CN204481391U - A kind of replacing double bundle conductor conductor spacer specific purpose tool - Google Patents
A kind of replacing double bundle conductor conductor spacer specific purpose tool Download PDFInfo
- Publication number
- CN204481391U CN204481391U CN201420657864.6U CN201420657864U CN204481391U CN 204481391 U CN204481391 U CN 204481391U CN 201420657864 U CN201420657864 U CN 201420657864U CN 204481391 U CN204481391 U CN 204481391U
- Authority
- CN
- China
- Prior art keywords
- hook
- connecting hole
- action bars
- conductor
- short hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
Description
技术领域 technical field
本实用新型属于电力技术领域,具体涉及一种更换双分裂导线间隔棒专用工具。 The utility model belongs to the technical field of electric power, and in particular relates to a special tool for replacing a spacer bar of a double-split wire.
背景技术 Background technique
分裂导线上的间隔棒由于当初安装时螺栓紧固不到位或在运行中长期受导线振动等影响,会出现松动、损坏等威胁线路安全运行的缺陷,如不及时处理,间隔棒长期磨损导线就会造成断线、倒杆等重大事故,带电更换或加装新的间隔棒时,采用的是软梯作业法,软梯悬挂在一根子导线上,作业人员通过攀爬软梯到达安装位置时,自身加软梯的重量就会和另一根子导线之间上下拉开一定的距离(一般3-5米)。如果不能够到上面子导线,作业人员就无法更换、安装新的间隔棒。为了够到另一根子导线,我们以前采用的是抛绳子的方法。导线上的人员把一根绳子抛过高处的子导线,用其拽到两根导线的间距大致为0.4米的位置后,用绳子缠绕绑扎固定。但是这种方法存在不确定性,由于作业人员悬吊在导线上抛绳子时很难用力,一次直接抛过去的几率很低,往往通过多次抛掷才能成功,有风的天气抛掷更加困难。 The spacer rods on the split conductors may become loose, damaged or other defects that threaten the safe operation of the line because the bolts are not fastened in place during the initial installation or are affected by the vibration of the conductors for a long time during operation. It will cause major accidents such as broken wires and inverted rods. When replacing or installing new spacers with power on, the soft ladder operation method is adopted. The soft ladder is suspended on a sub-conductor. When the operator reaches the installation position by climbing the soft ladder, The weight of the soft ladder will be pulled up and down a certain distance (generally 3-5 meters) from the other sub-conductor. If the upper sub-conductor cannot be reached, the operator cannot replace or install a new spacer. In order to reach another sub-conductor, we used to throw the rope. The personnel on the wire throw a rope over the sub-wire at a high place, use it to drag it to a position where the distance between the two wires is about 0.4 meters, and then wrap it with a rope to fix it. However, there are uncertainties in this method. Because it is difficult for the operator to throw the rope while hanging on the wire, the probability of throwing it directly at one time is very low, and it is often successful through multiple throws. Throwing is more difficult in windy weather.
发明内容 Contents of the invention
为解决上述问题,本实用新型的目的是提供一种更换双分裂导线间隔棒专用工具,能够方便的加装或更换间隔棒,提高了工作效率。 In order to solve the above problems, the purpose of this utility model is to provide a special tool for replacing the spacer rods of double-split wires, which can conveniently add or replace the spacer rods and improve the work efficiency.
为达到上述目的,本实用新型采取的技术方案是:一种更换双分裂导线间隔棒专用工具,包括操作杆和挂钩装置,所述操作杆截面呈三棱形,具有绝缘可伸缩特性,且所述操作杆的一端固定一连接板,所述连接板上设有连接孔,所述挂钩装置包括一丝杠,所述丝杠两端分别设有一连接夹,所述两个连接夹均设有一连接孔,其中一个连接夹连接有长钩,所述长钩上设有一连接孔,另一个连接夹连接有短钩,所述短钩上设有两个连接孔,且所述短钩通过其中一个连接孔与所述操作杆连接。 In order to achieve the above purpose, the technical solution adopted by the utility model is: a special tool for replacing the double-split wire spacer, including an operating rod and a hook device. One end of the operating rod is fixed with a connecting plate, the connecting plate is provided with a connecting hole, the hook device includes a screw, the two ends of the screw are respectively provided with a connecting clip, and the two connecting clips are respectively provided with a connecting clip. One of the connecting clips is connected with a long hook, and the long hook is provided with a connecting hole, and the other connecting clip is connected with a short hook, and the short hook is provided with two connecting holes, and the short hook passes through one of the The connecting hole is connected with the operating rod.
进一步地,所述长钩和所述短钩采用环氧树脂板材制成,制作直径大于导线的直径,且所述长钩和所述短钩间的距离可调节至小于间隔棒的安装距离。 Further, the long hook and the short hook are made of epoxy resin sheet with a diameter larger than that of the wire, and the distance between the long hook and the short hook can be adjusted to be smaller than the installation distance of the spacer bar.
本实用新型在使用时,所述操作杆具有的可伸缩绝缘特性,不仅携带方便,而且比较安全;所述操作杆的三棱形状抗弯强度高,且重量轻,降低了劳动强度;所述长钩和所述短钩采用的环氧树脂板材具有绝缘性,强度高,重量轻,而且不磨损导线,加工也比较方便,在安全及使用寿命上具有较大优势;所述挂钩装置连接操作杆的一端设置的短钩只是为了固定导线,而另一端设置的长钩则是为了拽回导线并增加稳定性;所述专用工具采用的挂钩装置固定两根子导线定位比较准确,而且承受的拉力较大;所述专用工具采用的丝杠便于调节距离,待间隔棒安装完成后,调松丝杠就可以轻松的取掉所用工具;所述长钩与所述短钩间的距离可通过丝杠的调节至小于间隔棒的距离,这样便于间隔棒的安装。 When the utility model is in use, the telescopic insulating property of the operating rod is not only convenient to carry, but also relatively safe; the triangular shape of the operating rod has high bending strength and light weight, which reduces labor intensity; The epoxy resin plate used for the long hook and the short hook has insulation, high strength, light weight, and does not wear the wire, and is relatively convenient to process, and has great advantages in safety and service life; the hook device is connected and operated The short hook set at one end of the rod is only for fixing the wire, while the long hook set at the other end is for pulling back the wire and increasing the stability; The lead screw used by the special tool is convenient for distance adjustment. After the spacer is installed, the tool can be easily removed by loosening the lead screw; the distance between the long hook and the short hook can be adjusted by the wire The adjustment of the bar is less than the distance of the spacer bar, which is convenient for the installation of the spacer bar.
与现有技术相比,本实用新型不仅构造简单、结构合理、总重量轻,使用简便,而且坚固耐用,通用性好。 Compared with the prior art, the utility model is not only simple in structure, reasonable in structure, light in total weight, easy to use, but also strong and durable, and has good versatility.
附图说明 Description of drawings
下面通过附图和实施例对本实用新型的结构作进一步说明。 Below by accompanying drawing and embodiment the structure of the present utility model is further described.
图1为本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.
图2为所述长钩的结构示意图。 Fig. 2 is a structural schematic diagram of the long hook.
图3为所述短钩的结构示意图。 Fig. 3 is a structural schematic diagram of the short hook.
图1、图2及图3中,1.长钩,2.连接孔,3.连接夹,4.丝杠,5.短钩,6.连接板,7.操作杆。 Among Fig. 1, Fig. 2 and Fig. 3, 1. long hook, 2. connecting hole, 3. connecting clamp, 4. leading screw, 5. short hook, 6. connecting plate, 7. operating rod.
具体实施方式 Detailed ways
如图1所示,一种更换双分裂导线间隔棒专用工具,包括操作杆7和挂钩装置,所述操作杆7截面呈三棱形,具有绝缘可伸缩特性,且所述操作杆7的一端固定一连接板6,所述连接板6上设有连接孔2,所述挂钩装置包括一丝杠4,所述丝杠4两端分别设有一连接夹3,所述两个连接夹3均设有一连接孔2,其中一个连接夹3连接有长钩1,所述长钩1上设有一连接孔2,另一个连接夹3连接有短钩5,所述短钩上设有两个连接孔2,且所述短钩5通过其中一个连接孔2与所述操作杆7连接。 As shown in Figure 1, a special tool for replacing double-split wire spacers includes an operating rod 7 and a hook device. A connection plate 6 is fixed, the connection plate 6 is provided with a connection hole 2, the hook device includes a lead screw 4, and a connection clip 3 is respectively provided at both ends of the lead screw 4, and the two connection clips 3 are respectively provided with There is a connection hole 2, one of the connection clips 3 is connected with a long hook 1, the long hook 1 is provided with a connection hole 2, and the other connection clip 3 is connected with a short hook 5, and the short hook is provided with two connection holes 2, and the short hook 5 is connected to the operating rod 7 through one of the connection holes 2 .
所述长钩1和所述短钩5采用环氧树脂板材制成,制作直径大于导线的直径,且所述长钩1和所述短钩5间的距离可调节至小于间隔棒的安装距离。 The long hook 1 and the short hook 5 are made of epoxy resin sheet, the diameter of which is larger than the diameter of the wire, and the distance between the long hook 1 and the short hook 5 can be adjusted to be less than the installation distance of the spacer .
本实用新型在使用时,先将所述操作杆7伸至合适长度,然后使用所述长钩1拽回离工人比较远的子导线,这时所述短钩5固定住另一根导线,调节丝杠4至两导线距离小于间隔棒的安装距离,这时安装间隔棒,安装完毕后,松开丝杠4,调节长短钩至比较松的状态,可以从导线上拿开挂钩装置。 When the utility model is in use, first extend the operating rod 7 to a suitable length, and then use the long hook 1 to pull back the sub-conductor that is far away from the worker. At this time, the short hook 5 fixes another conductor. Adjust leading screw 4 to two lead wires distances less than the installation distance of spacer bar, install spacer bar at this moment, after installation, unclamp lead screw 4, adjust length hook to looser state, can take away hook device from lead.
以上所描述的仅为本实用新型的较佳实施例,上述具体实施例不是对本实用新型的限制,凡本领域的普通技术人员根据以上描述所做的润饰、修改或等同替换,均属于本实用新型的保护范围。 The above descriptions are only preferred embodiments of the present utility model, and the above-mentioned specific embodiments do not limit the present utility model. All modifications, modifications or equivalent replacements made by those of ordinary skill in the art according to the above descriptions belong to the present utility model. A new type of protection.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420657864.6U CN204481391U (en) | 2014-11-06 | 2014-11-06 | A kind of replacing double bundle conductor conductor spacer specific purpose tool |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420657864.6U CN204481391U (en) | 2014-11-06 | 2014-11-06 | A kind of replacing double bundle conductor conductor spacer specific purpose tool |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204481391U true CN204481391U (en) | 2015-07-15 |
Family
ID=53637165
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420657864.6U Expired - Fee Related CN204481391U (en) | 2014-11-06 | 2014-11-06 | A kind of replacing double bundle conductor conductor spacer specific purpose tool |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204481391U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105914490A (en) * | 2016-06-16 | 2016-08-31 | 国网江苏省电力公司高邮市供电公司 | Grounding rod used for wire maintenance |
| CN106410679A (en) * | 2016-11-29 | 2017-02-15 | 国家电网公司 | Vertical conductor spacing control device |
| CN109217179A (en) * | 2018-10-15 | 2019-01-15 | 云南送变电工程有限公司 | Double bundle conductor conductor spacer installation tool |
| CN110333132A (en) * | 2019-06-13 | 2019-10-15 | 国家电网有限公司 | 1000KV quadripartion lead spacing board installation special tool |
| CN111934267A (en) * | 2020-07-06 | 2020-11-13 | 国家电网有限公司 | Split type multi-bundle conductor spacing fixing device |
| CN119560929A (en) * | 2024-11-27 | 2025-03-04 | 广东电网有限责任公司 | Spacer rod removal tool |
-
2014
- 2014-11-06 CN CN201420657864.6U patent/CN204481391U/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105914490A (en) * | 2016-06-16 | 2016-08-31 | 国网江苏省电力公司高邮市供电公司 | Grounding rod used for wire maintenance |
| CN105914490B (en) * | 2016-06-16 | 2018-07-20 | 国网江苏省电力公司高邮市供电公司 | A kind of grounding rod for electric wire repair |
| CN106410679A (en) * | 2016-11-29 | 2017-02-15 | 国家电网公司 | Vertical conductor spacing control device |
| CN109217179A (en) * | 2018-10-15 | 2019-01-15 | 云南送变电工程有限公司 | Double bundle conductor conductor spacer installation tool |
| CN110333132A (en) * | 2019-06-13 | 2019-10-15 | 国家电网有限公司 | 1000KV quadripartion lead spacing board installation special tool |
| CN111934267A (en) * | 2020-07-06 | 2020-11-13 | 国家电网有限公司 | Split type multi-bundle conductor spacing fixing device |
| CN119560929A (en) * | 2024-11-27 | 2025-03-04 | 广东电网有限责任公司 | Spacer rod removal tool |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102820628A (en) | Special tool for replacing split conductor spacer rod | |
| CN102882157B (en) | Portable shockproof hammer tool for replacing tension wire in power cut | |
| CN203367865U (en) | Auxiliary bracket for maintaining power transmission line | |
| CN203300837U (en) | Throwing-hanging type ground wire | |
| CN204046062U (en) | The unsettled fixed support instrument of a kind of power transmission line overhead ground wire | |
| CN102593624A (en) | Special grounding wire for power transmission line | |
| CN102623927B (en) | Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method | |
| CN202721387U (en) | Special tool for changing split conductor spacer | |
| CN203850726U (en) | Wire lifter on 10 kV power distribution telegraph pole | |
| CN204407790U (en) | A kind of insulation gin pole for getting out wire jumper | |
| CN202602171U (en) | A tool for power-on replacing multi-loop double split conductor insulator of 220kV line | |
| CN202840371U (en) | Portable tool for replacing tension wire shockproof hammers in outage | |
| CN203398639U (en) | Vibration-proof hammer moving recovering device for overhead ground wire | |
| CN106300128B (en) | One kind changes double bundle conductor conductor spacer and puies forward the Line tool and application method | |
| CN204167793U (en) | Straight line steel tube tower side, double loop cross-arm jig | |
| CN203786357U (en) | Transformer station optical cable terminal leading-down fastening device | |
| CN203466505U (en) | Device for vertically pulling cable | |
| CN107425494B (en) | Strain clamp | |
| CN204144800U (en) | The special cross-arm card of a kind of ZML type tower | |
| CN105977860B (en) | A kind of replacement overhead transmission line composite cross-arm insulator device and method | |
| CN210779813U (en) | Special tool for adjusting sag of 220kV vertically-arranged double-bundle conductor in electrified manner | |
| CN203491597U (en) | Reversely hung grounding wire device | |
| CN205141531U (en) | Rope accuse slidingtype fixing -line device | |
| CN207976629U (en) | A kind of transmission line of electricity aerial optical cable carries line apparatus | |
| CN207339070U (en) | A Light Duty Replacement Insulator String Tool |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150715 Termination date: 20151106 |
|