CN206575086U - Insulate turnbuckle plate pulling device - Google Patents
Insulate turnbuckle plate pulling device Download PDFInfo
- Publication number
- CN206575086U CN206575086U CN201720088493.8U CN201720088493U CN206575086U CN 206575086 U CN206575086 U CN 206575086U CN 201720088493 U CN201720088493 U CN 201720088493U CN 206575086 U CN206575086 U CN 206575086U
- Authority
- CN
- China
- Prior art keywords
- insulating
- pull rod
- angle steel
- clamping block
- steel cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Insulators (AREA)
Abstract
一种绝缘紧线器拉板装置,包括绝缘拉杆、夹固块,所述绝缘拉杆与夹固块通过螺杆固定连接,所述绝缘拉杆的左端设置用于与第一角钢横担连接的拉钩,所述拉钩的卡槽为与角钢横担相匹配的“匚”型,以使第一角钢横担嵌入拉钩的卡槽中,避免绝缘拉杆发生移动,绝缘拉杆的中部设置第一连接孔,夹固块的上端设置第二连接孔,螺杆套设在第一连接孔和第二连接孔中,螺杆两端分别固定一个螺母,两个螺母将夹固块和绝缘拉杆夹紧;绝缘拉杆与夹固块共同作用,将第一角钢横担和第二角钢横担夹在拉钩与夹固块之间,以使绝缘紧线器拉板装置固定在第一角钢横担和第二角钢横担上,绝缘拉杆的右端设置用于连接千斤绳的套孔。
An insulating wire tensioner pulling plate device, comprising an insulating pull rod and a clamping block, the insulating pull rod and the clamping block are fixedly connected by a screw, and the left end of the insulating pull rod is provided with a pull hook for connecting with the first angle steel cross arm, The draw-in groove of the draw hook is a "匚" type matched with the angle steel cross-arm, so that the first angle-steel cross-arm is embedded in the draw-in slot of the draw hook to avoid movement of the insulating pull rod. The upper end of the solid block is provided with a second connection hole, the screw is sleeved in the first connection hole and the second connection hole, a nut is respectively fixed at both ends of the screw, and the two nuts clamp the clamping block and the insulating pull rod; the insulating pull rod and the clamp The solid blocks work together to clamp the first angle steel cross arm and the second angle steel cross arm between the hook and the clamping block, so that the insulating wire tensioner pull plate device is fixed on the first angle steel cross arm and the second angle steel cross arm , the right end of the insulating pull rod is provided with a sleeve hole for connecting the jack rope.
Description
技术领域technical field
本实用新型涉及电力维护设备技术领域,尤其涉及一种绝缘紧线器拉板装置。The utility model relates to the technical field of electric power maintenance equipment, in particular to a pulling plate device of an insulating wire tensioner.
背景技术Background technique
在配网架空线路带电作业更换耐张绝缘子串、横担或直线杆改耐张杆以及直线杆改耐张杆并加装柱上开关或隔离开关等项目中,均需利用绝缘紧线器对导线进行紧、松线操作,以完成悬式瓷瓶的更换、拆除或安装工作。国内现行的做法为作业人员将邻相导线、悬式瓷瓶以及耐张横担用绝缘毯进行绝缘遮蔽后,利用绝缘千斤绳对绝缘紧线器及后备保护绳卡线器与角钢横担进行固定连接。具体为将千斤绳的一端套在包裹有绝缘毯的固定悬式瓷瓶的双横担上,千斤绳的另一端与绝缘紧线器或保护用卡线器固定连接。在作业过程中千斤绳在双角钢横担一端的摩擦较为频繁,时间久了之后,千斤绳会出现较大的磨损。如果继续使用,就会影响千斤绳的抗拉强度,从而影响千斤绳的安全性。出于安全性的考虑,千斤绳需要定期更换,甚至使用一次过后就不能再次使用,存在着较大的浪费。同时作业人员在将千斤绳套绑在角钢横担的操作过程也存在着许多不确定因素,有可能因为千斤绳没有绑好导致事故的发生。于是在确保绝缘毯、千斤绳的作业到位的过程中需要花费较多时间,同时在拆解过程中也要花费很多时间。这样导致整个配网架空线路带电作业耗费大量时间,而这样的作业又是在露天环境中进行,尤其是在夏天,这样的作业条件对人的体力还有精力都有很大的消耗。长时间作业后对人的健康有较大影响,同时因为精力的不集中可能会造成一些或大或小的事故的发生。In projects such as replacement of tension insulator strings, cross-arm or straight rods to tension rods, straight rods to tension rods and installation of pole-mounted switches or isolating switches, etc., it is necessary to use insulation tensioners to Conduct wire tightening and loosening operations to complete the replacement, removal or installation of the hanging porcelain bottle. The current practice in China is that the operators use insulating blankets to insulate and shield the adjacent phase wires, hanging porcelain bottles and tension cross arms, and then use insulating jack ropes to fix the insulation tensioner and backup protection rope clamps to the angle steel cross arms. connect. Specifically, one end of the jack rope is placed on the double cross arms of the fixed hanging porcelain bottle wrapped with an insulating blanket, and the other end of the jack rope is fixedly connected with the insulating wire tightener or the protective wire clamp. During the operation process, the jack rope rubs frequently at one end of the double-angle steel cross-arm. After a long time, the jack rope will be greatly worn. If you continue to use it, it will affect the tensile strength of the jack rope, thereby affecting the safety of the jack rope. For the sake of safety, the jack rope needs to be replaced regularly, even after being used once, it cannot be used again, and there is a large waste. At the same time, there are many uncertain factors in the operation process of operators binding the heavy rope cover to the angle steel cross-arm, which may cause accidents because the heavy rope is not tied well. Therefore, it takes a lot of time to ensure that the operations of the insulation blanket and the jack rope are in place, and it also takes a lot of time in the dismantling process. This leads to a lot of time-consuming live work on the overhead lines of the entire distribution network, and such work is carried out in an open-air environment, especially in summer. Such working conditions consume a lot of human physical strength and energy. After working for a long time, it will have a great impact on people's health, and at the same time, some large or small accidents may occur due to inattention.
发明内容Contents of the invention
针对上述通过千斤绳连接角钢横担和绝缘紧线器或后备保护绳卡线器存在的问题,有必要提供一种拆装便捷、安全可靠的绝缘紧线器拉板装置。In view of the above-mentioned problems of connecting the angle steel cross-arm and the insulating wire tensioner or the backup protection rope wire clamping device through the jack rope, it is necessary to provide a convenient disassembly, safe and reliable insulating wire tensioner pulling plate device.
一种绝缘紧线器拉板装置,包括绝缘拉杆、夹固块,所述绝缘拉杆与夹固块通过螺杆固定连接,所述绝缘拉杆的左端设置用于与第一角钢横担连接的拉钩,所述拉钩的卡槽为与角钢横担相匹配的“匚”型,以使第一角钢横担嵌入拉钩的卡槽中,避免绝缘拉杆发生移动,绝缘拉杆的中部设置第一连接孔,一根螺杆穿过第一连接孔和第二连接孔以将夹固块和绝缘拉杆连接,在所述螺杆的两个端头分别固定一个螺母,以通过两个螺母及螺杆将夹固块和绝缘拉杆夹紧;绝缘拉杆与夹固块共同作用,将第一角钢横担和第二角钢横担夹在拉钩与夹固块之间,以使绝缘紧线器拉板装置固定在第一角钢横担和第二角钢横担上,绝缘拉杆的右端设置用于连接千斤绳的套孔,千斤绳的一端穿过千斤绳的套孔,千斤绳的另一端与卡线器或绝缘紧绳器连接。An insulating wire tensioner pulling plate device, comprising an insulating pull rod and a clamping block, the insulating pull rod and the clamping block are fixedly connected by a screw, and the left end of the insulating pull rod is provided with a pull hook for connecting with the first angle steel cross arm, The slot of the draw hook is "匚" type matched with the angle steel cross arm, so that the first angle steel cross arm is embedded in the slot of the draw hook to avoid the movement of the insulating pull rod. The middle part of the insulating pull rod is provided with a first connecting hole. A screw goes through the first connecting hole and the second connecting hole to connect the clamping block and the insulating pull rod, and a nut is respectively fixed at the two ends of the screw, so that the clamping block and the insulating rod are connected by two nuts and the screw rod. The pull rod is clamped; the insulating pull rod and the clamping block work together to clamp the first angle steel cross arm and the second angle steel cross arm between the pull hook and the clamping block, so that the pull plate device of the insulating wire tensioner is fixed on the first angle steel cross arm On the shoulder and the second angle steel cross arm, the right end of the insulating pull rod is provided with a hole for connecting the heavy rope, one end of the heavy rope passes through the hole of the heavy rope, and the other end of the heavy rope is connected with the wire clamp or the insulating rope tightener .
优选的,所述第一连接孔为腰型孔,螺栓在腰型孔中滑动带动夹固块移动,以对拉钩与夹固块之间的距离进行微调,使角钢横担能够卡紧在拉钩与夹固块之间。Preferably, the first connection hole is a waist-shaped hole, and the bolt slides in the waist-shaped hole to drive the clamping block to move, so as to fine-tune the distance between the draw hook and the clamping block, so that the angle steel cross arm can be clamped on the draw hook between the clamping block.
优选的,绝缘紧线器拉板装置设有两个夹固块,绝缘拉杆夹在两个夹固块之间,所述螺杆依次穿过夹固块的第二连接孔、绝缘拉杆的第一连接孔、及夹固块的第二连接孔,以将两个夹固块和绝缘拉杆连接,在所述螺杆的两个端头分别固定一个螺母,以通过两个螺母及螺杆将两个夹固块和绝缘拉杆夹紧。Preferably, the pulling plate device of the insulating wire tightener is provided with two clamping blocks, and the insulating pull rod is clamped between the two clamping blocks, and the screw rod passes through the second connection hole of the clamping block, the first connecting hole of the insulating pull rod in turn, The connecting hole and the second connecting hole of the clamping block are used to connect the two clamping blocks with the insulating pull rod, and a nut is respectively fixed at the two ends of the screw rod to connect the two clamping blocks through the two nuts and the screw rod. The solid block and the insulating tie rod are clamped.
优选的,所述绝缘拉杆上还设有用于水平校正的气泡水平仪。Preferably, the insulating pull rod is also provided with a bubble level for level correction.
优选的,所述绝缘拉杆上还设置有刻度标识,以方便现场测距,刻度标识为在绝缘拉杆的表面上开设的凹槽,或刻度标识为在绝缘拉杆的表面上凸设的凸条。Preferably, the insulating pull rod is also provided with a scale mark to facilitate on-site distance measurement. The scale mark is a groove opened on the surface of the insulating pull rod, or the scale mark is a convex line formed on the surface of the insulating pull rod.
有益效果:本实用新型的绝缘紧线器拉板装置在安装时,依靠拉钩与夹固块的配合,能够使绝缘紧线器拉板装置可靠地固定在角钢横担上,安全可靠,因此无需花费过多时间检验装置的可靠性。在拆卸时,只需用扳手将螺杆上的螺母拆掉即可。由于千斤绳是栓套在绝缘紧线器拉板装置上的,千斤绳不用反复拆装。同时千斤绳与绝缘紧线器拉板装置的摩擦几乎可以忽略不计,千斤绳的使用寿命得到延长。Beneficial effects: when the pull plate device of the insulation wire tensioner of the utility model is installed, relying on the cooperation of the pull hook and the clamping block, the pull plate device of the insulation wire tensioner can be reliably fixed on the angle steel cross arm, which is safe and reliable, so there is no need to Excessive time is spent verifying the reliability of the device. When disassembling, just use a wrench to remove the nut on the screw rod. Because the jack rope is bolted and sheathed on the pull plate device of the insulating wire tensioner, the jack rope does not need to be disassembled repeatedly. At the same time, the friction between the jack rope and the pulling plate device of the insulating wire tensioner is almost negligible, and the service life of the jack rope is extended.
附图说明Description of drawings
图1为本实用新型的绝缘紧线器拉板装置的拆分结构示意图。Fig. 1 is a schematic diagram of the disassembled structure of the pulling plate device of the insulating wire tensioner of the present invention.
图2为本实用新型的绝缘紧线器拉板装置的装配结构示意图。Fig. 2 is a schematic diagram of the assembly structure of the pulling plate device of the insulating wire tensioner of the present invention.
图中:绝缘紧线器拉板装置10、绝缘拉杆20、拉钩201、第一连接孔202、套孔203、气泡水平仪204、刻度标识205、夹固块30、第二连接孔301、第一角钢横担40、第二角钢横担50、电杆60。In the figure: pull plate device 10 of insulating wire tensioner, insulating pull rod 20, pull hook 201, first connecting hole 202, sleeve hole 203, bubble level 204, scale mark 205, clamping block 30, second connecting hole 301, first Angle steel cross arm 40, the second angle steel cross arm 50, electric pole 60.
具体实施方式detailed description
为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例中所需要使用的附图作简单的介绍,显而易见地,下面描述中的附图是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings that need to be used in the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are some embodiments of the present invention. For Those of ordinary skill in the art can also obtain other drawings based on these drawings without making creative efforts.
请参看图1和图2,一种绝缘紧线器拉板装置10,包括绝缘拉杆20、夹固块30,所述绝缘拉杆20与夹固块30通过螺杆固定连接,所述绝缘拉杆20的左端设置用于与第一角钢横担40连接的拉钩201,所述拉钩201的卡槽为与角钢横担相匹配的“匚”型,以使第一角钢横担40嵌入拉钩201的卡槽中,避免绝缘拉杆20发生移动,绝缘拉杆20的中部设置第一连接孔202,夹固块30的上端设置第二连接孔301,一根螺杆穿过第一连接孔202和第二连接孔301以将夹固块30和绝缘拉杆20连接,在所述螺杆的两个端头分别固定一个螺母,以通过两个螺母及螺杆将夹固块30和绝缘拉杆20夹紧;绝缘拉杆20与夹固块30共同作用,将第一角钢横担40和第二角钢横担50夹在拉钩201与夹固块30之间,以使绝缘紧线器拉板装置10固定在第一角钢横担40和第二角钢横担50上,绝缘拉杆20的右端设置用于连接千斤绳的套孔203,千斤绳的一端穿过千斤绳的套孔203,千斤绳的另一端与卡线器或绝缘紧绳器连接。Please refer to Fig. 1 and Fig. 2, a pull plate device 10 for an insulating wire tightener, including an insulating pull rod 20 and a clamping block 30, the insulating pull rod 20 and the clamping block 30 are fixedly connected by a screw, and the insulating pull rod 20 The left end is provided with a draw hook 201 for connecting with the first angle steel cross arm 40, and the draw-in groove of the draw hook 201 is a "匚" type matched with the angle steel cross-arm, so that the first angle steel cross-arm 40 is inserted into the draw-in slot of the draw hook 201 In order to prevent the insulating pull rod 20 from moving, the middle part of the insulating pull rod 20 is provided with a first connecting hole 202, and the upper end of the clamping block 30 is provided with a second connecting hole 301, and a screw passes through the first connecting hole 202 and the second connecting hole 301 To connect the clamping block 30 and the insulating pull rod 20, a nut is respectively fixed at the two ends of the screw rod, so that the clamping block 30 and the insulating pull rod 20 are clamped by two nuts and the screw rod; the insulating pull rod 20 and the clamping The solid block 30 works together to sandwich the first angle steel cross arm 40 and the second angle steel cross arm 50 between the pull hook 201 and the clamping block 30, so that the insulating wire tensioner pulling device 10 is fixed on the first angle steel cross arm 40 And on the second angle steel cross arm 50, the right end of the insulating pull rod 20 is provided with the sleeve hole 203 that is used to connect the heavy rope, and one end of the heavy rope passes through the sleeve hole 203 of the heavy rope, and the other end of the heavy rope is connected with the clamp or the insulating tight rope connection.
一般电杆60上的角钢横担的上沿与电杆60的顶部的距离为0.3米。如果电杆60是锥形电杆,那么角钢横担的安装位置一定,两个角钢横担的间距就是定值。角钢横担自身的宽度安装时也有标准,因此两个角钢横担的外侧距离在理想情况下是定值。那么拉钩201与夹固块30之间的距离也是定值。但是角钢横担的安装过程存在偏差,这就有可能导致绝缘紧线器拉板装置10无法安装到位。因此,进一步的,所述第一连接孔202为腰型孔,螺栓在腰型孔中滑动带动夹固块30移动,以对拉钩201与夹固块30之间的距离进行微调,使角钢横担能够卡紧在拉钩201与夹固块30之间。Generally, the distance between the upper edge of the angle steel cross-arm on the electric pole 60 and the top of the electric pole 60 is 0.3 meters. If the pole 60 is a tapered pole, the installation position of the angle steel cross arm is certain, and the distance between the two angle steel cross arms is a fixed value. There are also standards for the width of the angle steel cross-arm itself, so the outer distance between the two angle steel cross-arms is ideally a fixed value. Then the distance between the drag hook 201 and the clamping block 30 is also a constant value. However, there are deviations in the installation process of the angle steel cross-arm, which may cause the insulating wire tensioner pull plate device 10 to be unable to be installed in place. Therefore, further, the first connection hole 202 is a waist-shaped hole, and the bolt slides in the waist-shaped hole to drive the clamping block 30 to move, so as to fine-tune the distance between the drag hook 201 and the clamping block 30, so that the angle steel The shoulder can be fastened between the pull hook 201 and the clamping block 30 .
一个夹固块30与绝缘拉杆20之间的摩擦力有限,为了确保夹固块30不与绝缘拉杆20发生相对转动,进一步的,绝缘紧线器拉板装置10设有两个夹固块30,绝缘拉杆20夹在两个夹固块30之间,所述螺杆依次穿过夹固块30的第二连接孔301、绝缘拉杆20的第一连接孔202、及夹固块30的第二连接孔301,以将两个夹固块30和绝缘拉杆20连接,在所述螺杆的两个端头分别固定一个螺母,以通过两个螺母及螺杆将两个夹固块30和绝缘拉杆20夹紧。The frictional force between a clamping block 30 and the insulating pull rod 20 is limited, in order to ensure that the clamping block 30 does not rotate relative to the insulating pull rod 20, further, the pull plate device 10 of the insulating wire tensioner is provided with two clamping blocks 30 , the insulating pull rod 20 is clamped between two clamping blocks 30, and the screw passes through the second connecting hole 301 of the clamping block 30, the first connecting hole 202 of the insulating pull rod 20, and the second connecting hole 30 of the clamping block 30 in sequence. The connection hole 301 is used to connect the two clamping blocks 30 with the insulating pull rod 20, and a nut is respectively fixed at the two ends of the screw rod, so that the two clamping blocks 30 and the insulating pull rod 20 are connected by two nuts and the screw rod. Clamp.
进一步的,所述绝缘拉杆20上还设有用于水平校正的气泡水平仪204。Further, the insulating pull rod 20 is also provided with a bubble level 204 for level correction.
进一步的,所述绝缘拉杆20上还设置有刻度标识205,以方便现场测距,刻度标识205为在绝缘拉杆20的表面上开设的凹槽,或刻度标识205为在绝缘拉杆20的表面上凸设的凸条。Further, the insulating pull rod 20 is also provided with a scale mark 205 to facilitate on-site distance measurement. The scale mark 205 is a groove opened on the surface of the insulating pull rod 20, or the scale mark 205 is a groove on the surface of the insulating pull rod 20. Convex ribs.
在一较佳实施方式中,绝缘拉杆20和夹固块30采用树脂制成。In a preferred embodiment, the insulating pull rod 20 and the clamping block 30 are made of resin.
很多状况下,电力作业不止需要更换绝缘子。例如在新线架设时,需要架设电杆60、安装角钢横担、绝缘子等。其中,角钢横担的倾斜度不能大于横担长度的1/100,角钢横担的上沿与电杆60的顶部的距离为0.3米。本实用新型的绝缘紧线器拉板装置10既能够进行水平校正,又能够测距,同时还能作为过渡装置,方便千斤绳使用。能够方便工作人员操作,减少作业时间。In many cases, electrical work requires more than replacing insulators. For example, when erecting a new line, it is necessary to erect poles 60, install angle steel cross-arms, insulators, and the like. Wherein, the inclination of the angle steel cross arm cannot be greater than 1/100 of the length of the cross arm, and the distance between the upper edge of the angle steel cross arm and the top of the pole 60 is 0.3 meters. The pull plate device 10 of the insulating wire tensioner of the present utility model can not only perform level correction, but also can measure distance, and can also be used as a transition device at the same time, which is convenient for the use of the jack rope. It can facilitate the operation of the staff and reduce the working time.
以上所揭露的仅为本实用新型较佳实施例而已,当然不能以此来限定本实用新型之权利范围,本领域普通技术人员可以理解实现上述实施例的全部或部分流程,并依本实用新型权利要求所作的等同变化,仍属于实用新型所涵盖的范围。What is disclosed above is only a preferred embodiment of the utility model, and of course it cannot be used to limit the scope of rights of the utility model. Those of ordinary skill in the art can understand all or part of the process of realizing the above-mentioned embodiments, and according to the utility model The equivalent changes made by the claims still belong to the scope covered by the utility model.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720088493.8U CN206575086U (en) | 2017-01-21 | 2017-01-21 | Insulate turnbuckle plate pulling device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720088493.8U CN206575086U (en) | 2017-01-21 | 2017-01-21 | Insulate turnbuckle plate pulling device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206575086U true CN206575086U (en) | 2017-10-20 |
Family
ID=60061966
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720088493.8U Expired - Fee Related CN206575086U (en) | 2017-01-21 | 2017-01-21 | Insulate turnbuckle plate pulling device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206575086U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106786179A (en) * | 2017-01-21 | 2017-05-31 | 国网宁夏电力公司银川供电公司 | Insulation turnbuckle plate pulling device |
| CN108879486A (en) * | 2018-07-25 | 2018-11-23 | 珠海市中力电力设备有限公司 | A kind of gage turnbuckle |
-
2017
- 2017-01-21 CN CN201720088493.8U patent/CN206575086U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106786179A (en) * | 2017-01-21 | 2017-05-31 | 国网宁夏电力公司银川供电公司 | Insulation turnbuckle plate pulling device |
| CN108879486A (en) * | 2018-07-25 | 2018-11-23 | 珠海市中力电力设备有限公司 | A kind of gage turnbuckle |
| CN108879486B (en) * | 2018-07-25 | 2019-06-21 | 珠海市中力电力设备有限公司 | a wire tensioner |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103066526B (en) | A kind of ground connection line method and separated earthing instrument for ultra-high-tension power transmission line | |
| CN206471747U (en) | It is a kind of can charged for replacement insulator arrangement | |
| CN103606854A (en) | Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode | |
| CN107104387A (en) | One kind can second lift wire insulation cross-arm and lifting wire method | |
| CN206575086U (en) | Insulate turnbuckle plate pulling device | |
| CN106450835A (en) | Shoe manufacturer high voltage wire landing device | |
| CN106684756A (en) | Power transmission angle iron tower conductor and ground wire lifting tool and application method of the same | |
| CN206250670U (en) | It is a kind of to be easy to operation and safe replacing device for insulator | |
| CN204391613U (en) | A kind of wire support device of auxiliary replacement porcelain pole arm | |
| CN105162028A (en) | Method for replacing linear insulator of 220kV steel pipe tower in live working state | |
| CN103199461B (en) | Transmission line lightning conducter elevating method | |
| CN103746316B (en) | A device and method for live replacement of straight-line corner tower insulator strings | |
| CN201440584U (en) | The device for replacing the insulator and accessories of the tension tower of the transmission line by the ground potential | |
| CN106786164B (en) | Multipurpose insulating bearing | |
| CN101364716A (en) | Clamp type hot-line work fastener and using method | |
| CN114204482B (en) | Universal live working dummy device for power transmission line | |
| CN206575079U (en) | Multipurpose insulating bearing | |
| CN203707670U (en) | Tool for lively processing bolt of by-pass jumper clamp | |
| CN106786179A (en) | Insulation turnbuckle plate pulling device | |
| CN203690799U (en) | Device for replacing suspension angle tower insulator string in live state | |
| CN103606849B (en) | Transmission tower multiple fission conductor live line working lifting device and special mould clamp thereof | |
| CN105896372A (en) | Cable insulation support device for substation maintenance | |
| CN201584691U (en) | Special tool for 220KV double-circuit common-tower line accessing tension-resistance high-pressure high-electric field | |
| CN204205413U (en) | A kind of link rod of Electrified fastening screw | |
| CN210956301U (en) | Insulator string suspension device for salt density test |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171020 Termination date: 20200121 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |