CN204205402U - UHVDC Transmission Lines changes tangent tower wire clamp tool - Google Patents
UHVDC Transmission Lines changes tangent tower wire clamp tool Download PDFInfo
- Publication number
- CN204205402U CN204205402U CN201420527963.2U CN201420527963U CN204205402U CN 204205402 U CN204205402 U CN 204205402U CN 201420527963 U CN201420527963 U CN 201420527963U CN 204205402 U CN204205402 U CN 204205402U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- rod
- ratchet
- wire clamp
- transmission lines
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
本实用新型公开了一种特高压直流线路更换直线塔线夹工具,包括横担侧连接金具、绝缘拉棒、机械丝杠、两用提线卡,横担侧连接金具通过转接头与绝缘拉棒的一端连接,机械丝杠包括丝轴、内套筒、外套筒,三者从内到外依次套装,并且三者之间两两通过螺纹连接,丝轴的外端通过端部接头与绝缘拉棒的另一端连接,外套筒的外端通过端部接头与两用提线卡连接,内套筒外端设置有棘轮,棘轮外套装有转动套和棘齿,转动套与把手的一端连接,本实用新型简化作业工具,大幅缩小提线工具的尺寸及重量,达到更换悬垂线夹的目的,且提线钩设计为两用型,作业时无需更换卡具,可一次完成多根子导线线夹的更换工作,提高工作效率。
The utility model discloses a line clamp tool for replacing a straight line tower of an UHV DC line, which comprises a cross-arm side connecting fitting, an insulating pull rod, a mechanical lead screw, and a dual-purpose wire lifting card. One end of the rod is connected, and the mechanical screw includes a screw shaft, an inner sleeve, and an outer sleeve, and the three are sequentially fitted from the inside to the outside, and the two of the three are connected by threads, and the outer end of the screw shaft is connected to The other end of the insulating pull rod is connected, the outer end of the outer sleeve is connected to the dual-purpose cable clamp through the end joint, the outer end of the inner sleeve is provided with a ratchet, and the outer sleeve of the ratchet is equipped with a rotating sleeve and ratchets. Connected at one end, the utility model simplifies the operation tool, greatly reduces the size and weight of the wire lifting tool, and achieves the purpose of replacing the hanging wire clamp, and the wire lifting hook is designed as a dual-purpose type, no need to replace clamps during operation, and multiple wires can be completed at one time The replacement of wire clamps improves work efficiency.
Description
技术领域:Technical field:
本实用新型涉及一种更换直线塔线夹工具,特别是涉及一种特高压直流线路更换直线塔线夹工具。 The utility model relates to a tool for replacing line clamps of straight towers, in particular to a tool for replacing line clamps of straight line towers for UHV DC lines. the
背景技术:Background technique:
哈密南-郑州±800kV天中线直流工程投运后,输送负荷约占河南电网负荷的五分之一,将有效缓解河南电网和华中电网的供电压力,同时若哈密南-郑州±800kV天中线直流工程出现非计划停运,将造成巨大经济损失,并对电网的稳定运行构成极大威胁,甚至影响整个电网的安全稳定运行,带电检修工作是掌握电网设备的运行情况、及时发现和处理设备缺陷的重要手段。 After the Hami South-Zhengzhou ±800kV Tianzhong Line DC project is put into operation, the transmission load will account for about one-fifth of the load of Henan Power Grid, which will effectively relieve the power supply pressure of Henan Power Grid and Central China Power Grid. The unplanned outage of the project will cause huge economic losses, pose a great threat to the stable operation of the power grid, and even affect the safe and stable operation of the entire power grid. important means.
在±800kV线路更换线夹的工作问题主要表现在以下方面:(1)±800kV天中线直流输电工程杆塔档距较大,线径相对也大,因此垂直档距也大,整体导线自重较重,常规提升导线的作业方式有较大困难;(2)±800kV直流输电线路的绝缘子长度更长,导线截面积更大,所需的作业工具长、大、重,承力工具荷载加大后自身重量太大和操作难度也成了问题,影响到作业人员的操作。 The working problems of replacing clamps on the ±800kV line are mainly manifested in the following aspects: (1) The tower span of the ±800kV sky-central line DC transmission project is relatively large, and the wire diameter is relatively large, so the vertical span is also large, and the overall weight of the conductor is heavy , the conventional operation method of lifting conductors is more difficult; (2) The insulators of ±800kV DC transmission lines are longer in length, the cross-sectional area of conductors is larger, and the required working tools are long, large and heavy. Its own weight is too large and the difficulty of operation has also become a problem, which affects the operation of the operator.
实用新型内容:Utility model content:
本实用新型所要解决的技术问题是:克服现有技术的不足,提供一种结构简单、安装方便、能够在无需更换卡具的情况下,可一次完成多根子导线线夹更换工作的特高压直流线路更换直线塔线夹工具。 The technical problem to be solved by the utility model is: to overcome the deficiencies of the prior art, to provide a UHV DC cable with simple structure, convenient installation, and the ability to replace multiple sub-conductor clips at one time without changing the fixture. Line Replacement Straight Tower Wire Clamp Tool.
本实用新型的技术方案是:一种特高压直流线路更换直线塔线夹工具,包括横担侧连接金具、绝缘拉棒、机械丝杠、两用提线卡,其中:所述横担侧连接金具通过转接头与绝缘拉棒的一端连接,所述机械丝杠包括丝轴、内套筒、外套筒,三者从内到外依次套装,并且三者之间两两通过螺纹连接,所述丝轴的外端通过端部接头与所述绝缘拉棒的另一端连接,所述外套筒的外端通过端部接头与两用提线卡连接,所述内套筒外端设置有棘轮,所述棘轮外套装有转动套和棘齿,所述转动套与把手的一端连接。 The technical scheme of the utility model is: a UHV DC line replacement linear tower line clamp tool, including cross-arm side connection fittings, insulating pull rods, mechanical screw, dual-purpose wire lifting card, wherein: the cross-arm side connection The metal tool is connected to one end of the insulating pull rod through an adapter. The mechanical lead screw includes a screw shaft, an inner sleeve and an outer sleeve. The outer end of the silk shaft is connected to the other end of the insulating pull rod through the end joint, the outer end of the outer sleeve is connected to the dual-purpose wire lifting card through the end joint, and the outer end of the inner sleeve is provided with The ratchet wheel is provided with a rotating sleeve and ratchet teeth, and the rotating sleeve is connected with one end of the handle.
所述棘齿为双向棘齿,所述转动套上设置有拨杆,所述拨杆与所述棘齿相配合。 The ratchet is a two-way ratchet, and a driving rod is arranged on the rotating sleeve, and the driving rod cooperates with the ratchet.
所述把手另一端通过螺纹与加力杆连接,所述加力杆外部设置有套筒。 The other end of the handle is connected to the reinforcing rod through threads, and a sleeve is arranged on the outside of the reinforcing rod.
所述加力杆和套筒套装在一起,并通过螺栓连接,所述套筒上设置有条形孔,与条形孔对应的加力杆上间隔设置有螺纹孔,所述螺栓的内端穿过条形孔设置在螺纹孔内。 The booster rod and the sleeve are set together and connected by bolts. The sleeve is provided with a bar hole, and the bar hole corresponding to the bar hole is provided with threaded holes at intervals. The inner end of the bolt Set through the bar hole in the threaded hole.
所述转接头为H形结构,所述端部接头为Y形结构,且转接头和端部接头两端均设置有圆孔。 The adapter has an H-shaped structure, the end joint has a Y-shaped structure, and both ends of the adapter and the end joint are provided with round holes.
所述绝缘拉杆为多段结构,所述两用提线卡上设置有连接机构,所述连接机构两侧对称设置至少一个线槽。 The insulating pull rod has a multi-section structure, and the dual-purpose wire lifting card is provided with a connecting mechanism, and at least one wire slot is symmetrically arranged on both sides of the connecting mechanism.
本实用新型的有益效果是: The beneficial effects of the utility model are:
1、本实用新型简化作业工具,大幅缩小提线工具的尺寸及重量,达到更换悬垂线夹的目的,且提线钩设计为两用型,作业时无需更换卡具,可一次完成多根子导线线夹的更换工作,提高工作效率。 1. The utility model simplifies the operation tool, greatly reduces the size and weight of the wire lifting tool, and achieves the purpose of replacing the hanging wire clamp, and the wire lifting hook is designed as a dual-purpose type, so there is no need to replace the fixture during operation, and multiple sub-conductors can be completed at one time The replacement of wire clamps improves work efficiency.
2、本实用新型转动把手即可通过机械丝杠完成对导线的提升和下降,方便操作人员的操作,且转动套上的拨杆能够控制棘轮的转动方向,防止操作人员的误操作。 2. Turning the handle of the utility model can complete the lifting and lowering of the wire through the mechanical screw, which is convenient for the operator to operate, and the lever on the turning sleeve can control the rotation direction of the ratchet, preventing the operator from misoperation.
3、本实用新型加力杆和套筒具有伸缩功能,通过螺母固定位置的不同,来改变加力杆长端,方便操作人员的操作,且加力杆通过螺纹与把手连接,有利于操作人员的安装和携带,转动套、把手均可拆卸。 3. The booster rod and the sleeve of the utility model have a telescopic function, and the long end of the booster rod can be changed by changing the fixing position of the nut, which is convenient for the operator to operate, and the booster rod is connected with the handle through a thread, which is beneficial to the operator Easy to install and carry, the swivel sleeve and the handle can be disassembled.
4、本实用新型绝缘拉棒为多段结构,可根据现场情况进行增减,灵活性好,方便操作人员进行工作。 4. The insulating pull rod of the utility model has a multi-section structure, which can be increased or decreased according to the site conditions. It has good flexibility and is convenient for operators to work.
附图说明:Description of drawings:
图1为特高压直流线路更换直线塔线夹工具结构示意图。 Figure 1 is a schematic diagram of the structure of the tool for replacing the straight tower line clamp of the UHV DC line.
图2为机械丝杠结构示意图 Figure 2 is a schematic diagram of the mechanical screw structure
具体实施方式:Detailed ways:
实施例:参见图1和图2,图中,1-横担侧连接金具、2-绝缘拉棒、3-机械丝杠、4-两用提线卡、5-转接头、6-端部接头、7-套筒、8-把手、9-转动套、10-丝轴、11-内套筒、12-外套筒、13-条形孔、14-加力杆。 Embodiment: See Figure 1 and Figure 2, in the figure, 1-connecting fittings on the cross-arm side, 2-insulating pull rod, 3-mechanical screw, 4-dual-purpose cable clamp, 5-transfer joint, 6-end Joint, 7-sleeve, 8-handle, 9-turning sleeve, 10-screw shaft, 11-inner sleeve, 12-outer sleeve, 13-strip hole, 14-addition rod.
特高压直流线路更换直线塔线夹工具,一种特高压直流线路更换直线塔线夹工具,包括横担侧连接金具1、绝缘拉棒2、机械丝杠3、两用提线卡4,其特征是:横担侧连接金具1通过转接头5与绝缘拉棒2的一端连接,机械丝杠3包括丝轴10、内套筒11、外套筒12,三者从内到外依次套装,并且三者之间两两通过螺纹连接,丝轴10的外端通过端部接头6与绝缘拉棒2的另一端连接,外套筒12的外端通过端部接头6与两用提线卡4连接,内套筒11外端设置有棘轮,棘轮外套装有转动套9和棘齿,转动套9与把手8的一端连接。 UHV DC line replacement linear tower wire clamp tool, a UHV DC line replacement straight tower wire clamp tool, including cross-arm side connection fittings 1, insulating pull rods 2, mechanical screw 3, dual-purpose wire lifting clamp 4, and The feature is: the cross-arm side connection fitting 1 is connected to one end of the insulating pull rod 2 through the adapter 5, the mechanical screw 3 includes a screw shaft 10, an inner sleeve 11, and an outer sleeve 12, and the three are sequentially assembled from the inside to the outside. And the two of the three are connected by threads, the outer end of the silk shaft 10 is connected to the other end of the insulating pull rod 2 through the end joint 6, and the outer end of the outer sleeve 12 is connected to the dual-purpose wire lifting card through the end joint 6. 4 are connected, the inner sleeve 11 outer end is provided with a ratchet, the ratchet outer cover is provided with a rotating sleeve 9 and ratchets, and the rotating sleeve 9 is connected with one end of the handle 8.
棘齿为双向棘齿,转动套9上设置有拨杆,拨杆与所述棘齿相配合。 The ratchet is a two-way ratchet, and the rotating sleeve 9 is provided with a driving lever, which cooperates with the ratchet.
把手8另一端通过螺纹与加力杆14连接,加力杆14外部设置有套筒7。 The other end of the handle 8 is connected to the booster rod 14 through threads, and the sleeve 7 is arranged on the outside of the booster rod 14 .
加力杆14和套筒7套装在一起,并通过螺栓连接,套筒上设置有条形孔13,与条形孔13对应的加力杆14上间隔设置有螺纹孔,螺栓的内端穿过条形孔13设置在螺纹孔内。 The booster rod 14 and the sleeve 7 are set together and connected by bolts. The sleeve is provided with strip holes 13, and the booster rods 14 corresponding to the strip holes 13 are provided with threaded holes at intervals, and the inner ends of the bolts pass through The strip-shaped hole 13 is arranged in the threaded hole.
转接头5为H形结构,端部接头6为Y形结构,且转接头5和端部接头6两端均设置有圆孔。 The adapter 5 has an H-shaped structure, and the end joint 6 has a Y-shaped structure, and both ends of the adapter 5 and the end joint 6 are provided with round holes.
绝缘拉杆2为多段结构,两用提线卡4上设置有连接机构,连接机构两侧对称设置至少一个线槽。 The insulating pull rod 2 has a multi-section structure, and the dual-purpose wire lifting card 4 is provided with a connecting mechanism, and at least one wire slot is arranged symmetrically on both sides of the connecting mechanism.
使用时,把横担侧连接金具1与杆塔通过螺栓连接,然后横担侧连接金具1通过转接头5与绝缘拉棒2的一端连接,绝缘拉棒2的另一端通过端部接头6与丝轴10的外端连接,外套筒12的外端通过端部接头6与两用提线卡4上的连接机构连接,调节绝缘拉杆2,将两用提线卡4置于导线下侧,安装转动套9、把手8、加力杆14,调节套筒7至合适长度,把拨杆拨到上升位置,转动套筒7,导线固定在线槽内上升,操作人员完成更换任务后,把拨杆拨到下降位置,转动套筒7,导线随着两用提线卡4下降,当两用提线卡4不再承受导线的重量时,即可依次拆除。 When in use, the connecting fitting 1 on the cross-arm side is connected to the pole tower through bolts, and then the connecting fitting 1 on the cross-arm side is connected to one end of the insulating rod 2 through the adapter 5, and the other end of the insulating rod 2 is connected to the wire through the end joint 6. The outer end of the shaft 10 is connected, and the outer end of the outer sleeve 12 is connected to the connection mechanism on the dual-purpose wire lifting card 4 through the end joint 6, and the insulating pull rod 2 is adjusted to place the dual-purpose wire lifting card 4 on the lower side of the wire. Install the rotating sleeve 9, the handle 8, and the booster rod 14, adjust the sleeve 7 to a suitable length, turn the lever to the rising position, turn the sleeve 7, and the wire is fixed in the wire groove to rise. After the operator completes the replacement task, turn the lever The lever is transferred to the descending position, the sleeve 7 is rotated, and the wire descends along with the dual-purpose wire lifting card 4, and when the dual-purpose wire lifting card 4 no longer bears the weight of the wire, it can be removed successively.
以上所述,仅是本实用新型的较佳实施例而已,并非对本实用新型作任何形式上的限制,凡是依据本实用新型的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本实用新型技术方案的范围内。 The above is only a preferred embodiment of the utility model, and does not limit the utility model in any form. Any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the utility model, All still belong to within the scope of the technical solution of the utility model.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420527963.2U CN204205402U (en) | 2014-09-15 | 2014-09-15 | UHVDC Transmission Lines changes tangent tower wire clamp tool |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420527963.2U CN204205402U (en) | 2014-09-15 | 2014-09-15 | UHVDC Transmission Lines changes tangent tower wire clamp tool |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204205402U true CN204205402U (en) | 2015-03-11 |
Family
ID=52663322
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420527963.2U Expired - Fee Related CN204205402U (en) | 2014-09-15 | 2014-09-15 | UHVDC Transmission Lines changes tangent tower wire clamp tool |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204205402U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104201611A (en) * | 2014-09-15 | 2014-12-10 | 国家电网公司 | Tangent tower wire clamp replacing tool for extra-high voltage direct-current transmission lines |
| CN107248708A (en) * | 2017-05-15 | 2017-10-13 | 国家电网公司 | Strain tower of transmission line drainage thread lifting device |
-
2014
- 2014-09-15 CN CN201420527963.2U patent/CN204205402U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104201611A (en) * | 2014-09-15 | 2014-12-10 | 国家电网公司 | Tangent tower wire clamp replacing tool for extra-high voltage direct-current transmission lines |
| CN107248708A (en) * | 2017-05-15 | 2017-10-13 | 国家电网公司 | Strain tower of transmission line drainage thread lifting device |
| CN107248708B (en) * | 2017-05-15 | 2019-01-01 | 国家电网公司 | Strain tower of transmission line drainage thread lifting device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101820144B (en) | Special tool of live line work for replacing rectilinear insulator string of large-section double multiple wire | |
| CN204205402U (en) | UHVDC Transmission Lines changes tangent tower wire clamp tool | |
| CN104201611B (en) | UHVDC Transmission Lines change tangent tower wire clamp tool | |
| CN201674159U (en) | Double angle steel hanging point insulator string live replacement tool | |
| CN203787855U (en) | Power transmission line linear charged wire lifting device | |
| CN208337014U (en) | A kind of charged for replacement Voltage for Insulators on HV Lines lifting block hanging point heightening device | |
| CN201438617U (en) | ZM tower linear insulator string live lifting tool | |
| CN202197048U (en) | Double angle steel hanging point lifting and connecting tool for tower use | |
| CN114172078A (en) | Transmission line overhauls supports with automatically regulated and turns to coaster device | |
| CN204834927U (en) | Transmission line live working divides streamline temporarily | |
| CN204067592U (en) | A kind of earth connection conductor wire end wire clamp | |
| CN201742027U (en) | Special tool for replacing insulators in electriferous state for 110kV single tower double circuit | |
| CN204230763U (en) | A kind of 10kV overhead distribution electrical verification operation insulating bar | |
| CN202057866U (en) | Special double-hook lifting device for transmission line tangent suspension tower optical cables | |
| CN204967142U (en) | Join in marriage comprehensive electrified maintenance of net and carry lineman's utensil | |
| CN204131004U (en) | Four loop straight line steel tube tower circle cross-arm jigs | |
| CN204886008U (en) | Change large -tonnage wire insulator chain's traditional thread binding putting of carrying with electricity | |
| CN104022461B (en) | Change the double string horizontal insulator instruments of 500KV straight lines simply connected | |
| CN202978110U (en) | Overhead ground wire lifter of transmission line | |
| CN202455015U (en) | Adjustable linear four-hook fastener | |
| CN202930836U (en) | Tension insulator replacement tool | |
| CN202856239U (en) | Wire lifting device for wire laying construction | |
| CN203536859U (en) | Single hanging self-tightening four-hook clamp | |
| CN203871746U (en) | Rod head fixture used for live change of linear insulator on steel pipe pole of 66kV line | |
| CN206023136U (en) | A kind of bypass lead-up cable fixing device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150311 Termination date: 20160915 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |