CN205531616U - Equipment that non - single tube communication tower owner material was changed - Google Patents

Equipment that non - single tube communication tower owner material was changed Download PDF

Info

Publication number
CN205531616U
CN205531616U CN201620039963.7U CN201620039963U CN205531616U CN 205531616 U CN205531616 U CN 205531616U CN 201620039963 U CN201620039963 U CN 201620039963U CN 205531616 U CN205531616 U CN 205531616U
Authority
CN
China
Prior art keywords
equipment
tower
ring
main material
support bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620039963.7U
Other languages
Chinese (zh)
Inventor
俞毕业
徐光�
杜文甫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Branch China Tower Co ltd
Zhejiang Ningyuan County Tower Mast Make Co ltd
Original Assignee
Zhejiang Branch China Tower Co ltd
Zhejiang Ningyuan County Tower Mast Make Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Branch China Tower Co ltd, Zhejiang Ningyuan County Tower Mast Make Co ltd filed Critical Zhejiang Branch China Tower Co ltd
Priority to CN201620039963.7U priority Critical patent/CN205531616U/en
Application granted granted Critical
Publication of CN205531616U publication Critical patent/CN205531616U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model relates to an equipment that non - single tube communication tower owner material was changed relates to post and telecommunications communication system, broadcasting and TV system and FM broadcasting tower, embrace ring, U type staple bolt including equipment principal, lug, two -way regulation armful ring, bracing piece, fixed armful of ring, regulation. This equipment can be used for non - single tube communication tower's such as tee pipe tower, four tubs of towers, triangle angle -steel tower, four corners angle -steel tower, the angle -steel tower that acts as go -between main material to change, strong, the wide range of utensil practicality, and the advantage is: can practice thrift a large amount of costs, nothings needs the former iron tower of whole dismouting, and nothings needs lifting device and logical water and electricity, need it only 1 to trade the tower time 2 my god, is required cost 3 of newly -built basic station 5%, next is that simple structure, volume are light and handy, the transport is convenient, the installation is succinct, used repeatedly many times, safe and reliable.

Description

A kind of equipment of non-single tube communication iron tower main material replacing
Technical field
Type of the present invention relates to post and telecommunications system, Broadcast and TV system, the Mobile Communication Tower of petrochemical system and frequency modulation broadcasting tower, is particularly well-suited to the non-single tube communication iron tower main material replacings such as three Guan Ta, four pipe towers, triangle angle steel tower, corner angle steel tower, bracing wire angle steel tower.
Background technology
Started from 2014, formal establishment along with steel tower company of China, the base station that three big operators built up in the past transfers steel tower company in a large number to, before being much several years or more than ten years in the middle of the base station transferring steel tower company to, the base station of these early stages is due to the impact of natural environment,, there is certain potential safety hazard in a lot of main material corrosions.In this case the measure taked is intended to whole tower to change, and again builds tower, causes resource to waste in a large number, and affects the properly functioning of communication network.
Summary of the invention
Type of the present invention solves the problems referred to above and is to provide the equipment of non-single tube communication iron tower main material replacing, including equipment body, hanger, two-ways regulation embraces ring, support bar, fixed armful of ring, ring is embraced in regulation, U-shaped anchor ear, it is characterized in that equipment body is formed by Flange joint by the multi-segmental body of rod, hanger is welded in side, equipment body top, support bar is single pipe, two-ways regulation is embraced and is encircled on equipment body and support bar, regulation is embraced boxing and is connected to equipment body other end side, fixed armful of boxing is connected to support bar one end side, fixed armful of ring is connected with equipment body by support bar by U-shaped anchor ear, constitute the equipment of a kind of non-single tube communication iron tower main material replacing.
The equipment of described non-single tube communication iron tower main material replacing, it is characterised in that: described equipment body two ends all have embraces ring, and one end is fixed armful of ring structure, and the other end is that two-ways regulation embraces ring structure.
The equipment of described non-single tube communication iron tower main material replacing, it is characterised in that: the single two ends of described support bar all have embraces ring, and one end is fixed armful of ring structure, and the other end embraces ring structure for regulation.
The equipment of described non-single tube communication iron tower main material replacing, it is characterised in that: described support bar is two one group, has two groups of support bars, and often group support bar is encircled in equipment body two ends by its fixed armful respectively.
nullDescribed replacing options is first to be formed equipment body by the multi-segmental body of rod by Flange joint,Embracing the two-ways regulation of equipment body one end to encircle needs in the upper adjacent main material section of more change owner material section in former steel tower,Embracing to encircle by the regulation of the equipment body other end again needs in the lower adjacent main material section of more change owner material section in former steel tower,Then being embraced single supporting bar one end by two-ways regulation to encircle is needed in the horizontal adjacent main material section of more change owner material in former steel tower,Again its support bar other end is encircled the one end in equipment body by fixing embracing,Use identical installation method to be individually fixed in by remaining support bar and need in the adjacent main material section of more change owner material section and the other end of equipment body,But same one end that wherein two support bars are fixed on equipment body is one group,The other end that another two support bars are fixed on equipment body is one group,After equipment is all installed and is fixed,Finally needs more change owner material section is taken off,Replace with new main material again,Fix after connecting,Successively dress support bar and equipment body take off,The most one by one by the main material replacing of former steel tower.
The advantage of type of the present invention:
Use the method that this equipment exchanges main material for, great amount of cost can be saved, it is not necessary to the former steel tower of integral disassembly, assembly, it is not necessary to hanging device and water flowing electricity, required cost is the 3-5% of newly-built base station.
The method using this equipment to exchange main material for, utilizes mode to embrace ring structure, can be arbitrarily by the main material replacing of steel tower any section, flexibly, conveniently, reliably.
Using the method that this equipment exchanges main material for, if change whole tower, within general 1-2 days, just can complete, after dismounting, a newly-built base station duration is typically at 20-30 days, is greatly shortened the duration, reducings the construction costs.
Use the equipment exchanging main material for, use high strength steel to make, and equipment body top-side welding hanger, its simple in construction, volume are light and handy, and convenient in carrying can repeatedly use, safe and reliable.
Use the equipment of main material of exchanging for, the non-single tube communication iron tower more change owner materials such as three Guan Ta, four pipe towers, triangle angle steel tower, corner angle steel tower, bracing wire angle steel tower can be used for, have practical, scope is wide.
Accompanying drawing explanation
Fig. 1 is type device structure front view of the present invention
Fig. 2 is type device structure top view of the present invention
Fig. 3 is type equipment replacement iron tower main material schematic diagram front view of the present invention
Fig. 4 is type equipment replacement iron tower main material schematic diagram top view of the present invention
The explanation of label in accompanying drawing:
1-equipment body 2-hanger 3-two-ways regulation embraces ring 4-support bar
Ring 7-U type anchor ear 8-steel tower is embraced in fixed armful of ring 6-regulation of 5-
Adjacent main material section under 9-upper adjacent main material section 10-horizontal adjacent main material section 11-more change owner material section 12-
13-equipment
Detailed description of the invention
Detailed description of the invention combines accompanying drawing and is described further the structure of type of the present invention:
As shown in Fig. 1~2, of the present utility model a kind of change the equipment that the main material of communication iron tower is fixing, including equipment body 1, hanger 2, 3 two-ways regulations embrace ring, support bar 4, fixed armful of ring 5, ring 6 is embraced in regulation, U-shaped anchor ear 7, it is characterized in: equipment body 1 is formed by Flange joint by the multi-segmental body of rod, hanger 2 is welded in side, equipment body 1 top, support bar 4 is single pipe, two-ways regulation embraces 3 armfuls of ring on equipment body 1 and support bar 4, regulation is embraced ring 6 and is welded in equipment body 1 other end side, fixed armful of ring 5 is welded in support bar one end side, fixed armful of ring 5 is connected with equipment body 1 by support bar 4 by U-shaped anchor ear 7, constitute the equipment 13 of non-single tube communication iron tower main material replacing.
nullAs shown in figs. 34,The method of non-single tube communication iron tower main material replacing is first to be formed equipment body 1 by the multi-segmental body of rod by Flange joint,The two-ways regulation of equipment body 1 one end is embraced 3 armfuls of ring need in the upper adjacent main material section 9 of more change owner material section 11 in former steel tower 8,Again the regulation of equipment body 1 other end is embraced 6 armfuls of ring to need in the lower adjacent main material section 12 of more change owner material section 11 in former steel tower 8,Then by two-ways regulation, single supporting bar 4 one end is embraced 3 armfuls of ring to need in more change owner material 11 horizontal adjacent main material section 10 in former steel tower 8,Again its support bar 4 other end is embraced 5 armfuls of ring in one end of equipment body 1 by fixing,Use identical installation method to be individually fixed in by remaining support bar 4 and need in the adjacent main material section of more change owner material section 11 and the other end of equipment body 1,But same one end that wherein two support bars 4 are fixed on equipment body 1 is one group,The other end that another two support bars are fixed on equipment body 1 is one group,After equipment 13 is all installed and is fixed,Finally needs more change owner material section 11 is taken off,Replace with new main material again,Fix after connecting,Successively dress support bar 4 and equipment body 1 take off,The most one by one by the main material replacing of former steel tower 8.

Claims (4)

1. the equipment of a non-single tube communication iron tower main material replacing, including equipment body, hanger, two-ways regulation embraces ring, support bar, fixed armful of ring, ring is embraced in regulation, U-shaped anchor ear, it is characterized in that equipment body is formed by Flange joint by the multi-segmental body of rod, hanger is welded in side, equipment body top, support bar is single pipe, two-ways regulation is embraced and is encircled on equipment body and support bar, regulation is embraced boxing and is connected to equipment body other end side, fixed armful of boxing is connected to support bar one end side, fixed armful of ring is connected with equipment body by support bar by U-shaped anchor ear, constitute the equipment of a kind of non-single tube communication iron tower main material replacing.
The equipment of the most non-single tube communication iron tower main material replacing, it is characterised in that: described equipment body two ends all have embraces ring, and one end is fixed armful of ring structure, and the other end is that two-ways regulation embraces ring structure.
The equipment of the most non-single tube communication iron tower main material replacing, it is characterised in that: the single two ends of described support bar all have embraces ring, and one end is fixed armful of ring structure, and the other end embraces ring structure for regulation.
The equipment of the most non-single tube communication iron tower main material replacing, it is characterised in that: described support bar is two one group, has two groups of support bars, and often group support bar is encircled in equipment body two ends by its fixed armful respectively.
CN201620039963.7U 2016-01-12 2016-01-12 Equipment that non - single tube communication tower owner material was changed Expired - Fee Related CN205531616U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620039963.7U CN205531616U (en) 2016-01-12 2016-01-12 Equipment that non - single tube communication tower owner material was changed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620039963.7U CN205531616U (en) 2016-01-12 2016-01-12 Equipment that non - single tube communication tower owner material was changed

Publications (1)

Publication Number Publication Date
CN205531616U true CN205531616U (en) 2016-08-31

Family

ID=56764983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620039963.7U Expired - Fee Related CN205531616U (en) 2016-01-12 2016-01-12 Equipment that non - single tube communication tower owner material was changed

Country Status (1)

Country Link
CN (1) CN205531616U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958380A (en) * 2016-01-12 2017-07-18 浙江宁远塔桅制造有限公司 A kind of device and method of non-single tube communication iron tower main material replacing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958380A (en) * 2016-01-12 2017-07-18 浙江宁远塔桅制造有限公司 A kind of device and method of non-single tube communication iron tower main material replacing

Similar Documents

Publication Publication Date Title
CN102336378A (en) On-pole lifting device
CN204898706U (en) Steel pipe pile foundation communication tower structure
CN205531616U (en) Equipment that non - single tube communication tower owner material was changed
CN102946065B (en) Employing electric substation pipe bus bar column insulator more changing device realizes the method for post insulator replacing
CN213980159U (en) Single tube communication tower reinforcing apparatus
CN103967314B (en) A kind of 10kv-110kv emergency first-aid repair bar
CN206245842U (en) It is a kind of with high intensity and the strong communication tower of non-deformability
CN203487548U (en) Connecting structure of transformer substation steel bracket and concrete foundation joint
CN106013832A (en) Reinforcement and reconstruction method of communication pipe tower
CN205089028U (en) Weight type four -column communication base station tower
CN204571321U (en) A kind of integrated form steel bar meter booth structure
CN108739574A (en) Just structure supports cultivation apparatus copper alloy net method for providing and its cultivation apparatus in far-reaching sea
CN211549044U (en) Stay bar
CN205454959U (en) Green house convenient to installation
CN106958380A (en) A kind of device and method of non-single tube communication iron tower main material replacing
CN202007522U (en) Safety construction device for pole tower
CN205452794U (en) Reinforcing apparatus of lightning rod
CN204947527U (en) A kind of iron tower of power transmission line cable bearer
CN210129725U (en) Quick positioning and fixing device for cable support of comprehensive pipe rack
CN104895391A (en) External inserted cross arm connecting device for steel pipe rods
CN202906286U (en) Exchanging apparatus of post insulator of tubular bus of transformer station
CN204046001U (en) A kind of Portable supporting guard bar installed for the maintenance of 35kV pole-mounted circuit breaker
CN204571436U (en) There is the quick mounting type multitube communication launching tower of dilatation function
CN104078869B (en) Portable supporting and protecting rod used for maintaining and mounting 35KV pole-mounted circuit breaker
CN203285092U (en) Integrated base station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Patent director of Zhejiang branch of China Tower Co.,Ltd.

Document name: payment instructions

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Patent of China iron tower Co.,Ltd. Zhejiang Branch The person in charge

Document name: Notice of termination of patent right

DD01 Delivery of document by public notice
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20210112

CF01 Termination of patent right due to non-payment of annual fee