CN104532735B - 一种装配式钢桥梁及其搭建方法 - Google Patents
一种装配式钢桥梁及其搭建方法 Download PDFInfo
- Publication number
- CN104532735B CN104532735B CN201410820484.4A CN201410820484A CN104532735B CN 104532735 B CN104532735 B CN 104532735B CN 201410820484 A CN201410820484 A CN 201410820484A CN 104532735 B CN104532735 B CN 104532735B
- Authority
- CN
- China
- Prior art keywords
- floorings
- connecting rod
- connector
- steel
- snap fit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
- E01D15/12—Portable or sectional bridges
- E01D15/133—Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/30—Metal
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410820484.4A CN104532735B (zh) | 2014-12-25 | 2014-12-25 | 一种装配式钢桥梁及其搭建方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410820484.4A CN104532735B (zh) | 2014-12-25 | 2014-12-25 | 一种装配式钢桥梁及其搭建方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104532735A CN104532735A (zh) | 2015-04-22 |
CN104532735B true CN104532735B (zh) | 2016-07-06 |
Family
ID=52848343
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410820484.4A Active CN104532735B (zh) | 2014-12-25 | 2014-12-25 | 一种装配式钢桥梁及其搭建方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104532735B (zh) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104846734B (zh) * | 2015-06-02 | 2017-03-01 | 安徽中机诚建建设有限公司 | 一种单元拼装式钢栈桥 |
CN105178159B (zh) * | 2015-08-04 | 2017-03-22 | 中铁第四勘察设计院集团有限公司 | 钢桥主体与桥面隔离的钢结构桥梁及其建造方法 |
CN105442456B (zh) * | 2015-12-31 | 2017-07-04 | 广西路桥工程集团有限公司 | 一种装配式重型钢管支撑装置 |
CN106567334B (zh) * | 2016-11-01 | 2018-07-17 | 湖北华舟重工应急装备股份有限公司 | 装配式公路钢桥快速施工方法 |
CN106592438B (zh) * | 2016-12-27 | 2018-03-30 | 中铁六局集团有限公司 | 双柱墩和中系梁桁架整体移动施工方法 |
CN107326792B (zh) * | 2017-08-28 | 2023-05-02 | 广西昊桥交通设施有限责任公司 | 一种模块化钢桥主桥体结构及其施工方法 |
CN108103922A (zh) * | 2017-12-22 | 2018-06-01 | 中铁十七局集团第二工程有限公司 | 一种用于高流速大涨幅河道的过水便桥施工方法 |
CN109235234B (zh) * | 2018-11-19 | 2023-10-10 | 江苏苏建路桥机械有限公司 | 一种有效调节贝雷片钢桥的平衡梁 |
CN109894788A (zh) * | 2019-03-01 | 2019-06-18 | 深圳市联天钢结构桥梁工程有限公司 | 一种钢桥梁架的底架 |
CN109778660A (zh) * | 2019-03-18 | 2019-05-21 | 浙江兴土桥梁专用装备制造有限公司 | 采用装配式桥台安装的钢桥梁 |
CN110512528A (zh) * | 2019-08-29 | 2019-11-29 | 广州宏途设备工程有限公司 | 一种连接装置及方法 |
CN112502040B (zh) * | 2020-11-03 | 2022-09-16 | 江苏中海桥梁设备有限公司 | 一种免开孔的桥面板、横梁连接装置 |
CN113897874A (zh) * | 2021-10-29 | 2022-01-07 | 安徽省公路桥梁工程有限公司 | 一种钢栈桥桥面免焊接安装方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060008207A (ko) * | 2004-07-23 | 2006-01-26 | 노윤근 | 교량 승상과 동시에 접속높이를 조절할 수 있는 설치 및해체가 용이한 조립식 접속가교 및 이의 설치방법 |
JP2007120051A (ja) * | 2005-10-26 | 2007-05-17 | Dps Bridge Works Co Ltd | 合成床版を用いた鋼とコンクリートの複合桁構造及びこの構造を有する橋桁の施工方法 |
CN102041781A (zh) * | 2011-01-13 | 2011-05-04 | 海波重型工程科技股份有限公司 | 一种基于龙门吊机的内湖梁式钢桥安装法 |
CN102797224A (zh) * | 2012-08-22 | 2012-11-28 | 中铁二十三局集团有限公司 | 桥面板的铺设方法及其模板支撑装置 |
CN103469724A (zh) * | 2012-06-08 | 2013-12-25 | 辽宁省交通规划设计院 | 一种带可控沉降的基础体系的钢构桥梁及其施工方法 |
CN204455794U (zh) * | 2014-12-25 | 2015-07-08 | 浙江兴土桥梁专用装备制造有限公司 | 一种装配式钢桥梁 |
-
2014
- 2014-12-25 CN CN201410820484.4A patent/CN104532735B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060008207A (ko) * | 2004-07-23 | 2006-01-26 | 노윤근 | 교량 승상과 동시에 접속높이를 조절할 수 있는 설치 및해체가 용이한 조립식 접속가교 및 이의 설치방법 |
JP2007120051A (ja) * | 2005-10-26 | 2007-05-17 | Dps Bridge Works Co Ltd | 合成床版を用いた鋼とコンクリートの複合桁構造及びこの構造を有する橋桁の施工方法 |
CN102041781A (zh) * | 2011-01-13 | 2011-05-04 | 海波重型工程科技股份有限公司 | 一种基于龙门吊机的内湖梁式钢桥安装法 |
CN103469724A (zh) * | 2012-06-08 | 2013-12-25 | 辽宁省交通规划设计院 | 一种带可控沉降的基础体系的钢构桥梁及其施工方法 |
CN102797224A (zh) * | 2012-08-22 | 2012-11-28 | 中铁二十三局集团有限公司 | 桥面板的铺设方法及其模板支撑装置 |
CN204455794U (zh) * | 2014-12-25 | 2015-07-08 | 浙江兴土桥梁专用装备制造有限公司 | 一种装配式钢桥梁 |
Also Published As
Publication number | Publication date |
---|---|
CN104532735A (zh) | 2015-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104532735B (zh) | 一种装配式钢桥梁及其搭建方法 | |
CN111254796B (zh) | 下跨多条铁路营业线单侧整体吊装大跨度天桥及施工方法 | |
CN204455794U (zh) | 一种装配式钢桥梁 | |
CN203430059U (zh) | 一种大跨度钢结构屋盖主桁架安装用临时固定装置 | |
CN201762663U (zh) | 钢筋混凝土叠合梁翼板支架 | |
CN207829599U (zh) | 一种建筑工地可循环使用的生态围墙 | |
CN103255717A (zh) | 一种防撞墙的施工方法 | |
CN107355037A (zh) | 装配式钢结构建筑自承式钢桁架楼板支撑体系及施工方法 | |
CN110485707A (zh) | 墙柱模板封堵调平装置及其施工方法 | |
CN206768675U (zh) | 一种公路三波梁钢护栏增高型防阻块 | |
CN202000265U (zh) | 桥梁高墩混凝土施工模板 | |
CN104033166B (zh) | 一种隧道衬砌台车的门架系统 | |
CN203783170U (zh) | 一种可拆卸防护棚 | |
CN104481087A (zh) | 一种轻便稳固易排水的雨棚 | |
CN209779908U (zh) | 一种适合安装于楼顶的抗震缝连接装置 | |
CN210127654U (zh) | 一种大跨度钢结构滑移装置 | |
CN203420477U (zh) | 一种用于混凝土浇筑的钢结构搭建平台 | |
CN216194090U (zh) | 预制箱梁湿接缝附着式施工平台 | |
CN106988520B (zh) | 用于高层悬吊结构的施工方法及支撑体系 | |
CN205663282U (zh) | 一种大容量轻型格构式钢柱 | |
CN211229458U (zh) | 一种用于圆柱墩混凝土浇筑施工的作业平台 | |
CN210947661U (zh) | 一种承插式悬挑脚手架的安装装置 | |
CN211285428U (zh) | 一种砼护栏挂板装配式模板 | |
CN206053402U (zh) | 装配式建筑叠合板支撑架 | |
CN110512639A (zh) | 一种无落地式钢结构塔吊基础施工方法及施工结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: Xiuzhou District of Jiaxing City, Zhejiang province 314001 Jiachuang Road No. 1509 Jiaxing Industrial Park Chinese energy research building room 101-2 South 14# Applicant after: ZHEJIANG XINGTU BRIDGE SPECIAL EQUIPMENT MANUFACTURING Co.,Ltd. Address before: Jiaxing City, Zhejiang province 314001 Hongxing Road No. 999 Su silver International Building 10 buildings Applicant before: ZHEJIANG XINGTU BRIDGE SPECIAL EQUIPMENT MANUFACTURING Co.,Ltd. |
|
CB03 | Change of inventor or designer information |
Inventor after: Liu Min Inventor after: Jiang Jun Inventor after: Hu Yueming Inventor after: Tao Zhanghao Inventor after: Wang Die Inventor after: Sun Runzhi Inventor before: Liu Min |
|
COR | Change of bibliographic data | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160608 Address after: Jiaxing City, Zhejiang province 314000 Hongxing Road No. 999 Su silver International Building 10 buildings Applicant after: ZHEJIANG XINGTU BRIDGE TEMPORARY STEEL STRUCTURE ENGINEERING CO.,LTD. Address before: Xiuzhou District of Jiaxing City, Zhejiang province 314001 Jiachuang Road No. 1509 Jiaxing Industrial Park Chinese energy research building room 101-2 South 14# Applicant before: ZHEJIANG XINGTU BRIDGE SPECIAL EQUIPMENT MANUFACTURING Co.,Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 314000 Room 301, 251 Chengxiu Road, Xincheng street, Xiuzhou District, Jiaxing City, Zhejiang Province Patentee after: Xingtu Co.,Ltd. Address before: 10 / F, Suyin international building, 999 Hongxing Road, Jiaxing, Zhejiang 314000 Patentee before: ZHEJIANG XINGTU BRIDGE TEMPORARY STEEL STRUCTURE ENGINEERING CO.,LTD. |