CN104712139B - Construction method for radian column formwork erection - Google Patents

Construction method for radian column formwork erection Download PDF

Info

Publication number
CN104712139B
CN104712139B CN201510110147.0A CN201510110147A CN104712139B CN 104712139 B CN104712139 B CN 104712139B CN 201510110147 A CN201510110147 A CN 201510110147A CN 104712139 B CN104712139 B CN 104712139B
Authority
CN
China
Prior art keywords
radian
pillar
formwork
formworks
fixing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510110147.0A
Other languages
Chinese (zh)
Other versions
CN104712139A (en
Inventor
马全丽
孙志波
任杰
王帅
周立芳
王竹
张苗苗
王佳玉
张鹏
曹桐
宋淑婷
李景秋
武佳斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
MCC Tiangong Group Tianjin Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Tianjin Corp Ltd filed Critical MCC Tiangong Group Tianjin Corp Ltd
Priority to CN201510110147.0A priority Critical patent/CN104712139B/en
Publication of CN104712139A publication Critical patent/CN104712139A/en
Application granted granted Critical
Publication of CN104712139B publication Critical patent/CN104712139B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a construction method for radian column formwork erection. The method includes the construction procedures of radian column steel bar binding, radian formwork erection, concrete pouring, formwork detachment, concrete maintenance and the like, wherein the radian formwork erection includes the steps of manufacturing a radian formwork fixing frame, manufacturing a radian formwork, erecting the radian formwork and the like. The construction method has the advantages that the defects in the prior art are overcome, the method is particularly suitable for formworks which are simple in design, small in number and single in shape, the problem that formworks are rented from the market, and rent expense is extra added is totally avoided, and therefore unnecessary expenses are reduced, construction cost is saved, and high practicability is achieved.

Description

A kind of construction method for radian pillar formwork
Technical field
The present invention relates to a kind of construction method of reinforced column formwork, it is more particularly related to a kind of use Construction method in radian pillar formwork.
Background technology
Current skyscraper gets more and more, and the moulding of building is also more and more attractive in appearance, and therefore, a lot of moulding has fixed The template of type, market can also be leased.But, the mould of and quantity few single moulding simple for design in construction Plate, if going lease on market, just adds additional lease expenses, and such expense, for construction enterprises, belonging to need not The input wanted.For example: with cambered reinforced concrete column in a kind of shape-designing.
Content of the invention
The purpose of the present invention is exactly to solve the problems of above prior art, and provides one kind to be used for radian post for this The construction method of sub- formwork.The enforcement of this construction method, the shortcoming overcoming prior art, additionally need not increase operating expenses, And there is the Reliable guarantee of construction quality.
The technical scheme is that
A kind of construction method for radian pillar formwork, including radian pillar reinforcing bar binding, radian formwork erection, coagulation The construction process such as soil pours, template removing and concrete curing, wherein: described radian formwork erection comprises the following steps:
(1) make radian fixing frame of formworks: according to the radian of radian pillar, with reinforcement welding radian fixing frame of formworks, institute The radian stated between the vertical plane of radian fixing frame of formworks and horizontal plane is agreed with the radian phase of radian pillar;
(2) make radian template: along described radian fixing frame of formworks inner face order arrange flitch and with iron wire by its according to Secondary colligation pastes galvanized iron sheet on described radian fixing frame of formworks, then on the good flitch surface of colligation, then along galvanized iron sheet Surrounding nails on nail, so that both is fixed, and completes the making of radian template;
(3) radian formwork erection: the radian made model sheetinstallat is had the one side of radian in radian pillar, and at it Multi-layer wood mould plate is installed on the plane of another side, then adopts split bolt to pass through the framework of steel reinforcement of described radian pillar, to two Block template carries out, to drawing, completing installing of radian template.
In above step (1): the bar diameter making radian fixing frame of formworks is 12mm:
In above step (2): the flitch specification being placed in described radian fixing frame of formworks inner face is 50*100mm.
In above step (3): the specification of described split bolt is m14.
The inventive method, the shortcoming overcoming prior art, its advantage is: provides one kind and props up for radian pillar The construction method of mould, for design is simple and the single template of the few moulding of quantity, it is entirely avoided the lease on market and volume The outer problem increasing lease expenses, thus reducing unnecessary expense expenditure, saving construction cost, having good practicality.
Brief description
Fig. 1 is the section structure schematic diagram of radian fixing frame of formworks in the present invention;
Fig. 2 is the sectional schematic diagram of radian template construct in the present invention;
Fig. 3 is the radian template schematic diagram completing in the present invention to make;
Fig. 4 is the schematic diagram of radian pillar formwork in the present invention.
Specific embodiment
In order that technical scheme is easier to be understood, below in conjunction with the accompanying drawings with the applying of radian pillar formwork Work embodiment is described in detail.
With reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, the present invention is used for the construction method of radian pillar formwork, including radian pillar reinforcing bar The construction process such as colligation, radian formwork erection, concreting, template removing and concrete curing, wherein: described radian Formwork erection comprises the following steps:
(1) make radian fixing frame of formworks:
According to the radian of radian pillar, radian fixing frame of formworks as shown in Figure 1 is connected into the steel bar welding of a diameter of 12mm 1, the radian between the vertical plane 11 of described radian fixing frame of formworks 1 and horizontal plane 12 should be consistent with the radian of radian pillar;
(2) make radian template:
Inner face along described radian fixing frame of formworks 1 lays specification for 50*100 to order arrangement as shown in Figure 2 Flitch 2, and with iron wire by described flitch 2 successively with described radian fixing frame of formworks 1 colligation firmly, then with galvanized iron sheet 3 It is covered on the good flitch of colligation 2, then followed closely in institute along the surrounding of described galvanized iron sheet 3 with nail 7 as shown in Figure 3 Fixed on the flitch 2 stated, thus completing the making of radian template 4;
(3) radian formwork erection:
The radian made template 4 is arranged on the one side that the good radian pillar of colligation has radian, and in its another side Plane on install multi-layer wood mould plate 6, then adopt specification be m14 split bolt 5 pass through radian pillar framework of steel reinforcement, right Two pieces of templates carry out to drawing, thus completing installing of radian template 4.
In the implementation process of the inventive method, especially when making described radian fixing frame of formworks 1, must root Radian according to radian pillar is carried out, and controls the one of radian between the two to make peace and agrees with degree, with the latter made radian template of guarantee Radian pillar is had radian one side best install effect.
Present invention utilizes the compound action of flitch and galvanized iron sheet, make the radian mould being applied to radian pillar formwork Plate, not only need not go lease profiled template on market additionally to increase lease expenses again, and ensure that reliable formwork construction Quality, solves one of problems that this area exists always well.
Above by reference to drawings and Examples, technical scheme is schematically described, this description does not limit Property processed.Those skilled in the art will be understood that in actual applications, and in the present invention, the implementation detail of each step is all possible to There are some changes, and other staff are likely to make similar Design under its enlightenment.Specifically: as long as not taking off From the design aim of the present invention, all obvious variations in detail or similar Design, it is all contained in protection scope of the present invention Within.

Claims (4)

1. a kind of construction method for radian pillar formwork, including radian pillar tie with reinforcing bar, radian formwork erection, mixes Solidifying soil pours, template removing and concrete curing construction process, it is characterized in that: described radian formwork erection includes following step Rapid:
(1) make radian fixing frame of formworks: according to the radian of radian pillar, with reinforcement welding radian fixing frame of formworks, described arc Radian between the vertical plane of degree fixing frame of formworks and horizontal plane is agreed with the radian phase of radian pillar;
(2) make radian template: the inner face order along described radian fixing frame of formworks is arranged flitch and tied up it successively with iron wire Prick on described radian fixing frame of formworks, then paste galvanized iron sheet on the good flitch surface of colligation, then along the surrounding of galvanized iron sheet Nail on nail, so that both is fixed, complete the making of radian template;
(3) radian formwork erection: the radian made model sheetinstallat is had the one side of radian in radian pillar, and another at it Multi-layer wood mould plate is installed on the plane in face, then adopts split bolt to pass through the framework of steel reinforcement of described radian pillar, to radian mould Plate and multi-layer wood mould plate carry out, to drawing, completing installing of radian template.
2. the construction method for radian pillar formwork according to claim 1, is characterized in that: makes radian template and fixes The bar diameter of frame is 12mm.
3. the construction method for radian pillar formwork according to claim 1, is characterized in that: is placed in described radian mould The flitch specification of plate fixed mount inner face is 50*100mm.
4. the construction method for radian pillar formwork according to claim 1, is characterized in that: the rule of described split bolt Lattice are m14.
CN201510110147.0A 2015-03-12 2015-03-12 Construction method for radian column formwork erection Active CN104712139B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510110147.0A CN104712139B (en) 2015-03-12 2015-03-12 Construction method for radian column formwork erection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510110147.0A CN104712139B (en) 2015-03-12 2015-03-12 Construction method for radian column formwork erection

Publications (2)

Publication Number Publication Date
CN104712139A CN104712139A (en) 2015-06-17
CN104712139B true CN104712139B (en) 2017-01-25

Family

ID=53411826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510110147.0A Active CN104712139B (en) 2015-03-12 2015-03-12 Construction method for radian column formwork erection

Country Status (1)

Country Link
CN (1) CN104712139B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201205B (en) * 2015-10-13 2017-05-31 中建八局第三建设有限公司 A kind of minor diameter high-fineness ratio clear-water concrete bundle pillar formwork structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090084930A1 (en) * 2007-09-28 2009-04-02 Sonoco Development, Inc. Concrete form for pouring polygonal columns
KR20120115616A (en) * 2011-04-11 2012-10-19 이피아이주식회사 Paper framwork with improving water resistance and strength
CN203452380U (en) * 2013-08-01 2014-02-26 中铁九局集团第四工程有限公司 Novel column hoop for reinforcing cylindrical formwork
CN103603495B (en) * 2013-11-07 2015-06-24 中煤建筑安装工程集团有限公司 Cylinder construction method
CN204059957U (en) * 2014-04-17 2014-12-31 中国建筑第八工程局有限公司 A kind of formwork reinforcement structure
CN104047422B (en) * 2014-06-13 2016-03-23 北京首钢建设集团有限公司 A kind of cylinder mold fabrication and installation method
CN204098487U (en) * 2014-09-12 2015-01-14 北京建工集团有限责任公司 Gear-like curved wall pilaster template

Also Published As

Publication number Publication date
CN104712139A (en) 2015-06-17

Similar Documents

Publication Publication Date Title
CN103243817B (en) A kind of assembled beam-column attachment means
CN204826619U (en) Mould is hung to superimposed sheet instrument formula
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN106032692A (en) Integral pouring molding construction method for reinforced concrete column
CN104805960B (en) One kind exempts from form removal beams of concrete and its construction method
CN106088327A (en) Manufacture method based on the assembling frame post that 3D prints
CN106968435A (en) A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction
CN204098486U (en) The concrete of building basement roof ater-casting hangs mould
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN204898736U (en) Underground garage roof or bottom plate post -cast strip prestressing tendons structure
CN104863296A (en) Integrally modular steel bar truss floor plate and construction method thereof
CN207812838U (en) One kind is U-shaped to be exempted to tear construction column template open
CN103737718B (en) Prefabricated reinforced concrete hollow column template and preparation method thereof
CN206784924U (en) A kind of combined type structure post steel form
CN104712139B (en) Construction method for radian column formwork erection
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN203891462U (en) Form erecting device for fair-faced concrete independent columns
CN205348767U (en) Utilize steel reinforcement cage to make external formwork system of skeleton
CN105804396B (en) A kind of non-type, template system precast stair bench and construction can be had enough to meet the need
CN107893478A (en) Overlap wall and horizontal member connecting node and its construction method
CN202689344U (en) Tensioning bar connecting device
CN207739390U (en) Overlap wall and horizontal member connecting node
CN206873924U (en) Assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork
CN215443119U (en) ALC wallboard entrance to a cave pouring structure
CN108193874A (en) A kind of stairway steel formwork for building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 300301 Dongli district no time street Jintang highway bridge, No. ten, No.

Applicant after: MCC TIANGONG GROUP TIANJIN CO., LTD.

Address before: 300301 Dongli District, Tianjin Street

Applicant before: Tianjin MCC20 Construction Co., Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant