CN106567334B - 装配式公路钢桥快速施工方法 - Google Patents
装配式公路钢桥快速施工方法 Download PDFInfo
- Publication number
- CN106567334B CN106567334B CN201610939484.5A CN201610939484A CN106567334B CN 106567334 B CN106567334 B CN 106567334B CN 201610939484 A CN201610939484 A CN 201610939484A CN 106567334 B CN106567334 B CN 106567334B
- Authority
- CN
- China
- Prior art keywords
- pile
- steel bridge
- vibration hammer
- operation platform
- assembly type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
本发明属于桥梁工程技术领域,特别涉及钢桥施工。一种装配式公路钢桥快速施工装备,其技术方案是:施工平台由两个以上的工程浮箱通过连接耳板连接组装而成;工程浮箱外侧焊接固定用于安装舷外挂机的挂机支座;舷外挂机为施工平台提供行驶动力;施工平台上布置有:用于悬吊振动锤及管桩进行管桩施工的吊机,为振动锤提供动力的动力系统,用于控制振动锤进行管桩操作的液压控制站,用于桩基定位的GPS定位系统和锚定系统。利用本发明,桩基间距可突破限制,充分发挥钢桥的承载能力;本发明可适用公路运输,运输储存方便,能在不通航的河流、湖泊进行施工,解决大型打桩船无法达到打桩地点的问题;桩基、桥跨可并行施工,有效提高施工效率。
Description
技术领域
本发明属于桥梁工程技术领域,特别涉及钢桥施工。
背景技术
目前装配式公路钢桥在多跨连续架设时一般采用“钓鱼法”施工,即采用大吨位吊机悬臂吊装振动锤打桩,然后采用悬臂拼装法安装桥跨。此法限于吊机吨位,最大单孔跨度只能达到15米,不能充分发挥装配式公路钢桥的承载能力;且打桩、拼桥两部分工作不能同时工作,效率较低,桩基的数目也比较多,费时废料。
发明内容
本发明的目的是:提供一种装配式公路钢桥快速施工装备及方法,有效提高施工效率和经济效益。
本发明的技术方案是:一种装配式公路钢桥快速施工装备,它包括:施工平台,振动锤,吊机,动力系统,液压控制站,GPS定位系统,舷外挂机,锚定系统;
施工平台由两个以上的工程浮箱通过连接耳板连接组装而成;工程浮箱外侧固定舷外挂机;舷外挂机为施工平台提供行驶动力;施工平台上布置有:用于悬吊振动锤及管桩进行管桩施工的吊机,为振动锤提供动力的动力系统,用于控制振动锤进行管桩操作的液压控制站,用于锚定施工平台的锚定系统;振动锤上设有用于桩基定位的GPS定位系统;
管桩操作包括夹紧、卸夹、打桩、拔桩。
本发明的另一个技术方案是:一种装配式公路钢桥快速施工方法,它使用上所述的装配式公路钢桥快速施工装备,包括以下步骤:
A.启动舷外挂机,当装配式公路钢桥快速施工装备在水中行驶到设定水域后关闭舷外挂机,通过锚定系统锚定施工平台;
B.用GPS定位系统找到管桩施工位置,吊机悬吊振动锤进行桩基施工,通过液压控制站控制振动锤完成包括夹紧/ 卸夹、打桩/拔桩的施工动作;
C.当前位置的桩基完成施工后,装配式公路钢桥快速施工装备在水中行驶到下一设定位置继续打桩。
有益效果:利用本发明,桩基间距(也即桥梁单孔跨距)可突破限制,充分发挥钢桥的承载能力;本发明可适用公路运输,运输储存方便,能在不通航的河流、湖泊进行施工,解决大型打桩船无法达到打桩地点的问题;桩基、桥跨可并行施工,有效提高施工效率。
附图说明
图1是本发明中施工装备布置示意图;
图2是本发明中施工方法示意图;
图3是本发明中工程浮箱结构示意图;
图4是本发明中舷外挂机安装示意图。
具体实施方式
实施例1,参见附图,一种装配式公路钢桥快速施工装备,它包括:施工平台1,振动锤 2,吊机3,动力系统4,液压控制站5,GPS定位系统6,舷外挂机7,锚定系统8;
施工平台1由若干工程浮箱9通过连接耳板10依次连接组装而成;工程浮箱9外侧焊接用于安装舷外挂机7的挂机支座11;舷外挂机7为施工平台1提供行驶动力;施工平台1上布置有:用于悬吊振动锤2及管桩进行管桩施工的吊机3,为振动锤2提供动力的动力系统4,用于控制振动锤2进行管桩操作的液压控制站5,用于锚定施工平台1的锚定系统8;振动锤 2上设有用于桩基定位的GPS定位系统6;
管桩操作包括夹紧、卸夹、打桩、拔桩。
实施例2:一种装配式公路钢桥快速施工方法,它使用如实施例1所述的装配式公路钢桥快速施工装备,包括以下步骤:
A.在岸边组装完成装配式公路钢桥快速施工装备;
B.装配式公路钢桥快速施工装备利用舷外挂机7在水中行驶到设计水域后通过锚定系统 8锚定施工平台1;
C.用GPS定位系统6找到设定的管桩施工位置,用振动锤2进行桩基施工,通过液压控制站5控制振动锤2完成包括夹紧/卸夹、打桩/拔桩的各种施工动作;
D.本处桩基完成施工后,装配式公路钢桥快速施工装备在水中行驶到下一处继续打桩。
Claims (1)
1.一种装配式公路钢桥快速施工方法,它使用装配式公路钢桥快速施工装备,
所述一种装配式公路钢桥快速施工装备,其特征是:它包括:施工平台(1),振动锤(2),吊机(3),动力系统(4),液压控制站(5),GPS定位系统(6),舷外挂机(7),锚定系统(8);
所述施工平台(1)由两个以上的工程浮箱(9)通过连接耳板(10)连接组装而成;所述工程浮箱(9)外侧固定所述舷外挂机(7);所述舷外挂机(7)为所述施工平台(1)提供行驶动力;所述施工平台(1)上布置有:用于悬吊所述振动锤(2)及管桩进行管桩施工的所述吊机(3),为所述振动锤(2)提供动力的所述动力系统(4),用于控制所述振动锤(2)进行管桩操作的所述液压控制站(5),用于锚定所述施工平台(1)的所述锚定系统(8);所述振动锤(2)上设有用于桩基定位的所述GPS定位系统(6);
所述管桩操作包括夹紧、卸夹、打桩、拔桩;
所述一种装配式公路钢桥快速施工方法,包括以下步骤:
A.启动所述舷外挂机(7),当所述装配式公路钢桥快速施工装备在水中行驶到设定水域后关闭所述舷外挂机(7),通过所述锚定系统(8)锚定所述施工平台(1);
B.用所述GPS定位系统(6)找到管桩施工位置,所述吊机(3)悬吊所述振动锤(2)进行桩基施工,通过所述液压控制站(5)控制所述振动锤(2)完成包括夹紧/卸夹、打桩/拔桩的施工动作;
C.当前位置的桩基完成施工后,所述装配式公路钢桥快速施工装备在水中行驶到下一设定位置继续打桩。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610939484.5A CN106567334B (zh) | 2016-11-01 | 2016-11-01 | 装配式公路钢桥快速施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610939484.5A CN106567334B (zh) | 2016-11-01 | 2016-11-01 | 装配式公路钢桥快速施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106567334A CN106567334A (zh) | 2017-04-19 |
CN106567334B true CN106567334B (zh) | 2018-07-17 |
Family
ID=58536310
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610939484.5A Expired - Fee Related CN106567334B (zh) | 2016-11-01 | 2016-11-01 | 装配式公路钢桥快速施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106567334B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114703737B (zh) * | 2021-12-20 | 2023-11-03 | 中国船舶重工集团应急预警与救援装备股份有限公司 | 一种堤坝溃决快速化封堵辅助系统及方法 |
CN114481843A (zh) * | 2022-01-12 | 2022-05-13 | 中铁大桥局集团第二工程有限公司 | 一种水上单桩独柱基础栈桥平台一体化快速施工方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU500330A1 (ru) * | 1973-05-31 | 1976-01-25 | Войсковая часть 12093 | Приспособление дл забивки свай к мостостроительной машине |
JPH11200319A (ja) * | 1998-01-16 | 1999-07-27 | Mototaka Okuda | 橋梁施工方法 |
CN104196026A (zh) * | 2014-05-27 | 2014-12-10 | 天津二十冶建设有限公司 | 水中桥梁临时工程用钢管桩拔除方法 |
CN104627326A (zh) * | 2014-12-22 | 2015-05-20 | 中交第三航务工程局有限公司 | 一种格型钢板桩大圆筒副格整打专用起重、振沉船 |
CN104532735B (zh) * | 2014-12-25 | 2016-07-06 | 浙江兴土桥梁临时钢结构工程有限公司 | 一种装配式钢桥梁及其搭建方法 |
CN204456115U (zh) * | 2015-03-03 | 2015-07-08 | 中交第二航务工程局有限公司 | 一种带有导向架的浮吊打桩船 |
CN104863152A (zh) * | 2015-06-11 | 2015-08-26 | 中国铁建大桥工程局集团有限公司 | 一种高强度裸岩管桩插打方法 |
-
2016
- 2016-11-01 CN CN201610939484.5A patent/CN106567334B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN106567334A (zh) | 2017-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101736754B (zh) | 一种采用预应力混凝土筒型结构的海上风电机组地基基础 | |
CN105926628B (zh) | 一种浮动、固定可转换的水中桩基施工平台装置 | |
CN201738321U (zh) | 一种多功能桩机 | |
CN110382781A (zh) | 用于在海洋环境中利用重力铺设建筑物、设备和风力涡轮机的基础的海事结构 | |
CN106567334B (zh) | 装配式公路钢桥快速施工方法 | |
CN108179735A (zh) | 一种卵石层大型深水基础施工平台及方法 | |
CN106759423A (zh) | 超大直径桩基装配式码头结构及其施工方法 | |
CN101858083A (zh) | 低空间水中钢管桩拔桩施工方法及装置 | |
CN102425165A (zh) | 一种河堤打桩机 | |
CN102182203A (zh) | 一种钢排式测风塔基础及测风塔结构 | |
CN106759340A (zh) | 低空间水中钢管桩拔桩施工方法及装置 | |
CN104805828B (zh) | W型钢板桩结构 | |
CN102587377B (zh) | 吊锤沉桩装置及沉桩方法 | |
CN204456106U (zh) | 水域沉桩用移动导向定位船 | |
CN209162824U (zh) | 大直径钢混组合圆筒分散式多沉井基础 | |
CN113293708B (zh) | 水中现浇梁支架采用贯穿式钢管桩基础的安装拆除方法 | |
CN204226097U (zh) | 固定于水底的潮流能发电装置 | |
CN205804363U (zh) | 一种浮动、固定可转换的水中桩基施工平台装置 | |
CN105064271B (zh) | 一种码头改造结构及码头改造施工方法 | |
CN204875664U (zh) | 一种用于港湾临时码头的挡土墙结构 | |
CN204510256U (zh) | 海上风机的钢筒型基础结构 | |
CN208039210U (zh) | 一种卵石层大型深水基础施工平台 | |
JP2015519489A (ja) | 海上風力、橋および海上建造物用部分浮体式海上プラットホーム、および施工方法 | |
CN202492846U (zh) | 吊锤沉桩装置 | |
CN105443311A (zh) | 固定于水底的潮流能发电装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 430223 No. 5 Sunshine Road, Miao Temple development area, Jiangxia District, Wuhan, Hubei. Patentee after: China Shipbuilding Heavy Industry Group emergency warning and rescue equipment Limited by Share Ltd Address before: 430223 Sunshine Avenue, Jiangxia District, Wuhan, Hubei Province, No. 5 Patentee before: Hubei China Harzone Industry Corp., Ltd. |
|
CP03 | Change of name, title or address | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180717 Termination date: 20201101 |
|
CF01 | Termination of patent right due to non-payment of annual fee |