- CN203422399U CN203422399U CN201320488759.XU CN201320488759U CN203422399U CN 203422399 U CN203422399 U CN 203422399U CN 201320488759 U CN201320488759 U CN 201320488759U CN 203422399 U CN203422399 U CN 203422399U
- Authority
- CN
- China
- Prior art keywords
- chuck
- fixing iron
- insulating bar
- pulley
- altitude
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 31
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 68
- 229910052742 iron Inorganic materials 0.000 claims abstract description 34
- 238000004382 potting Methods 0.000 claims description 16
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical group [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 7
- 244000273618 Sphenoclea zeylanica Species 0.000 claims description 3
- 230000009194 climbing Effects 0.000 abstract description 4
- 238000009413 insulation Methods 0.000 abstract description 3
- 230000005540 biological transmission Effects 0.000 description 4
- 238000002955 isolation Methods 0.000 description 3
- 241000196324 Embryophyta Species 0.000 description 2
- 229910052802 copper Inorganic materials 0.000 description 2
- 239000010949 copper Substances 0.000 description 2
- 239000003822 epoxy resin Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 229920000647 polyepoxide Polymers 0.000 description 2
- 239000007799 cork Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 230000001131 transforming effect Effects 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
Images
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
The utility model relates to an auxiliary tool for high-voltage experiments and tests, and specifically relates to a high-altitude test clamp for high-voltage tests. The clamp comprises a chuck, an insulating bar, a first fixing iron piece, a pull rope and a pull rod, wherein the chuck includes a front clamp piece, a rear clamp piece, and a spring component arranged between the two clamp pieces; a front end part of the insulation bar is fixedly connected with the spring component of the chuck; the first fixing iron piece is mounted at a rear end part of the insulation bar, and the lower end of the first fixing iron piece is hinged to the upper end of the pull rod; and one end of the pull rope is connected with the tail end of the front clamp piece, while the other end is fixedly connected with the lower end of the pull rod. According to the utility model, a remote operation chuck is used to carry out high-altitude wire feed, wire connection and wire replacement, thereby preventing problems caused by wire feed by hydraulic aerial cage or human climbing. The high-altitude test clamp has the advantages of simple structure, convenient operation and high operation efficiency, so that the smoothness of the wiring of various high-altitude tests is ensured, and the safety of operation personnel safety is ensured.
Description
Technical field
The utility model relates to a kind of high-potting aid, particularly a kind of high-potting altitude test fixture.
Background technology
When carrying out normal transforming plant primary equipment annual test, all can relate to as loop resistance tests such as isolating switch, disconnectores.The equipment that at the beginning of existing loop resistance instrument wire clamp (as Baoding gold reaches the circuit resistance tester 5502 of product) design be all terrestrial operation considers, in the time will measuring altitude plant (as isolating switch, disconnector), often will climb testing wire clamp is delivered to the operation of high vacancy by high altitude vehicle or manpower.Therefore there is following problem: in practical operation, have the blind area that high altitude vehicle or manpower climbing cannot arrive, for example when station equipment is too intensive, cause not having enough spaces to operate for high altitude vehicle or personnel, this will directly affect surveying work, make surveying work become complicated; In addition, while often needing to change wiring, now need to reuse high altitude vehicle in process of the test, or need work high above the ground personnel to carry enough wiring, caused operation inefficient, increase the hazards of work high above the ground, have potential safety hazard.
Summary of the invention
The purpose of this utility model is to provide a kind of simple, convenient, operation high-level efficiency, safe high-potting altitude test fixture according to the deficiencies in the prior art part.
The purpose of this utility model realizes by following approach:
High-potting altitude test fixture, its structural feature is, include chuck, insulating bar, the first fixing iron member, stay cord and pull bar, wherein chuck includes front folder, rear folder and the spring member between two folders, the leading section of insulating bar is fixedly connected with the spring member of chuck, the first fixing iron member is arranged on the rearward end of insulating bar, and the lower end of this first fixing iron member and the upper end of pull bar are hinged, one end of stay cord is connected with the tail end of front folder, and the other end is fixedly connected with pull bar bottom.
Pull bar can be along the pin joint swing of itself and the first fixing iron member, when pull bar swings backward, can drive stay cord to pull backward, thereby the tail end of front folder is swung backward, open the jaws of chuck, and during pull bar return, before folder can be under the effect of spring member return, be clamp position with rear folder.During use, adopt chuck to fix wiring, then by surface work personnel, directly by sufficiently long insulating bar, wiring is delivered to the high pressure primary equipment of appointment, by operation pull bar, realize the folding to chuck, thereby complete altitude test wiring, line taking and thread-changing, and without high altitude vehicle or manpower climbing, remote-operated clamp structure is simple, easy to operate, the smooth inlet wire that operating efficiency is high, guaranteed various altitude test wiring, has guaranteed operating personnel's personal safety.
The utility model can further be specially:
Chuck also includes two clamping screws, lays respectively at the position of front folder and rear folder front end jaws, and two bolts distribute in opposite directions, and withstands on jaws copper part.
Because loop resistance wire clamp requires wire clamp jaws, tightness is very high, therefore adopts clamping screw that jaws copper part is carried out effectively fixing and further clamped.Jaws partly adopts copper part, and preferably pure copper material, enough little to guarantee itself and isolating switch and isolation switch wire clamp contact resistance, and do not affect test figure.
Also include the second fixing iron member, the first pulley and the second pulley, the first pulley is arranged on the spring member of chuck, the second fixing iron member is arranged on insulating bar, be positioned at the first fixed clip and chuck centre position, the second pulley is arranged on the bottom of the second fixing iron member, one end of stay cord is fixed on the tail end of rear folder, and sequentially walks around tail end, second pulley of the first pulley, front folder, is finally fixed on pull bar bottom.
The first pulley is for the bracing wire of fixing and transmission folding chuck, the second pulley is for supporting and the stay cord of transmission from chuck to pull bar, the second fixing iron member is for installing the second pulley, the pulley gearing that the first described pulley and the second pulley form can fixed pulling rope track, thereby make stay cord in two pulley room transmissions, complete the folding operation to chuck.
Insulating bar is a kind of hollow stem, and its tail end has embedded connecting piece.
Like this, can continue as required to connect insulating bar, lengthen insulating bar, to meet the length requirement of operation.
The first fixing iron member includes circular external member and extends fixture, and circular external member cover is trapped among on insulating bar, extends the side that fixture is positioned at insulating bar, hinged with pull bar.
The second described fixing iron member and the first fixing iron member structural similarity, wherein the second pulley extends between fixture at two of the second fixing iron member.The first fixing iron member is for cylinder lever connecting rod and insulating bar, controls pull bar and just can easily pull stay cord, thereby freely control the folding of insulating bar top chuck.
In sum, the utility model provides a kind of high-potting altitude test fixture, adopts remote control chuck, high-potting wiring is carried out to high-altitude line sending, wiring and thread-changing.The series of problems of having avoided high altitude vehicle or manpower climbing line sending to bring, the utility model is simple in structure, easy to operate, and the smooth inlet wire that operating efficiency is high, guaranteed various altitude test wiring, has guaranteed operating personnel's personal safety.
Accompanying drawing explanation
Figure 1 shows that the structural representation of altitude test furniture for the high-potting described in most preferred embodiment.
Figure 2 shows that the structural representation of chuck in Fig. 1.
Figure 3 shows that the structural representation of the first fixing iron member and the second fixing iron member in Fig. 1.
Below in conjunction with embodiment, the utility model is described further.
Embodiment
Most preferred embodiment:
With reference to accompanying drawing 1, high-potting altitude test fixture, includes chuck 1, insulating bar 2, the first fixing iron member 3, the second fixing iron member 4, the first pulley 5, the second pulley 6, stay cord 7 and pull bar 8.
The structure of chuck 1 on the basis of accompanying drawing 1 with reference to accompanying drawing 2, two clamping screws 14 that chuck 1 includes front folder 11, rear folder 12, the spring member between two folders 13 and is positioned at jaws.Front folder 11 is hinged by spring member 13 and rear folder 12 pretensions, and two clamping screws 14 distribute in opposite directions and withstand on the Zijin copper part 15 of jaws.
The first fixing iron member 3 is identical with the structure of the second fixing iron member 4, with reference to accompanying drawing 1 and accompanying drawing 3, include circular external member 31 and extend fixture 32, circular external member 31 covers are trapped among on insulating bar, extension fixture 32 is positioned at a side of insulating bar, clamping with bolts.
With reference to accompanying drawing 1, chuck 1 is fixedly connected with insulating bar 2 by plastic fastening 9; The first fixing iron member 3 is arranged on the rearward end of insulating bar 2, and the lower end of this first fixing iron member 3 (extension fixture) is hinged with the upper end of pull bar 8.The first pulley 5 is arranged on the spring member of chuck 1, the second fixing iron member 4 is arranged on insulating bar 2, be positioned at the first fixed clip 3 and chuck 1 centre position, the second pulley 6 is arranged on the bottom (extension fixture) of the second fixing iron member, one end of stay cord 7 is fixed on the tail end of chuck 1 rear folder, and sequentially walk around tail end, second pulley 6 of the first pulley 5, front folder, be finally fixed on pull bar 8 bottoms.
Consider the requirement for height of work high above the ground, may need insulating bar long enough, now insulating bar can be made to the structure that can continue, at the tail end of insulating bar, have embedded T-shaped web member 21, with continued access insulating bar, in figure, 22,22 is the operation insulating bar of continued access.In addition, insulating bar 2 is a kind of hollow stem, by the insulating material of epoxy resin, is made, and the electric current line of wire clamp and voltage can pass hollow insulating bar.
The making key point of altitude test fixture described in the utility model is also:
1, the physical strength of insulating bar and dielectric strength, physical strength can be born whole device and can not be fractureed, and dielectric strength guarantees the potential isolation between insulating bar spacer assembly top and bottom, and primary insulation bar is made with high-intensity epoxy resin.
2: the intensity of chuck medi-spring structure, because loop resistance wire clamp requires wire clamp jaws, tightness is very high, therefore requires spring force and intensity to meet the demands.
3: chuck jaws requirement pure copper material is very little to guarantee itself and isolating switch and isolation switch wire clamp contact resistance.
4: electric current line, the electric current line that passes hollow insulating bar is connected to the chuck jaws at top, because measuring current will reach 200A, because require electric current line can bear so large electric current.
By the first fixing iron member, control stay cord, drive the folding of chuck, operating personnel just can control the folding of chuck like a cork on ground like this, as high-potting altitude test fixture, very practical in electric power overhaul production work.Staff can carry out on ground the clamping connection of test lead, firm fixing, effectively improves job security and the work efficiency of high-potting.
The utility model is easy to use, and dismounting is simple, and transmission is stable, is conducive to collection in worksite transient overvoltage signal accurately, and through experimental examination, contact resistance can meet testing requirements.It is same as the prior art that the utility model is not stated part.
Claims (5)
1. high-potting altitude test fixture, it is characterized in that, include chuck, insulating bar, the first fixing iron member, stay cord and pull bar, wherein chuck includes front folder, rear folder and the spring member between two folders, the leading section of insulating bar is fixedly connected with the spring member of chuck, the first fixing iron member is arranged on the rearward end of insulating bar, and the lower end of this first fixing iron member and the upper end of pull bar are hinged, one end of stay cord is connected with the tail end of front folder, and the other end is fixedly connected with pull bar bottom.
2. high-potting according to claim 1 altitude test fixture, is characterized in that, chuck also includes two clamping screws, lays respectively at the position of front folder and rear folder front end jaws, and two bolts distribute in opposite directions, and withstands on jaws copper part.
3. altitude test fixture tool for high-potting according to claim 1, it is characterized in that, also include the second fixing iron member, the first pulley and the second pulley, the first pulley is arranged on the spring member of chuck, the second fixing iron member is arranged on insulating bar, be positioned at the first fixed clip and chuck centre position, the second pulley is arranged on the bottom of the second fixing iron member, one end of stay cord is fixed on the tail end of rear folder, and sequentially walk around tail end, second pulley of the first pulley, front folder, be finally fixed on pull bar bottom.
4. high-potting according to claim 1 altitude test fixture, is characterized in that, insulating bar is a kind of hollow stem, and its tail end has embedded connecting piece.
5. high-potting according to claim 1 altitude test fixture, it is characterized in that, the first fixing iron member includes circular external member and extends fixture, and circular external member cover is trapped among on insulating bar, extension fixture is positioned at a side of insulating bar, hinged with pull bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320488759.XU CN203422399U (en) | 2013-08-12 | 2013-08-12 | High-altitude test clamp for high-voltage tests |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320488759.XU CN203422399U (en) | 2013-08-12 | 2013-08-12 | High-altitude test clamp for high-voltage tests |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203422399U true CN203422399U (en) | 2014-02-05 |
Family
ID=50021494
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320488759.XU Expired - Fee Related CN203422399U (en) | 2013-08-12 | 2013-08-12 | High-altitude test clamp for high-voltage tests |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203422399U (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104062470A (en) * | 2014-06-27 | 2014-09-24 | 国网河北省电力公司衡水供电分公司 | High-voltage switch characteristic test auxiliary wire connection tool |
CN104377469A (en) * | 2014-11-18 | 2015-02-25 | 国网河南省电力公司平顶山供电公司 | Aloft containing and taking device and method for aloft test wires of power system |
CN106290995A (en) * | 2016-07-13 | 2017-01-04 | 国网山东省电力公司东营供电公司 | A kind of high-potting auxiliary connection device |
CN107425309A (en) * | 2017-03-17 | 2017-12-01 | 国家电网公司 | The electric test fixture of terrestrial operation eminence wiring |
CN107688106A (en) * | 2017-09-25 | 2018-02-13 | 中国长江电力股份有限公司 | A kind of electrical equipment high-voltage large current experiment special fixture and method |
CN107796964A (en) * | 2017-11-29 | 2018-03-13 | 国家电网公司 | A kind of current transformer tests aid |
CN108089033A (en) * | 2017-12-29 | 2018-05-29 | 国网河北省电力有限公司衡水供电分公司 | High-voltage test of electrical equipment auxiliary connection device |
CN108387760A (en) * | 2018-01-23 | 2018-08-10 | 安徽送变电工程有限公司 | A kind of improved power high voltage test connection device |
CN109282984A (en) * | 2017-07-20 | 2019-01-29 | 安徽江淮专用汽车有限公司 | A kind of pressure gas tank safety valve Manual test device |
CN110940834A (en) * | 2019-11-29 | 2020-03-31 | 国网福建省电力有限公司检修分公司 | A quick wiring pincers for power equipment electrical test |
CN112505587A (en) * | 2021-02-08 | 2021-03-16 | 山东广域科技有限责任公司 | Power failure detection device of transformer substation |
-
2013
- 2013-08-12 CN CN201320488759.XU patent/CN203422399U/en not_active Expired - Fee Related
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104062470A (en) * | 2014-06-27 | 2014-09-24 | 国网河北省电力公司衡水供电分公司 | High-voltage switch characteristic test auxiliary wire connection tool |
CN104377469A (en) * | 2014-11-18 | 2015-02-25 | 国网河南省电力公司平顶山供电公司 | Aloft containing and taking device and method for aloft test wires of power system |
CN104377469B (en) * | 2014-11-18 | 2016-08-24 | 国网河南省电力公司平顶山供电公司 | A kind of power system high-altitude p-wire eminence assembling and removing device and attaching/detaching method |
CN106290995A (en) * | 2016-07-13 | 2017-01-04 | 国网山东省电力公司东营供电公司 | A kind of high-potting auxiliary connection device |
CN107425309A (en) * | 2017-03-17 | 2017-12-01 | 国家电网公司 | The electric test fixture of terrestrial operation eminence wiring |
CN107425309B (en) * | 2017-03-17 | 2024-03-15 | 国家电网公司 | Electrical test clamp for wiring at ground operation high place |
CN109282984A (en) * | 2017-07-20 | 2019-01-29 | 安徽江淮专用汽车有限公司 | A kind of pressure gas tank safety valve Manual test device |
CN107688106B (en) * | 2017-09-25 | 2023-12-29 | 中国长江电力股份有限公司 | Special fixture and method for high-voltage and high-current test of electrical equipment |
CN107688106A (en) * | 2017-09-25 | 2018-02-13 | 中国长江电力股份有限公司 | A kind of electrical equipment high-voltage large current experiment special fixture and method |
CN107796964A (en) * | 2017-11-29 | 2018-03-13 | 国家电网公司 | A kind of current transformer tests aid |
CN108089033A (en) * | 2017-12-29 | 2018-05-29 | 国网河北省电力有限公司衡水供电分公司 | High-voltage test of electrical equipment auxiliary connection device |
CN108387760A (en) * | 2018-01-23 | 2018-08-10 | 安徽送变电工程有限公司 | A kind of improved power high voltage test connection device |
CN108387760B (en) * | 2018-01-23 | 2024-01-16 | 安徽送变电工程有限公司 | Improved electric power high-voltage test wiring device |
CN110940834A (en) * | 2019-11-29 | 2020-03-31 | 国网福建省电力有限公司检修分公司 | A quick wiring pincers for power equipment electrical test |
CN112505587A (en) * | 2021-02-08 | 2021-03-16 | 山东广域科技有限责任公司 | Power failure detection device of transformer substation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203422399U (en) | High-altitude test clamp for high-voltage tests | |
CN203690524U (en) | Test operating lever for outdoor high-voltage class transformer | |
CN202929093U (en) | Multifunctional high-voltage electricity-testing device | |
CN201548642U (en) | Junction pole for high voltage test | |
CN107425309B (en) | Electrical test clamp for wiring at ground operation high place | |
CN203300937U (en) | High-hitching ground wire operating lever | |
CN203800477U (en) | Clamping tool used for electriferous replacement of first insulator of power transmission line tension single chain at wire side | |
CN202384516U (en) | Secondary voltage drop live-line wiring device | |
CN103887735A (en) | Linear charged wire lifting device of electric transmission line | |
CN207134711U (en) | A kind of wireless remote control shearing equipment | |
CN202075310U (en) | Crosslinked cable test terminal fixing device | |
CN206387819U (en) | A kind of high-altitude automatic deploying and retracting test wire action bars | |
CN203277304U (en) | Built-in high-voltage fuse sleeve installation apparatus | |
CN203672919U (en) | Wiring clamp for breaker insulation resistance testing | |
CN203365481U (en) | A foldable insulating bar withstand voltage test support | |
CN207217978U (en) | Parallel groove clamp assembly and disassembly operations instrument | |
CN202720248U (en) | Insulating bracket for high voltage test | |
CN103809011A (en) | Lightning arrester resistive-current testing tool | |
CN205489263U (en) | Insulated wire vaulting pole | |
CN201639196U (en) | Insulating tool set | |
CN209148844U (en) | A kind of high-voltage circuitbreaker test short jumper device | |
CN203909222U (en) | Clamp plate electrode for 220 kV and greater insulation tool AC high-voltage holding test device | |
CN204441795U (en) | Synthetic insulator outlet bridge | |
CN205720315U (en) | Anti-corona standoff | |
CN202308923U (en) | Insulator replacement equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140205 Termination date: 20200812 |