- CN106958380A CN106958380A CN201610027562.4A CN201610027562A CN106958380A CN 106958380 A CN106958380 A CN 106958380A CN 201610027562 A CN201610027562 A CN 201610027562A CN 106958380 A CN106958380 A CN 106958380A
- Authority
- CN
- China
- Prior art keywords
- main material
- equipment body
- ring
- support bar
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000463 material Substances 0.000 title claims abstract description 66
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 title claims abstract description 44
- 238000000034 method Methods 0.000 title claims abstract description 23
- 229910052742 iron Inorganic materials 0.000 title claims abstract description 22
- 238000004891 communication Methods 0.000 title claims abstract description 21
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 29
- 239000010959 steel Substances 0.000 claims abstract description 29
- 230000002457 bidirectional effect Effects 0.000 claims abstract description 14
- 238000010276 construction Methods 0.000 abstract description 2
- 230000005611 electricity Effects 0.000 abstract description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 230000001603 reducing effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
- E04H12/10—Truss-like structures
Abstract
Type of the present invention is related to post and telecommunications system, Broadcast and TV system and frequency modulation broadcasting tower for a kind of device and method of non-single tube communication iron tower main material replacing, including equipment body, hanger, bidirectional modulation embrace ring, support bar, fixed armful of ring, regulation armful ring, U-shaped anchor ear.The equipment can be used for the main material replacing of the non-single tube communication iron towers such as three Guan Ta, four pipe towers, triangle angle steel tower, corner angle steel tower, bracing wire angle steel tower, have practical, scope extensively, advantage is:Great amount of cost can be saved, without the former steel tower of integral disassembly, assembly is needed, without hanging device and water flowing electricity is needed, changing the tower time only needs 1-2 days, and required cost is the 3-5% of newly-built base station;Next to that simple in construction, volume is light and handy, convenient in carrying, install succinct, it can repeatedly use, it is safe and reliable.
Description
Technical field
Type of the present invention is related to post and telecommunications system, Broadcast and TV system, the Mobile Communication Tower of petrochemical system and frequency modulation broadcasting
Tower, is particularly suitable for use in the non-single tube communication iron tower masters such as three Guan Ta, four pipe towers, triangle angle steel tower, corner angle steel tower, bracing wire angle steel tower
Material is changed.
Background technology
Since 2014, with the formal establishment of Chinese steel tower company, the base station built up before three big operators was a large amount of
Transfer steel tower company to, before among the base station for transferring steel tower company to being much several years or more than ten years, the base of these early stages
Stand due to the influence of natural environment, the corrosion of many main materials, there is certain potential safety hazard.In this case the measure taken
It is that whole tower is changed, tower is built again, cause resource largely to waste, and influences the normal operation of communication network.
The content of the invention
It is the device and method for providing non-single tube communication iron tower main material replacing that type of the present invention, which solves the above problems, including is set
Standby main body, hanger, bidirectional modulation embrace ring, support bar, fixed armful of ring, regulation armful ring, U-shaped anchor ear, it is characterised in that equipment master
Body is formed by connecting by the multi-segmental body of rod by flange, and hanger is welded in equipment body top sideways, and support bar is single pipe, double
Embrace and encircled on equipment body and support bar to regulation, regulation embraces boxing and is connected to the equipment body other end sideways, fixed armful of ring
Support bar one end side is welded in, fixed armful of ring is connected by support bar by U-shaped anchor ear with equipment body, constitutes a kind of non-list
The equipment of pipe communication iron tower main material replacing.
The device and method of the non-single tube communication iron tower main material replacing, it is characterised in that:The equipment body two ends are equal
Have and embrace ring, one end is fixed armful of ring structure, the other end is that bidirectional modulation embraces ring structure.
The device and method of the non-single tube communication iron tower main material replacing, it is characterised in that:The single two ends of support bar
Have and embrace ring, one end is fixed armful of ring structure, the other end embraces ring structure for regulation.
The device and method of the non-single tube communication iron tower main material replacing, it is characterised in that:The support bar is two one
Group, has two groups of support bars, and every group of support bar is encircled in equipment body two ends by its fixed armful respectively.
The replacing options are to be formed by connecting equipment body by flange by the multi-segmental body of rod first, by equipment body one end
Bidirectional modulation embrace in the upper adjacent main material section encircled and need to change main material section in former steel tower, then by the tune of the equipment body other end
Section is embraced to encircle to be needed to change under main material section in adjacent main material section in former steel tower, and single supporting bar one end then is passed through into two-way tune
Section is embraced in the horizontally adjacent main material section encircled and need replacing main material in former steel tower, then its support bar other end is embraced into ring by fixed
Embrace in one end of equipment body, being individually fixed in remaining support bar using identical installation method needs to change the adjacent of main material section
Upper and equipment body the other end of main material section, but wherein two support bars are fixed on same one end of equipment body for one group, another two
The other end that root support bar is fixed on equipment body is one group, after equipment all install it is fixed after, finally needing to change main material
Section is removed, then replaces with new main material, after being fixedly connected, and successively fills support bar and equipment body is removed, and according to said method one by one will
The main material replacing of former steel tower.
The advantage of type of the present invention:
The method for exchanging main material for using the equipment, can save great amount of cost, without the former steel tower of integral disassembly, assembly is needed, be set without lifting is needed
Standby and water flowing electricity, required cost is the 3-5% of newly-built base station.
The method for exchanging main material for using the equipment, ring structure is embraced using mode, can be arbitrarily by the main material of steel tower any section more
Change, flexibly, conveniently, reliably.
The method for exchanging main material for using the equipment, if change whole tower, can just complete, newly-built one after dismounting for general 1-2 days
The base station duration is general at 20-30 days, greatly shortens the duration, reducings the construction costs.
Equipment using main material is exchanged for, is made using high strength steel, and equipment body top-side welding hanger, its structure
Simply, volume is light and handy, and convenient in carrying can be repeatedly used, safe and reliable.
Equipment using main material is exchanged for, can be used for three Guan Ta, four pipe towers, triangle angle steel tower, corner angle steel tower, bracing wire angle steel
The non-single tube communication iron tower such as tower changes main material, has practical, scope wide.
Brief description of the drawings
Fig. 1 is type device structure front view of the present invention
Fig. 2 is type device structure top view of the present invention
Fig. 3 is type equipment replacement iron tower main material schematic diagram front view of the present invention
Fig. 4 is type equipment replacement iron tower main material schematic diagram top view of the present invention
The explanation of label in accompanying drawing:
1- equipment body 2- hanger 3- bidirectional modulations embrace ring 4- support bars
Ring 7-U type anchor ear 8- steel towers are embraced in fixed armful of ring 6- regulation of 5-
The upper adjacent horizontally adjacent main material section 11- of main material section 10- of 9- change adjacent main material section under main material section 12-
13- equipment
Embodiment
Embodiment combination accompanying drawing is described further to the structure of type of the present invention:
As shown in Fig. 1~2, a kind of device and method of replacing communication iron tower main material fixation of type of the present invention, including equipment body
1st, hanger 2,3 bidirectional modulations embrace ring, support bar 4, fixed armful of ring 5, regulation armful ring 6, U-shaped anchor ear 7, are characterized in:Equipment master
Body 1 is formed by connecting by the multi-segmental body of rod by flange, and hanger 2 is welded in the top of equipment body 1 sideways, and support bar 4 is single circle
Pipe, bidirectional modulation embraces 3 armfuls of ring on equipment body 1 and support bar 4, and regulation embraces ring 6 and is welded in the other end of equipment body 1 sideways,
Fixed armful of ring 5 is welded in support bar one end side, and support bar 4 is connected fixed armful of ring 5 and equipment body 1 by U-shaped anchor ear 7
Connect, constitute the equipment 13 of non-single tube communication iron tower main material replacing.
As shown in figs. 34, the method for non-single tube communication iron tower main material replacing is to be connected first by the multi-segmental body of rod by flange
Connect into equipment body 1, the bidirectional modulation of the one end of equipment body 1 is embraced into 3 armfuls of ring needs to change the upper of main material section 11 in former steel tower 8
In adjacent main material section 9, then 6 armfuls of ring is embraced into the regulation of the other end of equipment body 1 need to change the lower phase of main material section 11 in former steel tower 8
In adjacent main material section 12, the one end of single supporting bar 4 then is embraced into 3 armfuls of ring by bidirectional modulation needs to change main material 11 in former steel tower 8
In horizontally adjacent main material section 10, then by its other end of support bar 4 by fixed armful of 5 armfuls of one end in equipment body 1 of ring, using phase
Being individually fixed in remaining support bar 4 with installation method needs the adjacent main material section for changing main material section 11 upper and equipment body 1
The other end, but wherein two support bars 4 are fixed on same one end of equipment body 1 for one group, and another two support bars are fixed on equipment
The other end of main body 1 is one group, after equipment 13 is all installed and fixed, and is finally removed needing to change main material section 11, then change
Upper new main material, after being fixedly connected, successively fills support bar 4 and equipment body 1 is removed, according to said method one by one by the master of former steel tower 8
Material is changed.
Claims (5)
1. a kind of device and method of non-single tube communication iron tower main material replacing, including equipment body, hanger, bidirectional modulation armful ring,
Ring, U-shaped anchor ear are embraced in support bar, fixed armful of ring, regulation, it is characterised in that equipment body is connected by the multi-segmental body of rod by flange
Form, hanger is welded in equipment body top sideways, support bar is single pipe, bidirectional modulation is embraced and encircled in equipment body and branch
On strut, regulation embraces boxing and is connected to the equipment body other end sideways, and fixed armful of boxing is connected to support bar one end side, support bar
Fixed armful of ring is connected with equipment body by U-shaped anchor ear, a kind of equipment of non-single tube communication iron tower main material replacing is constituted.
2. device and method of non-single tube communication iron tower main material replacing according to claim 1, it is characterised in that:The equipment
Main body two ends, which have, embraces ring, and one end is fixed armful of ring structure, and the other end is that bidirectional modulation embraces ring structure.
3. device and method of non-single tube communication iron tower main material replacing according to claim 1, it is characterised in that:The support
The single two ends of bar, which have, embraces ring, and one end is fixed armful of ring structure, and the other end embraces ring structure for regulation.
4. device and method of non-single tube communication iron tower main material replacing according to claim 1, it is characterised in that:The support
Bar is two one group, has two groups of support bars, and every group of support bar is encircled in equipment body two ends by its fixed armful respectively.
5. change non-single tube communication iron tower main material replacing device and method, it is characterised in that:The replacing options are first by many
The section body of rod is formed by connecting equipment body by flange, and the bidirectional modulation of equipment body one end is embraced to encircle needs more in former steel tower
In the upper adjacent main material section of change owner material section, then the regulation of the equipment body other end is embraced to encircle need to change main material section in former steel tower
Under in adjacent main material section, then embrace single supporting bar one end by bidirectional modulation to encircle needs to change main material in former steel tower
In horizontally adjacent main material section, then its support bar other end encircled in one end of equipment body by fixed embrace, using phase Tongan City
Remaining support bar is individually fixed in by dress method needs upper and equipment body the other end of the adjacent main material section for changing main material section, but
Same one end that wherein two support bars are fixed on equipment body is one group, and another two support bars are fixed on the other end of equipment body
For one group, after equipment is all installed and fixed, finally removed needing to change main material section, then replace with new main material, be fixedly connected
After good, successively fill support bar and equipment body is removed, according to said method one by one by the main material replacing of former steel tower.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610027562.4A CN106958380B (en) | 2016-01-12 | 2016-01-12 | Method for replacing main material of non-single-tube communication iron tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610027562.4A CN106958380B (en) | 2016-01-12 | 2016-01-12 | Method for replacing main material of non-single-tube communication iron tower |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106958380A true CN106958380A (en) | 2017-07-18 |
CN106958380B CN106958380B (en) | 2020-12-11 |
Family
ID=59480813
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610027562.4A Expired - Fee Related CN106958380B (en) | 2016-01-12 | 2016-01-12 | Method for replacing main material of non-single-tube communication iron tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106958380B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06189421A (en) * | 1992-12-17 | 1994-07-08 | Kansai Electric Power Co Inc:The | Main column material replacement equipment for steel pipe tower |
CN201635416U (en) * | 2010-03-19 | 2010-11-17 | 四川电力送变电建设公司 | Device for replacing principle materials of iron tower |
JP2011149171A (en) * | 2010-01-20 | 2011-08-04 | Kyushu Electric Power Co Inc | Device and method for replacing main column material of tower structure |
JP2011256623A (en) * | 2010-06-10 | 2011-12-22 | Nippon Tetto Kogyo Kk | Pylon web member replacement method and gears |
JP2013042622A (en) * | 2011-08-18 | 2013-02-28 | Kyushu Electric Power Co Inc | Diagonal member replacement device of steel tower |
CN204645703U (en) * | 2015-05-14 | 2015-09-16 | 中国电力科学研究院 | A kind of device for changing the main material of electric power pylon |
CN205531616U (en) * | 2016-01-12 | 2016-08-31 | 浙江宁远塔桅制造有限公司 | Equipment that non - single tube communication tower owner material was changed |
-
2016
- 2016-01-12 CN CN201610027562.4A patent/CN106958380B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06189421A (en) * | 1992-12-17 | 1994-07-08 | Kansai Electric Power Co Inc:The | Main column material replacement equipment for steel pipe tower |
JP2011149171A (en) * | 2010-01-20 | 2011-08-04 | Kyushu Electric Power Co Inc | Device and method for replacing main column material of tower structure |
CN201635416U (en) * | 2010-03-19 | 2010-11-17 | 四川电力送变电建设公司 | Device for replacing principle materials of iron tower |
JP2011256623A (en) * | 2010-06-10 | 2011-12-22 | Nippon Tetto Kogyo Kk | Pylon web member replacement method and gears |
JP2013042622A (en) * | 2011-08-18 | 2013-02-28 | Kyushu Electric Power Co Inc | Diagonal member replacement device of steel tower |
CN204645703U (en) * | 2015-05-14 | 2015-09-16 | 中国电力科学研究院 | A kind of device for changing the main material of electric power pylon |
CN205531616U (en) * | 2016-01-12 | 2016-08-31 | 浙江宁远塔桅制造有限公司 | Equipment that non - single tube communication tower owner material was changed |
Non-Patent Citations (1)
Title |
---|
刘庆长: "无专用扒杆更换旧塔主材施工方法", 《电力建设》 * |
Also Published As
Publication number | Publication date |
---|---|
CN106958380B (en) | 2020-12-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103383400B (en) | A kind of insulation safety device preventability test device | |
CN203583974U (en) | 750KV outdoor A-shaped column, lattice type column and power distribution device | |
CN202625659U (en) | Lifting frame for isolating switch | |
CN205057364U (en) | Truss assemble bed -jig | |
CN213980159U (en) | Single tube communication tower reinforcing apparatus | |
CN106958380A (en) | A kind of device and method of non-single tube communication iron tower main material replacing | |
CN205531616U (en) | Equipment that non - single tube communication tower owner material was changed | |
CN204938800U (en) | Tower crane rood beam basis | |
CN202788126U (en) | Anchor bolt type column foot herringbone framework | |
CN206245842U (en) | It is a kind of with high intensity and the strong communication tower of non-deformability | |
CN206319559U (en) | A kind of height can consecutive variations braced bar system | |
CN202817609U (en) | Multi-purpose bottle supporting bracket | |
CN108739574A (en) | Just structure supports cultivation apparatus copper alloy net method for providing and its cultivation apparatus in far-reaching sea | |
CN103967314A (en) | 10kv-110kv emergency repair pole | |
CN203334760U (en) | Same rod tower cross span abnormal tower | |
CN202081689U (en) | Alternating-current ultrahigh voltage single-tower dual-loop terminal tower | |
CN203536852U (en) | Tube-type busbar lifting device | |
CN202578116U (en) | Single-person on-pole assembler for dual-fan cross arm | |
CN204947527U (en) | A kind of iron tower of power transmission line cable bearer | |
CN106522530B (en) | A kind of height can consecutive variations braced bar system | |
CN216489658U (en) | Positioning device and cable terminal tower | |
CN216142499U (en) | Detachable ice-viewing frame | |
CN203821931U (en) | 10kv-110kv emergency repair rod | |
CN203951109U (en) | The supporting construction of high-voltgae pothead | |
CN204046001U (en) | A kind of Portable supporting guard bar installed for the maintenance of 35kV pole-mounted circuit breaker |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20210608 Granted publication date: 20201211 |
|
PD01 | Discharge of preservation of patent | ||
PD01 | Discharge of preservation of patent |
Date of cancellation: 20230608 Granted publication date: 20201211 |
|