CN104348111A - Lead backup protection device for live replacement of tension insulator string, and mounting method thereof - Google Patents
Lead backup protection device for live replacement of tension insulator string, and mounting method thereof Download PDFInfo
- Publication number
- CN104348111A CN104348111A CN201410661746.7A CN201410661746A CN104348111A CN 104348111 A CN104348111 A CN 104348111A CN 201410661746 A CN201410661746 A CN 201410661746A CN 104348111 A CN104348111 A CN 104348111A
- Authority
- CN
- China
- Prior art keywords
- pull
- width
- wire
- rod
- hinged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Insulators (AREA)
Abstract
本发明涉及一种带电更换耐张绝缘子串导线后备保护装置及其安装方法,该装置包括翼型卡线器、绝缘拉绳、第一操作杆和第二操作杆;翼型卡线器的卡线槽安装基板上设有连接钩,下侧面左、右两侧分别铰接一第一拉臂,两侧的第一拉臂上分别铰接一卡线块以形成卡线槽,第一拉臂前端与第二拉臂相铰接,两第二拉臂前端相铰接且同时铰接U型环;两第二拉臂之间连接自动闭锁弹簧及限宽装置,以固定弹簧的撑开宽度;绝缘拉绳两端分别连接杆塔和U型环,第一操作杆与连接钩连接,第二操作杆与限宽装置连接,卡线槽卡入导线后打开限宽装置,自动闭锁弹簧收缩并带动卡线块卡住导线。该装置及其安装方法提高了带电作业的安全性和可靠性,且易于安装实施。
The invention relates to a backup protection device for live replacement of tension insulator string conductors and an installation method thereof. There is a connecting hook on the wire groove installation base plate, and a first pull arm is respectively hinged on the left and right sides of the lower side, and a wire clamping block is respectively hinged on the first pull arms on both sides to form a wire clamp groove, and the front end of the first pull arm It is hinged with the second pull arm, the front ends of the two second pull arms are hinged and the U-shaped ring is hinged at the same time; the automatic locking spring and the width limiting device are connected between the two second pull arms to fix the stretching width of the spring; the insulating pull rope The two ends are respectively connected to the pole tower and U-shaped ring, the first operating rod is connected to the connecting hook, the second operating rod is connected to the width limiting device, the wire clamping slot is inserted into the wire and the width limiting device is opened, the automatic locking spring shrinks and drives the clamping block Jammed wires. The device and its installation method improve the safety and reliability of live work, and are easy to install and implement.
Description
技术领域 technical field
本发明涉及输电线路施工技术领域,特别涉及一种带电更换耐张绝缘子串导线后备保护装置及其安装方法。 The invention relates to the technical field of power transmission line construction, in particular to a backup protection device for live replacement of tension insulator string conductors and an installation method thereof. the
背景技术 Background technique
目前,更换耐张绝缘子串作业多数是在输电线路导线未采用后备保护装置,或者采用简易型的卡线器作业导线后备保护装置的情况下实施,在以上的两种情况下作业存在严重的安全隐患,一旦更换工具发生脱落或损坏就会引起导线断落事故。在现有技术中,也公开了一些更换耐张绝缘子串后备保护装置及方法,但该些装置大多结构复杂,安装方法不易实施,工作效率低,且保护效果并不理想,使用效果不佳。 At present, most of the operations of replacing strain insulator strings are carried out when the backup protection device is not used for the transmission line conductors, or the backup protection device for the conductors of the simple clamping device is used. In the above two cases, there are serious safety hazards in the operation. Hidden danger, once the replacement tool falls off or is damaged, it will cause a wire breakage accident. In the prior art, some backup protection devices and methods for replacing tension insulator strings are also disclosed, but most of these devices have complex structures, difficult installation methods, low work efficiency, and unsatisfactory protection effects and poor use effects. the
发明内容 Contents of the invention
本发明的目的在于提供一种带电更换耐张绝缘子串导线后备保护装置及其安装方法,该装置及其安装方法不仅提高了带电作业的安全性和可靠性,而且结构简单,易于安装实施。 The object of the present invention is to provide a backup protection device for live replacement of strain insulator string conductors and its installation method. The device and its installation method not only improve the safety and reliability of live work, but also have a simple structure and are easy to install and implement.
为实现上述目的,本发明的技术方案是:一种带电更换耐张绝缘子串导线后备保护装置,包括翼型卡线器、绝缘拉绳、第一操作杆和第二操作杆;所述翼型卡线器包括卡线槽安装基板,所述卡线槽安装基板上侧面上设有用于连接第一操作杆的第一连接钩,下侧面上左、右两侧分别与一第一拉臂后端相铰接,左、右两侧的第一拉臂上分别铰接有一卡线块,以通过左、右两侧的卡线块形成卡线槽,左、右两侧的第一拉臂前端分别与一第二拉臂后端相铰接,左、右两侧的第二拉臂前端相铰接,该铰接点同时铰接有用于连接绝缘拉绳的U型环;左、右两侧的第二拉臂之间连接有自动闭锁弹簧以及限宽装置,以在限宽装置闭合时,固定住自动闭锁弹簧的撑开宽度,在限宽装置打开时,自动闭锁弹簧自动收缩并带动卡线块卡住导线;所述绝缘拉绳一端连接至杆塔,另一端与所述U型环相连接,所述第一操作杆与所述第一连接钩相连接,以将翼型卡线器吊到导线处,所述第二操作杆与所述限宽装置相连接,以当卡线槽卡入导线后,通过第二操作杆打开限宽装置。 In order to achieve the above object, the technical solution of the present invention is: a backup protection device for live replacement of strain insulator string wires, including an airfoil clamp, an insulating pull rope, a first operating lever and a second operating lever; the airfoil The wire clamping device includes a wire clamping groove installation base plate, the upper side of the wire clamping groove installation base plate is provided with a first connecting hook for connecting the first operating rod, and the left and right sides of the lower side are respectively connected with a first pull arm rear The ends are hinged, and the first pull arms on the left and right sides are respectively hinged with a clamping block to form a clamping groove through the clamping blocks on the left and right sides. The front ends of the first pull arms on the left and right sides are respectively It is hinged with the rear end of a second pull arm, and the front ends of the second pull arms on the left and right sides are hinged. The hinge point is also hinged with a U-shaped ring for connecting the insulating pull rope; the second pull arms on the left and right sides are hinged. The arms are connected with an automatic locking spring and a width limiting device, so that when the width limiting device is closed, the opening width of the automatic locking spring is fixed. When the width limiting device is opened, the automatic locking spring automatically contracts and drives the clamping block to lock Wire; one end of the insulating stay rope is connected to the pole tower, the other end is connected to the U-shaped ring, and the first operating rod is connected to the first connecting hook to lift the airfoil wire clamp to the wire , the second operating lever is connected with the width limiting device, so that when the wire is clamped into the wire slot, the width limiting device is opened through the second operating lever.
进一步的,所述第一连接钩由并排设置的两个问号形状的挂钩构成,所述第一操作杆由一直杆和设于直杆前端的山字形钩头构成,所述山字形钩头穿设于所述两个挂钩之间并向左、右两侧钩住所述两个挂钩。 Further, the first connecting hook is composed of two question mark-shaped hooks arranged side by side, the first operating rod is composed of a straight rod and a mountain-shaped hook head arranged at the front end of the straight rod, and the mountain-shaped hook head passes through It is arranged between the two hooks and hooks the two hooks to the left and right sides.
进一步的,所述自动闭锁弹簧一端的挂钩挂设于弹簧装卸扣上,所述弹簧装卸扣安装在一侧的第二拉臂上,所述自动闭锁弹簧另一端的连接环套设于弹簧固定卡扣上,所述弹簧固定卡扣安装在另一侧的第二拉臂上。 Further, the hook at one end of the automatic locking spring is hung on the spring loading and unloading buckle, and the spring loading and unloading buckle is installed on the second pull arm on one side, and the connecting ring at the other end of the automatic locking spring is sleeved on the spring to fix it. On the buckle, the spring fixing buckle is installed on the second pull arm on the other side.
进一步的,所述限宽装置包括一限宽拉杆和一插销,所述限宽拉杆铰接在一侧的第二拉臂上,所述插销铰接在另一侧的第二拉臂上,所述限宽拉杆上设有卡口,以当限宽拉杆上的卡口卡入插销时,固定住自动闭锁弹簧的撑开宽度;所述第二操作杆与所述限宽拉杆相连接,以当卡线槽卡入导线后,通过第二操作杆打开限宽拉杆。 Further, the width-limiting device includes a width-limiting pull rod and a bolt, the width-limiting pull rod is hinged on the second pull arm on one side, and the bolt is hinged on the second pull arm on the other side, the A bayonet is provided on the width-limiting pull rod, so that when the bayonet on the width-limiting pull rod is snapped into the latch, the expansion width of the automatic locking spring is fixed; the second operating rod is connected with the width-limiting pull rod to hold After the wire slot is snapped into the wire, the width-limiting pull bar is opened by the second operating lever.
进一步的,所述限宽拉杆上设有用于连接第二操作杆的拉环,以通过第二操作杆的操作打开限宽拉杆。 Further, the width-limiting pull rod is provided with a pull ring for connecting to the second operating rod, so as to open the width-limiting pull rod through the operation of the second operating rod.
进一步的,所述第二操作杆由一直杆和设于直杆前端的问号形状的钩头构成。 Further, the second operating rod is composed of a straight rod and a hook head in the shape of a question mark arranged at the front end of the straight rod.
进一步的,一侧的第一拉臂上设有第二连接钩。 Further, a second connecting hook is provided on the first pull arm on one side.
本发明还公开了上述带电更换耐张绝缘子串导线后备保护装置的安装方法,包括以下步骤: The present invention also discloses an installation method of the above-mentioned backup protection device for live replacement of tension insulator string conductors, which includes the following steps:
(1)将限宽装置闭合,以固定住自动闭锁弹簧的撑开宽度;同时,将自动闭锁弹簧的两端分别与左、右两侧的第二拉臂连接好,并保持一定的拉紧力; (1) Close the width limiting device to fix the opening width of the automatic locking spring; at the same time, connect the two ends of the automatic locking spring to the second pull arms on the left and right sides respectively, and keep a certain tension force;
(2)将绝缘绳的一端与U型环可靠连接; (2) Reliably connect one end of the insulating rope to the U-shaped ring;
(3)采用第一操作杆钩住卡线器的第一连接钩,将翼型卡线器吊到导线处; (3) Use the first operating lever to hook the first connecting hook of the wire clamp, and lift the airfoil wire clamp to the wire;
(4)将翼型卡线器卡入导线; (4) Insert the wing clamp into the wire;
(5)采用第二操作杆打开限宽装置,此时,第二拉臂在自动闭锁弹簧的收缩作用下向内收合,从而带动第一拉臂及其上的卡线块向内收合,卡紧导线; (5) Use the second operating lever to open the width limiting device. At this time, the second pull arm is retracted inwardly under the contraction of the automatic locking spring, thereby driving the first pull arm and the clamping block on it to retract inwardly , clamp the wire;
(6)将绝缘拉绳的另一端与杆塔紧固连接并保持一定的拉力,至此完成带电更换耐张绝缘子串导线后备保护装置的安装。 (6) Fasten the other end of the insulating stay rope to the pole tower and maintain a certain tension, so far complete the installation of the backup protection device for live replacement of tension insulator string conductors.
本发明的有益效果是提供了一种带电更换耐张绝缘子串导线后备保护装置及其安装方法,通过在翼型卡线器上设置由自动闭锁弹簧及限宽装置构成的自动闭锁装置,作业时一旦发生脱落或损坏,自动闭锁装置自动闭锁,防止导线脱落断线,从而提高了作业的安全性和可靠性。此外,该装置结构简单,易于施工,提高了工作效率,具有很强的实用性。 The beneficial effect of the present invention is to provide a backup protection device for live replacement of tension insulator string wires and its installation method. By setting an automatic locking device composed of an automatic locking spring and a width limiting device on the airfoil wire gripper, during operation In the event of falling off or damage, the automatic locking device will lock automatically to prevent the wire from falling off and disconnecting, thus improving the safety and reliability of the operation. In addition, the device has a simple structure, is easy to construct, improves work efficiency, and has strong practicability.
附图说明 Description of drawings
图1是本发明实施例中翼型卡线器的俯视图。 Fig. 1 is a top view of an airfoil wire gripper in an embodiment of the present invention.
图2是本发明实施例中翼型卡线器的仰视图。 Fig. 2 is a bottom view of the airfoil wire gripper in the embodiment of the present invention.
图3是本发明实施例中第一操作杆的结构示意图。 Fig. 3 is a schematic structural diagram of the first operating lever in the embodiment of the present invention.
图4是本发明实施例中第二操作杆的结构示意图。 Fig. 4 is a schematic structural diagram of the second operating lever in the embodiment of the present invention.
图中,1-卡线块,2-自动闭锁弹簧,3-限宽拉杆,4-U型环,5-弹簧装卸扣,6-第一拉臂,7-连接螺栓,8-第一连接钩,9-弹簧固定卡扣,10-插销,11-卡线槽安装基板,12-第二拉臂,13-第二连接钩,14-拉环,15-挂钩,16-连接环,17-问号形状的挂钩,18-直杆,19-山字形钩头,20-直杆,21-问号形状的钩头。 In the figure, 1-clamping block, 2-automatic locking spring, 3-width-limiting tie rod, 4-U-shaped ring, 5-spring loading and unloading buckle, 6-first pull arm, 7-connecting bolt, 8-first connection Hook, 9-spring fixing buckle, 10-bolt, 11-wire slot installation base plate, 12-second pull arm, 13-second connecting hook, 14-pull ring, 15-hook, 16-connecting ring, 17 -Hook in the shape of a question mark, 18-straight rod, 19-chevron-shaped hook head, 20-straight rod, 21-hook head in the shape of a question mark.
具体实施方式 Detailed ways
下面结合附图及具体实施例对本发明作进一步的详细说明。 The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
本发明的带电更换耐张绝缘子串导线后备保护装置,包括翼型卡线器、绝缘拉绳、第一操作杆和第二操作杆;如图1、2所示,翼型卡线器包括卡线槽安装基板11,卡线槽安装基板11上侧面上设有用于连接第一操作杆的第一连接钩8,下侧面上左、右两侧分别与一第一拉臂6后端相铰接,左、右两侧的第一拉臂6上分别铰接有一卡线块1,以通过左、右两侧的卡线块1形成卡线槽;左、右两侧的第一拉臂6前端分别与一第二拉臂12后端相铰接,左、右两侧的第二拉臂12前端相铰接,该铰接点同时铰接有用于连接高强度绝缘拉绳的U型环4;左、右两侧的第二拉臂12之间连接有自动闭锁弹簧2以及限宽装置,以在限宽装置闭合时,固定住自动闭锁弹簧2的撑开宽度,在限宽装置打开时,自动闭锁弹簧2自动收缩并带动卡线块1卡住导线。绝缘拉绳一端连接至杆塔,另一端与U型环4相连接,第一操作杆与第一连接钩8相连接,以将翼型卡线器吊到导线处,第二操作杆与限宽装置相连接,以当卡线槽卡入导线后,通过第二操作杆打开限宽装置。 The live replacement tension insulator string backup protection device of the present invention includes an airfoil clamp, an insulating pull cord, a first operating lever and a second operating lever; as shown in Figures 1 and 2, the wing clamp includes a clamp The wire groove installation base plate 11, the upper side of the wire groove installation base plate 11 is provided with the first connecting hook 8 for connecting the first operating rod, and the left and right sides on the lower side are respectively hinged with the rear end of a first pull arm 6 , the first pull arms 6 on the left and right sides are respectively hinged with a clamping block 1 to form a clamping groove through the clamping blocks 1 on the left and right sides; the front ends of the first pull arms 6 on the left and right sides Respectively hinged with the rear end of a second pull arm 12, the front ends of the second pull arm 12 on the left and right sides are hinged, and the hinge point is hinged with a U-shaped ring 4 for connecting a high-strength insulating stay rope at the same time; An automatic locking spring 2 and a width limiting device are connected between the second pull arms 12 on both sides, so as to fix the stretching width of the automatic locking spring 2 when the width limiting device is closed, and automatically lock the spring when the width limiting device is opened. 2 automatically shrinks and drives the clamping block 1 to clamp the wire. One end of the insulating stay rope is connected to the pole tower, the other end is connected to the U-shaped ring 4, the first operating rod is connected to the first connecting hook 8, so as to lift the airfoil clamp to the wire, the second operating rod is connected to the width limiting The device is connected to open the width limiting device through the second operating lever after the wire is clamped into the wire clamping groove.
220kV、110kV输电线路单根导线线径多为300-400mm,导线的耐张力一般大于3吨,为了满足现有带电更换耐张绝缘子串常规作业的要求,翼型卡线器的卡线槽采用300~400mm线径的规格,高强度绝缘绳最大承载力为6吨,操作杆满足220kV电压等级的绝缘性能和绝缘有效长度的要求。 220kV, 110kV transmission lines have a single wire diameter of 300-400mm, and the tension resistance of the wire is generally greater than 3 tons. The wire diameter is 300~400mm, the maximum bearing capacity of high-strength insulating rope is 6 tons, and the operating rod meets the requirements of 220kV voltage level insulation performance and insulation effective length.
如图1、3所示,第一连接钩8由并排设置的两个问号形状的挂钩17构成,第一操作杆由一直杆18和设于直杆18前端的山字形钩头19构成,山字形钩头19穿设于两个挂钩17之间并向左、右两侧钩住两个挂钩17。 As shown in Figures 1 and 3, the first connecting hook 8 is composed of two question mark-shaped hooks 17 arranged side by side. The glyph hook head 19 is set between the two hooks 17 and hooks the two hooks 17 to the left and right sides.
在本实施例中,自动闭锁弹簧2一端的挂钩15挂设于弹簧装卸扣5上,弹簧装卸扣5安装在一侧的第二拉臂12上,自动闭锁弹簧2另一端的连接环16套设于弹簧固定卡扣9上,弹簧固定卡扣9安装在另一侧的第二拉臂12上。 In this embodiment, the hook 15 at one end of the automatic locking spring 2 is hung on the spring loading and unloading buckle 5, the spring loading and unloading buckle 5 is installed on the second pull arm 12 on one side, and the connecting ring 16 sets at the other end of the automatic locking spring 2 It is arranged on the spring fixing buckle 9, and the spring fixing buckle 9 is installed on the second pull arm 12 on the other side.
限宽装置包括一限宽拉杆3和一插销10,限宽拉杆3铰接在一侧的第二拉臂12上,插销10铰接在另一侧的第二拉臂12上,限宽拉杆3上设有卡口,以当限宽拉杆3上的卡口卡入插销10时,固定住自动闭锁弹簧2的撑开宽度。限宽拉杆3上设有用于连接第二操作杆的拉环14。第二操作杆与限宽拉杆3的拉环14相连接,以当卡线槽卡入导线后,通过第二操作杆的操作打开限宽拉杆3。如图4所示,第二操作杆由一直杆20和设于直杆20前端的问号形状的钩头21构成。 The width limiting device comprises a width limiting pull rod 3 and a bolt 10, the width limiting pull rod 3 is hinged on the second pull arm 12 on one side, the latch 10 is hinged on the second pull arm 12 on the other side, and the width limiting pull rod 3 is hinged on the second pull arm 12 on the other side. A bayonet is provided to fix the stretching width of the automatic locking spring 2 when the bayonet on the width-limiting pull rod 3 is inserted into the latch 10 . A pull ring 14 for connecting the second operating rod is provided on the width-limiting pull rod 3 . The second operating lever is connected with the pull ring 14 of the width-limiting pull rod 3, so that when the wire is snapped into the wire slot, the width-limiting pull rod 3 is opened through the operation of the second operating lever. As shown in FIG. 4 , the second operating rod is composed of a straight rod 20 and a hook head 21 in the shape of a question mark arranged at the front end of the straight rod 20 .
在本实施例中,一侧的第一拉臂6上还设有用于连接第三操作杆的第二连接钩13,以通过第三操作杆的操作辅助将卡线器卡入导线,或者在作业结束后,通过第三操作杆经第二连接钩带动第一拉臂及其上的卡线块打开导线。 In this embodiment, the first pull arm 6 on one side is also provided with a second connecting hook 13 for connecting the third operating lever, so as to assist the operation of the third operating lever to snap the wire clamp into the wire, or After the operation is finished, the first pull arm and the clamping block on it are driven by the third operating rod through the second connecting hook to open the wire.
本发明还公开了上述带电更换耐张绝缘子串导线后备保护装置的安装方法,包括以下步骤: The present invention also discloses an installation method of the above-mentioned backup protection device for live replacement of tension insulator string conductors, which includes the following steps:
(1)将限宽装置闭合,以固定住自动闭锁弹簧的撑开宽度;同时,将自动闭锁弹簧的两端分别与左、右两侧的第二拉臂连接好,并保持一定的拉紧力。具体的,首先将限宽拉杆3上的卡口卡入插销10,以固定住自动闭锁弹簧2的撑开宽度;接着打开弹簧固定卡扣9,这样自动闭锁弹簧2一端的挂钩15就可以轻易地挂扣住弹簧装卸扣5;然后闭合弹簧固定卡扣9,从而拉紧自动闭锁弹簧2,使其保持一定的拉紧力。 (1) Close the width limiting device to fix the opening width of the automatic locking spring; at the same time, connect the two ends of the automatic locking spring to the second pull arms on the left and right sides respectively, and keep a certain tension force. Specifically, at first the bayonet on the width-limiting pull rod 3 is snapped into the latch 10 to fix the stretching width of the automatic locking spring 2; then the spring fixing buckle 9 is opened, so that the hook 15 at one end of the automatic locking spring 2 can easily The ground hangs to buckle the spring loading and unloading buckle 5; then close the spring fixing buckle 9, thereby tightening the automatic locking spring 2 to keep a certain tension.
(2)将高强度绝缘绳的一端与U型环4可靠连接。 (2) Connect one end of the high-strength insulating rope to the U-shaped ring 4 reliably.
(3)作业人员站在杆塔横担处,采用第一操作杆钩住卡线器的第一连接钩8,将翼型卡线器吊到导线处,此时,翼型卡线器的卡线槽是张开的。 (3) The operator stands at the cross arm of the pole tower, hooks the first connecting hook 8 of the wire clamp with the first operating lever, and lifts the airfoil wire clamp to the wire. At this time, the clamp of the airfoil wire clamp The trunking is open.
(4)将翼型卡线器卡入导线。 (4) Insert the wing clamp into the wire.
(5)采用第二操作杆打开限宽装置,即采用第二操作杆钩住限宽拉杆3上的拉环14,打开限宽拉杆3,此时,第二拉臂12在自动闭锁弹簧2的收缩作用下向内收合,从而带动第一拉臂6及其上的卡线块1向内收合,卡紧导线。 (5) Use the second operating lever to open the width-limiting device, that is, use the second operating lever to hook the pull ring 14 on the width-limiting pull rod 3, and open the width-limiting pull rod 3. At this time, the second pull arm 12 automatically locks the spring 2 Under the action of contraction, the first pull arm 6 and the clamping block 1 on it are retracted inwardly to tighten the wire.
(6)将高强度绝缘拉绳的另一端与杆塔紧固连接并保持一定的拉力,至此完成带电更换耐张绝缘子串导线后备保护装置的安装。 (6) Fasten the other end of the high-strength insulating stay rope to the pole tower and maintain a certain tension, so far complete the installation of the backup protection device for live replacement of tension insulator string conductors.
此时,即使高强度绝缘拉绳发生松弛,翼型卡线器在自动闭锁弹簧的作用下也会紧紧地卡住输电线路导线。 At this time, even if the high-strength insulating stay rope is loose, the wing-shaped wire clamp will tightly clamp the transmission line conductor under the action of the automatic locking spring.
以上是本发明的较佳实施例,凡依本发明技术方案所作的改变,所产生的功能作用未超出本发明技术方案的范围时,均属于本发明的保护范围。 The above are the preferred embodiments of the present invention, and all changes made according to the technical solution of the present invention, when the functional effect produced does not exceed the scope of the technical solution of the present invention, all belong to the protection scope of the present invention. the
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410661746.7A CN104348111B (en) | 2014-11-19 | 2014-11-19 | Charged changing tension-resisting insulator wire reserve protection and installation method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410661746.7A CN104348111B (en) | 2014-11-19 | 2014-11-19 | Charged changing tension-resisting insulator wire reserve protection and installation method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104348111A true CN104348111A (en) | 2015-02-11 |
| CN104348111B CN104348111B (en) | 2016-10-19 |
Family
ID=52503172
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410661746.7A Active CN104348111B (en) | 2014-11-19 | 2014-11-19 | Charged changing tension-resisting insulator wire reserve protection and installation method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104348111B (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105281271A (en) * | 2015-11-27 | 2016-01-27 | 国家电网公司 | Corrosion-resistant wire grip |
| CN107768857A (en) * | 2017-09-15 | 2018-03-06 | 武汉里得电力科技股份有限公司 | A kind of L-type self-locking drop-proof earthing clamp |
| CN109811534A (en) * | 2017-11-21 | 2019-05-28 | 山东天睿玻纤复合材料有限公司 | A kind of glass fabric cutting knife |
| CN111567513A (en) * | 2020-04-24 | 2020-08-25 | 申思博 | Bird repelling spacer, insulating operating rod and mounting method of insulating operating rod |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH04133608A (en) * | 1990-09-21 | 1992-05-07 | Himeno:Kk | Remotely removable type come along |
| CN2467271Y (en) * | 2001-02-26 | 2001-12-26 | 青岛港务局 | Steel wire reinforcing strainer head restraints |
| CN101383491A (en) * | 2008-07-09 | 2009-03-11 | 辽宁省电力有限公司盘锦供电公司 | Wire free card |
| CN201393017Y (en) * | 2009-04-17 | 2010-01-27 | 上海峰翔五金机械设备制造厂 | Line clamping machine |
| CN201742033U (en) * | 2010-07-27 | 2011-02-09 | 东北电网有限公司 | Anti-tripping wire blocker |
| CN102361304A (en) * | 2011-07-25 | 2012-02-22 | 哈尔滨第二电业局 | Electric stringing and tightening device |
| CN203553768U (en) * | 2013-11-14 | 2014-04-16 | 国家电网公司 | Auxiliary wire tightening apparatus |
| CN203674630U (en) * | 2013-12-04 | 2014-06-25 | 国家电网公司 | Novel wire grip chuck |
| CN204205422U (en) * | 2014-11-19 | 2015-03-11 | 国家电网公司 | Charged changing tension-resisting insulator wire backup protection equipment |
-
2014
- 2014-11-19 CN CN201410661746.7A patent/CN104348111B/en active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH04133608A (en) * | 1990-09-21 | 1992-05-07 | Himeno:Kk | Remotely removable type come along |
| CN2467271Y (en) * | 2001-02-26 | 2001-12-26 | 青岛港务局 | Steel wire reinforcing strainer head restraints |
| CN101383491A (en) * | 2008-07-09 | 2009-03-11 | 辽宁省电力有限公司盘锦供电公司 | Wire free card |
| CN201393017Y (en) * | 2009-04-17 | 2010-01-27 | 上海峰翔五金机械设备制造厂 | Line clamping machine |
| CN201742033U (en) * | 2010-07-27 | 2011-02-09 | 东北电网有限公司 | Anti-tripping wire blocker |
| CN102361304A (en) * | 2011-07-25 | 2012-02-22 | 哈尔滨第二电业局 | Electric stringing and tightening device |
| CN203553768U (en) * | 2013-11-14 | 2014-04-16 | 国家电网公司 | Auxiliary wire tightening apparatus |
| CN203674630U (en) * | 2013-12-04 | 2014-06-25 | 国家电网公司 | Novel wire grip chuck |
| CN204205422U (en) * | 2014-11-19 | 2015-03-11 | 国家电网公司 | Charged changing tension-resisting insulator wire backup protection equipment |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105281271A (en) * | 2015-11-27 | 2016-01-27 | 国家电网公司 | Corrosion-resistant wire grip |
| CN107768857A (en) * | 2017-09-15 | 2018-03-06 | 武汉里得电力科技股份有限公司 | A kind of L-type self-locking drop-proof earthing clamp |
| CN109811534A (en) * | 2017-11-21 | 2019-05-28 | 山东天睿玻纤复合材料有限公司 | A kind of glass fabric cutting knife |
| CN109811534B (en) * | 2017-11-21 | 2023-08-22 | 山东天睿新材料科技股份公司 | Glass fiber cloth cuts sword |
| CN111567513A (en) * | 2020-04-24 | 2020-08-25 | 申思博 | Bird repelling spacer, insulating operating rod and mounting method of insulating operating rod |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104348111B (en) | 2016-10-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202651692U (en) | Large-knife clamp tool for changing double-strain string insulator | |
| WO2012088987A1 (en) | Maintenance tool for insulator of direct current transmission line | |
| CN104348111B (en) | Charged changing tension-resisting insulator wire reserve protection and installation method thereof | |
| CN105356371A (en) | Same-tower multi-loop power transmission line strain insulator string electrification replacing method and device | |
| CN204144479U (en) | A kind of earth connection | |
| CN104348116B (en) | Symmetrical wing type conductor clamping device with automatic clamping function | |
| CN203553738U (en) | Portable simple crossing frame for power distribution network | |
| CN102842868A (en) | Method for fastening lead damper bolt in electrified way | |
| CN103795005A (en) | Special tool for dual protection of wire of strain tower | |
| CN105162028A (en) | Method for replacing linear insulator of 220kV steel pipe tower in live working state | |
| CN103474909B (en) | Drainage thread supports the method for expansion live-line replacing multiloop strain insulator string | |
| CN101378153B (en) | Ground wire diverter | |
| CN103532042B (en) | A kind of portable simple crossing frame of power distribution network | |
| CN103779809B (en) | The two oidiospore wire pitch operational method of charged adjustment | |
| CN104348115B (en) | Wing type automatic conductor clamping device with automatic locking device | |
| CN205724008U (en) | Fall arrest earth terminal | |
| CN202602171U (en) | A tool for power-on replacing multi-loop double split conductor insulator of 220kV line | |
| CN205159908U (en) | Backup protection fixing -line device | |
| CN204205429U (en) | The automatic fixing-line device of a kind of aerofoil profile | |
| CN110707599B (en) | A special tool for live adjustment of 220kv vertically arranged double-split conductor sag | |
| CN101364716A (en) | Clamp type hot-line work fastener and using method | |
| CN203503821U (en) | Hard pipe busbar grounding device | |
| CN102545102B (en) | 1000-Kv tension-resistant horizontal insulator charged exchange device | |
| CN204316011U (en) | A kind of symmetrical expression aerofoil profile fixing-line device | |
| CN203690799U (en) | Device for replacing suspension angle tower insulator string in live state |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |