输送管路6。

Claims (2)

1.一种采煤与矸石胶结条带充填同步进行方法,其特征在于,步骤如下:
第一步,首先,采煤机按常规方法由开切眼进刀推进,当采煤工作面推进后的采空区为设计的冒落带的宽度时,此时为充填条带的位置,将充填支架移动到充填位置,在充填支架的保护下由人工放置充填包;同时工作面继续推进;
第二步,当工作面再推进一定距离,且该距离达到能够布置挖掘机和充填系统的宽度时,将挖掘机和充填设备运至充填支架下组装,调试;所述的挖掘机是能够挖出底板岩石的机械,亦称掘底机;所述的充填系统为移动式,拖拉在掘底机后面,由掘底机牵引一起行进;充填系统包括依次布置的刮板运输机、粉碎机、搅拌机和注浆机;
第三步,采煤机采煤的同时,掘底机同时掘底,掘底机掘出的底板岩石由刮板输送机输送至粉碎机,粉碎机按要求粉碎成一定粒度,然后输送到搅拌机,同时向搅拌机中加入的一定比例的胶结料,搅拌成均匀的混合充填材料,混合充填材料进入注浆机,注浆机加压经管道输送至充填包中;凝固定型后形成稳固的第一个充填条带,支护采空区顶板;
第四步,第一条充填条带充填完毕后,将掘底机和充填系统牵引至巷道内暂时停放,此时工作面继续向前推进,当推进距离为基本顶垮落步距时,将掘底机和充填系统重新牵引至充填支架下,进行第二条充填条带的充填作业;如此循环,边采煤边充填,直至采煤工作面进行采完。
2.如权利要求1所述的采煤与矸石胶结条带充填同步进行方法,其特征在于,所述的移动式充填系统是在井下采煤工作面液压支架的后探梁下面布置有掘底机和拖板车,拖板车拖挂在掘底机后面,刮板输送机、粉碎机、搅拌机和注浆机依次布置在拖板车上,注浆机与充填胶结条带之间布置有输送管路。
CN201210385316.8A 2012-09-26 2012-09-26 采煤与矸石胶结条带充填同步进行方法 Active CN102877848B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210385316.8A CN102877848B (zh) 2012-09-26 2012-09-26 采煤与矸石胶结条带充填同步进行方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210385316.8A CN102877848B (zh) 2012-09-26 2012-09-26 采煤与矸石胶结条带充填同步进行方法

Publications (2)

Publication Number Publication Date
CN102877848A true CN102877848A (zh) 2013-01-16
CN102877848B CN102877848B (zh) 2015-06-03

Family

ID=47479338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210385316.8A Active CN102877848B (zh) 2012-09-26 2012-09-26 采煤与矸石胶结条带充填同步进行方法

Country Status (1)

Country Link
CN (1) CN102877848B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437765A (zh) * 2013-07-19 2013-12-11 中国矿业大学(北京) 煤矿岩层移动控制的“采-充-留”耦合协调开采方法
CN104110259A (zh) * 2014-04-29 2014-10-22 四川省华蓥山煤业股份有限公司李子垭南煤矿 急倾斜煤层综采工作面开切眼下矸孔孔壁加固方法及装置
CN104675399A (zh) * 2015-01-30 2015-06-03 赤峰西拉沐沦(集团)公格营子煤业有限公司 煤矿采掘充填一体化采煤方法
CN105332733A (zh) * 2015-09-25 2016-02-17 山东科技大学 普采工作面采空区泵送胶结材料的条带充填方法
CN103437765B (zh) * 2013-07-19 2016-11-30 中国矿业大学(北京) 煤矿岩层移动控制的“采‑充‑留”耦合协调开采方法
CN109667618A (zh) * 2019-02-25 2019-04-23 闫红世 一种回填采煤巷道的注浆车
CN110318803A (zh) * 2019-07-12 2019-10-11 中国矿业大学 一种利用散体充填材料的条式间隔充填方法
CN112096449A (zh) * 2020-10-26 2020-12-18 西安科技大学 一种煤矿采空区膏体条带注浆组合充填开采方法
CN113893933A (zh) * 2021-10-21 2022-01-07 中煤能源研究院有限责任公司 一种井上破碎井下制浆系统及使用方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1546678A1 (ru) * 1988-04-04 1990-02-28 Inst Gornogo Dela An Kazakhsk Способ закладки камер
RU2246618C1 (ru) * 2003-12-08 2005-02-20 Государственное образовательное учреждение высшего профессионального образования Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (технический университет) Способ управления труднообрушаемой кровлей
CN101059077A (zh) * 2007-05-31 2007-10-24 刘兴才 软岩巷道、隧道快速充填支护工艺
CN201982137U (zh) * 2011-03-11 2011-09-21 沈阳天安矿山机械科技有限公司 以矸石为骨料混凝土充填材料的井下制备装置
CN102230396A (zh) * 2011-05-31 2011-11-02 大连大学 煤矿采空区随采随充充填方法
CN102392644A (zh) * 2010-11-30 2012-03-28 淄博市王庄煤矿 中厚以下煤层的条带式流体膨胀充填开采方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1546678A1 (ru) * 1988-04-04 1990-02-28 Inst Gornogo Dela An Kazakhsk Способ закладки камер
RU2246618C1 (ru) * 2003-12-08 2005-02-20 Государственное образовательное учреждение высшего профессионального образования Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (технический университет) Способ управления труднообрушаемой кровлей
CN101059077A (zh) * 2007-05-31 2007-10-24 刘兴才 软岩巷道、隧道快速充填支护工艺
CN102392644A (zh) * 2010-11-30 2012-03-28 淄博市王庄煤矿 中厚以下煤层的条带式流体膨胀充填开采方法
CN201982137U (zh) * 2011-03-11 2011-09-21 沈阳天安矿山机械科技有限公司 以矸石为骨料混凝土充填材料的井下制备装置
CN102230396A (zh) * 2011-05-31 2011-11-02 大连大学 煤矿采空区随采随充充填方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437765A (zh) * 2013-07-19 2013-12-11 中国矿业大学(北京) 煤矿岩层移动控制的“采-充-留”耦合协调开采方法
CN103437765B (zh) * 2013-07-19 2016-11-30 中国矿业大学(北京) 煤矿岩层移动控制的“采‑充‑留”耦合协调开采方法
CN104110259A (zh) * 2014-04-29 2014-10-22 四川省华蓥山煤业股份有限公司李子垭南煤矿 急倾斜煤层综采工作面开切眼下矸孔孔壁加固方法及装置
CN104675399A (zh) * 2015-01-30 2015-06-03 赤峰西拉沐沦(集团)公格营子煤业有限公司 煤矿采掘充填一体化采煤方法
CN105332733A (zh) * 2015-09-25 2016-02-17 山东科技大学 普采工作面采空区泵送胶结材料的条带充填方法
CN109667618A (zh) * 2019-02-25 2019-04-23 闫红世 一种回填采煤巷道的注浆车
CN110318803A (zh) * 2019-07-12 2019-10-11 中国矿业大学 一种利用散体充填材料的条式间隔充填方法
CN112096449A (zh) * 2020-10-26 2020-12-18 西安科技大学 一种煤矿采空区膏体条带注浆组合充填开采方法
CN113893933A (zh) * 2021-10-21 2022-01-07 中煤能源研究院有限责任公司 一种井上破碎井下制浆系统及使用方法
CN113893933B (zh) * 2021-10-21 2023-03-14 中煤能源研究院有限责任公司 一种井上破碎井下制浆系统及使用方法

Also Published As

Publication number Publication date
CN102877848B (zh) 2015-06-03

Similar Documents

Publication Publication Date Title
CN102877848B (zh) 采煤与矸石胶结条带充填同步进行方法
CN110593874B (zh) 一种煤矿强弱强全采全充方法
CN104405437B (zh) 一种固体充填与综采混合式工作面开采方法
AU2013358812B2 (en) Solid-filling coal mining method with two pre-excavated tunnels for advancing
CN107387084B (zh) 一种沿空留巷减少切顶深度的施工方法
CN103742148B (zh) 一种急倾斜煤层柔掩支护下行矸石充填的采煤法
CN104500070B (zh) 一种连续采煤机膏体充填开采方法
CN110424966B (zh) 一种超高水材料充填工作面矸石泵送留巷无煤柱开采方法
CN103527195A (zh) 一种厚夹矸煤层分采分运矸石回填采空区方法
CN101915100B (zh) 煤矿井下黄土充填采煤方法
CN102937035B (zh) 在煤矿采空区内采岩充填的方法
CN109869150B (zh) 一种矿山资源分段全采局充开采方法
CN109630112B (zh) 一种切顶充填的n00采矿法
CN101749020A (zh) 充填法前进式采煤
CN110410076A (zh) 一种用于老房柱采空区遗留煤柱回收的充填开采方法
CN103104260A (zh) 复杂地质条件下综—机对拉面采煤方法
CN104453994A (zh) 一种放顶矸巷旁充填沿空留巷方法
CN108204244A (zh) 矸石间隔充填采煤法
CN105971607A (zh) 一种中厚煤层沿空留巷方法
CN102011610B (zh) 一种用于中厚煤层无煤柱开采模式的支护方法
CN101824986A (zh) 钻装运锚一体化机采煤工艺
CN108331580B (zh) 一种清洁高效的采煤方法
CN110388210B (zh) 适于缓倾斜中厚矿体组合分段开采的采场结构布置方式
CN101338675A (zh) 露天矿边帮下压覆有益矿物露井联合开采方法
CN109973094B (zh) 一种矿山资源同面全采局充开采方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant