CN104775831A - Tunnel secondary lining inverted arch and arch wall combined part short-free side wall arcing construction method - Google Patents

Tunnel secondary lining inverted arch and arch wall combined part short-free side wall arcing construction method Download PDF

Info

Publication number
CN104775831A
CN104775831A CN201510065788.9A CN201510065788A CN104775831A CN 104775831 A CN104775831 A CN 104775831A CN 201510065788 A CN201510065788 A CN 201510065788A CN 104775831 A CN104775831 A CN 104775831A
Authority
CN
China
Prior art keywords
inverted arch
arch
template
construction method
arcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510065788.9A
Other languages
Chinese (zh)
Other versions
CN104775831B (en
Inventor
陈军社
李凯
江海浪
马奇峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
Original Assignee
THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU filed Critical THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
Priority to CN201510065788.9A priority Critical patent/CN104775831B/en
Publication of CN104775831A publication Critical patent/CN104775831A/en
Application granted granted Critical
Publication of CN104775831B publication Critical patent/CN104775831B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a tunnel secondary lining inverted arch and arch wall combined part short-free side wall arcing construction method, and relates to the field of tunnel construction. The method comprises five processes of reinforcement binding, template fixing, arch concrete casting, arch top template dismantling, and center ditch template mounting and filled concrete casting and template dismantling. The method reduces the construction procedures, improves the construction quality level, is high in working efficiency, and saves a lot of costs.

