CN102011610B - 一种用于中厚煤层无煤柱开采模式的支护方法 - Google Patents

一种用于中厚煤层无煤柱开采模式的支护方法 Download PDF

Info

Publication number
CN102011610B
CN102011610B CN 201010522499 CN201010522499A CN102011610B CN 102011610 B CN102011610 B CN 102011610B CN 201010522499 CN201010522499 CN 201010522499 CN 201010522499 A CN201010522499 A CN 201010522499A CN 102011610 B CN102011610 B CN 102011610B
Authority
CN
China
Prior art keywords
filling
template
supporting method
filling template
stones
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010522499
Other languages
English (en)
Other versions
CN102011610A (zh
Inventor
文志杰
宋振骐
石永奎
文金浩
汤建泉
卢国志
陈连军
尹立明
刘安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN 201010522499 priority Critical patent/CN102011610B/zh
Publication of CN102011610A publication Critical patent/CN102011610A/zh
Application granted granted Critical
Publication of CN102011610B publication Critical patent/CN102011610B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种用于中厚煤层无煤柱开采模式的支护方法,将工作面矸石掘进机获得的矸石料输送至破碎机中进行破碎;将所得破碎后的矸石料输送至搅拌机进行搅拌得到填充石料;将填充石料通过注浆泵输送至填充模板内,填充模板再将填充石料填充在采空区域内。本发明将工作面获得的矸石经过粉碎、搅拌等工序后获得填充石料,再将填充石料回填到采空区域内,在工作面推进过程中,液压护顶支架保护的条件下,窝底机(或挑顶机)直接窝底(或挑顶),将采出的矸石料粉碎、搅拌后回填至采空区域,并随工作面的开采推进,不断前移;充填模板由充填支架带动前移或后移,实现了采、掘、支、充填一体化,减少了传统采掘煤矿的留设煤柱量,提高了回采率。

Description

一种用于中厚煤层无煤柱开采模式的支护方法
技术领域
本发明涉及一种用于无煤柱开采模式的方法,尤其涉及一种用于中厚煤层无煤柱开采模式的支护方法。
背景技术
无煤柱充填开采模式的推广应用是当前我国煤矿生产建设中探索实现节能减排循环经济思想和贯彻人类生存可持续发展战略的重要组成部分。我国现有矿井建筑、铁路、村庄,即“三下”压煤储量比重超过30%,受灰水威胁不能开采的煤炭资源不低于10%(华北地区接近25%)。在埋深800m以下,受护巷煤柱开采传统思想束缚不能开采的储量可能数以百亿吨计。目前无煤柱开采主要存在以下几个问题:
一、开采煤矿后的充填成本高。
二、作业效率不高,工序复杂,不能实现采、掘、支、充填一体化,浪费了大量的财力物力。
由此可见,现有技术有待于更进一步的改进和发展。
发明内容
本发明为解决上述现有技术中的缺陷提供一种用于中厚煤层无煤柱开采模式的支护方法,解决现有技术不能实现采、掘、支、充填一体化以及开采煤矿后充填成本高的技术问题,以降低开采煤矿后的充填成本,提高无煤柱开采模式的作业效率。
为解决上述技术问题,本发明方案包括:
一种用于中厚煤层无煤柱开采模式的支护方法,其包括以下步骤:
A、将工作面矸石掘进机获得的矸石料输送至破碎机中进行破碎;
B、将步骤A中所得破碎后的矸石料输送至搅拌机进行搅拌得到填充石料;
C、将填充石料通过注浆泵输送至填充模板内,填充模板再将填充石料填充在采空区域内。
所述的支护方法,其中,上述步骤C中还包括:填充模板将填充石料以间隔支撑条带的方式填充在采空区域内。
所述的支护方法,其中,上述填充模板与一填充支架相连接,填充模板随填充支架移动。
所述的支护方法,其中,上述步骤A中所述工作面上设置有液压护顶支架。
所述的支护方法,其中,上述相邻支撑条带之间的间隔距离在十米至五十米之间。
所述的支护方法,其中,上述填充模板为缺一面的长方体,填充模板与注浆泵相连通。
本发明提供的一种用于中厚煤层无煤柱开采模式的支护方法,将工作面获得的矸石经过粉碎、搅拌等工序后获得填充石料,再将填充石料回填到采空区域内,在工作面推进过程中,液压护顶支架保护的条件下,窝底机(或挑顶机)直接窝底(或挑顶),将采出的矸石料粉碎、搅拌后回填至采空区域,并随工作面的开采推进,不断前移;充填模板由充填支架带动前移或后移,实现了采、掘、支、充填一体化,减少了传统采掘煤矿的留设煤柱量,提高了回采率;并且在高瓦斯矿井中,可预抽瓦斯,实现了节能减排,降低了瓦斯爆炸事故,降低了开采煤矿后的充填成本,提高了无煤柱开采模式的作业效率。
附图说明
图1是本发明中支护方法的流程简图;
图2是本发明中实施支护方法的系统结构简图;
图3是本发明中填充模板的结构简图。
具体实施方式
本发明提供了一种用于中厚煤层无煤柱开采模式的支护方法,为了使本发明的目的、技术方案以及优点更清楚、明确,以下将结合附图与实施例,对本发明进一步详细说明。
本发明提供了一种用于中厚煤层无煤柱开采模式的支护方法,将工作面矸石掘进机获得的矸石料通过粉碎、搅拌后回填在采空区域内,实现了采、掘、支、充填一体化,降低了开采煤矿后的充填成本,提高了无煤柱开采模式的作业效率。如图1、图2与图3所示的,本发明提供的支护方法主要包括以下步骤:
a、将工作面矸石掘进机1获得的矸石料输送至破碎机中3进行破碎;
b、将步骤a中所得破碎后的矸石料输送至搅拌机进行搅拌得到填充石料;
c、将填充石料通过注浆泵4输送至填充模板2内,填充模板2再将填充石料填充在采空区域内。
更进一步的,上述的填充模板将填充石料以间隔支撑条带的方式填充在采空区域内,相邻支撑条带之间的间隔距离在十米至五十米之间,提高了资源利用率,增强了支撑的稳固性。
更进一步的,填充模板2与一填充支架11相连接,填充模板2随填充支架11移动,提高了填充效率,方便了工人的操作。
更进一步的,在上述工作面上设置有液压护顶支架5,保证了工人操作的安全性。并且填充模板2为缺一面的长方体,填充模板与注浆泵相连通,使注浆泵更舒畅的将填充石料输送至填充模板2内,提高了填充效率。
为了更进一步阐述本发明,如图2与图3所示的,矸石掘进机1在液压护顶支架5作用范围下方,矸石掘进机1掘出矸石,输送到破碎机3中进行粉碎,然后再将粉碎后的矸石料输送至搅拌机6搅拌后,然后再由注浆泵4通过由充填管路7输送到采空区域的填充模板2中进行充填。8为填充后的支撑条带,9为矸石掘进机1掘进后形成的窝槽,10为即将充填的条带位置,填充模板2可以随填充支架11前移而移动。
应当理解的是,上述针对较佳实施例的描述较为详细,并不能因此而认为是对本发明专利保护范围的限制,本领域的普通技术人员在本发明的启示下,在不脱离本发明权利要求所保护的范围情况下,还可以做出替换、简单组合等多种变形,这些均落入本发明的保护范围之内,本发明的请求保护范围应以所附权利要求为准。

Claims (3)

1.一种用于中厚煤层无煤柱开采模式的支护方法,其包括以下步骤:
A、将工作面矸石掘进机获得的矸石料输送至破碎机中进行破碎;
B、将步骤A中所得破碎后的矸石料输送至搅拌机进行搅拌得到填充石料;
C、将填充石料通过注浆泵输送至填充模板内,填充模板再将填充石料填充在采空区域内;
上述步骤C中还包括:填充模板将填充石料以间隔支撑条带的方式填充在采空区域内;
上述填充模板与一填充支架相连接,填充模板随填充支架移动;
上述步骤A中所述工作面上设置有液压护顶支架。
2.根据权利要求1所述的支护方法,其特征在于:上述相邻支撑条带之间的间隔距离在十米至五十米之间。
3.根据权利要求2所述的支护方法,其特征在于:上述填充模板为缺一面的长方体,填充模板与注浆泵相连通。
CN 201010522499 2010-10-28 2010-10-28 一种用于中厚煤层无煤柱开采模式的支护方法 Active CN102011610B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010522499 CN102011610B (zh) 2010-10-28 2010-10-28 一种用于中厚煤层无煤柱开采模式的支护方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010522499 CN102011610B (zh) 2010-10-28 2010-10-28 一种用于中厚煤层无煤柱开采模式的支护方法

Publications (2)

Publication Number Publication Date
CN102011610A CN102011610A (zh) 2011-04-13
CN102011610B true CN102011610B (zh) 2013-01-16

Family

ID=43841920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010522499 Active CN102011610B (zh) 2010-10-28 2010-10-28 一种用于中厚煤层无煤柱开采模式的支护方法

Country Status (1)

Country Link
CN (1) CN102011610B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322261A (zh) * 2011-06-01 2012-01-18 山东科技大学 大采高综采工作面小煤柱等压过空巷方法
CN102966353A (zh) * 2012-10-26 2013-03-13 枣庄矿业集团高庄煤业有限公司 厚煤层桥拱式三下压煤全采方法
CN103075189B (zh) * 2013-02-19 2015-04-22 山东黄金矿业股份有限公司新城金矿 一种薄壁中空结构人工点柱式上向水平分层尾砂胶充填方法
CN103726846B (zh) * 2014-01-15 2016-01-20 山东科技大学 一种上行分层开采特厚、巨厚煤层的采煤方法
CN109763822A (zh) * 2019-01-21 2019-05-17 西安科技大学 大倾角厚煤层多区段无煤柱错层护巷及段间煤柱充填方法
CN109915204B (zh) * 2019-04-11 2021-05-14 兖矿东华重工有限公司 一种利用充填支架对采煤区进行填充的方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3440824A (en) * 1967-05-16 1969-04-29 Thomas J Doolin Method and apparatus for backfilling and underpinning an underground coal or ore mine
CN1807843A (zh) * 2005-01-19 2006-07-26 新汶矿业集团汶南煤矿有限责任公司 矸石充填采空区的方法
CN101021153A (zh) * 2007-02-23 2007-08-22 中国矿业大学 一种矸石充填薄煤层掘巷方法
CN101372891A (zh) * 2008-06-10 2009-02-25 沈阳市华祥矿山机械厂 条带充填整体回采采煤方法
CN101392659A (zh) * 2008-08-05 2009-03-25 山东华恒矿业有限公司 井下矸石直接利用的方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3440824A (en) * 1967-05-16 1969-04-29 Thomas J Doolin Method and apparatus for backfilling and underpinning an underground coal or ore mine
CN1807843A (zh) * 2005-01-19 2006-07-26 新汶矿业集团汶南煤矿有限责任公司 矸石充填采空区的方法
CN101021153A (zh) * 2007-02-23 2007-08-22 中国矿业大学 一种矸石充填薄煤层掘巷方法
CN101372891A (zh) * 2008-06-10 2009-02-25 沈阳市华祥矿山机械厂 条带充填整体回采采煤方法
CN101392659A (zh) * 2008-08-05 2009-03-25 山东华恒矿业有限公司 井下矸石直接利用的方法

Also Published As

Publication number Publication date
CN102011610A (zh) 2011-04-13

Similar Documents

Publication Publication Date Title
CN102011610B (zh) 一种用于中厚煤层无煤柱开采模式的支护方法
CN103821558B (zh) 煤矿采空区充填采矿及沿空留巷充填工艺
CN101864956B (zh) 一种区段无煤柱开采方法
CN102011589B (zh) 一种适于井下二步骤回采的采场底部结构及其生产工艺
CN112360462B (zh) 短壁综采矸石充填注浆的开采工艺
CN102392642A (zh) 一种无煤柱回采工作面的巷道布置方法
CN102678121B (zh) 无盘区中深孔留矿分层控顶嗣后充填采矿法
CN109209382B (zh) 无煤柱无掘巷z型工作面回采方法
CN100590294C (zh) 一种矸石充填薄煤层掘巷方法
CN102953732A (zh) 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法
CN102877848B (zh) 采煤与矸石胶结条带充填同步进行方法
CN103470261A (zh) 综采放顶煤采空区原巷道顶板下沿空掘巷的方法
CN107829742A (zh) 一种崩落‑充填‑空场‑崩落采矿方法
CN101749020A (zh) 充填法前进式采煤
CN110410076A (zh) 一种用于老房柱采空区遗留煤柱回收的充填开采方法
CN109763821A (zh) 一种动压采区大巷复合护巷方法
CN104100271A (zh) 预掘导硐充填人造帮二次复用巷旁支护成巷方法
CN104863588A (zh) 超前预设墩柱沿空留巷方法
CN114622953B (zh) 煤矿矸石及co2采动覆岩隔离注浆充填减排方法
CN102287211A (zh) 沿空留巷端头液压支架及其进行沿空留巷煤矿开采的方法
CN103437766A (zh) 一种原地碎裂采矿方法
CN105240012A (zh) 一种实现煤柱同采的f型区段采煤方法
CN102852532B (zh) 一种防止煤壁片帮的注浆方法
CN102425431B (zh) 一种极近距离煤层开采巷道布置方法
CN203756173U (zh) 一种采后充填原巷道无煤柱沿空掘巷系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant