CN204886008U - Wire lifting device for replacing insulator strings of large-tonnage wires with power on - Google Patents

Wire lifting device for replacing insulator strings of large-tonnage wires with power on Download PDF

Info

Publication number
CN204886008U
CN204886008U CN201520700297.2U CN201520700297U CN204886008U CN 204886008 U CN204886008 U CN 204886008U CN 201520700297 U CN201520700297 U CN 201520700297U CN 204886008 U CN204886008 U CN 204886008U
Authority
CN
China
Prior art keywords
wire
connecting plate
hook
tonnage
couple
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520700297.2U
Other languages
Chinese (zh)
Inventor
徐文洋
孟遂民
丁志敏
秦坤
卢银均
祝一帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges University CTGU
Original Assignee
China Three Gorges University CTGU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University CTGU filed Critical China Three Gorges University CTGU
Priority to CN201520700297.2U priority Critical patent/CN204886008U/en
Application granted granted Critical
Publication of CN204886008U publication Critical patent/CN204886008U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model relates to a change large -tonnage wire insulator chain's traditional thread binding putting of carrying with electricity, the line couple is reached and carried including turn -buckle, the insulating pull -rod of multiple, the turn -buckle is including screwing the handle, and the handle of screwing constitutes screw thread transmission coordination with tight filament pole, tight filament pole lower extreme fixedly connected with connecting block, and the processing of connecting block lower extreme has the couple, the insulating pull -rod of multiple includes the upper junction plate, and U type couple and U type couple have down been welded respectively to upper junction plate and the center of connecting plate down, and it is continuous with the couple of connecting block through last round pin axle to go up U type couple, carrying the line couple and including U type hanging hole, U type hanging hole is continuous with the lower U type couple of lower U type couple through selling the axle down. The problem of it is complicated to change the technological installation of multiplexer utensil, the use of using of the many hoisting points of large -tonnage wire insulator chain with electricity, and operation personnel live working is chronic, and operation intensity is big, and danger is high is solved.

Description

带电更换大吨位导线绝缘子串的提线装置Wire lifting device for replacing insulator strings of large-tonnage wires with power on

技术领域 technical field

本实用新型属于高电压技术领域,特别涉及到一种带电更换大吨位导线绝缘子串的提线装置。 The utility model belongs to the high-voltage technical field, in particular to a wire lifting device for live replacement of large-tonnage wire insulator strings.

背景技术 Background technique

随着经济的发展,电力需求日益增大,大吨位输电线路也被广泛应用于电网主网中,针对大吨位输电线路绝缘子串的带电检修作业量也日益增加,为了满足大吨位导线强度要求,目前带电更换大吨位导线绝缘子串采用的是多点起吊技术,即四根绝缘拉棒与紧线器配合使用。然而,这种多吊点技术所使用的工器具安装、使用复杂,作业人员带电作业时间长,作业强度大,危险性高,不利于大吨位导线绝缘子串带电作业的开展。 With the development of the economy, the demand for electricity is increasing, and large-tonnage transmission lines are also widely used in the main grid of the power grid. The live maintenance work for the insulator strings of large-tonnage transmission lines is also increasing. In order to meet the strength requirements of large-tonnage conductors, At present, the replacement of large-tonnage wire insulator strings with live use adopts multi-point lifting technology, that is, four insulating pull rods are used in conjunction with a wire tensioner. However, the tools used in this multi-lifting point technology are complicated to install and use, and the operators have long hours of live work, high work intensity and high risk, which is not conducive to the development of live work on large-tonnage wire insulator strings.

发明内容 Contents of the invention

本实用新型的目的是为了克服上述背景技术的不足,提供一种带电更换大吨位导线绝缘子串的提线装置,以解决带电更换大吨位导线绝缘子串多吊点技术所使用的工器具安装、使用复杂,作业人员带电作业时间长,作业强度大,危险性高的问题。 The purpose of this utility model is to overcome the deficiency of the above-mentioned background technology, to provide a wire lifting device for live replacement of large-tonnage wire insulator strings, to solve the problem of installation and use of tools used in the technology of live replacement of large-tonnage wire insulator strings with multiple lifting points It is complicated, and the operators work with live wires for a long time, with high work intensity and high risk.

为实现上述目的,本实用新型提供了如下方案:带电更换大吨位导线绝缘子串的提线装置,包括紧线器、多联式绝缘拉棒及和提线挂钩,所述紧线器包括旋紧把手,旋紧把手与紧线丝杆构成螺纹传动配合,紧线丝杆下端固定连接有连接块,连接块下端加工有挂钩;所述多联式绝缘拉棒包括上连接板、下连接板和绝缘拉杆,上连接板和下连接板的中心分别焊接有上U型挂钩和下U型挂钩,上U型挂钩通过上销轴与连接块的挂钩相连,上连接板和下连接板的边缘相同直径处都均布加工有多个螺纹孔,螺纹孔之间连接有多根绝缘拉杆;所述提线挂钩包括U型挂孔,U型挂孔通过下销轴与下U型挂钩的下U型挂钩相连。 In order to achieve the above purpose, the utility model provides the following scheme: a wire lifting device for replacing large-tonnage wire insulator strings with electricity, including a wire tensioner, a multi-connected insulating pull rod and a wire lifting hook, and the wire tensioner includes a tightening The handle, tightening the handle and the tightening screw rod form a threaded transmission fit, the lower end of the tightening screw rod is fixedly connected with a connecting block, and the lower end of the connecting block is processed with a hook; the multi-connected insulating pull rod includes an upper connecting plate, a lower connecting plate and Insulated pull rod, upper U-shaped hook and lower U-shaped hook are welded at the center of the upper connecting plate and lower connecting plate respectively, the upper U-shaped hook is connected with the hook of the connecting block through the upper pin shaft, and the edges of the upper connecting plate and the lower connecting plate are the same A plurality of threaded holes are evenly distributed on the diameter, and a plurality of insulating pull rods are connected between the threaded holes; the wire lifting hook includes a U-shaped hanging hole, and the U-shaped hanging hole passes through the lower pin shaft and the lower U of the lower U-shaped hook. type hook.

所述绝缘拉杆的上端通过上螺母固定在上连接板的螺纹孔内,下端通过下螺母固定在下连接板的螺纹孔内。 The upper end of the insulating pull rod is fixed in the threaded hole of the upper connecting plate through the upper nut, and the lower end is fixed in the threaded hole of the lower connecting plate through the lower nut.

所述绝缘拉杆采用绝缘材料制成。 The insulating pull rod is made of insulating material.

所述U型挂孔的下端焊接有挂钩。 The lower end of the U-shaped hanging hole is welded with a hook.

所述紧线器、多联式绝缘拉棒及和提线挂钩各个零部件主体的非圆形结构都采用倒角处理。 The non-circular structures of the main parts of the wire tensioner, the multi-connected insulating pull rod and the wire lifting hook are all chamfered.

本实用新型有如下有益效果: The utility model has the following beneficial effects:

1、采用多根绝缘拉杆,能够同时提升多个大吨位的绝缘棒,采用多点起吊技术能够有效的提高绝缘子吊装过程的稳定性。 1. Using multiple insulating tie rods can lift multiple large-tonnage insulating rods at the same time. Using multi-point lifting technology can effectively improve the stability of the insulator hoisting process.

2、通过四根绝缘拉杆与紧线器配合使用,能够有效的起到绝缘作用,从而方便了带点绝缘子的直接起吊作业。 2. Through the use of four insulating pull rods in conjunction with the wire tensioner, it can effectively play an insulating role, thus facilitating the direct lifting operation with point insulators.

3、通过将所述紧线器、多联式绝缘拉棒及和提线挂钩各个零部件主体的非圆形结构都采用倒角处理,能够有效的防止发生电晕现象,保证了作业的安全性。 3. By chamfering the non-circular structures of the main parts of the wire tensioner, multi-connected insulating pull rod and the wire lifting hook, it can effectively prevent the corona phenomenon and ensure the safety of the operation sex.

4、通过紧线器上的旋紧把手能够通过螺纹传动配合对整个装置进行提升作业,在安装到位之后起到了紧线的目的。 4. Through the tightening handle on the thread tensioner, the entire device can be lifted through thread transmission, and the purpose of tightening the thread can be achieved after the installation is in place.

附图说明 Description of drawings

下面结合附图和实施例对本实用新型作进一步说明。 Below in conjunction with accompanying drawing and embodiment the utility model is further described.

图1是本实用新型的使用状态示意图。 Fig. 1 is a schematic diagram of the use state of the utility model.

图2是图1中多联式绝缘拉棒示意图。 Fig. 2 is a schematic diagram of multi-connected insulating rods in Fig. 1 .

图3是图1中提线挂钩的正视。 Fig. 3 is a front view of the thread-handling hook in Fig. 1 .

图4是挂钩的主视图。 Fig. 4 is a front view of the hook.

图中:旋紧把手1、紧线丝杆2、连接块3、上销轴4、上U型挂钩5、上连接板6、上螺母7、绝缘拉杆8、下连接板9、下螺母10、下U型挂钩11、下U型挂钩12、下销轴13、U型挂孔14、挂钩15。 In the figure: Tightening handle 1, tightening screw rod 2, connecting block 3, upper pin shaft 4, upper U-shaped hook 5, upper connecting plate 6, upper nut 7, insulating pull rod 8, lower connecting plate 9, lower nut 10 , following U-shaped hook 11, following U-shaped hook 12, following bearing pin 13, U-shaped hanging hole 14, hook 15.

具体实施方式 Detailed ways

下面结合附图对本实用新型的实施方式做进一步的说明。 Embodiments of the present utility model will be further described below in conjunction with the accompanying drawings.

参加图1-4,带电更换大吨位导线绝缘子串的提线装置,包括紧线器、多联式绝缘拉棒及和提线挂钩,所述紧线器包括旋紧把手1,旋紧把手1与紧线丝杆2构成螺纹传动配合,紧线丝杆2下端固定连接有连接块3,连接块3下端加工有挂钩;所述多联式绝缘拉棒包括上连接板6、下连接板9和绝缘拉杆8,上连接板6和下连接板9的中心分别焊接有上U型挂钩5和下U型挂钩11,上U型挂钩5通过上销轴4与连接块3的挂钩相连,上连接板6和下连接板9的边缘相同直径处都均布加工有多个螺纹孔,螺纹孔之间连接有多根绝缘拉杆8;所述提线挂钩包括U型挂孔14,U型挂孔14通过下销轴13与下U型挂钩11的下U型挂钩12相连。通过多根绝缘拉杆8能够保证整个装置在进行提升过程中受理平衡,保证了提升过程中的安全性。 Refer to Figure 1-4, the wire lifting device for replacing large-tonnage wire insulator strings with electricity, including a wire tightener, a multi-connected insulating pull rod and a wire lifting hook. The wire tightener includes a tightening handle 1, and a tightening handle 1 It forms a thread transmission cooperation with the tightening screw rod 2, and the lower end of the tightening screw rod 2 is fixedly connected with a connecting block 3, and the lower end of the connecting block 3 is processed with a hook; the multi-connected insulating pull rod includes an upper connecting plate 6 and a lower connecting plate 9 And insulating pull rod 8, the center of upper connecting plate 6 and lower connecting plate 9 is welded with upper U-shaped hook 5 and lower U-shaped hook 11 respectively, and upper U-shaped hook 5 links to each other with the hook of connecting block 3 by upper bearing pin 4, and upper The edges of the connecting plate 6 and the lower connecting plate 9 are evenly processed with a plurality of threaded holes at the same diameter, and a plurality of insulating pull rods 8 are connected between the threaded holes; The hole 14 links to each other with the lower U-shaped hook 12 of the lower U-shaped hook 11 through the lower pin shaft 13 . The plurality of insulating pull rods 8 can ensure the acceptance balance of the whole device during the lifting process, thereby ensuring the safety during the lifting process.

进一步的,在使用时将带电大吨位导线绝缘子串与提线挂钩的挂钩15相连,然后再进行起吊作业。 Further, when in use, the live large-tonnage wire insulator string is connected to the hook 15 of the wire lifting hook, and then the lifting operation is carried out.

进一步的,所述绝缘拉杆8的上端通过上螺母7固定在上连接板6的螺纹孔内,下端通过下螺母10固定在下连接板9的螺纹孔内。通过螺母对绝缘拉杆8进行有效的固定连接保证了提高了过程中的安全性。 Further, the upper end of the insulating pull rod 8 is fixed in the threaded hole of the upper connecting plate 6 through the upper nut 7 , and the lower end is fixed in the threaded hole of the lower connecting plate 9 through the lower nut 10 . The effective fixed connection of the insulating pull rod 8 through the nut ensures that the safety in the process is improved.

进一步的,所述绝缘拉杆8采用绝缘材料制成。采用绝缘材料能够对带电的绝缘子起到绝缘的作用,保证提升过程的安全性。 Further, the insulating pull rod 8 is made of insulating material. The use of insulating materials can insulate live insulators and ensure the safety of the lifting process.

进一步的,所述U型挂孔14的下端焊接有挂钩15。通过挂钩15能够方便的对绝缘子串进行吊装。 Further, a hook 15 is welded at the lower end of the U-shaped hanging hole 14 . The insulator string can be conveniently hoisted through the hook 15 .

进一步的,所述紧线器、多联式绝缘拉棒及和提线挂钩各个零部件主体的非圆形结构都采用倒角处理。避免带电作业运行时产生电晕。 Further, the non-circular structures of the main parts of the wire tensioner, the multi-connected insulating pull rod and the wire lifting hook are all chamfered. Avoid corona when live work is running.

本实用新型的具体使用方法和操作过程为: Concrete use method and operation process of the present utility model are:

首先将紧线器通过连接块3与上连接板6上的上U型挂钩5相连,并将下连接板9通过多根绝缘拉杆8与上连接板6相连,然后通过螺母将绝缘拉杆8的两端分别固定在上连接板6和下连接板9上。 First, the wire tensioner is connected to the upper U-shaped hook 5 on the upper connecting plate 6 through the connecting block 3, and the lower connecting plate 9 is connected to the upper connecting plate 6 through a plurality of insulating pull rods 8, and then the insulating pull rods 8 are connected to each other through nuts. The two ends are fixed on the upper connecting plate 6 and the lower connecting plate 9 respectively.

然后将U型挂孔14通过下销轴13与下U型挂钩12相连,进行组装成起吊装置。 Then the U-shaped hanging hole 14 is connected with the lower U-shaped hook 12 by the lower bearing pin 13, and is assembled into a lifting device.

最后将绝缘子串与挂钩15相连,进而进行起吊作业。 Finally, the insulator string is connected to the hook 15, and then the lifting operation is carried out.

本实用新型所述带电更换大吨位导线绝缘子串的提线装置可以延伸考虑在带电更换玻璃绝缘子、复合绝缘子等电气设备中,用以提高带电作业工作效率及可靠性,应该都在本实用新型的权利要求范围之类,且凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。 The wire lifting device for live replacement of large-tonnage wire insulator strings in the utility model can be extended and considered in electrical equipment such as live replacement of glass insulators, composite insulators, etc., to improve the working efficiency and reliability of live work, and should be included in the utility model The scope of the claims and the like, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (5)

1.带电更换大吨位导线绝缘子串的提线装置,其特征在于:包括紧线器、多联式绝缘拉棒及和提线挂钩,所述紧线器包括旋紧把手(1),旋紧把手(1)与紧线丝杆(2)构成螺纹传动配合,紧线丝杆(2)下端固定连接有连接块(3),连接块(3)下端加工有挂钩;所述多联式绝缘拉棒包括上连接板(6)、下连接板(9)和绝缘拉杆(8),上连接板(6)和下连接板(9)的中心分别焊接有上U型挂钩(5)和下U型挂钩(11),上U型挂钩(5)通过上销轴(4)与连接块(3)的挂钩相连,上连接板(6)和下连接板(9)的边缘相同直径处都均布加工有多个螺纹孔,螺纹孔之间连接有多根绝缘拉杆(8);所述提线挂钩包括U型挂孔(14),U型挂孔(14)通过下销轴(13)与下U型挂钩(11)的下U型挂钩(12)相连。 1. The wire lifting device for replacing large-tonnage wire insulator strings with electricity is characterized in that it includes a wire tensioner, a multi-connected insulating pull rod and a wire lifting hook. The wire tensioner includes a tightening handle (1), and the tightening The handle (1) and the tightening screw rod (2) form a threaded transmission cooperation, the lower end of the tightening screw rod (2) is fixedly connected with a connecting block (3), and the lower end of the connecting block (3) is processed with a hook; the multi-connection insulation The pull bar includes an upper connecting plate (6), a lower connecting plate (9) and an insulating pull rod (8). The upper connecting plate (6) and the center of the lower connecting plate (9) are respectively welded with an upper U-shaped hook (5) and a lower connecting plate. U-shaped hook (11), the upper U-shaped hook (5) links to each other with the hook of the connecting block (3) by the upper bearing pin (4), and the edges of the upper connecting plate (6) and the lower connecting plate (9) have the same diameter. A plurality of threaded holes are evenly distributed, and a plurality of insulating pull rods (8) are connected between the threaded holes; the wire-lifting hook includes a U-shaped hanging hole (14), and the U-shaped hanging hole (14) passes through the lower pin shaft (13 ) is connected with the lower U-shaped hook (12) of the lower U-shaped hook (11). 2.根据权利要求1所述的带电更换大吨位导线绝缘子串的提线装置,其特征在于:所述绝缘拉杆(8)的上端通过上螺母(7)固定在上连接板(6)的螺纹孔内,下端通过下螺母(10)固定在下连接板(9)的螺纹孔内。 2. The wire lifting device for live replacement of large-tonnage wire insulator strings according to claim 1, characterized in that: the upper end of the insulating pull rod (8) is fixed to the thread of the upper connecting plate (6) through the upper nut (7) In the hole, the lower end is fixed in the threaded hole of the lower connecting plate (9) by the lower nut (10). 3.根据权利要求1或2所述的带电更换大吨位导线绝缘子串的提线装置,其特征在于:所述绝缘拉杆(8)采用绝缘材料制成。 3. The wire lifting device for live replacement of large-tonnage wire insulator strings according to claim 1 or 2, characterized in that: the insulating pull rod (8) is made of insulating material. 4.根据权利要求1所述的带电更换大吨位导线绝缘子串的提线装置,其特征在于:所述U型挂孔(14)的下端焊接有挂钩(15)。 4. The wire lifting device for live replacement of large-tonnage wire insulator strings according to claim 1, characterized in that: the lower end of the U-shaped hanging hole (14) is welded with a hook (15). 5.根据权利要求1所述的带电更换大吨位导线绝缘子串的提线装置,其特征在于:所述紧线器、多联式绝缘拉棒及和提线挂钩各个零部件主体的非圆形结构都采用倒角处理。 5. The wire lifting device for live replacement of large-tonnage wire insulator strings according to claim 1, characterized in that: the non-circular parts of the main parts of the wire tensioner, multi-connected insulating pull rods and wire lifting hooks The structures are all chamfered.
CN201520700297.2U 2015-09-11 2015-09-11 Wire lifting device for replacing insulator strings of large-tonnage wires with power on Expired - Fee Related CN204886008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520700297.2U CN204886008U (en) 2015-09-11 2015-09-11 Wire lifting device for replacing insulator strings of large-tonnage wires with power on

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520700297.2U CN204886008U (en) 2015-09-11 2015-09-11 Wire lifting device for replacing insulator strings of large-tonnage wires with power on

Publications (1)

Publication Number Publication Date
CN204886008U true CN204886008U (en) 2015-12-16

Family

ID=54830340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520700297.2U Expired - Fee Related CN204886008U (en) 2015-09-11 2015-09-11 Wire lifting device for replacing insulator strings of large-tonnage wires with power on

Country Status (1)

Country Link
CN (1) CN204886008U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114123027A (en) * 2021-11-24 2022-03-01 国网江苏省电力有限公司检修分公司 Steel tube tower linear double-I-string clamp and operation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114123027A (en) * 2021-11-24 2022-03-01 国网江苏省电力有限公司检修分公司 Steel tube tower linear double-I-string clamp and operation method thereof
CN114123027B (en) * 2021-11-24 2024-03-01 国网江苏省电力有限公司检修分公司 Steel pipe tower straight line double-I-string clamp and operation method thereof

Similar Documents

Publication Publication Date Title
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN101820144B (en) Special tool of live line work for replacing rectilinear insulator string of large-section double multiple wire
CN104505766B (en) The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings
CN105305317B (en) Live wire hangs the instrument of insulated flexible ladder
CN201188519Y (en) Special support for maintaining 10KV overhead line
CN204424800U (en) The lifting device of replacing insulator string on transmission line
CN203800477U (en) Clamping tool used for electriferous replacement of first insulator of power transmission line tension single chain at wire side
CN203787855U (en) A straight-line electrified wire lifting device for transmission lines
CN103887735A (en) Linear charged wire lifting device of electric transmission line
CN202014055U (en) Overhauling device of V-shaped double-string insulator for +-660KV direct current transmission line
CN204886008U (en) Wire lifting device for replacing insulator strings of large-tonnage wires with power on
CN203871745U (en) Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line
CN208337014U (en) A kind of charged for replacement Voltage for Insulators on HV Lines lifting block hanging point heightening device
CN204793844U (en) Change promotion instrument of single wire insulator of 110kV with electricity
CN202197048U (en) Double angle steel hanging point lifting and connecting tool for tower use
CN201438617U (en) Electric lifting tool for linear insulator string on ZM tower
CN203895633U (en) Short circuit grounding wire suitable for box transformer substation and electricity distribution room
CN203813317U (en) Novel large-tonnage self-lifting type wire lifting device
CN204205402U (en) UHVDC Transmission Lines changes tangent tower wire clamp tool
CN204230763U (en) A kind of 10kV overhead distribution electrical verification operation insulating bar
CN206099164U (en) A combined tool for live replacement of UHV double-circuit tension insulators on the same tower
CN201272256Y (en) Insulated three-sheave block double hook hoist
CN201629516U (en) Three-connected extension-resisting clamp for extra HVDC transmission line
CN201266807Y (en) Device for replacing insulator
CN106602465A (en) Power transmission line tangent tower first insulator replacement tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151216

Termination date: 20160911

CF01 Termination of patent right due to non-payment of annual fee