Description

Short abutment wall arcing construction method is exempted from a kind of tunnel double-lining inverted arch and arch wall joint portion
Technical field
The present invention relates to constructing tunnel field, be specifically related to a kind of tunnel double-lining inverted arch and short abutment wall arcing construction method is exempted from arch wall joint portion.
Background technology
Conventional tunnel inverted arch sequence of construction is first install inverted arch termination arc formwork, treats that inverted arch concreting completes, then installs filling template, carry out fill concrete construction.The sequence of construction of this secondary formwork form removal, produces a large amount of labour costs, inadvisable economically, and production efficiency is low, affects the construction period; Also existing defects qualitatively, do not ensure inverted arch and fill linear smoother of contact surface, inverted arch concrete easily invades in cable trench body simultaneously.And inverted arch arc formwork is the general name of inverted arch termination sizing arc punching block, the little punching block of inverted arch top arc, cable trench arc formwork.Its appearance, makes inverted arch construct and not only saves time but also facilitate, ensure that work progress quality simultaneously.It is more excellent compared with conventional construction method in quality control, financial cost, man-hour work efficiency etc.
Summary of the invention
It is good that problem to be solved by this invention is to provide a kind of construction quality, and short abutment wall arcing construction method is exempted from the tunnel double-lining inverted arch that operating efficiency is high and arch wall joint portion.
To achieve these goals, the technical scheme that the present invention takes for: short abutment wall arcing construction method is exempted from a kind of tunnel double-lining inverted arch provided and arch wall joint portion, comprises the steps:
(1) reinforcing bar binding: after inverted arch has excavated, manual amendment, according to drawing colligation inverted arch reinforcing bar;
(2) fixed form: first according to inverted arch excavation shape, integral hoisting inverted arch arced terminus template, and the longitudinal component in inverted arch reinforcing bar that in step (1), colligation is good is stretched out the reserved eyelet of end head formwork, then reinforce, again angle steel is fixed on mounted reinforcing bar, little for inverted arch top arc punching block is embedded wherein and uses bolt tightening;
(3) inverted arch concreting: build arch base concrete in the template first made in step (2), then symmetry is built until two linings and inverted arch line of demarcation place;
(4) inverted arch top template is removed and Central drain model sheetinstallat: after the inverted arch concreting of step (3) completes, and removes inverted arch top template and angle steel every other day, integral hoisting Central drain template;
(5) fill concrete is built and form removable: in the Central drain template made in step (4), symmetry builds fill concrete, prevent Central drain template from offseting, treat concrete setting, remove inverted arch end head formwork and Central drain template, clean out and reuse.
Preferably, the shape of template used in described step (1) and step (4) is arc.
Preferably, the material of bolt used in described step (2) is metal material.
Preferably, the eye diameter in described step (2) is 2-5cm.
Preferably, the concrete main component of inverted arch used in described step (3) comprises cement, water, stone and sand, and its corresponding mass ratio is 1:0.45:3:2.
Preferably, in described step (3), the concrete mode of building of inverted arch is that chute enters mould, and employing diameter is that the plug-in type vibrating rod of 50mm vibrates.
Adopt technical scheme of the present invention, inverted arch termination adopts sizing arc-shaped steel template, ensure that inverted arch thickness, makes absolute altitude be convenient to control; When inverted arch top arc formwork is installed, first on the inverted arch reinforcing bar that colligation is good, weld angle steel, template embedded and be joined with bolts, guarantee that inverted arch meets design drawing requirement with filling line of demarcation, construction quality is effectively guaranteed, utilize construction method provided by the present invention can reduce by 2 road working procedures, save labour, simplify because the present invention obtains in operation, operating efficiency is improved, time reduces cyclic advance greatly, accelerates construction speed.
accompanying drawing illustrates:
Fig. 1 is that tunnel invert and fill concrete formwork for placing install general arrangement.
Fig. 2 is that inverted arch top arc formwork mounting plane arranges schematic diagram.
Fig. 3 is inverted arch end head formwork constructional drawing, and alphabetical a, b are respectively template rib spacing, and c1 is that template is thick, and c2 is that rib is high, and diameter of bolt hole Φ, spacing a1 and template height h choose by construction requirement different designs.
Fig. 4 is inverted arch end face formwork structure schematic diagram, and long (a), wide (b), thick (c) and diameter of bolt hole (Φ) choose by construction requirement different designs.
Fig. 5 is inward turning nut structure schematic diagram, and wherein Φ 1, Φ 2, Φ 3 and h1 and h2 choose by construction requirement different designs.
Fig. 6 is the structural representation of connecting bolt, and wherein Φ 5 matches with the Φ 3 of nut.
Fig. 7 is gasket construction schematic diagram, and wherein Φ 7 is slightly larger than Φ 5, is standard component.
Formwork sides figure in gutter centered by Fig. 8, alphabetical a, b are respectively adjustable leading screw and template rib spacing.
Wherein: 1-inverted arch arced terminus template, 2-inverted arch concrete, 3-angle steel, 4-inverted arch top arc formwork, 5-connecting bolt, 6-interior spin nut, 7-liner, 8-center ditch typified form, 9-concrete, 10-bolt hole, 11-adjustable leading screw.
Detailed description of the invention
The technological means realized for making the present invention, creation characteristic, reaching object and effect is easy to understand, below in conjunction with detailed description of the invention, setting forth the present invention further.
As shown in Fig. 1 ~ Fig. 8, short abutment wall arcing construction method is exempted from a kind of tunnel double-lining inverted arch and arch wall joint portion, comprises the steps:
(1) reinforcing bar binding: after inverted arch has excavated, manual amendment, according to drawing colligation inverted arch reinforcing bar;
(2) fixed form: first according to inverted arch excavation shape, integral hoisting inverted arch arced terminus template, and the longitudinal component in inverted arch reinforcing bar that in step (1), colligation is good is stretched out the reserved eyelet of end head formwork, then reinforce, again angle steel is fixed on mounted reinforcing bar, little for inverted arch top arc punching block is embedded wherein and uses bolt tightening;
(3) inverted arch concreting: build arch base concrete in the template first made in step (2), then symmetry is built until two linings and inverted arch line of demarcation place;
(4) inverted arch top template is removed and Central drain model sheetinstallat: after the inverted arch concreting of step (3) completes, and removes inverted arch top template and angle steel every other day, integral hoisting Central drain template;
(5) fill concrete is built and form removable: in the Central drain template made in step (4), symmetry builds fill concrete, prevent Central drain template from offseting, treat concrete setting, remove inverted arch end head formwork and Central drain template, clean out and reuse.
It should be noted that the shape of template used in described step (1) and step (4) is arc.
In the present embodiment, the material of bolt used in described step (2) is metal material.
In the present embodiment, the eye diameter in described step (2) is 2-5cm.
In the present embodiment, the concrete main component of inverted arch used in described step (3) comprises cement, water, stone and sand, and its corresponding mass ratio is 1:0.45:3:2.
In addition, in described step (3), the concrete mode of building of inverted arch is that chute enters mould, and employing diameter is that the plug-in type vibrating rod of 50mm vibrates.
Letter a, b are respectively template rib spacing, and c1 is that template is thick, and c2 is that rib is high, and diameter of bolt hole Φ, spacing a1 and template height h choose by construction requirement different designs; Long (a), wide (b), thick (c) and diameter of bolt hole (Φ) choose by construction requirement different designs; Wherein Φ 1, Φ 2, Φ 3 and h1 and h2 choose by construction requirement different designs; Wherein Φ 5 matches with the Φ 3 of nut; Wherein Φ 7 is slightly larger than Φ 5, is standard component; Letter a, b are respectively adjustable leading screw and template rib spacing.
Based on above-mentioned, in the present invention, inverted arch termination adopts sizing arc-shaped steel template, ensure that inverted arch thickness, makes absolute altitude be convenient to control; When inverted arch top arc formwork is installed, first on the inverted arch reinforcing bar that colligation is good, weld angle steel, template embedded and be joined with bolts, guarantee that inverted arch meets design drawing requirement with filling line of demarcation, construction quality is effectively guaranteed, utilize construction method provided by the present invention can reduce by 2 road working procedures, save labour, simplify because the present invention obtains in operation, operating efficiency is improved, time reduces cyclic advance greatly, accelerates construction speed.
Obvious specific implementation of the present invention is not subject to the restrictions described above; as long as have employed the improvement of the various unsubstantialities that method of the present invention is conceived and technical scheme is carried out; or design of the present invention and technical scheme directly applied to other occasion, all within protection scope of the present invention without to improve.

Claims (6)

1. a short abutment wall arcing construction method is exempted from tunnel double-lining inverted arch and arch wall joint portion, comprises the steps:
(1) reinforcing bar binding: after inverted arch has excavated, manual amendment, according to drawing colligation inverted arch reinforcing bar;
(2) fixed form: first according to inverted arch excavation shape, integral hoisting inverted arch arced terminus template, and the longitudinal component in inverted arch reinforcing bar that in step (1), colligation is good is stretched out the reserved eyelet of end head formwork, then reinforce, again angle steel is fixed on mounted reinforcing bar, little for inverted arch top arc punching block is embedded wherein and uses bolt tightening;
(3) inverted arch concreting: build arch base concrete in the template first made in step (2), then symmetry is built until two linings and inverted arch line of demarcation place;
(4) inverted arch top template is removed and Central drain model sheetinstallat: after the inverted arch concreting of step (3) completes, and removes inverted arch top template and angle steel every other day, integral hoisting Central drain template;
(5) fill concrete is built and form removable: in the Central drain template made in step (4), symmetry builds fill concrete, prevent Central drain template from offseting, treat concrete setting, remove inverted arch end head formwork and Central drain template, clean out and reuse.
2. short abutment wall arcing construction method is exempted from a kind of tunnel double-lining inverted arch according to claim 1 and arch wall joint portion, it is characterized in that: the shape of template used in described step (1) and step (4) is arc.
3. short abutment wall arcing construction method is exempted from a kind of tunnel double-lining inverted arch according to claim 1 and arch wall joint portion, it is characterized in that: the material of bolt used in described step (2) is metal material.
4. short abutment wall arcing construction method is exempted from a kind of tunnel double-lining inverted arch according to claim 1 and arch wall joint portion, it is characterized in that: the eye diameter in described step (2) is 2-5cm.
5. short abutment wall arcing construction method is exempted from a kind of tunnel double-lining inverted arch according to claim 1 and arch wall joint portion, it is characterized in that: the concrete main component of inverted arch used in described step (3) comprises cement, water, stone and sand, and its corresponding mass ratio is 1:0.45:3:2.
6. short abutment wall arcing construction method is exempted from a kind of tunnel double-lining inverted arch according to claim 1 and arch wall joint portion, it is characterized in that: in described step (3), the concrete mode of building of inverted arch is that chute enters mould, employing diameter is that the plug-in type vibrating rod of 50mm vibrates.
CN201510065788.9A 2015-02-09 2015-02-09 A kind of tunnel double-lining inverted arch exempts from short abutment wall arcing construction method with arch wall joint portion Active CN104775831B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510065788.9A CN104775831B (en) 2015-02-09 2015-02-09 A kind of tunnel double-lining inverted arch exempts from short abutment wall arcing construction method with arch wall joint portion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510065788.9A CN104775831B (en) 2015-02-09 2015-02-09 A kind of tunnel double-lining inverted arch exempts from short abutment wall arcing construction method with arch wall joint portion

Publications (2)

Publication Number Publication Date
CN104775831A true CN104775831A (en) 2015-07-15
CN104775831B CN104775831B (en) 2016-08-24

Family

ID=53617553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510065788.9A Active CN104775831B (en) 2015-02-09 2015-02-09 A kind of tunnel double-lining inverted arch exempts from short abutment wall arcing construction method with arch wall joint portion

Country Status (1)

Country Link
CN (1) CN104775831B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107201908A (en) * 2017-06-16 2017-09-26 中铁五局集团有限公司 A kind of construction method of the regional buried Central drain in tunnel of bitter cold
CN113700289A (en) * 2021-05-24 2021-11-26 海南优技建筑铝模有限公司 Assembly type aluminum alloy template assembling system for building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967985A (en) * 2010-09-08 2011-02-09 中铁隧道集团三处有限公司 Self-propelled inverted arch template construction method
CN102146799A (en) * 2011-03-10 2011-08-10 中铁二局股份有限公司 Construction equipment for inverted arch of two-track tunnel of high-speed railway
CN202017493U (en) * 2011-03-10 2011-10-26 中铁二局股份有限公司 Construction equipment for inverted arch of high-speed railway double-track tunnel
CN102852531A (en) * 2012-09-29 2013-01-02 中铁八局集团第一工程有限公司 Construction method for suspended reinforcement of high gas tunnel inverted arch model
CN203394540U (en) * 2013-07-25 2014-01-15 成都锐龙机械制造有限公司 Suspension overturning inverted arch formwork trolley for tunnels

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967985A (en) * 2010-09-08 2011-02-09 中铁隧道集团三处有限公司 Self-propelled inverted arch template construction method
CN102146799A (en) * 2011-03-10 2011-08-10 中铁二局股份有限公司 Construction equipment for inverted arch of two-track tunnel of high-speed railway
CN202017493U (en) * 2011-03-10 2011-10-26 中铁二局股份有限公司 Construction equipment for inverted arch of high-speed railway double-track tunnel
CN102852531A (en) * 2012-09-29 2013-01-02 中铁八局集团第一工程有限公司 Construction method for suspended reinforcement of high gas tunnel inverted arch model
CN203394540U (en) * 2013-07-25 2014-01-15 成都锐龙机械制造有限公司 Suspension overturning inverted arch formwork trolley for tunnels

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107201908A (en) * 2017-06-16 2017-09-26 中铁五局集团有限公司 A kind of construction method of the regional buried Central drain in tunnel of bitter cold
CN107201908B (en) * 2017-06-16 2023-10-31 中铁五局集团有限公司 Construction method for deep-buried central ditch of tunnel in severe cold region
CN113700289A (en) * 2021-05-24 2021-11-26 海南优技建筑铝模有限公司 Assembly type aluminum alloy template assembling system for building

Also Published As

Publication number Publication date
CN104775831B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN202644997U (en) Simple plugging device for wall-penetrating holes of wall
CN104989102A (en) Improved concrete wall and column construction method
CN106014446B (en) A kind of reinforcement means of enhancing high ground stress soft rock stress tunnel inverted arch structural stability
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN105275097A (en) A post-cast strip water-stop steel plate and demolition-free template net installing method
CN104278840A (en) Decorating bare concrete construction method and split bolt hole die for same
CN108019054A (en) A kind of wall hole to be provided antiseep plugging device
CN207553314U (en) A kind of concrete postposition beam anchor bar constructing structure
CN204456428U (en) A kind of entirety being installed on composite wallboard is waftd window
CN204212023U (en) A kind of spliced steel concrete temporary pavement
CN106968692B (en) Tunnel excavation supporting structure and construction method thereof
CN203270627U (en) Construction joint structure of shear wall
CN104775831A (en) Tunnel secondary lining inverted arch and arch wall combined part short-free side wall arcing construction method
CN105041340A (en) Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN104911999A (en) Construction method for deeply burying anchor
CN205714221U (en) A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure
CN210621760U (en) Cast-in-place aluminium mould installation system of utility tunnel
CN111810193A (en) Small-section tunnel secondary lining construction method
CN204941567U (en) A kind of structure accelerating construction of tunnel vault pouring concrete speed
CN202622993U (en) Side mold plugging device at hoop position of wall concrete prefabricated member
CN206319404U (en) A kind of building precast exterior sheathing
CN105568927A (en) Construction method of water bag type concrete engineering deformation joint water stop cavity die
CN205088634U (en) Berme ditch typical forms

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant