CN104652289A - 牵索挂篮滑移安装方法 - Google Patents
牵索挂篮滑移安装方法 Download PDFInfo
- Publication number
- CN104652289A CN104652289A CN201510123505.1A CN201510123505A CN104652289A CN 104652289 A CN104652289 A CN 104652289A CN 201510123505 A CN201510123505 A CN 201510123505A CN 104652289 A CN104652289 A CN 104652289A
- Authority
- CN
- China
- Prior art keywords
- suspension basket
- dragging suspension
- girder
- installation method
- guyed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
本发明公开了一种牵索挂篮滑移安装方法,包括以下步骤:(1)主梁0#块施工过程中,在主塔基础附近场地打设钢管桩,在地面设置扩大基础,并分别在承台和扩大基础上设置第三分配梁、第二分配梁;(2)安装贝雷梁(3)在贝雷梁顶面安装第一分配梁,第一分配梁等距设置并与滑道焊接固定;(4)拼装;(5)滑移;(6)起吊提升;(7)提升就位。其优点是:牵索挂篮的拼装平台可在主塔墩附近岸侧场地进行布置,可采用扩大基础或打入式钢管桩作为拼装平台的支承结构;主梁0#块施工过程中,可同步进行牵索挂篮的拼装,节约工期;牵索挂篮的滑移安全可靠,施工方便;牵索挂篮滑移到位后,利用主梁结构布置起吊装置,无需大型起吊设备,施工方便快捷。
Description
技术领域
本发明涉及桥梁施工技术领域,具体的说是一种牵索挂篮滑移安装方法。
背景技术
牵索挂篮主要用于预应力混凝土斜拉桥主梁施工,是利用待浇梁段斜拉索作为挂篮前支点提供支承力,将挂篮后端锚固在已浇梁段,承受梁体自重及施工荷载并能逐段向前移动的施工设备。
牵索挂篮的常见安装方法,主要有以下几种:
第一种,主梁0#块施工完成后,拆除支架,在地面上将牵索挂篮拼装成整体,再利用起重机械将牵索挂篮安装至桥面主梁。
第二种,在牵索挂篮设计安装位置处搭设拼装支架,在支架顶面原位拼装牵索挂篮。
以上两种施工方法,牵索挂篮的拼装时间均受到主梁0#块施工的影响,必须在主梁0#块施工完成,且拆除0#块支架后方可进行挂篮拼装,需要较长的施工工期。
发明内容
本发明的目的是提供一种牵索挂篮的滑移安装方法,该方法既能缩短施工工期,又能保证施工质量。
本发明一种牵索挂篮滑移安装方法,包括以下步骤:
1)、主梁0#块施工过程中,在主塔基础附近场地打设钢管桩,在地面设置扩大基础,并分别在承台和扩大基础上设置第三分配梁、第二分配梁;
2)、利用吊机安装贝雷梁,作为滑道的支承结构;
3)、贝雷梁安装完成后,在其顶面安装第一分配梁,第一分配梁等距设置并与滑道焊接固定;
4)、在滑道上设置垫梁支承,将牵索挂篮各分块拼装成整体;
5)、利用精轧螺纹钢和千斤顶将牵索挂篮滑移至混凝土主梁下端设计位置;
6)、在混凝土主梁上布置上扁担梁、精轧螺纹钢和千斤顶,在牵索挂篮底部布置下扁担梁;
7)、利用千斤顶多次顶升,将牵索挂篮整体提升至设计高度。
牵索挂篮拼装前,需在主塔墩附近布置挂篮拼装场地及滑道。
滑道的承重结构为贝雷梁,其通过打入式钢管桩和扩大基础将牵索挂篮拼装和滑移过程中的荷载传递至地基中。
混凝土主梁施工时,需预留孔洞,孔洞直径为50mm,以便于精轧螺纹钢穿过,所述精轧螺纹钢直径为32mm。
牵索挂篮提升至设计高度后,在牵索挂篮上安装挂钩,将牵索挂篮的自重转移至已浇筑完成的混凝土主梁后,拆除提升装置。
本发明牵索挂篮滑移安装方法的优点是:
(1)牵索挂篮的拼装平台可在主塔墩附近岸侧场地进行布置,可采用扩大基础或打入式钢管桩作为拼装平台的支承结构;
(2)主梁0#块施工过程中,可同步进行牵索挂篮的拼装,节约工期;
(3)牵索挂篮的滑移安全可靠,施工方便;
(4)牵索挂篮滑移到位后,利用主梁结构布置起吊装置,无需大型起吊设备,施工方便快捷。
附图说明
图1为拼装过程示意图;
图2为滑移过程示意图;
图3为起吊提升示意图;
图4为提升就位示意图;
图5为提升就位局部放大图。
图中,1为混凝土主梁,2为牵索挂篮,3为垫梁,4为滑道,5为第一分配梁,6为贝雷梁,7为基础,8为第二分配梁,9为第三分配梁,10为钢管桩,11为下扁担梁,12为上扁担梁,13为精轧螺纹钢,14为千斤顶。
具体实施方式
下面结合附图,对本发明进行进一步说明。如图1-5所示,本发明一种牵索挂篮滑移安装方法,包括以下步骤:
1)、在主塔基础附近场地打设钢管桩10,在地面设置扩大基础7,并在承台上设置第三分配梁9,在钢管桩10顶面上设置第二分配梁8。
2)、利用吊机安装贝雷梁6,作为滑道4的支承结构。
3)、贝雷梁6安装完成后,在其顶面布置第一分配梁5,第一分配梁5等间距布置,并与滑道4焊接固定。
4)、滑道布置完成后,在滑道上设置垫梁3支承,将牵索挂篮2各分块拼装成整体。
5)、拼装完成后,利用精轧螺纹钢和千斤顶将牵索挂篮2滑移至混凝土主梁1下端设计位置。
6)、在混凝土主梁1上布置上扁担梁12、精轧螺纹钢13、千斤顶14,并在牵索挂篮2底部布置下扁担梁11。
7)、利用千斤顶14多次顶升,将牵索挂篮2整体提升至设计高度。
牵索挂篮2拼装前,需在主塔墩附近布置挂篮拼装场地及滑道4。
滑道4的承重结构为贝雷梁6,其通过打入式钢管桩10和扩大基础7将牵索挂篮2拼装和滑移过程中的荷载传递至地基中。
混凝土主梁1施工时,需预留孔洞,孔洞直径为50mm,以便于精轧螺纹钢13穿过,所述精轧螺纹钢直径为32mm。
牵索挂篮提升至设计高度后,在牵索挂篮上安装挂钩,将牵索挂篮的自重转移至已浇筑完成的混凝土主梁后,拆除提升装置。
如图1所示,滑道4受力纵梁为贝雷梁6,也可采用型钢,其跨度根据拼装需要来确定。滑道4的荷载通过纵梁传递至扩大基础7和钢管桩10。
如图1、图2所示,牵索挂篮拼装时,需在挂篮的前后两端分别设置垫梁3作为临时支承。
如图3所示,在主梁上设置上扁担梁12,精轧螺纹钢13,千斤顶14,用于牵索挂篮梁顶提升,并在牵索挂篮底部布置下扁担梁。
如图4所示,精轧螺纹钢筋13顶端锚固在上扁担梁上,底端锚固在下扁担梁上。需采用精轧螺纹钢筋的专用锚固装置。
如图4所示,每四根精轧螺纹钢筋需对应一台千斤顶。施工时两侧挂篮同时提升,每个挂篮需四台千斤顶,八台千斤顶需同步作业。
在实际应用中,为了满足不同桥梁施工环境的要求,滑道基础可全部为扩大基础或钢管桩,也可组合使用。
本发明在使用时,根据拼装场地和挂篮的实际尺寸,当滑道受力纵梁为大跨度时采用贝雷梁,小跨度时可采用型钢梁。
Claims (4)
1.一种牵索挂篮滑移安装方法,其特征在于包括以下步骤:
(1)主梁0#块施工过程中,在主塔基础附近场地打设钢管桩,在地面设置扩大基础,并分别在承台和扩大基础上设置第三分配梁、第二分配梁;
(2)利用吊机安装贝雷梁,作为滑道的支承结构;
(3)贝雷梁安装完成后,在其顶面安装第一分配梁,第一分配梁等距设置并与滑道焊接固定;
(4)在滑道上设置垫梁支承,将牵索挂篮各分块拼装成整体;
(5)利用精轧螺纹钢和千斤顶将牵索挂篮滑移至混凝土主梁下端设计位置;
(6)在混凝土主梁上布置上扁担梁、精轧螺纹钢和千斤顶,在牵索挂篮底部布置下扁担梁;
(7)利用千斤顶多次顶升,将牵索挂篮整体提升至设计高度。
2.如权利要求1所述的牵索挂篮滑移安装方法,其特征在于:牵索挂篮拼装前,在主塔墩附近布置挂篮拼装场地及滑道。
3.如权利要求1所述的牵索挂篮滑移安装方法,其特征在于:混凝土主梁施工时预留孔洞,孔洞直径为50mm,以便于精轧螺纹钢穿过,所述精轧螺纹钢直径为32mm。
4.如权利要求1所述的牵索挂篮滑移安装方法,其特征在于:牵索挂篮提升至设计高度后,在牵索挂篮上安装挂钩,将牵索挂篮的自重转移至已浇筑完成的混凝土主梁后,拆除提升装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510123505.1A CN104652289B (zh) | 2015-03-20 | 2015-03-20 | 牵索挂篮滑移安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510123505.1A CN104652289B (zh) | 2015-03-20 | 2015-03-20 | 牵索挂篮滑移安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104652289A true CN104652289A (zh) | 2015-05-27 |
CN104652289B CN104652289B (zh) | 2016-06-08 |
Family
ID=53243885
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510123505.1A Expired - Fee Related CN104652289B (zh) | 2015-03-20 | 2015-03-20 | 牵索挂篮滑移安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104652289B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113914225A (zh) * | 2021-10-19 | 2022-01-11 | 安徽省公路桥梁工程有限公司 | 一种大吨位牵索挂篮主桁架纵向滑移竖向提升施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11256521A (ja) * | 1998-03-09 | 1999-09-21 | Sumitomo Constr Co Ltd | 橋梁架設装置 |
CN101173503A (zh) * | 2007-11-20 | 2008-05-07 | 中铁大桥局集团第二工程有限公司 | 三点走行单索面牵索挂篮 |
CN101672013A (zh) * | 2009-08-27 | 2010-03-17 | 孙广喜 | 无配重斜拉贝雷挂篮 |
CN103061269A (zh) * | 2012-12-27 | 2013-04-24 | 中铁港航局集团有限公司 | 一种牵索挂篮的整体安装方法 |
CN103243658A (zh) * | 2013-05-16 | 2013-08-14 | 中交路桥华南工程有限公司 | 斜拉桥牵索挂篮及其组拼方法 |
-
2015
- 2015-03-20 CN CN201510123505.1A patent/CN104652289B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11256521A (ja) * | 1998-03-09 | 1999-09-21 | Sumitomo Constr Co Ltd | 橋梁架設装置 |
CN101173503A (zh) * | 2007-11-20 | 2008-05-07 | 中铁大桥局集团第二工程有限公司 | 三点走行单索面牵索挂篮 |
CN101672013A (zh) * | 2009-08-27 | 2010-03-17 | 孙广喜 | 无配重斜拉贝雷挂篮 |
CN103061269A (zh) * | 2012-12-27 | 2013-04-24 | 中铁港航局集团有限公司 | 一种牵索挂篮的整体安装方法 |
CN103243658A (zh) * | 2013-05-16 | 2013-08-14 | 中交路桥华南工程有限公司 | 斜拉桥牵索挂篮及其组拼方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113914225A (zh) * | 2021-10-19 | 2022-01-11 | 安徽省公路桥梁工程有限公司 | 一种大吨位牵索挂篮主桁架纵向滑移竖向提升施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104652289B (zh) | 2016-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104963301B (zh) | 用于墩顶梁段与桥墩拆除的拖拉平移下放装置及方法 | |
CN100543235C (zh) | 斜拉索辅助全悬臂架设钢桁梁的方法及系统 | |
CN103061506B (zh) | 一种钢结构穹顶的施工方法 | |
CN103072893B (zh) | 一种核电站中的立式设备翻转用工具及翻转方法 | |
CN101284628B (zh) | 大吨位压力机架的吊装方法 | |
CN103243658B (zh) | 斜拉桥牵索挂篮的组拼方法 | |
CN201635020U (zh) | 用于大中型混凝土桥梁的拆除桥面吊机 | |
CN102108676A (zh) | 一种结合梁-钢拱组合体系拱桥施工方法 | |
CN104005338A (zh) | 一种大跨斜拉桥塔梁三向临时固结结构 | |
CN201106155Y (zh) | 斜拉索辅助全悬臂架设钢桁梁装置 | |
CN106522112A (zh) | 斜拉桥边跨梁段架设系统及其方法 | |
CN102251483A (zh) | 自提升附着式吊机吊装钢管混凝土格构桥墩的施工方法 | |
CN104195948A (zh) | 桥梁悬吊管道顶推安装施工方法 | |
CN105804400A (zh) | 一种曲面网架提升施工方法 | |
CN104762882A (zh) | 桥梁节段吊装装置及吊装方法 | |
CN105484164B (zh) | 一种跨式贝雷梁支架及其施工方法 | |
CN104790301A (zh) | 一种索式桥体系转换吊索张拉一次到位施工方法 | |
CN106012863B (zh) | 一种吊装门架及其在异型反对称钢主塔施工中的使用方法 | |
CN103132702A (zh) | 一种大跨度管桁架拔杆提升、空中施转就位施工方法 | |
CN103061269B (zh) | 一种牵索挂篮的整体安装方法 | |
JP5260709B2 (ja) | 橋桁送出し工法 | |
CN203866711U (zh) | 一种大跨斜拉桥塔梁三向临时固结结构 | |
CN102493353A (zh) | 桥梁施工中大型设备的起吊方法及墩顶提升吊架 | |
CN104652289A (zh) | 牵索挂篮滑移安装方法 | |
CN102041779A (zh) | 一种桥面吊机及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |