CN203746348U - Adjustable signboard mounting rack - Google Patents

Adjustable signboard mounting rack Download PDF

Info

Publication number
CN203746348U
CN203746348U CN201320777737.5U CN201320777737U CN203746348U CN 203746348 U CN203746348 U CN 203746348U CN 201320777737 U CN201320777737 U CN 201320777737U CN 203746348 U CN203746348 U CN 203746348U
Authority
CN
China
Prior art keywords
rods
crossed
parallel
erecting frame
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320777737.5U
Other languages
Chinese (zh)
Inventor
覃乐丰
李国生
王飞行
张大伟
刘文进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAIYIN POWER SUPPLY COMPANY STATE GRID GANSU ELECTRIC POWER Co Ltd
Original Assignee
BAIYIN POWER SUPPLY COMPANY STATE GRID GANSU ELECTRIC POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAIYIN POWER SUPPLY COMPANY STATE GRID GANSU ELECTRIC POWER Co Ltd filed Critical BAIYIN POWER SUPPLY COMPANY STATE GRID GANSU ELECTRIC POWER Co Ltd
Priority to CN201320777737.5U priority Critical patent/CN203746348U/en
Application granted granted Critical
Publication of CN203746348U publication Critical patent/CN203746348U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model relates to an adjustable signboard mounting rack, which includes a rod number board or a warning board, two parallel rods, two crossed rods and bolts, wherein an elongated hole is formed in the upper part of each of the parallel rods, and the two elongated holes are mutually symmetrical; the two crossed rods are crossed and hinged at the middle; the lower end points of the two crossed rods are hinged to the lower parts of the two parallel rods; the two upper end points of the two crossed rods are fixedly connected with the elongated holes in the upper parts of the two parallel rods through the bolts; the rod number board or the warning board is fixedly mounted on the parallel rods. The mounting rack has a simple structure, is convenient and quick to use, saves manpower and reduces labor intensity and material waste, prolongs the service life of the signboard, has the advantages of neat and attractive appearance, firmness, reliability and the like, and can be widely applied in mounting of rod number boards or warning boards on steel angle towers and communication towers of an electric transmission line.

Description

Adjustable Sign Board erecting frame
Technical field
The utility model relates to a kind of Sign Board field engineering, specifically, is for being arranged on the Sign Board erecting frame on angle steel tower of power transmission line.
Background technology
On iron tower of power transmission line, need to install such as the multiple mark such as pole tag, safety warning-panel (hereinafter to be referred as " number plate "), be beneficial to safety, maintenance and management.
Number plate model is not of uniform size, conventionally: pole tag is less, is 300*400mm; Warning sign is larger, has: the Multiple Types such as 500*400,800*500,2000*800mm.
The mounting means of tradition number plate, generally adopts the connection such as bolt or galvanized wire, steel band, that is: bolt or galvanized wire, steel band etc. are passed to the eyelet on number plate, and number plate is fixedly connected on the bar of steel tower.The major defect that so connected mode exists is: number plate is throughout the year under the External Force Actings such as wind, rain, snow, easily wave with the wind, occur twisted, even drop, and even therefore cause the generation of security incident, affected normal management and the normal operation of transmission line of electricity.For this reason, need to regularly check, keep in repair, expend a large amount of human and material resources, be not suitable with the needs of transmission line of electricity standardization, star evaluation and lean management.
Utility model content
The purpose of this utility model is, a kind of easy for installation, fixed Sign Board erecting frame is provided.
The Sign Board erecting frame of the utility model: mainly formed by pole tag or warning sign, two parallel bars 1, two crossing rod pieces 2 and bolt.A symmetrical strip eyelet 8 is respectively arranged at the top of two parallel bars 1; The intermediate interdigitated hinge joint of two crossing rod pieces 2; The end points of two crossing rod piece 2 belows and the hinge joint of the bottom of two parallel bars 1; Two end points of two crossing rod piece 2 tops are fixedly connected in two parallel bars, 1 top strip eyelet 8 by bolt 5.By regulate two crossing rod pieces, 2 top end points be fixed in strip eyelet 8 under diverse location, determined the width of erecting frame, thereby the number plates of different sizes can be installed.Pole tag or warning sign are fixed on parallel bar 1.
Described parallel bar 1 is zinc-plated L40 × 4 band steel; Described crossing rod piece 2 is zinc-plated L20 × 4 band steel.
When use: terrestrial operation personnel are first according to the size of number plate, determine between bolt 5 and two parallel bar 1 top strip eyelets 8 and be fixedly connected with position, be that bolt 5 is fixed on not existing together up and down of strip eyelet, can make parallel bar 1 left and right shorten or stretch, subsequently bolted is put in place.Then, erecting frame is played to the installation site winching on steel tower, on bar, operating personnel has marked screw mark, utilizes tapping and plugging machine to complete the perforating work of mounting hole, utilizes four M16 bolts 3 that erecting frame and Sign Board are fixed on angle steel tower firmly.So install, a support only needs ground one people to coordinate, and on bar, a people easily completes, and front and back only need to get final product for 10 minutes " putting things right once and for all ".
If line name changes, only four of a pole tag bolt 4 need be dismantled, load onto new pole tag.
This adjustable Sign Board erecting frame, convenient, fast, saved manpower, reduced the waste of material, improved the serviceable life of Sign Board, alleviated staff's labour intensity, reduced the O&M cost of equipment, specification the mounting process of transmission line of electricity mark.
The advantages such as this adjustable Sign Board erecting frame is applicable to pole tag, the warning sign etc. installed on all angle steel towers, has neat appearance, solid and reliable, are widely used on the angle steel tower of transmission line of electricity, on communication tower.
Below in conjunction with drawings and Examples, the utility model is described further.
Brief description of the drawings
Fig. 1. the structural representation of little Sign Board erecting frame;
Fig. 2. large Sign Board mounting support structure schematic diagram.
In figure, the 1st, parallel bar, the 2nd, crossing rod piece, the 3rd, the affixed bolt of erecting frame, the 4th, the affixed bolt of number plate, the 5th, adjusting bolt, the 6th, pole tag, the 7th, warning sign, the 8th, bar shaped eyelet.
Embodiment
Embodiment 1, a kind of little Sign Board erecting frame
The structure of this erecting frame is as shown in Figure 1: be mainly made up of two parallel bars 1, two crossing rod pieces 2, bolt and little Sign Boards.A symmetrical strip eyelet 8 is respectively arranged at the top of two parallel bars 1; It is integral that two crossing rod pieces 2 link by infall, two end points of two crossing rod piece 2 belows and the hinge joint of the bottom of two parallel bars 1; Two end points of two crossing rod piece 2 tops are fixedly connected on the bar shaped eyelet top of two parallel bars 1 by bolt 5.Little Sign Board 6 is the bottom of parallel bar 1 by bolt 4 fixed installations.
Parallel bar 1 adopts zinc-plated L40 × 4 band steel, and crossing rod piece 2 adopts zinc-plated L20 × 4 band steel.
When use, by the affixed bolt 4 of number plate, identifying plate 6 is fixed on the erecting frame installing, then it is fixed on iron tower pole by the affixed bolt 3 of erecting frame.
Embodiment 2, a kind of large Sign Board erecting frame
The structure of this erecting frame as shown in Figure 2.This erecting frame is identical with embodiment 1, and dissimilarity is only: two end points of two crossing rod piece 2 tops are fixedly connected on the bottom of two parallel bar 1 strip eyelets 8 by bolt 5, is convenient to install large Sign Board 7 thereby erecting frame is widened to one.
Large Sign Board (warning sign) 7 is the middle part of parallel bar 1 by bolt 4 fixed installations.
When use, by the affixed bolt 4 of number plate, large identifying plate 7 is fixed on the erecting frame installing, then it is fixed on iron tower pole by the affixed bolt 3 of erecting frame.

Claims (2)

1. adjustable Sign Board erecting frame, is characterized in that: be made up of pole tag or warning sign, two parallel bars (1), two crossing rod pieces (2) and bolt; A symmetrical strip eyelet (8) is respectively arranged at the top of two parallel bars (1); The intermediate interdigitated point place of two crossing rod pieces (2) is hinge joint; The bottom hinge joint of the end points of two crossing rod pieces (2) below and two parallel bars (1); Two end points of two crossing rod pieces (2) top are fixedly connected in two parallel bars (1) top strip eyelets (8) by bolt (5); Pole tag or warning sign are fixed on parallel bar (1).
2. adjustable Sign Board erecting frame according to claim 1, is characterized in that: described parallel bar (1) and crossing rod piece (2), be zinc-plated L40 × 4 band steel.
CN201320777737.5U 2013-12-03 2013-12-03 Adjustable signboard mounting rack Expired - Fee Related CN203746348U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320777737.5U CN203746348U (en) 2013-12-03 2013-12-03 Adjustable signboard mounting rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320777737.5U CN203746348U (en) 2013-12-03 2013-12-03 Adjustable signboard mounting rack

Publications (1)

Publication Number Publication Date
CN203746348U true CN203746348U (en) 2014-07-30

Family

ID=51346120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320777737.5U Expired - Fee Related CN203746348U (en) 2013-12-03 2013-12-03 Adjustable signboard mounting rack

Country Status (1)

Country Link
CN (1) CN203746348U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103617766A (en) * 2013-12-03 2014-03-05 国网甘肃省电力公司白银供电公司 Adjustable signboard mounting rack

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103617766A (en) * 2013-12-03 2014-03-05 国网甘肃省电力公司白银供电公司 Adjustable signboard mounting rack

Similar Documents

Publication Publication Date Title
CN102882157B (en) Portable shockproof hammer tool for replacing tension wire in power cut
CN203352100U (en) Windproof stay wire cross-arm device for power transmission line
CN103001146B (en) Usage method of steel pipe pole operation platform
CN103437283B (en) A kind of hanging basket truss of energy rapid-assembling
CN203367865U (en) Auxiliary bracket for maintaining power transmission line
CN103617766A (en) Adjustable signboard mounting rack
CN203352052U (en) Live-line fastening tool for bolt of strain clamp of power transmission line
CN203746348U (en) Adjustable signboard mounting rack
CN202840371U (en) Portable tool for replacing tension wire shockproof hammers in outage
CN201964100U (en) Hanging and connecting device
CN203640371U (en) Online monitoring system installation device used for power transmission tower
CN110552936A (en) Wire pole staple bolt device of balanced acting as go-between
CN202178556U (en) Steel tower universal type mounting support for controllable lightning rod
CN205165660U (en) Novel preparation of acting as go -between device
CN205189502U (en) Rail for electric overhaul equipment
CN201918113U (en) Simple connector for tower materials
CN201705000U (en) Rush repair tower with cross arm
CN204143774U (en) Electric power steel pipe tower signboard fixing device
CN104500512A (en) Cluster line squaring collector and electric pole fixing structure
CN210041128U (en) Insulating rolling bar that electrified was strideed across
CN204259692U (en) A kind of easily maintenance type windmill drives bird thorn
CN202584587U (en) Number plate for power pole
CN203719096U (en) Air conditioner outdoor unit support frame
CN201377200Y (en) High-voltage protective screen
CN204266684U (en) Power equipment alarming guard

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140730

Termination date: 20181203