CN104775831B - A kind of tunnel double-lining inverted arch exempts from short abutment wall arcing construction method with arch wall joint portion - Google Patents

A kind of tunnel double-lining inverted arch exempts from short abutment wall arcing construction method with arch wall joint portion Download PDF

Info

Publication number
CN104775831B
CN104775831B CN201510065788.9A CN201510065788A CN104775831B CN 104775831 B CN104775831 B CN 104775831B CN 201510065788 A CN201510065788 A CN 201510065788A CN 104775831 B CN104775831 B CN 104775831B
Authority
CN
China
Prior art keywords
inverted arch
arch
template
construction method
joint portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510065788.9A
Other languages
Chinese (zh)
Other versions
CN104775831A (en
Inventor
陈军社
李凯
江海浪
马奇峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
Original Assignee
THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU filed Critical THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
Priority to CN201510065788.9A priority Critical patent/CN104775831B/en
Publication of CN104775831A publication Critical patent/CN104775831A/en
Application granted granted Critical
Publication of CN104775831B publication Critical patent/CN104775831B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of tunnel double-lining inverted arch and exempt from short abutment wall arcing construction method with arch wall joint portion, relate to constructing tunnel field, including reinforcing bar binding, fixed form, inverted arch concreting, inverted arch top template is removed and Central drain model sheetinstallat and fill concrete pours and five technical processs of form removable, The present invention reduces working procedure, improve construction quality level, and work efficiency is high, has saved substantial amounts of cost.

Description

A kind of tunnel double-lining inverted arch exempts from short abutment wall arcing construction method with arch wall joint portion
Technical field
The present invention relates to constructing tunnel field, be specifically related to a kind of tunnel double-lining inverted arch and tie with arch wall Conjunction portion exempts from short abutment wall arcing construction method.
Background technology
Conventional tunnel inverted arch sequence of construction is first to install inverted arch termination arc formwork, treats inverted arch coagulation Soil has poured, then installs filling template, is filled with concrete construction.This secondary formwork The sequence of construction of form removal, produces substantial amounts of labour cost, the most inadvisable, and production efficiency is low, Affect the construction period;Defect is there is also, it is ensured that inverted arch is not with to fill contact surface linear in quality Smoother, in inverted arch concrete easily invades cable duct body simultaneously.And inverted arch arc formwork is inverted arch Termination sizing arc punching block, the inverted arch top little punching block of arc, the general name of cable duct arc formwork.It Appearance, make inverted arch construction not only save time but also facilitate, ensure that work progress quality simultaneously.It The aspects such as quality control, Financial cost, work efficiency in man-hour are more excellent compared with conventional construction method.
Summary of the invention
Problem to be solved by this invention is to provide that a kind of construction quality is good, the tunnel that work efficiency is high Road two serves as a contrast inverted arch and exempts from short abutment wall arcing construction method with arch wall joint portion.
To achieve these goals, the technical scheme that the present invention takes is a kind of tunnel of being provided Road two serves as a contrast inverted arch and exempts from short abutment wall arcing construction method with arch wall joint portion, comprises the steps:
(1) reinforcing bar binding: after inverted arch has excavated, manual amendment, face upward according to drawing colligation Arch reinforcing bar;
(2) fixed form: be first according to inverted arch excavation shape, integral hoisting inverted arch arc tips Head mould plate, and the longitudinal component in inverted arch reinforcing bar that in step (1), colligation is good is stretched out face upward The eyelet that curved arch end head formwork is reserved, then reinforces, then is fixed on by angle steel the most mounted On reinforcing bar, the inverted arch top little punching block of arc is embedded and tightens with bolt;
(3) inverted arch concreting: pour arch in the template first made in step (2) Base concrete, then symmetry pours until two serve as a contrast and at inverted arch demarcation line;
(4) inverted arch top arc formwork is removed and Central drain model sheetinstallat: treat step (3) Inverted arch concreting complete after, remove inverted arch top arc formwork and angle steel every other day, entirety is hung Dress Central drain template;
(5) fill concrete pours and form removable: the center made in step (4) In the template of ditch, symmetry pours fill concrete, prevents Central drain template from offseting, treats concrete Solidification, removes inverted arch arced terminus template and Central drain template, cleans out and reuse.
Preferably, the shape of template used in described step (1) and step (4) is arc Shape.
Preferably, the material of bolt used in described step (2) is metal material.
Preferably, the eye diameter in described step (2) is 2-5cm.
Preferably, the main component of inverted arch concrete used in described step (3) includes water Mud, water, stone and sand, its corresponding mass ratio is 1:0.45:3:2.
Preferably, in described step (3), the mode that pours of inverted arch concrete is that chute enters mould, The plug-in type vibrating rod using a diameter of 50mm vibrates.
Using technical scheme, inverted arch termination uses sizing arc-shaped steel template, it is ensured that Inverted arch thickness, makes absolute altitude be easy to control;When inverted arch top arc formwork is installed, the best in colligation Inverted arch reinforcing bar on weld angle steel, by template embed be joined with bolts, it is ensured that inverted arch with fill out Fully boundary line meets design drawing requirement, and construction quality is effectively guaranteed, and utilizes the present invention The construction method provided can reduce by 2 road working procedures, saves labour force, owing to the present invention exists Being simplified in operation, work efficiency is improved, and cyclic advance reduces on the time significantly, Accelerate construction speed.
Accompanying drawing illustrates:
Fig. 1 is tunnel inverted arch and fill concrete formwork for placing installation general arrangement.
Fig. 2 is that inverted arch top arc formwork mounting plane arranges schematic diagram.
Fig. 3 is inverted arch arced terminus structure of transvers plate figure, and letter a, b are respectively template rib spacing, C1 is that template is thick, and c2 is that rib is high, and diameter of bolt hole Φ, spacing a1 and template height h are by construction Requirement different designs is chosen.
Fig. 4 is inverted arch end face formwork structure schematic diagram, long (a), wide (b), thick (c) and bolt Bore dia (Φ) is chosen by construction requirement different designs.
Fig. 5 is inward turning nut structure schematic diagram, wherein Φ 1, Φ 2, Φ 3 and h1 and h2 Choose by construction requirement different designs.
Fig. 6 is the structural representation of connecting bolt, and wherein Φ 5 matches with the Φ 3 of nut.
Fig. 7 is gasket construction schematic diagram, and wherein Φ 7 is slightly larger than Φ 5, for standard component.
Formwork sides figure in gutter centered by Fig. 8, letter a, b be respectively scalable leading screw and Template rib spacing.
Wherein: 1 inverted arch arced terminus template, 2 inverted arch concrete, 3 angle steel, 4 face upward Vault arc formwork, 5 connecting bolts, spin nut in 6,7 liners, 8 central trench are fixed Section mould plate, 9 concrete, 10 bolts hole, 11 scalable leading screws.
Detailed description of the invention
For the technological means making the present invention realize, creation characteristic, reach purpose and be prone to bright with effect White understanding, below in conjunction with detailed description of the invention, is expanded on further the present invention.
As shown in Fig. 1~Fig. 8, a kind of tunnel double-lining inverted arch exempts from short abutment wall arc with arch wall joint portion Change construction method, comprise the steps:
(1) reinforcing bar binding: after inverted arch has excavated, manual amendment, face upward according to drawing colligation Arch reinforcing bar;
(2) fixed form: be first according to inverted arch excavation shape, integral hoisting inverted arch arc tips Head mould plate, and the longitudinal component in inverted arch reinforcing bar that in step (1), colligation is good is stretched out face upward The eyelet that curved arch end head formwork is reserved, then reinforces, then is fixed on by angle steel the most mounted On reinforcing bar, the inverted arch top little punching block of arc is embedded and tightens with bolt;
(3) inverted arch concreting: pour arch in the template first made in step (2) Base concrete, then symmetry pours until two serve as a contrast and at inverted arch demarcation line;
(4) inverted arch top arc formwork is removed and Central drain model sheetinstallat: treat step (3) Inverted arch concreting complete after, remove inverted arch top arc formwork and angle steel every other day, entirety is hung Dress Central drain template;
(5) fill concrete pours and form removable: the center made in step (4) In the template of ditch, symmetry pours fill concrete, prevents Central drain template from offseting, treats concrete Solidification, removes inverted arch arced terminus template and Central drain template, cleans out and reuse.
It should be noted that the shape of template used in described step (1) and step (4) It is arc.
In the present embodiment, the material of bolt used in described step (2) is metal material.
In the present embodiment, the eye diameter in described step (2) is 2-5cm.
In the present embodiment, the main component of inverted arch concrete used in described step (3) Including cement, water, stone and sand, its corresponding mass ratio is 1:0.45:3:2.
Additionally, the mode that pours of inverted arch concrete is that chute enters mould in described step (3), adopt Vibrate with the plug-in type vibrating rod of a diameter of 50mm.
Letter a, b are respectively template rib spacing, and c1 is that template is thick, and c2 is that rib is high, bolt hole Diameter of phi, spacing a1 and template height h are chosen by construction requirement different designs;Long (a), wide (b), Thick (c) and diameter of bolt hole (Φ) are chosen by construction requirement different designs;Wherein Φ 1, Φ 2, Φ 3 and h1 and h2 is chosen by construction requirement different designs;Wherein the Φ 5 and Φ 3 of nut Match;Wherein Φ 7 is slightly larger than Φ 5, for standard component;Letter a, b are respectively scalable silk Thick stick and template rib spacing.
Based on above-mentioned, in the present invention, inverted arch termination uses sizing arc-shaped steel template, it is ensured that inverted arch Thickness, makes absolute altitude be easy to control;When inverted arch top arc formwork is installed, first in good the facing upward of colligation Weld angle steel on arch reinforcing bar, template is embedded and is joined with bolts, it is ensured that inverted arch and filling point Boundary line meets design drawing requirement, and construction quality is effectively guaranteed, and utilizes the present invention to be carried The construction method of confession can reduce by 2 road working procedures, saves labour force, owing to the present invention is in operation On simplified, work efficiency is improved, and cyclic advance reduces on the time significantly, accelerate Construction speed.
Obviously the present invention implements and is not subject to the restrictions described above, if the present invention of have employed Method design and the improvement of various unsubstantialities that carries out of technical scheme, or the most improved incite somebody to action this Design and the technical scheme of invention directly apply to other occasion, all at the protection model of the present invention Within enclosing.

Claims (6)

1. a short abutment wall arcing construction method is exempted from tunnel double-lining inverted arch and arch wall joint portion, bag Include following step:
(1) reinforcing bar binding: after inverted arch has excavated, manual amendment, face upward according to drawing colligation Arch reinforcing bar;
(2) fixed form: be first according to inverted arch excavation shape, integral hoisting inverted arch arc tips Head mould plate, and the longitudinal component in inverted arch reinforcing bar that in step (1), colligation is good is stretched out face upward The eyelet that curved arch end head formwork is reserved, then reinforces, then is fixed on by angle steel the most mounted On reinforcing bar, the inverted arch top little punching block of arc is embedded and tightens with bolt;
(3) inverted arch concreting: pour arch in the template first made in step (2) Base concrete, then symmetry pours until two serve as a contrast and at inverted arch demarcation line;
(4) inverted arch top arc formwork is removed and Central drain model sheetinstallat: treat step (3) Inverted arch concreting complete after, remove inverted arch top arc formwork and angle steel every other day, entirety is hung Dress Central drain template;
(5) fill concrete pours and form removable: the center made in step (4) In the template of ditch, symmetry pours fill concrete, prevents Central drain template from offseting, treats concrete Solidification, removes inverted arch arced terminus template and Central drain template, cleans out and reuse.
A kind of tunnel double-lining inverted arch the most according to claim 1 is exempted from short with arch wall joint portion Abutment wall arcing construction method, it is characterised in that: used in described step (1) and step (4) The shape of template be arc.
A kind of tunnel double-lining inverted arch the most according to claim 1 is exempted from short with arch wall joint portion Abutment wall arcing construction method, it is characterised in that: the material of bolt used in described step (2) Matter is metal material.
A kind of tunnel double-lining inverted arch the most according to claim 1 is exempted from short with arch wall joint portion Abutment wall arcing construction method, it is characterised in that: the eye diameter in described step (2) is 2-5cm.
A kind of tunnel double-lining inverted arch the most according to claim 1 is exempted from short with arch wall joint portion Abutment wall arcing construction method, it is characterised in that: inverted arch coagulation used in described step (3) The main component of soil includes cement, water, stone and sand, and its corresponding mass ratio is 1:0.45: 3:2.
A kind of tunnel double-lining inverted arch the most according to claim 1 is exempted from short with arch wall joint portion Abutment wall arcing construction method, it is characterised in that: in described step (3), inverted arch concrete waters The mode of building is that chute enters mould, uses the plug-in type vibrating rod of a diameter of 50mm to vibrate.
CN201510065788.9A 2015-02-09 2015-02-09 A kind of tunnel double-lining inverted arch exempts from short abutment wall arcing construction method with arch wall joint portion Active CN104775831B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510065788.9A CN104775831B (en) 2015-02-09 2015-02-09 A kind of tunnel double-lining inverted arch exempts from short abutment wall arcing construction method with arch wall joint portion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510065788.9A CN104775831B (en) 2015-02-09 2015-02-09 A kind of tunnel double-lining inverted arch exempts from short abutment wall arcing construction method with arch wall joint portion

Publications (2)

Publication Number Publication Date
CN104775831A CN104775831A (en) 2015-07-15
CN104775831B true CN104775831B (en) 2016-08-24

Family

ID=53617553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510065788.9A Active CN104775831B (en) 2015-02-09 2015-02-09 A kind of tunnel double-lining inverted arch exempts from short abutment wall arcing construction method with arch wall joint portion

Country Status (1)

Country Link
CN (1) CN104775831B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107201908B (en) * 2017-06-16 2023-10-31 中铁五局集团有限公司 Construction method for deep-buried central ditch of tunnel in severe cold region
CN113700289B (en) * 2021-05-24 2023-02-10 海南优技建筑铝模有限公司 Assembly type aluminum alloy template assembling system for building

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967985B (en) * 2010-09-08 2012-11-07 中铁隧道集团有限公司 Self-propelled inverted arch template construction method
CN102146799B (en) * 2011-03-10 2013-01-09 中铁二局股份有限公司 Construction equipment for inverted arch of two-track tunnel of high-speed railway
CN202017493U (en) * 2011-03-10 2011-10-26 中铁二局股份有限公司 Construction equipment for inverted arch of high-speed railway double-track tunnel
CN102852531B (en) * 2012-09-29 2014-11-12 中铁八局集团第一工程有限公司 Construction method for suspended reinforcement of high gas tunnel inverted arch model
CN203394540U (en) * 2013-07-25 2014-01-15 成都锐龙机械制造有限公司 Suspension overturning inverted arch formwork trolley for tunnels

Also Published As

Publication number Publication date
CN104775831A (en) 2015-07-15

Similar Documents

Publication Publication Date Title
CN106320706A (en) Masonry-wall line-pipe, line-groove and line-box burying construction method
CN105113797A (en) Pouring device and method for constructional columns connected with ring beam
CN105951857B (en) Compound impervious wall and its construction method for water conservancy project coffering
CN207553314U (en) A kind of concrete postposition beam anchor bar constructing structure
CN108867964A (en) The thin-walled square chest that the closely knit construction method of cassette ceiling anti-floating and this method use
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN205735482U (en) A kind of structure of fixing built-in fitting
CN106930277A (en) A kind of construction of manual-excavation cast-in-place pile method
CN105275097A (en) A post-cast strip water-stop steel plate and demolition-free template net installing method
CN103485537A (en) Construction method and structure of embedded reinforcement of super high-rise horizontal secondary structure
CN108385986A (en) A kind of device and method ensureing constructional column reinforcement location
CN101446073A (en) Reinforced concrete pier stud with capping beam or irregular Y-shaped reinforced concrete pier stud once-forming construction method
CN107604920A (en) A kind of quick construction method for abolishing filling pile head
CN104775831B (en) A kind of tunnel double-lining inverted arch exempts from short abutment wall arcing construction method with arch wall joint portion
CN108412094A (en) The construction method and device of the hollow concrete wall of masonry between a kind of replacement shear wall
KR100725068B1 (en) Compound foundation method of construction using cast in place top base was formed connection groove and this
CN208966022U (en) A kind of template poured for large-scale beam column
CN106545071A (en) Inspection shaft, roof drain and cement concrete pavement one-time cast-forming construction method
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN103741651B (en) A kind of concrete teeth groove stiling basin and construction method thereof
CN104911999A (en) Construction method for deeply burying anchor
CN206143608U (en) Assembled T beam bridge hogging moment district anchorage sealing system
CN209309459U (en) Pipeline balance briquetting
CN103938610A (en) Construction pile tube and technology of variable cross-section reinforced gravel pile for reinforcing soft foundation
CN208310221U (en) A kind of fixed device of side mode

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant