CN102882157A - Portable tool for replacing tension wire shockproof hammer in power cut - Google Patents
Portable tool for replacing tension wire shockproof hammer in power cut Download PDFInfo
- Publication number
- CN102882157A CN102882157A CN2012104212999A CN201210421299A CN102882157A CN 102882157 A CN102882157 A CN 102882157A CN 2012104212999 A CN2012104212999 A CN 2012104212999A CN 201210421299 A CN201210421299 A CN 201210421299A CN 102882157 A CN102882157 A CN 102882157A
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- wire
- shaped connecting
- cross
- universal hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
- Insulators (AREA)
Abstract
本发明公开了一种便携式停电更换耐张导线防震锤工具,解决了现有作业方法风险大、程序繁琐、工作效率低的问题,其特征在于包括主绝缘管、导线侧万向挂钩、横担侧万向挂钩、U形连板、穿心固定螺栓等,在主绝缘管的两端通过穿心固定螺栓连接U形连板,穿心固定螺栓两侧螺帽前加装弹簧垫片;一端的U形连板连接导线侧万向挂钩,另一端的U形连板上设置横担侧保安线连接孔、支撑杆连接板,并通过连接杆、方向调节器连接横担侧万向挂钩。本发明使用安全,重量轻,便于运输、携带、安装,稳定性好,使用灵巧,操作便捷,安全可靠,降低了人员劳动强度和作业风险,提高了工作效率,减少了线路停电时间,节省检修施工作业费用。
The invention discloses a portable anti-vibration hammer tool for replacing strain-resistant wires during power failure, which solves the problems of high risk, cumbersome procedures and low work efficiency in the existing operation method. Side universal hooks, U-shaped connecting plates, through-center fixing bolts, etc., connect the U-shaped connecting plates through the through-center fixing bolts at both ends of the main insulating pipe, and install spring washers in front of the nuts on both sides of the through-center fixing bolts; one end The U-shaped connecting plate at the other end is connected to the universal hook on the wire side, and the U-shaped connecting plate at the other end is provided with a cross-arm side security line connecting hole and a support rod connecting plate, and is connected to the cross-arm side universal hook through a connecting rod and a direction regulator. The invention is safe to use, light in weight, easy to transport, carry and install, good in stability, dexterous in use, convenient in operation, safe and reliable, reduces labor intensity and operation risk of personnel, improves work efficiency, reduces power outage time of lines, and saves maintenance Construction work costs.
Description
技术领域 technical field
本发明涉及一种更换工具,更确切地说涉及一种更换耐张导线防震锤的工具。 The invention relates to a replacement tool, more specifically to a tool for replacing a tension wire anti-vibration hammer.
背景技术 Background technique
架空输电线路导线防震锤由于常年受风、雨、冰等气象条件的影响,易造成防震锤锈蚀变形或锤头断裂,影响其防震性能。特别是老旧输电线路,运行年限比较长,导线防震锤坏损有逐年上升趋势,使得更换、安装导线防震锤检修工作日益频繁。 Due to the influence of weather conditions such as wind, rain, ice, etc., the anti-vibration hammer of overhead transmission line wires is easy to cause corrosion and deformation of the anti-vibration hammer or the breakage of the hammer head, which affects its anti-vibration performance. Especially for old transmission lines, the service life is relatively long, and the damage of wire anti-vibration hammers has an increasing trend year by year, which makes the maintenance work of replacing and installing wire anti-vibration hammers more and more frequent.
在停电更换耐张导线防震锤作业,特别是更换耐张单串导线防震锤时,由于耐张绝缘子是水平安装的,导线防震锤距横担的位置距离比较远,常规更换、安装耐张导线防震锤传统的办法主要有平行梯法、软梯法、绳索法。平行梯法是作业人员通过将平行梯固定在横担与导线上,登至待更换导线防震锤位置进行更换,此方法需要至少三名地面辅助人员负责传递平行梯,两名杆塔上作业人员配合负责安装、拆除平行梯和更换防震锤,整个作业程序非常繁琐、风险大、费时费力,工作效率低。软梯法是在导线上进行挂软梯,作业人员通过登软梯至待更换导线防震锤位置进行更换,此方法弊端是作业劳动强度大,安全系数低,用时较长,并需要四名地面辅助人员。绳索法是利用绳索环绕靠近导线侧第一片绝缘子处,将导线与横担连接,作业人员通过绳索进入待更换防震锤处进行更换防震锤,此方法同样存在作业劳动强度大、用时比较长、安全系数低的弊端。总的看来,以上三种作业方法都存在风险大、程序繁琐、消耗体力大、用时比较长、工作效率低的问题。 During a power outage to replace the anti-vibration hammer for tension conductors, especially when replacing the anti-vibration hammer for single-strand conductors, since the tension insulators are installed horizontally, the distance between the anti-vibration hammer for the conductors and the cross arm is relatively far, so routinely replace and install the anti-vibration conductors The traditional methods of anti-vibration hammer mainly include parallel ladder method, soft ladder method and rope method. The parallel ladder method is that the operator fixes the parallel ladder on the cross arm and the wire, and then climbs to the position of the anti-vibration hammer to replace the wire. This method requires at least three ground assistants to be responsible for passing the parallel ladder, and two operators on the tower to cooperate. Responsible for installing and dismantling the parallel ladder and replacing the anti-vibration hammer. The entire operation procedure is very cumbersome, risky, time-consuming and labor-intensive, and the work efficiency is low. The soft ladder method is to hang a soft ladder on the wire, and the operator climbs the soft ladder to the position of the anti-vibration hammer of the wire to be replaced. The disadvantage of this method is that the operation is labor intensive, the safety factor is low, the time is long, and four ground assistants are required. The rope method is to use the rope to surround the first insulator near the conductor side, connect the conductor to the cross arm, and the operator enters the place to replace the shock hammer through the rope to replace the shock hammer. This method also has the disadvantages of high labor intensity and long time. The disadvantage of low safety factor. In general, the above three operation methods all have the problems of high risk, cumbersome procedures, high energy consumption, long time consumption and low work efficiency.
发明内容 Contents of the invention
本发明的目的在于克服现有技术的不足提供一种便携式停电更换耐张导线防震锤工具,携带方便,操作简便,稳定性较好,降低现场作业风险,省时省力,尽可能减少作业人员节省劳动力,提高工作效率。 The purpose of the present invention is to overcome the deficiencies of the prior art and provide a portable anti-vibration hammer tool for replacing tension wires during power outages. Labor force, improve work efficiency.
本发明的特征在于:包括主绝缘管、导线侧万向挂钩、横担侧万向挂钩、U形连板、穿心固定螺栓,所述的主绝缘管上设置4-6个次绝缘管,在主绝缘管的两端通过穿心固定螺栓连接U形连板,所述的穿心固定螺栓两侧螺帽前加装弹簧垫片;一端的U形连板通过螺帽、弹簧垫片连接导线侧万向挂钩,导线侧万向挂钩下端设置导线侧保安线连接板;另一端的U形连板上设置横担侧保安线连接孔、支撑杆连接板,支撑杆连接板连接支撑杆,支撑杆连接固定夹板,该U形连板通过连接杆、方向调节器连接横担侧万向挂钩;所述的导线侧保安线连接板、横担侧保安线连接孔之间连接穿过主绝缘管的保安线。 The present invention is characterized in that it includes a main insulating tube, a universal hook on the wire side, a universal hook on the cross-arm side, a U-shaped connecting plate, and a center-through fixing bolt. The main insulating tube is provided with 4-6 secondary insulating tubes. The two ends of the main insulating pipe are connected to the U-shaped connecting plate by the through-center fixing bolt, and spring washers are installed in front of the nuts on both sides of the through-center fixing bolt; the U-shaped connecting plate at one end is connected by a nut and a spring washer The universal hook on the wire side, the lower end of the universal hook on the wire side is provided with the wire side safety wire connecting plate; The support bar is connected to the fixed splint, and the U-shaped connecting plate is connected to the universal hook on the cross-arm side through the connecting rod and the direction adjuster; Tube security line.
所述的支撑杆连接板为两个。 There are two support rod connecting plates .
本发明采用的技术原理:利用杠杆原理及三角形的稳定性,作业人员将蜈蚣梯横担侧万向挂钩挂好后,通过单脚下压蜈蚣梯的一侧可轻松地将导线侧挂钩挂在导线上,同时工作人员将可以调节的固定架(由支撑杆、固定夹板组成)牢固地将蜈蚣梯固定在横担主材上,这样工作人员就可以安全平稳地通过蜈蚣梯进入待更换导线防震锤的作业点,轻松地进行更换或安装耐张导线防震锤,特别是更换单串耐张导线防震锤工作尤其体现其优越性。 The technical principle adopted in the present invention: using the principle of leverage and the stability of the triangle, after the operator hangs the universal hook on the side arm of the centipede ladder, he can easily hang the wire side hook on the wire by pressing down on one side of the centipede ladder with one foot At the same time, the staff will fix the centipede ladder firmly on the main material of the cross arm with the adjustable fixing frame (composed of support rods and fixed splints), so that the staff can safely and smoothly enter the anti-vibration hammer of the wire to be replaced through the centipede ladder It is easy to replace or install the anti-vibration hammer for tension wires, especially for the replacement of single-string anti-vibration wire for anti-vibration hammers.
本发明采用主绝缘管、次绝缘管制作蜈蚣梯:绝缘管自身强度高、轻便,经过改造成攀爬工具蜈蚣梯后便于携带、运输方便,降低劳动强度,同时在管壁内可以方便地安装个人保安线,使作业人员不需要再安装个人保安线,减少作业流程,操作简便,降低了作业风险。 The invention adopts the main insulation pipe and the secondary insulation pipe to make the centipede ladder: the insulation pipe itself is high in strength and light, and after being transformed into a climbing tool centipede ladder, it is easy to carry and transport, reduces labor intensity, and can be conveniently installed in the pipe wall The personal security line eliminates the need for operators to install personal security lines, reduces the operating process, is easy to operate, and reduces operating risks.
本发明采用导线侧、横担侧万向挂钩:根据导线侧、横担侧万向挂钩的万向特性,在安装导线侧和横担侧万向挂钩时,作业人员可以根据导线所处的位置、角度及横担主材朝向的不同自如选择,轻松将万向挂钩与导线、横担有效连接,操作起来也比较方便。 The present invention adopts the universal hooks on the wire side and the cross-arm side: according to the universal characteristics of the wire-side and cross-arm side universal hooks, when installing the wire-side and cross-arm side universal hooks, the operator can , different angles and orientations of the main material of the cross-arm can be freely selected, and the universal hook can be easily and effectively connected with the wire and the cross-arm, and the operation is more convenient.
本发明采用弹簧垫片和穿心固定螺栓固定导线侧、横担侧万向挂钩:弹簧垫片自身特性决定了它在使用过程中可以产生弹性张力。穿心固定螺栓固定导线侧、横担侧万向挂钩在绝缘管上时,在螺栓两侧安装螺帽前加装弹簧垫片,弹簧垫片产生的弹性张力可以使导线侧、横担侧万向挂钩固定在绝缘管上后不任意方向摆动,同时也便于作业人员调节导线侧、横担侧万向挂钩的方向,操作简单、灵活、方便。 The present invention adopts the spring washer and the fixing bolt through the center to fix the universal hook on the wire side and the cross arm side: the characteristic of the spring washer itself determines that it can generate elastic tension during use. When the center-through fixing bolt fixes the universal hook on the wire side and the cross-arm side on the insulating tube, install a spring washer before installing the nut on both sides of the bolt. The elastic tension generated by the spring washer can make the wire side and the cross-arm side universal hook After the hook is fixed on the insulating tube, it will not swing in any direction. At the same time, it is convenient for the operator to adjust the direction of the universal hook on the wire side and the cross arm side. The operation is simple, flexible and convenient.
本发明采用横担侧万向挂钩:针对杆塔横担主材朝向的不同,作业人员可以轻松自如地调节横担侧万向挂钩的方向,将横担侧万向挂钩牢固地挂在任意方向的横担主材上,作业人员作业时比较省力,操作起来也比较简便。 The present invention adopts the universal hook on the side of the cross arm: according to the different orientations of the main material of the cross arm of the pole tower, the operator can easily adjust the direction of the universal hook on the side of the cross arm, and hang the universal hook on the side of the cross arm firmly in any direction. On the main material of the cross arm, the operator saves labor when working, and the operation is relatively simple.
本发明增设可调支撑杆以增强稳定性:为增强绝缘管制成的蜈蚣梯、横担侧万向挂钩固定在横担上的稳定性,增设一根可调支撑杆进行固定,使得杆塔横担主材、挂好的横担侧万向挂钩和可调支撑杆形成三角形结构,有效防止了蜈蚣梯左右摆动。另外,可调支撑杆通过自身调节方向可以固定在不同朝向的杆塔横担主材上,增强蜈蚣梯的稳定性,使得作业人员可以通过蜈蚣梯安全平稳进入工作点进行作业,降低了作业风险。 The present invention adds an adjustable support rod to enhance stability: in order to enhance the stability of the centipede ladder made of insulating tubes and the universal hook on the cross arm side fixed on the cross arm, an adjustable support rod is added for fixing, so that the pole tower cross arm The main material, the universal hook on the side of the cross arm and the adjustable support rod form a triangular structure, which effectively prevents the centipede ladder from swinging left and right. In addition, the adjustable support rod can be fixed on the main material of the cross-arm of the tower in different orientations by adjusting the direction by itself, which enhances the stability of the centipede ladder, so that the operator can safely and smoothly enter the working point through the centipede ladder for operation, reducing the operation risk.
由上述技术方案可知,本发明使用安全,重量轻,便于运输、携带、安装,稳定性好,使用灵巧,操作便捷,安全可靠,在作业过程中降低了作业人员劳动强度和作业风险,提高了工作效率,减少了线路停电时间,节省检修施工作业费用,还可以用于停电更换耐张杆塔自爆绝缘子和引流线。 It can be seen from the above technical scheme that the present invention is safe to use, light in weight, easy to transport, carry, and install, good in stability, dexterous in use, convenient in operation, safe and reliable, reduces the labor intensity and operating risks of operators during the operation process, and improves the The work efficiency reduces the power outage time of the line, saves the cost of maintenance and construction operations, and can also be used to replace the self-explosive insulators and drain wires of the tension tower in a power outage.
附图说明 Description of drawings
图1是本发明的结构示意图。 Fig. 1 is a schematic structural view of the present invention.
图2是本发明U形连板、支撑杆、固定夹板的右视图。 Fig. 2 is a right view of the U-shaped connecting plate, the support rod and the fixing splint of the present invention.
图中,1.保安线,2.导线侧保安线连接板,3.导线侧万向挂钩,4.弹簧垫片,5.U形连板,6.穿心固定螺栓,7.主绝缘管,8.次绝缘管,9.横担侧万向挂钩,10.方向调节器,11.连接杆,12. 固定夹板,13.支撑杆,14.支撑杆连接板,15.横担侧保安线连接孔。 In the figure, 1. Security line, 2. Security line connection plate on the conductor side , 3. Universal hook on the conductor side, 4. Spring washer, 5. U-shaped connecting plate, 6. Through-hole fixing bolt, 7. Main insulating tube , 8. Secondary insulating tube, 9. Universal hook on the cross arm side, 10. Direction regulator, 11. Connecting rod, 12. Fixed splint, 13. Support rod, 14. Support rod connecting plate , 15. Cross arm side security wire connection hole.
具体实施方式 Detailed ways
下面结合附图对本发明作进一步的说明。 The present invention will be further described below in conjunction with the accompanying drawings.
如图1所示,本发明包括主绝缘管7、导线侧万向挂钩3、横担侧万向挂钩9、U形连板5、穿心固定螺栓6等。
As shown in FIG. 1 , the present invention includes a
所述的主绝缘管7上设置5个次绝缘管8,组成蜈蚣梯。在主绝缘管7的两端靠近端部的位置通过穿心固定螺栓6分别连接U形连板5,在穿心固定螺栓6两侧安装螺帽前加装弹簧垫片4。
Five
左端的U形连板5通过螺帽、弹簧垫片4连接导线侧万向挂钩3,导线侧万向挂钩3的下端设置导线侧保安线连接板2。
The U-shaped connecting
结合图2所示,右端的U形连板5上设置横担侧保安线连接孔15、支撑杆连接板14,所述的支撑杆连接板14为两个。支撑杆连接板14通过螺栓、螺母连接支撑杆13,支撑杆13通过可调螺栓连接固定夹板12。另外,该U形连板5还通过连接杆11、方向调节器10连接扁平结构的横担侧万向挂钩9。
As shown in FIG. 2 , the U-shaped connecting
所述的导线侧保安线连接板2、横担侧保安线连接孔15之间连接穿过主绝缘管7的保安线1,保护施工人员。
The safety
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210421299.9A CN102882157B (en) | 2012-10-30 | 2012-10-30 | Portable shockproof hammer tool for replacing tension wire in power cut |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210421299.9A CN102882157B (en) | 2012-10-30 | 2012-10-30 | Portable shockproof hammer tool for replacing tension wire in power cut |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102882157A true CN102882157A (en) | 2013-01-16 |
CN102882157B CN102882157B (en) | 2015-05-13 |
Family
ID=47483385
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210421299.9A Active CN102882157B (en) | 2012-10-30 | 2012-10-30 | Portable shockproof hammer tool for replacing tension wire in power cut |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102882157B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103368102A (en) * | 2013-07-11 | 2013-10-23 | 国家电网公司 | Damper replacing device |
CN103401178A (en) * | 2013-07-11 | 2013-11-20 | 国家电网公司 | Support frame for replacing vibration damper |
CN103401177A (en) * | 2013-07-11 | 2013-11-20 | 国家电网公司 | Method for replacing vibration damper |
CN104505768A (en) * | 2014-12-15 | 2015-04-08 | 国家电网公司 | Composite insulator wire outlet bridge |
CN104538891A (en) * | 2014-12-15 | 2015-04-22 | 国家电网公司 | Line outgoing method of composite insulator |
CN106911112A (en) * | 2017-04-20 | 2017-06-30 | 国网河南省电力公司检修公司 | A kind of fixing device of transmission line antivibration hammer |
CN106992464A (en) * | 2017-04-21 | 2017-07-28 | 国网青海省电力公司西宁供电公司 | A kind of strain insulator drainage overlap joint ladder |
CN107882502A (en) * | 2017-12-21 | 2018-04-06 | 国网河北省电力有限公司衡水供电分公司 | The offline special-purpose ladder fixing device of steel pipe pole cross-arm |
CN109217175A (en) * | 2018-10-25 | 2019-01-15 | 河北晋昌电力工程有限公司 | A kind of stage apparatus |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201883924U (en) * | 2010-11-30 | 2011-06-29 | 山东电力集团公司济宁供电公司 | Door frame type hook ladder |
CN102136691A (en) * | 2010-12-06 | 2011-07-27 | 河南省电力公司南阳供电公司 | Side-lap type wire vibration damper replacing tool |
US20120031354A1 (en) * | 2010-08-04 | 2012-02-09 | Ford Global Technologies, Llc | Fuel injector cooling |
CN202840371U (en) * | 2012-10-30 | 2013-03-27 | 安徽省电力公司淮北供电公司 | Portable anti-vibration hammer tool for replacing tension wires during power failure |
-
2012
- 2012-10-30 CN CN201210421299.9A patent/CN102882157B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120031354A1 (en) * | 2010-08-04 | 2012-02-09 | Ford Global Technologies, Llc | Fuel injector cooling |
CN201883924U (en) * | 2010-11-30 | 2011-06-29 | 山东电力集团公司济宁供电公司 | Door frame type hook ladder |
CN102136691A (en) * | 2010-12-06 | 2011-07-27 | 河南省电力公司南阳供电公司 | Side-lap type wire vibration damper replacing tool |
CN202840371U (en) * | 2012-10-30 | 2013-03-27 | 安徽省电力公司淮北供电公司 | Portable anti-vibration hammer tool for replacing tension wires during power failure |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103401177B (en) * | 2013-07-11 | 2016-04-27 | 国家电网公司 | A kind of stockbridge damper replacing options |
CN103401178A (en) * | 2013-07-11 | 2013-11-20 | 国家电网公司 | Support frame for replacing vibration damper |
CN103401177A (en) * | 2013-07-11 | 2013-11-20 | 国家电网公司 | Method for replacing vibration damper |
CN103368102A (en) * | 2013-07-11 | 2013-10-23 | 国家电网公司 | Damper replacing device |
CN103368102B (en) * | 2013-07-11 | 2016-08-10 | 国家电网公司 | A kind of replacing damper device |
CN104505768A (en) * | 2014-12-15 | 2015-04-08 | 国家电网公司 | Composite insulator wire outlet bridge |
CN104538891A (en) * | 2014-12-15 | 2015-04-22 | 国家电网公司 | Line outgoing method of composite insulator |
CN106911112A (en) * | 2017-04-20 | 2017-06-30 | 国网河南省电力公司检修公司 | A kind of fixing device of transmission line antivibration hammer |
CN106992464A (en) * | 2017-04-21 | 2017-07-28 | 国网青海省电力公司西宁供电公司 | A kind of strain insulator drainage overlap joint ladder |
CN106992464B (en) * | 2017-04-21 | 2019-01-25 | 国网青海省电力公司西宁供电公司 | A tension-resistant drainage lap ladder |
CN107882502A (en) * | 2017-12-21 | 2018-04-06 | 国网河北省电力有限公司衡水供电分公司 | The offline special-purpose ladder fixing device of steel pipe pole cross-arm |
CN107882502B (en) * | 2017-12-21 | 2024-01-30 | 国网河北省电力有限公司衡水供电分公司 | Special ladder fixing device for steel pipe pole cross arm offline |
CN109217175A (en) * | 2018-10-25 | 2019-01-15 | 河北晋昌电力工程有限公司 | A kind of stage apparatus |
Also Published As
Publication number | Publication date |
---|---|
CN102882157B (en) | 2015-05-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102882157B (en) | Portable shockproof hammer tool for replacing tension wire in power cut | |
CN105226568B (en) | Power transmission line composite insulator overhauling support and operating method thereof | |
CN105914646B (en) | Charged for replacement 35kV strain insulator string operational methods | |
CN204144479U (en) | A kind of earth connection | |
CN204481391U (en) | A kind of replacing double bundle conductor conductor spacer specific purpose tool | |
CN203352052U (en) | Live-line fastening tool for bolt of strain clamp of power transmission line | |
CN105071296A (en) | Structurally-improved high-voltage distribution line rod pole-mounted line hoisting device | |
CN202840371U (en) | Portable anti-vibration hammer tool for replacing tension wires during power failure | |
CN201717384U (en) | High and low pressure ground wire hook capable of adjusting direction | |
CN206250670U (en) | It is a kind of to be easy to operation and safe replacing device for insulator | |
CN102661057A (en) | Power angle tower pull leg main material changing method and special main material clamp | |
CN103500961B (en) | Tool special for electrified replacement of strain insulator string | |
CN204382187U (en) | A kind of contact net inclined cantilever insulator replacement tool | |
CN207098548U (en) | A kind of adjustable stockbridge damper of anti-positioning | |
CN104269669B (en) | A kind of earth lead | |
CN105977860B (en) | A kind of replacement overhead transmission line composite cross-arm insulator device and method | |
CN203109899U (en) | Insulating tool for installing bird repellent device without power failure | |
CN207004155U (en) | A kind of adjustable tower erection instrument | |
CN201741514U (en) | Lightning rod installing support | |
CN204144800U (en) | The special cross-arm card of a kind of ZML type tower | |
CN211829998U (en) | Tower crane main cable fixing device | |
CN204424843U (en) | One prevents stockbridge damper positioning device | |
CN105790158B (en) | Charged for replacement 35kV strain insulator string specific purpose tools | |
CN203504068U (en) | bird repellent installation tool | |
CN110499951B (en) | Iron tower cross arm rope ladder hanging point extension device and application |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: HUAIBEI POWER SUPPLY COMPANY, STATE GRID ANHUI ELE Effective date: 20131204 Owner name: STATE ELECTRIC NET CROP. Free format text: FORMER OWNER: HUAIBEI POWER SUPPLY COMPANY OF ANHUI ELECTRIC POWER COMPANY Effective date: 20131204 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 235000 HUAIBEI, ANHUI PROVINCE TO: 100031 XICHENG, BEIJING |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20131204 Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant after: State Grid Corporation of China Applicant after: HUAIBEI POWER SUPPLY COMPANY, STATE GRID ANHUI ELECTRIC POWER CO., LTD. Address before: 235000 No. 110 Huaihai Middle Road, phase mountain, Huaibei, Anhui Applicant before: Huaibei Power Supply Company of Anhui Electric Power Company |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |