CN104538891A - Line outgoing method of composite insulator - Google Patents
Line outgoing method of composite insulator Download PDFInfo
- Publication number
- CN104538891A CN104538891A CN201410775945.0A CN201410775945A CN104538891A CN 104538891 A CN104538891 A CN 104538891A CN 201410775945 A CN201410775945 A CN 201410775945A CN 104538891 A CN104538891 A CN 104538891A
- Authority
- CN
- China
- Prior art keywords
- bridge
- plate
- hook
- yoke plate
- outlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Insulators (AREA)
- Insulating Bodies (AREA)
Abstract
The invention discloses a line outgoing method of a composite insulator, and provides a composite insulator line outgoing bridge. The composite insulator line outgoing bridge comprises a guide line side connecting plate hook, an insulation bridge plate, a tensioning device and a cross arm side connecting plate hook, the cross arm side connecting plate hook is connected with one end of the tensioning device, the other end of the tensioning device is connected with the insulation bridge plate, and the other end of the insulation bridge plate is connected with the guide line side connecting plate hook. According to the line outgoing method, on-site operating personnel complete power failure maintenance work fast, smoothly and efficiently. The on-site operating personnel reflect that the 220kV vertical arrangement composite insulator chain line outgoing bridge is reasonable in design, light, convenient to carry, easy to mount and dismount and low in labor intensity, few personnel are needed, and the on-site application effect is good.
Description
Technical field
The present invention relates to a kind of outlet method, particularly a kind of synthetic insulator outlet method.
Background technology
The 220kV strain rod tower of current employing vertical arrangement composite insulation substring is on the increase, and when carrying out this type of line outage upkeep operation, operating personnel must go out wire along insulator string and carries out the maintenance such as wire clamp, gold utensil or check.Because insulator string is forbidden trampling, as there is no suitable go out the Line tool and just must use the replacements such as comparatively heavy ladder.Owing to adopting the 220kV strain insulator composite insulation substring of vertical arrangement, distance from cross-arm to wire generally can reach about 4m, if use similar ladder, tubing etc. directly to set up the method for transition, because after distant ladder used or tubing need be considered and bear operating personnel's human body load, also increasing section is needed, use insulating material if consider again, whole go out the weight of the Line tool will reach 20-30kg, onsite application is very inconvenient.Because line maintenance is multi-point and wide-ranging and setting is mostly positioned on high mountain, high tower, will greatly increase the labour intensity of operating personnel like this, be badly in need of the light outlet method be easy to carry about with one of development.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art part, and provide one to be easy to carry, and the synthetic insulator outlet method before and after insulator string between yoke plate can be quick installed at.
A kind of synthetic insulator outlet method, a kind of synthetic insulator outlet bridge is provided, include side of wire yoke plate hook, insulation bridge plate, tensioning apparatus, cross-arm side yoke plate is linked up with, described side of wire yoke plate is square, side of wire yoke plate hook comprises the connecting plate of sheet, one end of connecting plate is provided with the connector matched with the bridge plate that insulate, connecting plate and connector are that square crossing is arranged, what connector was flexibly connected locks on insulation bridge plate, the hook groove that can hook square yoke plate is provided with at the other end of connector, connector is also provided with the supporting leg perpendicular with connector, supporting leg is supported in twin sockets place,
Described insulation bridge plate, for be formed by several sections of connections, adopts detachable being actively coupled between several sections;
Described tensioning apparatus is lead screw device;
Described cross-arm side yoke plate hook includes the supporting bracket of sheet, the end of described supporting bracket is provided with an auxiliary hook, described auxiliary hook includes threaded peg, the end of supporting bracket is provided with contiguous block, contiguous block is provided with the screwed hole passed for peg, the axis of this screwed hole is parallel with supporting bracket, setscrew nut is provided with above screwed hole with on the peg of below, supporting bracket is provided with the location hole of a row along the length direction of supporting bracket, also include the hook groove that can snap in cross-arm side triangle yoke plate, this hook groove can be locked in any location hole place of supporting bracket according to the length selection of insulator string thus adapt to different insulator strings,
Cross-arm side yoke plate hook is connected with one end of tensioning apparatus, the other end of tensioning apparatus is connected with insulation bridge plate, in insulation, then side of wire yoke plate hook is connected for the other end of bridge plate, during outlet, (1) is arrived the shaft tower position of Awaiting Overhaul by interruption maintenance operating personnel, first the folding means of instrument is assembled into dormant state
(2) operating personnel carries a transmission rope and steps on the insulator string position of tower to Awaiting Overhaul, is passed on shaft tower by transmitting rope by synthetic insulator outlet bridge,
(3) operating personnel ties up dual control safety belt, be displaced to strain insulator string triangle yoke plate place, the hand-held synthetic insulator outlet bridge assembled, first side of wire yoke plate to be hung on square yoke plate and supporting leg is supported to place, then cross-arm side yoke plate is hung on triangle yoke plate and hang up properly auxiliary hook
(4) operating personnel tightens up the screw mandrel of tensioning apparatus, makes outlet bridge be in tight state,
(5) safety belt moves on on composite insulation substring by operating personnel, take crouching formula pin tread line bridge hand steered the upper insulator string of vertical arrangement, moved by the side small step of cross-arm side guiding line and carry out outlet,
(6) after the service work of wire position completes, operating personnel returns cross-arm side along outlet bridge, eases out the screw mandrel of tensioning apparatus, removes outlet bridge and transfers to an other phase, repeat above action until operation completes.
Described supporting leg is telescoping support leg.
The structure realizing telescoping support leg has a lot, itself or be hinged between two by more piece pipe, or for be nested in together by 2-section pipe, threaded engagement is set at mutual contact-making surface.
Described lead screw device is two-pass lead screw device.
Described insulation bridge plate adopts novolac epoxy resin frp layer pressing plate.
Strain insulator string outlet bridge is arranged between wire and cross-arm, if there is induced voltage in wire, just likely conduct to operating personnel's body part by outlet bridge, there is shock hazard, meanwhile, also likely occur operating personnel's fault rod climbing, outlet bridge is arranged on the situation on live wire by mistake, this just needs the bridge plate of outlet bridge, and higher dielectric strength should be had to have certain mechanical strength again, therefore adopts novolac epoxy resin frp layer pressing plate.
In sum, the present invention's following advantage compared to existing technology:
Composite insulation substring outlet method of the present invention, effectively can solve the 220kV transmission line interruption maintenance adopting strain insulator vertical arrangement composite insulation substring.Have employed tensioning mode innovatively to install, the lateral load of instrument is converted into longitudinal tension force, significantly reduce the weight of instrument, this instrument one man operation can carry out installation and removal.Because the bridge plate of outlet bridge have employed high-strength insulating material, also can prevent induction of electric shock and fault rod climbing from getting an electric shock.The parts such as this tool set is linked up with by side of wire yoke plate, insulation bridge plate, stretcher, cross-arm side yoke plate hook form, have that volume is little, quality is light, simple to operation, the advantage such as be easy to carry about with one, complete an outlet bridge installation and only need 5-10min, alleviate the labour intensity of operating personnel dramatically, increase work efficiency and operational security.
After this instrument has been developed, analog line carries out repeatedly try out, applied in the interruption maintenance of strain tower.Adopt the composite insulation substring outlet bridge newly developed, field operation personnel complete interruption maintenance work rapidly smoothly efficiently.Field operation personnel are reflected, 220kV vertical arrangement composite insulation substring outlet bridge is reasonable in design, lightweight, easy to carry; Install, remove simply, labour intensity is little, and required personnel are few, and effect of field application is good.
Accompanying drawing explanation
Fig. 1 is composite insulation substring outlet bridge construction schematic diagram of the present invention.
Fig. 2 is the vertical view of Fig. 1.
Hook 43 peg 44 setscrew nut 45 hook groove 46 contiguous block assisted by hook groove 12 supporting leg 2 that label declaration 1 side of wire yoke plate the links up with 11 connecting plate 111 connector 1111 connecting plates bridge plate 3 tensioning apparatus 4 cross-arm side yoke plate location hole 42 linked up with in 41 supporting bracket 411 supporting brackets that insulate.
Embodiment
Below in conjunction with embodiment, the present invention is described in more detail.
Embodiment 1
A kind of synthetic insulator outlet bridge, include side of wire yoke plate hook 1, insulation bridge plate 2, tensioning apparatus 3, cross-arm side yoke plate hook 4, described side of wire yoke plate is square, side of wire yoke plate hook comprises the connecting plate 11 of sheet, one end of connecting plate is provided with the connector 111 matched with the bridge plate that insulate, connecting plate and connector are that square crossing is arranged, what connector was flexibly connected locks on insulation bridge plate, the hook groove 1111 that can hook square yoke plate is provided with at the other end of connector, connector is also provided with the supporting leg 12 perpendicular with connector, supporting leg is supported in twin sockets place,
Described insulation bridge plate, for be formed by several sections of connections, adopts detachable being actively coupled between several sections;
Described tensioning apparatus is lead screw device;
Described cross-arm side yoke plate hook 4 includes the supporting bracket 41 of sheet, the end of described supporting bracket is provided with an auxiliary hook 42, described auxiliary hook includes threaded peg 43, the end of supporting bracket is provided with contiguous block 46, contiguous block is provided with the screwed hole passed for peg, the axis of this screwed hole is parallel with supporting bracket, setscrew nut 44 is provided with above screwed hole with on the peg of below, supporting bracket is provided with the location hole 411 of a row along the length direction of supporting bracket, also include the hook groove 45 that can snap in cross-arm side triangle yoke plate, this hook groove can be locked in any location hole place of supporting bracket according to the length selection of insulator string thus adapt to different insulator strings,
Cross-arm side yoke plate hook is connected with one end of tensioning apparatus, and the other end of tensioning apparatus is connected with insulation bridge plate, and in insulation, then side of wire yoke plate hook is connected for the other end of bridge plate.Described supporting leg is telescoping support leg.Described lead screw device is two-pass lead screw device.Described insulation bridge plate adopts novolac epoxy resin frp layer pressing plate.
It is same as the prior art that the present embodiment does not state part.
Claims (4)
1. a synthetic insulator outlet method, it is characterized in that: a kind of synthetic insulator outlet bridge is provided, include side of wire yoke plate hook, insulation bridge plate, tensioning apparatus, cross-arm side yoke plate is linked up with, described side of wire yoke plate is square, side of wire yoke plate hook comprises the connecting plate of sheet, one end of connecting plate is provided with the connector matched with the bridge plate that insulate, connecting plate and connector are that square crossing is arranged, what connector was flexibly connected locks on insulation bridge plate, the hook groove that can hook square yoke plate is provided with at the other end of connector, connector is also provided with the supporting leg perpendicular with connector, supporting leg is supported in twin sockets place,
Described insulation bridge plate, for be formed by several sections of connections, adopts detachable being actively coupled between several sections;
Described tensioning apparatus is lead screw device;
Described cross-arm side yoke plate hook includes the supporting bracket of sheet, the end of described supporting bracket is provided with an auxiliary hook, described auxiliary hook includes threaded peg, the end of supporting bracket is provided with contiguous block, contiguous block is provided with the screwed hole passed for peg, the axis of this screwed hole is parallel with supporting bracket, setscrew nut is provided with above screwed hole with on the peg of below, supporting bracket is provided with the location hole of a row along the length direction of supporting bracket, also include the hook groove that can snap in cross-arm side triangle yoke plate, this hook groove can be locked in any location hole place of supporting bracket according to the length selection of insulator string thus adapt to different insulator strings,
Cross-arm side yoke plate hook is connected with one end of tensioning apparatus, the other end of tensioning apparatus is connected with insulation bridge plate, in insulation, then side of wire yoke plate hook is connected for the other end of bridge plate, during outlet, (1) is arrived the shaft tower position of Awaiting Overhaul by interruption maintenance operating personnel, first the folding means of instrument is assembled into dormant state
(2) operating personnel carries a transmission rope and steps on the insulator string position of tower to Awaiting Overhaul, is passed on shaft tower by transmitting rope by synthetic insulator outlet bridge,
(3) operating personnel ties up dual control safety belt, be displaced to strain insulator string triangle yoke plate place, the hand-held synthetic insulator outlet bridge assembled, first side of wire yoke plate to be hung on square yoke plate and supporting leg is supported to place, then cross-arm side yoke plate is hung on triangle yoke plate and hang up properly auxiliary hook
(4) operating personnel tightens up the screw mandrel of tensioning apparatus, makes outlet bridge be in tight state,
(5) safety belt moves on on composite insulation substring by operating personnel, take crouching formula pin tread line bridge hand steered the upper insulator string of vertical arrangement, moved by the side small step of cross-arm side guiding line and carry out outlet,
(6) after the service work of wire position completes, operating personnel returns cross-arm side along outlet bridge, eases out the screw mandrel of tensioning apparatus, removes outlet bridge and transfers to an other phase, repeat above action until operation completes.
2. a kind of synthetic insulator outlet method according to claim 1, is characterized in that: described supporting leg is telescoping support leg.
3. a kind of synthetic insulator outlet method according to claim 2, is characterized in that: described lead screw device is two-pass lead screw device.
4. a kind of synthetic insulator outlet method according to claim 3, is characterized in that: described insulation bridge plate adopts novolac epoxy resin frp layer pressing plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410775945.0A CN104538891B (en) | 2014-12-15 | 2014-12-15 | A kind of composite insulator outlet method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410775945.0A CN104538891B (en) | 2014-12-15 | 2014-12-15 | A kind of composite insulator outlet method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104538891A true CN104538891A (en) | 2015-04-22 |
CN104538891B CN104538891B (en) | 2017-09-26 |
Family
ID=52854383
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410775945.0A Active CN104538891B (en) | 2014-12-15 | 2014-12-15 | A kind of composite insulator outlet method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104538891B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108551141A (en) * | 2018-04-23 | 2018-09-18 | 李宪宝 | Suspension insulator lifts Quick Release folder and installation method |
CN110571704A (en) * | 2019-08-30 | 2019-12-13 | 贵州电网有限责任公司 | Tool and method suitable for disassembling B-phase drainage line insulator of strain tower |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200969494Y (en) * | 2006-11-03 | 2007-10-31 | 福建省福州电业局 | Portable tangent towers, anchor towers outlet tools |
KR200438937Y1 (en) * | 2007-03-06 | 2008-03-12 | 주식회사 한발 | Working ladder for polymer insulator of power electric transmission line |
CN201298695Y (en) * | 2008-11-05 | 2009-08-26 | 河南省电力公司信阳供电公司 | Wire-outlet rack for a power transmission line to change a tension resistant insulator |
CN201868790U (en) * | 2010-12-06 | 2011-06-15 | 河南省电力公司濮阳供电公司 | Insulating gap bridge for repairing power lines |
JP2011171256A (en) * | 2010-02-22 | 2011-09-01 | Chugoku Electric Power Co Inc:The | Device and method for fixing insulator chain |
CN102882157A (en) * | 2012-10-30 | 2013-01-16 | 安徽省电力公司淮北供电公司 | Portable tool for replacing tension wire shockproof hammer in power cut |
CN103227431A (en) * | 2013-03-19 | 2013-07-31 | 国家电网公司 | Method for replacing insulator chains in 220 kV long-span high tower in live working |
CN203787859U (en) * | 2014-03-28 | 2014-08-20 | 国家电网公司 | Portable derrick applied to transmission line overhauling |
JP2014183688A (en) * | 2013-03-21 | 2014-09-29 | Chugoku Electric Power Co Inc:The | Load cancellation device for insulator |
CN203859440U (en) * | 2014-04-22 | 2014-10-01 | 国家电网公司 | 110kV tension double-string composite insulator loss prevention device |
-
2014
- 2014-12-15 CN CN201410775945.0A patent/CN104538891B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200969494Y (en) * | 2006-11-03 | 2007-10-31 | 福建省福州电业局 | Portable tangent towers, anchor towers outlet tools |
KR200438937Y1 (en) * | 2007-03-06 | 2008-03-12 | 주식회사 한발 | Working ladder for polymer insulator of power electric transmission line |
CN201298695Y (en) * | 2008-11-05 | 2009-08-26 | 河南省电力公司信阳供电公司 | Wire-outlet rack for a power transmission line to change a tension resistant insulator |
JP2011171256A (en) * | 2010-02-22 | 2011-09-01 | Chugoku Electric Power Co Inc:The | Device and method for fixing insulator chain |
CN201868790U (en) * | 2010-12-06 | 2011-06-15 | 河南省电力公司濮阳供电公司 | Insulating gap bridge for repairing power lines |
CN102882157A (en) * | 2012-10-30 | 2013-01-16 | 安徽省电力公司淮北供电公司 | Portable tool for replacing tension wire shockproof hammer in power cut |
CN103227431A (en) * | 2013-03-19 | 2013-07-31 | 国家电网公司 | Method for replacing insulator chains in 220 kV long-span high tower in live working |
JP2014183688A (en) * | 2013-03-21 | 2014-09-29 | Chugoku Electric Power Co Inc:The | Load cancellation device for insulator |
CN203787859U (en) * | 2014-03-28 | 2014-08-20 | 国家电网公司 | Portable derrick applied to transmission line overhauling |
CN203859440U (en) * | 2014-04-22 | 2014-10-01 | 国家电网公司 | 110kV tension double-string composite insulator loss prevention device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108551141A (en) * | 2018-04-23 | 2018-09-18 | 李宪宝 | Suspension insulator lifts Quick Release folder and installation method |
CN110571704A (en) * | 2019-08-30 | 2019-12-13 | 贵州电网有限责任公司 | Tool and method suitable for disassembling B-phase drainage line insulator of strain tower |
Also Published As
Publication number | Publication date |
---|---|
CN104538891B (en) | 2017-09-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203422399U (en) | High-altitude test clamp for high-voltage tests | |
CN102856838B (en) | Tubular bus support insulator changing tool and method | |
WO2012088987A1 (en) | Maintenance tool for insulator of direct current transmission line | |
CN104538891A (en) | Line outgoing method of composite insulator | |
CN203732572U (en) | Telescopic high-altitude wire clamp | |
CN204947468U (en) | For the operating desk of pole guy end portion treatment | |
CN201146346Y (en) | Portable insulation maintenance gap bridge | |
CN208337014U (en) | A kind of charged for replacement Voltage for Insulators on HV Lines lifting block hanging point heightening device | |
CN204441795U (en) | Synthetic insulator outlet bridge | |
CN103746316B (en) | A kind of device and method of electrified replacing linear angle tower insulator string | |
CN202917892U (en) | Replacing tool for supporting insulator of tubular busbar | |
CN203690799U (en) | Device for replacing suspension angle tower insulator string in live state | |
CN104505768A (en) | Composite insulator wire outlet bridge | |
CN103500961B (en) | Tool special for electrified replacement of strain insulator string | |
CN110048337A (en) | A kind of hanging type does not have a power failure conducting wire sectionaliser | |
CN203925259U (en) | A kind of New insulated lifting aerial ladder | |
CN206575086U (en) | Insulate turnbuckle plate pulling device | |
CN206775000U (en) | Wire lifts insulating support | |
CN104201606B (en) | A kind of 800KV strain insulator strings disengaging fixture | |
CN104201602B (en) | A kind of UHV transmission line bunch of insulator charged for replacement method and gold utensil thereof | |
CN203967279U (en) | Corner pole circuit interior angle side joint device for connecting earth | |
CN210111467U (en) | Suspended type uninterrupted power conductor sectionalizer | |
CN107425466A (en) | Wire lifts insulating support and its application method | |
CN204131004U (en) | Four loop straight line steel tube tower circle cross-arm jigs | |
CN208806586U (en) | A kind of power transmission sequence strain clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |