CN106320706A - Masonry-wall line-pipe, line-groove and line-box burying construction method - Google Patents

Masonry-wall line-pipe, line-groove and line-box burying construction method Download PDF

Info

Publication number
CN106320706A
CN106320706A CN201610776592.5A CN201610776592A CN106320706A CN 106320706 A CN106320706 A CN 106320706A CN 201610776592 A CN201610776592 A CN 201610776592A CN 106320706 A CN106320706 A CN 106320706A
Authority
CN
China
Prior art keywords
concrete
line box
line
construction
spool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610776592.5A
Other languages
Chinese (zh)
Inventor
洪成兵
郭继舟
李少祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201610776592.5A priority Critical patent/CN106320706A/en
Publication of CN106320706A publication Critical patent/CN106320706A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a masonry-wall line-pipe, line-groove and line-box burying construction method. The construction method includes the steps that in the pre-construction method, reinforcing steel bars are pre-buried or post-implanted into a top plate and a bottom plate on the peripheries of a line pipe and a line groove buried in a masonry wall, the line pipe, the line groove and a line box are completely arranged, then the corresponding pre-buried reinforcing steel bars of the bottom plate and the top plate are bound and woven into a whole in a concrete-constructional-column mode, the line pipe, the line groove and the line box are fixed, a formwork is installed, and concrete pouring is carried out; in the post-construction method, reinforcing steel bars are pre-buried or post-implanted into a top plate and a bottom plate on the peripheries of a line pipe and a line groove buried in a masonry wall, the portion is reserved when wall masonry is carried out, and after masonry construction is completed, the line pipe, the line groove and a line box are installed, then the corresponding pre-buried reinforcing steel bars of the bottom plate and the top plate are bound and woven into a whole in a concrete-constructional-column mode, the line pipe, the line groove and the line box are fixed, a formwork is installed, and concrete pouring is carried out. According to the construction method, the wall does not need to be slotted, cracks or fractures of the wall can be avoided, environment pollution is reduced, labor strength is reduced, construction is simple, construction time is short, the cost is low, and the installing quality is reliable.

Description

The construction method that a kind of masonry panel spool wire casing line box secretly buries
Technical field
The present invention relates to masonry panel wire casing line box construction field, be specifically related to a kind of masonry panel spool wire casing line box dark The construction method buried.
Background technology
Masonry panel construct in, it usually needs spool wire casing line box is secretly embedded in body of wall, with realize concealed wire connect or The purpose of the assembly such as electric switch, socket is installed.
Traditional manual cutting machine online pipeline box respectively is the most mostly used at present to lay after notch both sides cut, then by groove In mouthful, masonry uses chisel to coordinate hand hammer to pick chisel, then hookup wire pipeline box, and uses the materials such as mortar to carry out it at closing Reason.Using the method to there is following defect: during the cutting of (1) wire casing, both sides depth of cut is difficult to keep consistent, causes and picks chisel construction Difficulty is big, and is easily damaged periphery masonry, causes wall crazing;(2) artificial cutting is difficult to ensure that the linearity of spool laying groove, Spool can produce bending stress after installing, easy to crack after mortar closure;(3) after spool is installed, between its back side and body of wall have necessarily Gap, mortar is difficult to tamp, is easily generated ghost, will also result in wall crazing;(4) the method labor intensity is big, long in time limit, construction effect Rate is low, and construction quality is difficult to ensure that;(5) wire casing cutting can produce a large amount of dust and noise when picking chisel, causes environmental pollution.Also have One class method is prefabricated setting wire casing masonry, is shifted to an earlier date by line pipeline box cell body and prefabricated out then builds by laying bricks or stones, and it exists prefabricated groove face Smooth, and the closure bonding difference of mortar, easy hollowing, and have that construction requirement precision is high and high in cost of production defect.
The patent document of Application No. 201510271256.0 discloses the spool groove of a kind of block wall and quickly offers dress Put and using method, first with the both sides being provided with the cutting machine of twolip cutting blade and cutting in target location spool laying groove Limit, then uses special chisel hammer to take out the masonry in groove, and chisel speed and construction are picked in the cutting that raising block wall spool groove is offered Quality;However it is necessary that customization special-purpose machines and tools, pick chisel and can cause wall crazing, long in time limit, efficiency of construction is low, cost is high.
The patent document of Application No. 201410777894.5 discloses and a kind of prevents crack, Sunken wire tube position after masonry Method, solves under conventional construction method, prevents the method in crack, Sunken wire tube position after masonry;But picking chisel can cause body of wall to hold Split, construction procedure is loaded down with trivial details, requirement is high, cost is high, long in time limit.
The patent document of Application No. 03233525.3 discloses a kind of construction wall and reserves the concrete goods brick of wire casing, builds by laying bricks or stones After body of wall, by semicircle groove Buried pipe extremely easily, but preformed bricks arc surface is smooth, low, easily with mortar viscosity intensity Cracking;Construction requirement precision is high, and efficiency of construction is low, and cost is high.
Summary of the invention
The technical problem to be solved in the present invention is, for existing masonry panel construction wire casing cutting above shortcomings, Thering is provided the construction method that a kind of masonry panel spool wire casing line box secretly buries, construction is simple, the engineering time is short, with low cost, construction Reliable in quality, efficiently solves the problem such as the most cracking, the environmental pollution of body of wall that conventional construction method exists.
The present invention solves that above-mentioned technical problem be the technical scheme is that
The construction method that a kind of masonry panel spool wire casing line box secretly buries, construction of the most first excuting a law of constructing before building wall, Described construction of first excuting a law specifically includes following steps:
(1) base plate of wire casing surrounding and top board (or floor beam) at the dark Sunken wire tube of masonry panel implant embedded bar (also Embedded bar can be implanted) when main structure construction;
(2) spool and line box are installed: spool and line box are put in place by design requirement installation;
(3) colligation embedded bar;
(4) fixed spool and line box: spool uses tied silk to be fixed on embedded bar, and line box surrounding and rear side pass through respectively On rear side of line box surrounding spacer bar and line box, spacer bar is fixed on embedded bar;
(5) concrete construction column template is installed: before installing concrete construction column template, with cystosepiment implant fill line box And slightly higher outlet box 3~5mm, then by line box surrounding and concrete-constituted pile template proximate;
(6) casting concrete: after concrete-constituted pile formwork reinforcement completes, reserves from concrete-constituted pile die head Pour casting concrete at mouth;
(7) form removal: concrete strength carries out form removal after reaching form removal condition, and carries out maintenance by code requirement;
(8) masonry panel: torn masonry panel after concrete construction column template open.
By such scheme, in described step (1), embedded bar uses about A12mm concrete-constituted pile reinforcing bar, concrete The same thickness of wall body of constructional column reinforcing bar thickness, implantation depth about 200mm, protruded length about 500mm.
By such scheme, in described step (3), embedded bar includes main muscle and stirrup, main muscle diameter about 12mm, stirrup About diameter 6mm, spacing 250mm.
By such scheme, about concrete grade C20 poured in described step (6) (or with constructional column in layout design Concrete requires).
Present invention also offers the construction method that another kind of masonry panel spool wire casing line box secretly buries, execute after building wall Work is excuted a law construction after being, described after construction of excuting a law specifically include following steps:
(1) base plate of wire casing surrounding and top board (or floor beam) at the dark Sunken wire tube of masonry panel implant embedded bar (also Embedded bar can be implanted) when main structure construction;
(2) masonry panel: first eject dark Sunken wire tube and line box position control line, concrete-constituted pile and body of wall on flooring 10 use horse tooth trough forms connect, first step back into, stay raft width about 60mm, high about 300mm;
(3) spool and line box are installed: spool and line box are put in place by design requirement installation;
(4) colligation embedded bar;
(5) fixed spool and line box: spool uses tied silk to be fixed on embedded bar, and line box surrounding and rear side pass through respectively On rear side of line box surrounding spacer bar and line box, spacer bar is fixed on embedded bar;
(6) concrete construction column template is installed: before installing concrete construction column template, with cystosepiment implant fill line box And slightly higher outlet box 3~5mm, then by line box surrounding and constructional column template proximate;
(7) casting concrete: after concrete-constituted pile formwork reinforcement completes, reserves from concrete-constituted pile die head Pour casting concrete at mouth, about concrete grade C20 (or requiring with constructional column concrete in layout design);
(8) form removal: concrete strength carries out form removal after reaching form removal condition, and carries out maintenance by code requirement.
By such scheme, in described step (1), embedded bar uses about A12mm constructional column reinforcing bar, concrete-constituted pile The same thickness of wall body of reinforcing bar thickness, implantation depth about 200mm, protruded length about 500mm;
By such scheme, in described step (4), embedded bar includes main muscle and stirrup, main muscle diameter about 12mm, stirrup About diameter 6mm, spacing 250mm.
Compared with prior art, beneficial effects of the present invention: traditional method is after building wall completes to reach design strength Just can carry out slotting, picking chisel, hookup wire pipeline box, closure wire casing, easily cause wall body slit, dust pollution and noise pollution, work Phase length, efficiency are low, of poor quality, and the present invention before and after building wall hookup wire pipeline box, colligation concrete column reinforcing bar, formwork, Casting concrete, with concrete (post) structure substitute masonry structure, exempt from fluting pick chisel closure, can stop wall body slit produce, nothing Dust and noise pollution, reduction of erection time, efficiency height, quality is guaranteed.
Accompanying drawing explanation
Fig. 1 is that the embodiment of the present invention 1 is implanted embedded bar and installs spool and the structural representation of line box;
Fig. 2 is the structural representation of the embodiment of the present invention 1 colligation embedded bar;
Fig. 3 is partial structurtes enlarged diagram in Fig. 2;
Fig. 4 is the top view of Fig. 3;
Fig. 5 is that the embodiment of the present invention 2 is implanted embedded bar and installs spool and the structural representation of line box;
Fig. 6 is the structural representation of the embodiment of the present invention 2 colligation embedded bar;
In figure, 1-top board, 2-base plate, 3-spool, 4-line box, 5-embedded bar, the main muscle of 6-, 7-stirrup, 8-line box surrounding Spacer bar, spacer bar on rear side of 9-line box, 10-body of wall.
Detailed description of the invention
With embodiment, technical solution of the present invention is described in detail below in conjunction with the accompanying drawings.
With reference to shown in Fig. 1~Fig. 4, what a kind of masonry panel spool wire casing line box described in the embodiment of the present invention 1 secretly buried executes Work method, construction of the most first excuting a law of constructing before building wall, construction of first excuting a law specifically includes following steps:
(1) embedded bar implanted by the base plate 2 of wire casing surrounding and top board 1 (or floor beam) at the dark Sunken wire tube of masonry panel 3 5, it is possible to implant embedded bar 5 when main structure construction, embedded bar 5 uses about A12mm concrete-constituted pile reinforcing bar, mixed Solidifying soil constructional column reinforcing bar thickness with body of wall 10 thickness, implantation depth about 200mm, protruded length about 500mm, as shown in Figure 1;
(2) spool 3 and line box 4 are installed: spool 3 and line box 4 are put in place by design requirement installation;
(3) colligation embedded bar 5, as in figure 2 it is shown, embedded bar includes main muscle 6 and stirrup 7, main muscle 6 diameter 12mm is left The right side, about stirrup 7 diameter 6mm, spacing 250mm;
(4) fixed spool 3 and line box 4: spool 3 uses tied silk to be fixed on embedded bar 5, and line box 4 surrounding and rear side divide Do not lead to spacer bar 9 on rear side of connection box surrounding spacer bar 8 and line box to be fixed on embedded bar 5, as shown in Fig. 3~Fig. 4;
(5) concrete construction column template is installed: before concrete construction column template is installed, during for preventing concreting, mixed Solidifying soil enters in line box 4, with cystosepiment implant fill line box 4 slightly higher outlet box 4 about 3~5mm, then by line box 4 surrounding With concrete-constituted pile template proximate;
(6) casting concrete: after concrete-constituted pile formwork reinforcement completes, reserves from concrete-constituted pile die head Pour casting concrete at mouth, about concrete grade C20 (or requiring with constructional column concrete in layout design);
(7) form removal: concrete strength carries out form removal after reaching form removal condition, and carries out maintenance by code requirement;
(8) masonry panel 10: torn masonry panel 10 after concrete construction column template open.
As shown in figures 5 and 6, the embodiment of the present invention 2 additionally provides what another kind of masonry panel spool wire casing line box secretly buried Construction method, construction of excuting a law after construction i.e. after building wall, after construction of excuting a law specifically include following steps:
(1) embedded bar 5 implanted by the base plate 2 of wire casing surrounding and top board 1 (or floor beam) at the dark Sunken wire tube of masonry panel 3 (also can implant embedded bar 5 when main structure construction), embedded bar 5 uses about A12mm constructional column reinforcing bar 5, constructional column Reinforcing bar 5 thickness is with body of wall 10 thickness, implantation depth about 200mm, protruded length about 500mm;
(2) masonry panel 10: first eject dark Sunken wire tube 3 and line box 4 position control line on flooring, concrete-constituted pile with Body of wall 10 uses horse tooth trough form to connect, first step back into, stay raft width about 60mm, high about 300mm;
(3) spool 3 and line box 4 are installed: spool 3 and line box 4 put in place (this step and previous step by design requirement installation Can exchange);
(4) colligation embedded bar 5, embedded bar includes main muscle 6 and stirrup 7, main muscle 6 diameter about 12mm, stirrup 7 diameter About 6mm, spacing 250mm;
(5) fixed spool 3 and line box 4: spool 3 uses tied silk to be fixed on embedded bar 5, and line box 4 surrounding and rear side divide Do not lead to spacer bar 9 on rear side of connection box surrounding spacer bar 8 and line box to be fixed on embedded bar 5;
(6) concrete construction column template is installed: before concrete construction column template is installed, during for preventing concreting, mixed Solidifying soil enters in line box 4, with cystosepiment implant fill line box 4 slightly higher outlet box 4 about 3~5mm, then by line box 4 surrounding With constructional column template proximate;
(7) casting concrete: after concrete-constituted pile formwork reinforcement completes, reserves from concrete-constituted pile die head Pour casting concrete at mouth, about concrete grade C20 (or requiring with concrete-constituted pile concrete in layout design);
(8) form removal: concrete strength carries out form removal after reaching form removal condition, and carries out maintenance by code requirement.
Obviously, above-described embodiment is only for clearly demonstrating example of the present invention, and not to the present invention The restriction of embodiment.For those of ordinary skill in the field, what spirit under this invention was extended out is aobvious and easy The change seen or variation still in protection scope of the present invention among.

Claims (7)

1. the construction method that a masonry panel spool wire casing line box secretly buries, it is characterised in that construction is the most first before building wall Excuting a law construction, described construction of first excuting a law specifically includes following steps:
(1) embedded bar implanted by the base plate of wire casing surrounding and top board at the dark Sunken wire tube of masonry panel;
(2) spool and line box are installed: spool and line box are put in place by design requirement installation;
(3) colligation embedded bar;
(4) fixed spool and line box: spool uses tied silk to be fixed on embedded bar, and line box surrounding and rear side lead to connection box respectively On rear side of surrounding spacer bar and line box, spacer bar is fixed on embedded bar;
(5) concrete construction column template is installed: install before concrete construction column template, with cystosepiment implant fill line box and slightly High outlet box 3~5mm, then by line box surrounding and concrete column template proximate;
(6) casting concrete: after concrete column formwork reinforcement completes, from reserved the pouring at mouth of concrete-constituted pile die head Casting concrete;
(7) form removal: concrete strength carries out form removal after reaching form removal condition, and carries out maintenance by code requirement;
(8) masonry panel: torn masonry panel after concrete construction column template open.
The construction method that masonry panel spool wire casing line box the most according to claim 1 secretly buries, it is characterised in that described step Suddenly embedded bar employing about A12mm concrete-constituted pile reinforcing bar in (1), the same thickness of wall body of concrete-constituted pile reinforcing bar thickness, Implantation depth about 200mm, protruded length about 500mm.
The construction method that masonry panel spool wire casing line box the most according to claim 1 secretly buries, it is characterised in that described step Suddenly in (3), embedded bar includes main muscle and stirrup, and main muscle diameter about 12mm, about stirrup diameter 6mm, spacing 250mm.
The construction method that masonry panel spool wire casing line box the most according to claim 1 secretly buries, it is characterised in that described step About concrete grade C20 suddenly poured in (6).
5. the construction method that a masonry panel spool wire casing line box secretly buries, it is characterised in that after building wall after construction i.e. Excute a law construction, described after construction of excuting a law specifically include following steps:
(1) embedded bar implanted by the base plate of wire casing surrounding and top board at the dark Sunken wire tube of masonry panel;
(2) masonry panel: first eject dark Sunken wire tube and line box position control line on flooring, concrete-constituted pile uses with body of wall Horse tooth trough form connect, first step back into, stay raft width about 60mm, high about 300mm;
(3) spool and line box are installed: spool and line box are put in place by design requirement installation;
(4) colligation embedded bar;
(5) fixed spool and line box: spool uses tied silk to be fixed on embedded bar, and line box surrounding and rear side lead to connection box respectively On rear side of surrounding spacer bar and line box, spacer bar is fixed on embedded bar;
(6) concrete construction column template is installed: install before concrete construction column template, with cystosepiment implant fill line box and slightly High outlet box 3~5mm, then by line box surrounding and constructional column template proximate;
(7) casting concrete: after concrete-constituted pile formwork reinforcement completes, from reserved the pouring of concrete-constituted pile die head Casting concrete at Kou, about concrete grade C20;
(8) form removal: concrete strength carries out form removal after reaching form removal condition, and carries out maintenance by code requirement.
The construction method that masonry panel spool wire casing line box the most according to claim 5 secretly buries, it is characterised in that described step Suddenly embedded bar employing about A12mm concrete-constituted pile reinforcing bar in (1), the same thickness of wall body of concrete-constituted pile reinforcing bar thickness, Implantation depth about 200mm, protruded length about 500mm.
The construction method that masonry panel spool wire casing line box the most according to claim 5 secretly buries, it is characterised in that described step Suddenly in (4), embedded bar includes main muscle and stirrup, and main muscle diameter about 12mm, about stirrup diameter 6mm, spacing 250mm.
CN201610776592.5A 2016-08-30 2016-08-30 Masonry-wall line-pipe, line-groove and line-box burying construction method Pending CN106320706A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610776592.5A CN106320706A (en) 2016-08-30 2016-08-30 Masonry-wall line-pipe, line-groove and line-box burying construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610776592.5A CN106320706A (en) 2016-08-30 2016-08-30 Masonry-wall line-pipe, line-groove and line-box burying construction method

Publications (1)

Publication Number Publication Date
CN106320706A true CN106320706A (en) 2017-01-11

Family

ID=57788558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610776592.5A Pending CN106320706A (en) 2016-08-30 2016-08-30 Masonry-wall line-pipe, line-groove and line-box burying construction method

Country Status (1)

Country Link
CN (1) CN106320706A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107299761A (en) * 2017-06-30 2017-10-27 中国建筑第五工程局有限公司 A kind of method of fixed building line box
CN108316653A (en) * 2018-03-20 2018-07-24 中国五冶集团有限公司 Top plate fixes the accurate installation pre-buried structure and construction method of wall wire box holder
CN108390307A (en) * 2018-03-14 2018-08-10 中国五冶集团有限公司 A kind of box installation point construction method
CN110206312A (en) * 2019-06-18 2019-09-06 中国五冶集团有限公司 A kind of concrete wall pipeline construction method
CN110397188A (en) * 2019-07-30 2019-11-01 中信国安建工集团有限公司 A kind of cracking resistance masonry wall and construction method
CN110821169A (en) * 2019-11-06 2020-02-21 中冶天工集团天津有限公司 Quick release device for pre-embedding and shaping water heating point positions of concrete wall
CN110847414A (en) * 2019-10-31 2020-02-28 上海建工七建集团有限公司 Electric box equipment support device, wall containing the device and integral pouring method thereof
CN110924692A (en) * 2019-12-02 2020-03-27 中建三局第三建设工程有限责任公司 Masonry pipeline direct-buried construction method
CN111485712A (en) * 2020-04-29 2020-08-04 梅国强 Building template breakable pin, concrete maintenance method and wire tube embedding method
CN111535482A (en) * 2020-04-18 2020-08-14 湖南顺天建设集团有限公司 Aluminum mould construction concrete structure and tool and electromechanical reservation pre-embedding construction method
CN111576867A (en) * 2020-06-18 2020-08-25 陕西建工第六建设集团有限公司 Electric well pre-buried assembly type groove box and construction method thereof
CN113090046A (en) * 2021-04-30 2021-07-09 中国二十二冶集团有限公司 Positioning method for wire box of fabricated concrete shear wall and special positioning support thereof
CN113356890A (en) * 2021-07-19 2021-09-07 中铁一局集团有限公司 Tunnel lining reserved hole construction method
CN113389331A (en) * 2021-06-30 2021-09-14 中国建筑第八工程局有限公司 Wall structure on stair inclined steel beam and construction method
CN114039315A (en) * 2021-12-15 2022-02-11 山西五建集团有限公司 Electrical butt joint method for prefabricated wall board, roof board and floor board
CN114086696A (en) * 2021-12-01 2022-02-25 中冶南方城市建设工程技术有限公司 Construction method of overlapped constructional column
CN115749054A (en) * 2022-11-21 2023-03-07 韶关市粤仁建设工程有限公司 Masonry wall modular slotting-free wire pipe reservation and embedding construction method
CN116480034A (en) * 2023-04-23 2023-07-25 华川建设集团有限公司 Fireproof and heat-insulating building wall and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85105612A (en) * 1985-07-23 1987-04-15 斯托特 The device of pouring concrete in-situ building
NL1026521C2 (en) * 2004-06-29 2006-01-04 Johannes Andreas Haan Method for constructing a column using layers of bricks or block-shaped structural elements and cement
CN101247029A (en) * 2008-03-27 2008-08-20 成都市第四建筑工程公司 Construction method for installing wire pipe and wire box on the wall
CN101775902A (en) * 2010-01-15 2010-07-14 上海市浦东新区建设市场管理署 Method for arranging embedded part of as-cast finish concrete columnar member and casting concrete
CN102003069A (en) * 2010-11-24 2011-04-06 温州中城建设集团有限公司 Construction method and pouring device for framework masonry infill wall structure
CN104343239A (en) * 2014-08-20 2015-02-11 荣盛建设工程有限公司 Electric threading pipe dark laying construction technology for aerated concrete filler wall punching
CN205400066U (en) * 2016-03-03 2016-07-27 大连三川建筑科技有限公司 Shear force electric pre -buried chamber elevation positioner on wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85105612A (en) * 1985-07-23 1987-04-15 斯托特 The device of pouring concrete in-situ building
NL1026521C2 (en) * 2004-06-29 2006-01-04 Johannes Andreas Haan Method for constructing a column using layers of bricks or block-shaped structural elements and cement
CN101247029A (en) * 2008-03-27 2008-08-20 成都市第四建筑工程公司 Construction method for installing wire pipe and wire box on the wall
CN101775902A (en) * 2010-01-15 2010-07-14 上海市浦东新区建设市场管理署 Method for arranging embedded part of as-cast finish concrete columnar member and casting concrete
CN102003069A (en) * 2010-11-24 2011-04-06 温州中城建设集团有限公司 Construction method and pouring device for framework masonry infill wall structure
CN104343239A (en) * 2014-08-20 2015-02-11 荣盛建设工程有限公司 Electric threading pipe dark laying construction technology for aerated concrete filler wall punching
CN205400066U (en) * 2016-03-03 2016-07-27 大连三川建筑科技有限公司 Shear force electric pre -buried chamber elevation positioner on wall

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107299761A (en) * 2017-06-30 2017-10-27 中国建筑第五工程局有限公司 A kind of method of fixed building line box
CN108390307A (en) * 2018-03-14 2018-08-10 中国五冶集团有限公司 A kind of box installation point construction method
CN108316653A (en) * 2018-03-20 2018-07-24 中国五冶集团有限公司 Top plate fixes the accurate installation pre-buried structure and construction method of wall wire box holder
CN110206312A (en) * 2019-06-18 2019-09-06 中国五冶集团有限公司 A kind of concrete wall pipeline construction method
CN110397188B (en) * 2019-07-30 2024-05-14 中信国安建工集团有限公司 Anti-cracking masonry wall and construction method
CN110397188A (en) * 2019-07-30 2019-11-01 中信国安建工集团有限公司 A kind of cracking resistance masonry wall and construction method
CN110847414A (en) * 2019-10-31 2020-02-28 上海建工七建集团有限公司 Electric box equipment support device, wall containing the device and integral pouring method thereof
CN110821169A (en) * 2019-11-06 2020-02-21 中冶天工集团天津有限公司 Quick release device for pre-embedding and shaping water heating point positions of concrete wall
CN110924692A (en) * 2019-12-02 2020-03-27 中建三局第三建设工程有限责任公司 Masonry pipeline direct-buried construction method
CN111535482A (en) * 2020-04-18 2020-08-14 湖南顺天建设集团有限公司 Aluminum mould construction concrete structure and tool and electromechanical reservation pre-embedding construction method
CN111485712A (en) * 2020-04-29 2020-08-04 梅国强 Building template breakable pin, concrete maintenance method and wire tube embedding method
CN111576867A (en) * 2020-06-18 2020-08-25 陕西建工第六建设集团有限公司 Electric well pre-buried assembly type groove box and construction method thereof
CN113090046B (en) * 2021-04-30 2023-10-13 中国二十二冶集团有限公司 Positioning method for assembled concrete shear wall wire box and special positioning bracket thereof
CN113090046A (en) * 2021-04-30 2021-07-09 中国二十二冶集团有限公司 Positioning method for wire box of fabricated concrete shear wall and special positioning support thereof
CN113389331A (en) * 2021-06-30 2021-09-14 中国建筑第八工程局有限公司 Wall structure on stair inclined steel beam and construction method
CN113389331B (en) * 2021-06-30 2022-11-25 中国建筑第八工程局有限公司 Wall structure on stair inclined steel beam and construction method
CN113356890A (en) * 2021-07-19 2021-09-07 中铁一局集团有限公司 Tunnel lining reserved hole construction method
CN114086696A (en) * 2021-12-01 2022-02-25 中冶南方城市建设工程技术有限公司 Construction method of overlapped constructional column
CN114039315A (en) * 2021-12-15 2022-02-11 山西五建集团有限公司 Electrical butt joint method for prefabricated wall board, roof board and floor board
CN114039315B (en) * 2021-12-15 2023-06-30 山西五建集团有限公司 Electric butt joint method for prefabricated wallboard and floor slab
CN115749054A (en) * 2022-11-21 2023-03-07 韶关市粤仁建设工程有限公司 Masonry wall modular slotting-free wire pipe reservation and embedding construction method
CN115749054B (en) * 2022-11-21 2023-05-30 韶关市粤仁建设工程有限公司 Masonry wall modularization grooving-free line pipe reservation pre-buried construction method
CN116480034A (en) * 2023-04-23 2023-07-25 华川建设集团有限公司 Fireproof and heat-insulating building wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN106320706A (en) Masonry-wall line-pipe, line-groove and line-box burying construction method
CN111206698B (en) Construction method of assembled wallboard
CN207538350U (en) A kind of assembled cantilever stair
CN104405123B (en) Cast-in-situ reinforced concrete thin-wall rectangular small bore open tubular column template assembly and construction method thereof
CN103469806A (en) Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die
CN103938869B (en) The construction method of spool, line box in masonry panel after MS building block
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN102505709A (en) Concrete-formwork-precast foundation construction method
CN105951842B (en) Reversed beam styrofoam fetal membrane construction method under raft plate
CN102877486A (en) Integral cast-in-situ construction method for cable ducts
CN107443550A (en) Prefabricated cushion cap template and its installation method
CN110792200A (en) Masonry construction method without post-picking and pipe wrapping structure thereof
CN108265738A (en) Prefabricated assembled concrete thin plate loose tool structure and construction method
CN104328790B (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
CN108894242A (en) Prefabricated board and its cushion cap foundation fetal membrane construction method for cushion cap foundation fetal membrane
CN110344439B (en) Construction method of rear retaining wall drain hole
CN105862897B (en) Sandy Silt ground shallow foundation original groove pouring construction engineering method
CN104810744A (en) Free pre-burying construction method of wall pipeline
CN104890106B (en) The pre-buried more combination building block moulds of wall line box
CN103938635A (en) Method for conducting foundation pit bevel bed course construction by adopting inverted trapezoidal template
CN103215950A (en) Pile foundation extension construction method in backfilling area
CN105133630A (en) Prefabricated part for constructing foundation forming molds
CN203096762U (en) Anti-frost ground beam
CN106401276A (en) Construction method for wall column binding bars of frame type building block enclosing wall
CN102286958B (en) Method for excavating out face rockfill dam toe slab concrete with quality defects in construction period

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170111

RJ01 Rejection of invention patent application after publication