CN203800477U - Clamping tool used for electriferous replacement of first insulator of power transmission line tension single chain at wire side - Google Patents
Clamping tool used for electriferous replacement of first insulator of power transmission line tension single chain at wire side Download PDFInfo
- Publication number
- CN203800477U CN203800477U CN201420150527.8U CN201420150527U CN203800477U CN 203800477 U CN203800477 U CN 203800477U CN 201420150527 U CN201420150527 U CN 201420150527U CN 203800477 U CN203800477 U CN 203800477U
- Authority
- CN
- China
- Prior art keywords
- insulator
- clamping tool
- electriferous
- line tension
- connecting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000012212 insulator Substances 0.000 title claims abstract description 42
- 230000005540 biological transmission Effects 0.000 title abstract 3
- 230000007704 transition Effects 0.000 claims description 17
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 claims description 10
- 239000010931 gold Substances 0.000 claims description 10
- 229910052737 gold Inorganic materials 0.000 claims description 10
- 230000008901 benefit Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Insulators (AREA)
Abstract
The utility model discloses a clamping tool used for electriferous replacement of a first insulator of a power transmission line tension single chain at a wire side. The clamping tool includes a transitional connecting plate; the transitional connecting plate is provided with two symmetric extended fittings; each extended fitting is connected with one end of a screw rod; and the other ends of the screw rods are connected with an insulator end clamping plate. Compared with the prior art, the clamping tool of the utility model has the advantages of simple structure, light weight, ingenious design, safety and reliability. With the clamping tool adopted, electriferous replacement of a first insulator of a 110-to-220kV power transmission line tension single chain at a wire side can be realized, and therefore, problems such as difficulties in power outage, long operation time and high labor intensity can be solved, and great economic benefits can be brought about, and the clamping tool is of high practicability, and technical blank in electriferous operation can be filled.
Description
Technical field
The utility model relates to a kind of charged for replacement power line tension list string side of wire was first insulator jig, belongs to electric power apparatus examination technical field.
Background technology
At present, known a lot of 110kV of transformer station, 220kV bus-bar insulator all adopts the connected mode of single string, due to the nonlinear Distribution of insulator, spread voltage on every a slice insulator and pollution level are all different, according to the regularity of distribution of the working voltage of insulator, high by cross-arm side first insulator and side of wire was first insulator other insulator of born voltage ratio that is in operation, the spread voltage particularly bearing by side of wire was first insulator is the highest, therefore be in operation the most aging, cause the dielectric strength of insulator to reduce, finally become low value or zero resistance insulator, jeopardize the safe operation of electrical network.After insulator generation problem, just must overhaul it, all the time owing to there is no effectively separately side of wire was first insulator to be carried out method and the jig of live-line replacing, so all take interruption maintenance at every turn, the mode that whole string is changed, one-stop operation is ordered till end-of-job power transformation operation personnel operating equipment resumes operation from scheduling, at least need 6 hours, so will certainly increase its labour intensity and interruption duration, cause a large amount of energy losses, increase the operating risk that a lot of operations bring, so existing replacing method is still perfect not.
Summary of the invention
The purpose of this utility model is: provide a kind of simple in structure, practical, reliability is safe, simple to operate, can carry out monolithic charged for replacement to 110-220kV power line tension list string side of wire was first insulator, there is lower cost of manufacture, lightly facilitate, can save the more activity duration, alleviate the jig of a kind of charged for replacement power line tension list string side of wire was first insulator of operating personnel's labour intensity, to overcome the deficiencies in the prior art.
The utility model is constructed as follows: the jig of charged for replacement power line tension list string side of wire was first insulator, comprise transition connecting plate, in transition connecting plate, be provided with two symmetrical prolongation gold utensils, extend gold utensil and be connected with one end of screw mandrel, the other end of screw mandrel is connected with insulator end clamp.
In transition connecting plate, be provided with connecting hole, transition connecting plate is connected with prolongation gold utensil by connecting hole.
Transition connecting plate is joined by connecting hole and drawtongs.
Owing to having adopted technique scheme, when replacing, insulator end clamp is arranged on second insulator of side of wire was, the drawtongs of transition connecting plate is stuck on wire, tighten up insulator by leading screw, make insulator lax, insulator is changed; Compared with prior art, the utility model not only has simple in structure, the advantage that quality is light, and design ingenious, safe and reliable, can carry out monolithic charged for replacement to 110-220kV power line tension list string side of wire was first insulator and solved the problems such as interruption duration difficulty, the activity duration is long, labour intensity is large, there is larger economic benefit and practicality, solve the problem in actual production work, also filled up a blank of live line working.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Structural representation when Fig. 2 is work;
Description of reference numerals: 1-transition connecting plate, 2-connecting hole, 3-extends gold utensil, 4-screw mandrel, 5-insulator end clamp, 6-drawtongs, 7-insulator, 8-wire.
Embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Enforcement of the present utility model: the jig of charged for replacement power line tension list string side of wire was first insulator, comprise transition connecting plate 1, in transition connecting plate 1, be provided with two symmetrical prolongation gold utensils 3, extend gold utensil 3 and be connected with one end of screw mandrel 4, the other end of screw mandrel 4 is connected with insulator end clamp 5.
In transition connecting plate 1, be provided with connecting hole 2, transition connecting plate 1 is connected with prolongation gold utensil 3 by connecting hole 2.
Transition connecting plate 1 is joined by connecting hole 2 and drawtongs 6.
Jig is to be made by 7075 high-strength aluminum alloys.
When work, No. 1 electrician carries insulating cord and climbs shaft tower to pole tower operation phase insulator string hitch point, fastens seat belts, and then insulating cord is thrown and is suspended on operation phase conductor; Ground electrician is suspended to rope ladder on wire; No. 2 electricians wear a complete set of screening clothing and carry out equal potential working; Ground electrician assemble the set of tools, as shown in Figure 2: pass to electrician No. 2 by insulating cord, No. 2 electrician is arranged on insulator end clamp 5 on second insulator of side of wire was, the other end is stuck in the drawtongs of transition connecting plate on wire 8, tighten up insulator 8 by leading screw 4, make insulator lax, insulator is changed.
Claims (3)
1. the jig of charged for replacement power line tension list string side of wire was first insulator, comprise transition connecting plate (1), it is characterized in that: in transition connecting plate (1), be provided with symmetrical two prolongation gold utensils (3), extend gold utensil (3) and be connected with one end of screw mandrel (4), the other end of screw mandrel (4) is connected with insulator end clamp (5).
2. the jig of charged for replacement power line tension list string side of wire was first insulator according to claim 1, it is characterized in that: in transition connecting plate (1), be provided with connecting hole (2), transition connecting plate (1) is connected with prolongation gold utensil (3) by connecting hole (2).
3. the jig of charged for replacement power line tension list string side of wire was first insulator according to claim 1, is characterized in that: transition connecting plate (1) is joined by connecting hole (2) and drawtongs (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420150527.8U CN203800477U (en) | 2014-03-31 | 2014-03-31 | Clamping tool used for electriferous replacement of first insulator of power transmission line tension single chain at wire side |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420150527.8U CN203800477U (en) | 2014-03-31 | 2014-03-31 | Clamping tool used for electriferous replacement of first insulator of power transmission line tension single chain at wire side |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203800477U true CN203800477U (en) | 2014-08-27 |
Family
ID=51382666
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420150527.8U Expired - Lifetime CN203800477U (en) | 2014-03-31 | 2014-03-31 | Clamping tool used for electriferous replacement of first insulator of power transmission line tension single chain at wire side |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203800477U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104300435A (en) * | 2014-10-22 | 2015-01-21 | 国家电网公司 | Wire tightener used for replacing double insulator strings |
CN105244810A (en) * | 2015-10-29 | 2016-01-13 | 国家电网公司 | Clamping fixture for power-failure replacement of 110kV line hydraulic tension wire clamp single-string insulator |
CN106486922A (en) * | 2016-11-16 | 2017-03-08 | 国家电网公司 | Insulator replacement fixture |
CN108521100A (en) * | 2018-06-20 | 2018-09-11 | 国网河南省电力公司检修公司 | Three V-type insulator chain special mould clamp of ± 1100kV DC power transmission lines |
CN109473901A (en) * | 2018-05-09 | 2019-03-15 | 国网浙江省电力有限公司嘉兴供电公司 | A kind of fixture for replacing power transmission tower side of wire end insulation |
-
2014
- 2014-03-31 CN CN201420150527.8U patent/CN203800477U/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104300435A (en) * | 2014-10-22 | 2015-01-21 | 国家电网公司 | Wire tightener used for replacing double insulator strings |
CN105244810A (en) * | 2015-10-29 | 2016-01-13 | 国家电网公司 | Clamping fixture for power-failure replacement of 110kV line hydraulic tension wire clamp single-string insulator |
CN106486922A (en) * | 2016-11-16 | 2017-03-08 | 国家电网公司 | Insulator replacement fixture |
CN109473901A (en) * | 2018-05-09 | 2019-03-15 | 国网浙江省电力有限公司嘉兴供电公司 | A kind of fixture for replacing power transmission tower side of wire end insulation |
CN108521100A (en) * | 2018-06-20 | 2018-09-11 | 国网河南省电力公司检修公司 | Three V-type insulator chain special mould clamp of ± 1100kV DC power transmission lines |
CN108521100B (en) * | 2018-06-20 | 2021-05-04 | 国网河南省电力公司检修公司 | Special fixture of 1100kV direct current transmission line trigeminy V type insulator chain |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203800477U (en) | Clamping tool used for electriferous replacement of first insulator of power transmission line tension single chain at wire side | |
CN101814707B (en) | Tool for live replacement of 220kV line 'V' string insulator and method | |
CN103427370A (en) | Strain insulator string live replacing device for high-voltage transmission line | |
CN201146346Y (en) | Portable insulation maintenance gap bridge | |
CN204424804U (en) | Equipotential changes the instrument of the two soft bus strain insulator of simply connected | |
CN103887735A (en) | Linear charged wire lifting device of electric transmission line | |
CN203787855U (en) | Power transmission line linear charged wire lifting device | |
CN204793844U (en) | Change promotion instrument of single wire insulator of 110kV with electricity | |
CN206379675U (en) | Yoke plate card for live-line replacement of V-string insulator wire of tangent tower | |
CN204103354U (en) | Charged for replacement 110kV-2200kV strain insulator string special tool utensil | |
CN202930836U (en) | Tension insulator replacement tool | |
CN201629516U (en) | Three-connected extension-resisting clamp for extra HVDC transmission line | |
CN204886008U (en) | Change large -tonnage wire insulator chain's traditional thread binding putting of carrying with electricity | |
CN203813320U (en) | Tool for live exchange of 220 kV narrow base tower strain insulator string | |
CN101252263A (en) | Method for electrified replacing 500 kV line L string insulator | |
CN201853820U (en) | Miniature busbar connecting structure at top of metal armoured middle switch cabinet | |
CN202564818U (en) | Substation equipment bolt charged fastening device | |
CN203312731U (en) | Transformer station flexible bus sag-adjusting device | |
CN201639242U (en) | Y-shaped clip for extra-high voltage power transmission line | |
CN105429054A (en) | Universal fixture for lively replacing entire glass insulator string on strain pole | |
CN203967627U (en) | Charged for replacement 110kV strain insulator string bilateral hook bottle supporting Work tool | |
CN214280701U (en) | Soft hanging tool for replacing insulator in live line | |
CN205195138U (en) | A sharp shoulder pole card for changing sharp insulator chain that singly goes here and there | |
CN204947467U (en) | Vertical two elevator | |
CN204303232U (en) | A kind of low-voltage power distribution station area teaching mould |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20140827 |
|
CX01 | Expiry of patent term |