CN201639196U - Insulating tool set - Google Patents

Insulating tool set Download PDF

Info

Publication number
CN201639196U
CN201639196U CN201020148115.2U CN201020148115U CN201639196U CN 201639196 U CN201639196 U CN 201639196U CN 201020148115 U CN201020148115 U CN 201020148115U CN 201639196 U CN201639196 U CN 201639196U
Authority
CN
China
Prior art keywords
insulating
spanner
square
screw
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201020148115.2U
Other languages
Chinese (zh)
Inventor
李东
颜廷武
黄峰
孙凤强
刘洋
齐国刚
艾勇
温矿生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUXIN POWER SUPPLY Co OF LIAONING ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Original Assignee
FUXIN POWER SUPPLY Co OF LIAONING ELECTRIC POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUXIN POWER SUPPLY Co OF LIAONING ELECTRIC POWER Co Ltd filed Critical FUXIN POWER SUPPLY Co OF LIAONING ELECTRIC POWER Co Ltd
Priority to CN201020148115.2U priority Critical patent/CN201639196U/en
Application granted granted Critical
Publication of CN201639196U publication Critical patent/CN201639196U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Insulating Bodies (AREA)

Abstract

The utility model belongs to the special tool for electric maintenance, particularly relating to an insulating tool set. The insulating tool set comprises a bidirectional clincher wrench (10), a square jack (1-1), a square plug (8-1), a socket wrench (9), a nut (2) and a screw (3); a Silastic insulating component is sleeved outside a fiberglass insulating rod (6); a plurality of insulating umbelliform retaining sheets (5-1) are arranged on the Silastic insulating component; a socket wrench connecting sleeve (8) is sleeved on the front end of the fiberglass insulating rod (6) and fastened and fixed by the screw (3) and the nut (2), and then sleeved by a heat-shrinkable insulating protective sleeve (7) for insulating; the square plug (8-1) is arranged at the front end of the socket wrench connecting sleeve (8), the socket wrench (9) is sleeved on the square plug (8-1). Due to the special tool, the pole climbing distance for the operator is shortened, the operation is safer and more laborsaving, the safety factor of the operator is improved greatly and the operational benefit of electric network is increased.

Description

Insulation group cover instrument
Technical field
The utility model belongs to the electric power special tool for service, particularly a kind of insulation group cover instrument.
Background technology
The area, Fuxin is subjected to the influence of geographical environment, there were three seasons to blow hard throughout the year, strong wind causes the swing of bar upper conductor, make the insulator on the circuit under wind effect, bear lead deadweight more powerful horizontal force in addition, cause the loosening under the effect of lead nosing force of line insulator, severe patient even dropout cause the generation of line fault.In operation maintenance work, the loosening inclination of distribution line insulator is confirmed as general defective usually, lack processing so must often disappear, ensureing the circuit safe operation, and insulator is fastening must guarantee the normal operation of circuit and guarantee implement under the situation of operating personnel's personal safety not having a power failure.At present, the used instrument of fastening insulator is directly with colligation screw adapter sleeve barrel spanner on the insulating bar in line upkeep, it is firm that but this instrument is difficult to colligation, easily come off, it is also relatively heavier to operate, it is that the fastening sleeve spanner of screw is welded on the insulating bar that a kind of instrument is arranged again, and this instrument shortcoming is that the insulating bar mechanical strength is not enough, and that bears holding screw incessantly reverses strength more greatly.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned technical deficiency, provides a kind of safe, time saving and energy saving, makes insulator be able to fastening insulation group cover instrument fully.
The technical scheme that the utility model technical solution problem adopts is: insulation group cover instrument comprises two-way a thousand pieces of gold spanner, square jack, square plug, box spanner, nut, screw, be characterized in silicon rubber insulation assembly of reinforced plastic glass fibre insulating bar outside suit, the silicon rubber insulation assembly is provided with a plurality of insulation umbrella shape catch, box spanner adapter sleeve of reinforced plastic glass fibre insulating bar front end suit, fix with screw and nut check, and insulate with pyrocondensation insulating sleeve one suit, box spanner adapter sleeve front end is provided with a square plug, suit box spanner on the square plug, two-way a thousand pieces of gold spanner adapter sleeve of reinforced plastic glass fibre insulating bar rear end suit, fix with screw and nut check, and insulate with pyrocondensation insulating sleeve two suits, the rear end of two-way a thousand pieces of gold spanner adapter sleeve is provided with a square jack, and the square plug of two-way a thousand pieces of gold spanner is inserted in the square jack.
The beneficial effects of the utility model are: adopt high-intensity high-tenacity reinforced plastic glass fibre insulator to substitute insulating bar as insulating element, one end is connected with box spanner, the other end installs two-way a thousand pieces of gold spanner additional, the arm of force is rationally extended, make the screw can be fastening fully, because installing two-way a thousand pieces of gold spanner additional carries out application of force operation, can carry out fastening and the bidirectional operation of loosening to insulator.Owing to use this tool operation to increase the distance of operating personnel and operating equipment, reduce operating personnel's upper boom distance, made operation safe, laborsaving, improved personnel's coefficient of safety greatly, use this tool operation also can significantly reduce frequency of power cut simultaneously, increase the on-road efficiency of electrical network.
Description of drawings
Specify with embodiment below in conjunction with accompanying drawing.
Fig. 1 is an insulation group cover instrument stereochemical structure cutaway view.
Among the figure, the two-way a thousand pieces of gold spanner of 1-adapter sleeve; The square jack of 1-1-; The 2-nut; The 3-screw; 4-pyrocondensation insulating sleeve two; The 5-insulation assembly; 5-1-insulation umbrella shape catch; 6-reinforced plastic glass fibre insulating bar; 7-pyrocondensation insulating sleeve one; 8-box spanner adapter sleeve; The 8-1-square plug; The 9-box spanner; The two-way a thousand pieces of gold spanner of 10-;
Embodiment
Embodiment, with reference to accompanying drawing 1, silicon rubber insulation assembly 5 of outside suit of the high strength of insulation group cover instrument, the reinforced plastic glass fibre insulating bar 6 of high tenacity, silicon rubber insulation assembly 5 are provided with a plurality of insulation umbrella shape catch 5-1, impact operating personnel to prevent that the top object from dropping.Box spanner adapter sleeve 8 of the front end suit of reinforced plastic glass fibre insulating bar 6 is locked with screw 3 and nut 2, and insulate with pyrocondensation insulating sleeve one 7 suits.The front end of box spanner adapter sleeve 8 is provided with a square plug 8-1, and square plug 8-1 goes up suit box spanner 9.Two-way a thousand pieces of gold spanner adapter sleeve 1 of the rear end suit of reinforced plastic glass fibre insulating bar 6, be locked with screw 3 and nut 2, and insulate with pyrocondensation insulating sleeve 24 suits, the rear end of two-way a thousand pieces of gold spanner adapter sleeve 1 is provided with a square jack 1-1, and the square plug of two-way a thousand pieces of gold spanner 10 is inserted among the square jack 1-1.

Claims (1)

1. insulation group cover instrument, comprise two-way a thousand pieces of gold spanner (10), square jack (1-1), square plug (8-1), box spanner (9), nut (2), screw (3), it is characterized in that silicon rubber insulation assembly of reinforced plastic glass fibre insulating bar (6) outside suit, the silicon rubber insulation assembly is provided with a plurality of insulation umbrella shape catch (5-1), reinforced plastic glass fibre insulating bar (a 6) box spanner adapter sleeve of front end suit (8), be locked with screw (3) and nut (2), and insulate with pyrocondensation insulating sleeve one (7) suit, box spanner adapter sleeve (8) front end is provided with a square plug (8-1), square plug (8-1) is gone up suit box spanner (9), reinforced plastic glass fibre insulating bar (6) rear end two-way a thousand pieces of gold spanner adapter sleeve of suit (1), be locked with screw (3) and nut (2), and insulate with pyrocondensation insulating sleeve two (4) suits, the rear end of two-way a thousand pieces of gold spanner adapter sleeve (1) is provided with a square jack (1-1), and the square plug of two-way a thousand pieces of gold spanner (10) is inserted in the square jack (1-1).
CN201020148115.2U 2010-04-02 2010-04-02 Insulating tool set Expired - Fee Related CN201639196U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020148115.2U CN201639196U (en) 2010-04-02 2010-04-02 Insulating tool set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020148115.2U CN201639196U (en) 2010-04-02 2010-04-02 Insulating tool set

Publications (1)

Publication Number Publication Date
CN201639196U true CN201639196U (en) 2010-11-17

Family

ID=43083702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020148115.2U Expired - Fee Related CN201639196U (en) 2010-04-02 2010-04-02 Insulating tool set

Country Status (1)

Country Link
CN (1) CN201639196U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103170940A (en) * 2013-04-01 2013-06-26 国家电网公司 Bevel gear intermediate shaft insulation spanner
CN104143780A (en) * 2013-05-10 2014-11-12 国家电网公司 Vertical bottle fastening device
CN105024307A (en) * 2015-08-19 2015-11-04 国网新疆电力公司昌吉供电公司 Insulation operating rod for fastening pin insulator nuts in electrified mode

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103170940A (en) * 2013-04-01 2013-06-26 国家电网公司 Bevel gear intermediate shaft insulation spanner
CN104143780A (en) * 2013-05-10 2014-11-12 国家电网公司 Vertical bottle fastening device
CN105024307A (en) * 2015-08-19 2015-11-04 国网新疆电力公司昌吉供电公司 Insulation operating rod for fastening pin insulator nuts in electrified mode

Similar Documents

Publication Publication Date Title
CN202930254U (en) Multifunctional insulation control stick
CN201673736U (en) Pin type insulator
CN203456796U (en) Broadsword fixture for replacing single insulator of duplex insulator string during power failure
CN201639196U (en) Insulating tool set
CN203456797U (en) Broadsword fixture for replacing entire string of insulator of duplex insulator string during power failure
CN203300937U (en) High-hitching ground wire operating lever
CN101699677A (en) Multifunctional operating arm
CN201975744U (en) Electric-power deicing tool
CN101834415A (en) Method and special tool for live replacement of zinc oxide lightning arrester
CN208858706U (en) A kind of quick coupling
CN202817608U (en) Tool for fastening lead-fixing nut of transmission and transformation line in live-working
CN202572183U (en) Large-current telescopic high-altitude cable connecting clamp
CN204389542U (en) High-altitude converting equipment verification junction pole
CN202757990U (en) Length-increasing electroscope
CN202549635U (en) Integrated insulation operating lever of ground knife switch
CN203135277U (en) Nest dismantling apparatus
CN105811303A (en) Kit for electric installation of bird repeller
CN202712458U (en) Connection clamping plate
CN202308923U (en) Insulator replacement equipment
CN205141482U (en) Assembled multi -functional power maintenance action bars
CN202627981U (en) Electric control device for ground handling high-altitude drilling device
CN203859238U (en) Connector capable of improving installation efficiency of main ground wire
CN205195138U (en) A sharp shoulder pole card for changing sharp insulator chain that singly goes here and there
CN201975710U (en) Special tool for fixing isolating switch porcelain bottle
CN202831758U (en) Stand column component structure of rush-repair tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20121019

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121019

Address after: 123000 Jiefang street, Haizhou District, Liaoning, China, No. 53, No.

Patentee after: Fuxin Power Supply Company of Liaoning Electric Power Co., Ltd.

Patentee after: State Grid Corporation of China

Address before: 123000 Jiefang street, Haizhou District, Liaoning, China, No. 53, No.

Patentee before: Fuxin Power Supply Company of Liaoning Electric Power Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101117

Termination date: 20180402