CN211549044U - Stay bar - Google Patents

Stay bar Download PDF

Info

Publication number
CN211549044U
CN211549044U CN201922326185.6U CN201922326185U CN211549044U CN 211549044 U CN211549044 U CN 211549044U CN 201922326185 U CN201922326185 U CN 201922326185U CN 211549044 U CN211549044 U CN 211549044U
Authority
CN
China
Prior art keywords
hole
connecting rod
rod
threaded
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922326185.6U
Other languages
Chinese (zh)
Inventor
苏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Mingkang Generator Co ltd
Original Assignee
Hainan Mingkang Generator Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Mingkang Generator Co ltd filed Critical Hainan Mingkang Generator Co ltd
Priority to CN201922326185.6U priority Critical patent/CN211549044U/en
Application granted granted Critical
Publication of CN211549044U publication Critical patent/CN211549044U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to an anchor rod, including first connecting rod, second connecting rod and connecting piece, the connecting piece is square basket, the connecting piece includes first lateral wall and second lateral wall, be equipped with first through-hole on the first lateral wall, second through-hole and fourth through-hole, be equipped with third through-hole and fifth through-hole on the second lateral wall, the second through-hole is located same axis with the third through-hole, fourth through-hole and fifth through-hole are located same axis, the one end of first connecting rod pass behind the first through-hole with the connecting piece spiro union, the one end of second connecting rod passes the second through-hole in proper order, behind the fourth through-hole with the connecting piece spiro union.

Description

Stay bar
Technical Field
The utility model relates to an electric power tech field, concretely relates to anchor bar.
Background
At present, China needs a plurality of rods and towers for supporting in electric power and communication systems, the stability of the rods and the towers is maintained by stay wires, and the stay wires are rod pieces or other metal parts for connecting the stay wires to ground anchors. A wire rod refers to a rod or other metal component that connects the wire to the earth anchor. Many transmission line poles and towers are in paddy fields or wetlands, and the pollution of water quality and soil quality is serious day by day, so that the part of the stay bar buried underground is seriously corroded, the effective service life cannot be reached, the stability of the stay bar is reduced, and the safe operation of the line is seriously affected.
In the existing anchor rod, some anchor rods are formed by two connecting rods through connecting pieces in a threaded mode, when the anchor rod needs to be replaced, only the connecting rod buried underground needs to be replaced, the connecting rod on the ground is reserved, and therefore cost is saved. However, in the process of replacing the connecting rod, the connecting rod of the anchor rod needs to be replaced by multiple persons in a cooperative manner, one operator needs to hold the connecting rod which does not need to be replaced by hands so as to prevent the connecting rod from swinging around the power rod, the other operator replaces the connecting rod, and the process of replacing the connecting rod is time-consuming and labor-consuming.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an anchor rod, it is convenient to change the connecting rod, need not operating personnel and holds the connecting rod that does not need to change and can accomplish the change, moreover, the change process is simple and convenient.
In order to accomplish the above-mentioned purpose, the utility model provides an anchor rod, including first connecting rod, second connecting rod and connecting piece, the connecting piece is square basket, the connecting piece includes first lateral wall and second lateral wall, be equipped with first through-hole on the first lateral wall, second through-hole and fourth through-hole, be equipped with third through-hole and fifth through-hole on the second lateral wall, second through-hole and third through-hole are located same axis, fourth through-hole and fifth through-hole are located same axis, the one end of first connecting rod pass behind the first through-hole with the connecting piece spiro union, the one end of second connecting rod passes the second through-hole in proper order, behind the fourth through-hole with the connecting piece spiro union.
Preferably, a reinforcing block is arranged on the second side wall and located between the third through hole and the fifth through hole.
Preferably, one end of the first connecting rod is provided with a first threaded rod, the other end of the first connecting rod is welded with a first hanging ring, and the first threaded rod penetrates through the first through hole and then is in threaded connection with the first threaded connector.
Preferably, one end of the second connecting rod is provided with a second threaded rod, the other end of the second connecting rod is welded with a second hanging ring, and the second threaded rod penetrates through the second through hole and the fourth through hole and then is in threaded connection with the second threaded connector.
The utility model has the advantages that: the utility model discloses set up a plurality of through-holes on the connecting piece, when the installation second connecting rod, pass second through-hole and third through-hole with the one end of second connecting rod after, it is fixed to use screwed joint, prevents that the second connecting rod from breaking away from the connecting piece. When the second connecting rod needs to be replaced, the new second connecting rod is firstly sleeved on the ground anchor pull ring, then one end of the new second connecting rod penetrates through the fourth through hole and the fifth through hole respectively, the threaded connector is used for fixing, after the fixing is finished, the damaged second connecting rod is detached from the connecting piece and the ground anchor pull ring, and finally the newly replaced second connecting rod is fastened to prevent the new second connecting rod from falling off from the connecting piece. The utility model discloses change simply convenient operation.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
Fig. 1 is a perspective view of the overall structure of the anchor rod of the present invention.
Fig. 2 is a schematic perspective view of a first link of the anchor rod according to the present invention.
Fig. 3 is a schematic perspective view of a second link of the anchor rod according to the present invention.
Fig. 4 is a schematic perspective view of a connecting member of an anchor bar according to the present invention.
Description of the reference numerals
10. A pull wire;
100. a first link; 110. a first threaded rod; 120. a first suspension loop;
130. a first threaded joint;
200. a second link; 210. a second threaded rod; 220. a second suspension loop;
230. a second threaded joint;
300. a connecting member; 310. a first side wall; 311. a first through hole; 312. a second through hole;
313. a third through hole;
320. a second side wall; 321. a reinforcing block; 322. a fourth via hole; 323. a fifth through hole;
400. and a ground anchor pull ring.
Detailed Description
The technical solution in the embodiment of the present invention is clearly and completely described below with reference to the drawings in the embodiment of the present invention. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, but the present invention may be implemented in other ways different from the specific details set forth herein, and one skilled in the art may similarly generalize the present invention without departing from the spirit of the present invention, and therefore the present invention is not limited to the specific embodiments disclosed below.
As shown in fig. 1, the present embodiment provides an anchor including a first link 100, a second link 200, and a connector 300, wherein one end of the first link 100 is connected to the connector 300, and the other end is connected to an anchor 10; one end of the second link 200 is threadedly coupled to the coupling member 300, and the other end is coupled to the earth anchor pull ring 400, the earth anchor pull ring 400 is buried underground, and a part of the second link 200 is buried underground.
Specifically, in the present embodiment, as shown in fig. 4, the connection member 300 is a square basket, the connection member 300 includes a first side wall 310 and a second side wall 320, the first side wall 310 is provided with a first through hole 311, a second through hole 312 and a fourth through hole 313, and the second side wall 320 is provided with a third through hole 322 and a fifth through hole 322. The second through hole 312 and the third through hole 322 are located on the same axis, and the fourth through hole 313 and the fifth through hole 323 are located on the same axis. In addition, in order to prevent the second sidewall 320 from being deformed by a long-term tensile force, a reinforcing block 321 is provided on the second sidewall 320, and the reinforcing block 321 is located between the third through hole 322 and the fifth through hole 323.
In this embodiment, as shown in fig. 2, a first threaded rod 110 is provided at one end of the first link 100, specifically, the threaded rod 110 is formed by cutting a distance at one end of the first link 100, a first hanging ring 120 is welded at the other end of the first link 100, the first hanging ring 120 is connected to the stay wire 10, and the stay wire 10 is connected to the power tower or the power pole. When the first threaded rod 100 passes through the first through hole 311, it is screwed with the first screw joint 130.
In this embodiment, as shown in fig. 3, one end of the second connecting rod 200 is provided with a second threaded rod 210, the other end of the second connecting rod 200 is welded with a second hanging ring 220, and the second threaded rod 210 is screwed with the second threaded joint 230 after passing through the fourth through hole 323 and the second through hole 313.
The anchor rod assembled by the embodiment is convenient to mount, simple in structure and convenient to replace the broken second connecting rod. The specific installation method comprises the following steps:
firstly, connecting one end of the first link 100 with the first hanging ring 120 with the pull wire 10, then, penetrating one end of the first link 100 with the first threaded rod 110 through the first through hole 311 of the connecting piece 300, and screwing with the first threaded joint 130 to complete the installation of the first link 100 and the connecting piece 300; then, the second link 200 is mounted to the connecting member 300 by: one end of the second connecting rod 200 with the second hanging ring 220 is sleeved on the ground anchor pull ring 400, and then one end of the second connecting rod 200 with the second threaded rod 210 is threaded with the second threaded joint 230 after respectively passing through the fourth through hole 322 and the second through hole 312, so as to complete the installation of the second connecting rod 200.
When the second connecting rod is damaged and needs to be replaced, the specific replacing method comprises the following steps: firstly, the end of the new second connecting rod 200 with the second hanging ring 220 is hung on the ground anchor pull ring 400, then, the end of the second connecting rod 200 with the second threaded rod 210 respectively passes through the fifth through hole 323 and the third through hole 313 of the connecting piece 300, then the new second connecting rod 200 is fixed on the connecting piece 300 by using the second threaded joint 330, after the fixing is finished, the damaged second connecting rod 200 is detached, and finally, if the new second connecting rod 200 has the problem of looseness, the new second connecting rod 200 can be fastened by using the second threaded joint 330, and the replacement is completed.
It is obvious that the described embodiments are only some of the embodiments of the present invention, and not all of them. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.

Claims (4)

1. The anchor rod is characterized by comprising a first connecting rod, a second connecting rod and a connecting piece, wherein the connecting piece is a square basket body and comprises a first side wall and a second side wall, a first through hole, a second through hole and a fourth through hole are formed in the first side wall, a third through hole and a fifth through hole are formed in the second side wall, the second through hole and the third through hole are located on the same axis, the fourth through hole and the fifth through hole are located on the same axis, one end of the first connecting rod penetrates through the first through hole and then is in threaded connection with the connecting piece, and one end of the second connecting rod penetrates through the second through hole and the fourth through hole in sequence and then is in threaded connection with the connecting piece.
2. An anchor as claimed in claim 1, in which a reinforcement block is provided on the second side wall, the reinforcement block being located between the third and fifth through holes.
3. The anchor according to claim 1, wherein one end of the first link is provided with a first threaded rod, the other end of the first link is welded with a first suspension ring, and the first threaded rod is threaded with a first threaded joint after passing through the first through hole.
4. The anchor according to claim 1, wherein one end of the second link is provided with a second threaded rod, the other end of the second link is welded with a second suspension ring, and the second threaded rod is threaded with a second threaded joint after passing through the second through hole and the fourth through hole.
CN201922326185.6U 2019-12-20 2019-12-20 Stay bar Expired - Fee Related CN211549044U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922326185.6U CN211549044U (en) 2019-12-20 2019-12-20 Stay bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922326185.6U CN211549044U (en) 2019-12-20 2019-12-20 Stay bar

Publications (1)

Publication Number Publication Date
CN211549044U true CN211549044U (en) 2020-09-22

Family

ID=72507989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922326185.6U Expired - Fee Related CN211549044U (en) 2019-12-20 2019-12-20 Stay bar

Country Status (1)

Country Link
CN (1) CN211549044U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622736A (en) * 2021-08-30 2021-11-09 国网山东省电力公司邹城市供电公司 Electric pole stay wire fixing device and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622736A (en) * 2021-08-30 2021-11-09 国网山东省电力公司邹城市供电公司 Electric pole stay wire fixing device and method

Similar Documents

Publication Publication Date Title
CN102882157B (en) Portable shockproof hammer tool for replacing tension wire in power cut
CN207847228U (en) A kind of overturning-preventing concrete wire pole
CN203799586U (en) Signboard mounting support for power transmission line steel tube tower
CN211549044U (en) Stay bar
CN107780825B (en) Insulating ladder for live working
CN202840371U (en) Portable tool for replacing tension wire shockproof hammers in outage
CN202127196U (en) Inserted pin type yoke plate clamp for replacing linear rod double-linkage double-hanging-point insulator chain
CN110707599A (en) Special tool for electrified adjustment of 220kv vertically-arranged double-bundle conductor sag
CN103967314B (en) A kind of 10kv-110kv emergency first-aid repair bar
CN210263402U (en) Arc single-layer latticed shell structure for large-scale steel structure building
CN204609430U (en) Emergent repairing tower tractive hangs connection box
CN208900024U (en) A kind of firm formula climbing ladder apparatus for transmission line of electricity
CN210535805U (en) Antenna fixing device for communication tower
CN207420183U (en) Electric power flood-protection electric pole device
CN217326697U (en) Reinforced concrete straight rod
CN209607305U (en) One kind exempting from perforating type angle steel shaft tower warning sign fixture
CN205531616U (en) Equipment that non - single tube communication tower owner material was changed
CN220527398U (en) Epoxy glass fiber lightning-protection needle tube
CN204903061U (en) Outer wall scaffold is wall spare internal force monitoring devices even
CN203761008U (en) Installation base of lightning arrester
CN212225707U (en) Be used for adnexed girder steel subassembly of large-span steel structural framework tower building hoist
CN213782732U (en) Insulator wire device is changed to 10kV circuit ejector pin limit wire
CN204754185U (en) Fastener is connected to steel pipe
CN204099725U (en) A kind of power pipe optical ca ble protection pipe special fixing device
CN211775685U (en) Connecting piece fixing device is used in civil engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200922

Termination date: 20211220