CN104407286A - Method for monitoring mechanical states of high-voltage isolating switches and emitting warning - Google Patents

Method for monitoring mechanical states of high-voltage isolating switches and emitting warning Download PDF

Info

Publication number
CN104407286A
CN104407286A CN201410676399.5A CN201410676399A CN104407286A CN 104407286 A CN104407286 A CN 104407286A CN 201410676399 A CN201410676399 A CN 201410676399A CN 104407286 A CN104407286 A CN 104407286A
Authority
CN
China
Prior art keywords
current
current peak
value
peak value
running
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410676399.5A
Other languages
Chinese (zh)
Other versions
CN104407286B (en
Inventor
李大卫
徐党国
蔡巍
孙云生
刘健
侯力枫
刘中华
吴刚
崔贺平
高宇航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
Electric Power Research Institute of State Grid Jibei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
Electric Power Research Institute of State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, North China Electric Power Research Institute Co Ltd, Electric Power Research Institute of State Grid Jibei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410676399.5A priority Critical patent/CN104407286B/en
Publication of CN104407286A publication Critical patent/CN104407286A/en
Application granted granted Critical
Publication of CN104407286B publication Critical patent/CN104407286B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a method for monitoring mechanical states of high-voltage isolating switches and emitting warning, and belongs to the field of technologies for monitoring power transformation equipment in an online manner. The method for monitoring the mechanical states of the high-voltage isolating switches and emitting warning has the advantages that working currents, which represent the magnitude of operation resistance, of driving motors are monitored during opening or closing operation on the high-voltage isolating switches in real time, so that operation resistance change conditions can be comprehensively monitored in integral operation procedures, defects such as jamming and movement failure of equipment can be timely found out, and equipment state maintenance or state evaluation can be effectively supported; the method is simple in implementation and simple, clear and reliable in principle, and increase of the complexity of the original equipment can be prevented when the method is implemented; the mechanical states of the high-voltage isolating switches can be diagnosed in real time, defect types of the mechanical states of the high-voltage isolating switches can be intelligently judged, warning can be timely emitted, accordingly, severe faults of the equipment can be effectively prevented, and economic loss and social influence can be reduced.

Description

A kind of high voltage isolator machine performance monitoring and method for early warning
Technical field
The present invention relates to the monitoring of a kind of high voltage isolator machine performance and method for early warning, belong to converting equipment on-line monitoring technique field.
Background technology
High voltage isolator is as one of important switchgear of electric system, and in system primary equipment, usage quantity is maximum, mainly plays the effect of isolation voltage, ensures the safety of other electrical equipments when service work.Due to reasons such as manufacture, installation, environment for use and operation maintenance, often there is the defects such as water diversion part is overheated, gear train bite, tripping, operation porcelain insulator breaking in high voltage isolator, has a strong impact on network system safe and stable operation.
Since China's grid equipment implements in full repair based on condition of component, a series of research has been carried out to high voltage isolator state-detection means, as utilized infrared temperature-test technology Timeliness coverage water diversion part overheating defect, adopt insulator UT (Ultrasonic Testing) technology for detection operation porcelain vase inherent vice.But for the defect that high voltage isolator mechanical aspects exists, as operated bite, tripping etc., there is no effective monitoring and evaluation measures at present, can only be found by on-off switch manually when equipment prophylactic repair, cause above-mentioned defect cannot Timeliness coverage.
Under current most domestic transformer station adopts unmanned collection control operational mode, when by the electronic separating brake of centralized control center's Long-distance Control high voltage isolator or closing operation, due to on-the-spot without effectively monitoring and early warning means, disconnector mechanical defect cannot Timeliness coverage, when defect equipment is forced to cause the catastrophic failures such as operation porcelain insulator breaking during electric operating, cause electric grid large area power cut accident.
China Patent No. is the disclosed torsional forces on-line measuring device for high voltage isolator of ZL200920063880.1 and method, adopt the method installing torque sensor between high voltage isolating switch operating mechanism and operation porcelain vase additional, real-time detection disconnector divides/closing operation process in operate resistance on porcelain vase, whether there is the defect such as bite, tripping because Installation and Debugging are improper with this detection and isolation switch.The method need be changed original equipment structure, may impact original equipment design performance index.When the torque sensor installed additional runs under environment out of doors, be subject to the adverse weather conditions such as low temperature, severe cold, cause output data distortion, cannot ensure to run reliably and with long-term.In addition, the method need carry out manual analysis judgement to torque curve, does not possess intelligent diagnostics and real-time early warning function.
Summary of the invention
The object of the invention is to propose the monitoring of a kind of high voltage isolator machine performance and method for early warning, by the drive motor working current value of characterization operations drag size when Real Time Monitoring equipment separating brake or closing operation, intelligent decision plant machinery state and defect type, the timely early warning when equipment is in attention or abnormality.
The high voltage isolator machine performance monitoring that the present invention proposes and method for early warning, comprise the following steps:
(1) run working current according to the drive motor of high voltage isolator, obtain the working current curve of drive motor when the working current curve of drive motor during high voltage isolator normal sub-switching operation or normal closing operation;
(2) carry out process conversion to above-mentioned working current curve, obtain decision threshold, detailed process comprises the following steps:
(2-1) utilize low-pass filtering method, denoising is carried out to above-mentioned working current curve;
(2-2) Hilbert transform is carried out to the working current curve after above-mentioned denoising, obtain the amplitude envelope curve of working current curve;
(2-3) above-mentioned amplitude envelope curve is divided into two time intervals, wherein very first time length of an interval degree is x% × T, the length of the second time interval is then (100-x) % × T, current peak is extracted respectively from two time intervals, and the current peak in very first time interval is defined as starting current peak value, the current peak of the second time interval is defined as running current peak value, and wherein T is total duration of amplitude envelope curve, and the span of x is 5 ~ 15;
(2-4) be worth as reference according to above-mentioned starting current peak value and running current peak value, setting threshold value is as follows: starting current peak value × (1.2 ~ 1.5) are starting current peak value demand value, starting current peak value × (2 ~ 3) are starting current peak value exceptional value, running current peak value × (1.2 ~ 1.5) are running current peak value demand value, and running current peak value × (2 ~ 3) are running current peak value exceptional value;
(3) the drive motor working current curve of current high voltage isolator sub-switching operation corresponding with step (1) or the drive motor working current curve of current high voltage isolator closing operation is obtained;
(4) repeat step (2-1) ~ step (2-3), the working current curve of step (3) is processed, obtains the current starting current peak value of high voltage isolator and current running current peak value;
(5) the current starting current peak value of above-mentioned high voltage isolator and current running current peak value are compared with four threshold values of step (2-4) respectively, judge the machine performance that high voltage isolator is current and defect type, concrete decision rule is as follows:
If current starting current peak L EssT.LTssT.LT starting current peak value demand value, and current running current peak L EssT.LTssT.LT running current peak value demand value, then the machine performance that high voltage isolator is current is normal condition, and defect type is nothing;
If current starting current peak L EssT.LTssT.LT starting current peak value demand value, and running current peak value demand value≤current running current peak L EssT.LTssT.LT running current peak value exceptional value, the machine performance that then high voltage isolator is current is attention state, and defect type is slight bite;
If current starting current peak L EssT.LTssT.LT starting current peak value demand value, and current running current peak value >=running current peak value exceptional value, then the machine performance that high voltage isolator is current is abnormality, and defect type is serious bite;
If starting current peak value demand value≤current starting current peak L EssT.LTssT.LT starting current peak value exceptional value, and current running current peak L EssT.LTssT.LT running current peak value demand value, the machine performance that then high voltage isolator is current is attention state, and defect type is slight bite;
If starting current peak value demand value≤current starting current peak L EssT.LTssT.LT starting current peak value exceptional value, and running current peak value demand value≤current running current peak L EssT.LTssT.LT running current peak value exceptional value, the machine performance that then high voltage isolator is current is attention state, and defect type is slight bite;
If starting current peak value demand value≤current starting current peak L EssT.LTssT.LT starting current peak value exceptional value, and current running current peak value >=running current peak value exceptional value, the machine performance that then high voltage isolator is current is abnormality, and defect type is serious bite;
If current starting current peak value >=starting current peak value exceptional value, and current running current peak L EssT.LTssT.LT running current peak value demand value, then the machine performance that high voltage isolator is current is abnormality, and defect type is tripping;
If current starting current peak value >=starting current peak value exceptional value, and running current peak value demand value≤current running current peak L EssT.LTssT.LT running current peak value exceptional value, the machine performance that then high voltage isolator is current is abnormality, and defect type is tripping;
If current starting current peak value >=starting current peak value exceptional value, and current running current peak value >=running current peak value exceptional value, then the machine performance that high voltage isolator is current is abnormality, and defect type is tripping;
(6) by machine performance current for above-mentioned high voltage isolator and defect type result of determination write into Databasce, and result of determination be attention state or abnormality time, machine performance and defect type result of determination are exported as alarm signal.
The high voltage isolator machine performance monitoring that the present invention proposes and method for early warning, its advantage is:
(1) high voltage isolator machine performance monitoring of the present invention and method for early warning, principle is concisely reliable, by drive motor working current when Real-Time Monitoring high voltage isolator separating brake or closing operation, realize the comprehensive monitoring operating change in resistance situation in whole operating process, thus the defects such as Timeliness coverage equipment bite, tripping, for equipment state overhauling or state estimation provide effective support;
(2) the inventive method realizes simple, does not need to change original equipment structure, also do not increase original equipment complexity during enforcement;
(3) the inventive method possesses intelligent diagnostics and warning function, after the current separating brake of high voltage isolator or closing operation terminate, the real-time diagnosis of machine performance and the intelligent decision of defect type can be completed, send early warning in time, effectively avoid equipment catastrophic failure to occur, reduce economic loss and social influence.
Accompanying drawing explanation
Fig. 1 is the current amplitude enveloping curve Characteristic Extraction schematic diagram related in the inventive method.
Fig. 2 is the high voltage isolator Current mechanical state and defect type decision rule table that relate in the inventive method.
Embodiment
The high voltage isolator machine performance monitoring that the present invention proposes and method for early warning, comprise the following steps:
(1) run working current according to the drive motor of high voltage isolator, obtain the working current curve of drive motor when the working current curve of drive motor during high voltage isolator normal sub-switching operation or normal closing operation;
(2) carry out process conversion to above-mentioned working current curve, obtain decision threshold, detailed process comprises the following steps:
(2-1) utilize low-pass filtering method, carry out denoising to above-mentioned working current curve, because drive motor working current curve is generally the AC signal that frequency is less than 1kHz, the upper frequency limit of low-pass filtering generally gets 1kHz-10kHz;
(2-2) Hilbert transform is carried out to the working current curve after above-mentioned denoising, obtain the amplitude envelope curve of working current curve;
(2-3) above-mentioned amplitude envelope curve is divided into two time intervals, as shown in Figure 1, wherein very first time length of an interval degree is x% × T, the unloading phase of characterizing high voltage isolator transient state, as the T0 in figure, the length of the second time interval is then (100-x) % × T, characterize high voltage isolator steady state operation phase, as the T1 in figure, current peak is extracted respectively from two time intervals, and the current peak in very first time interval is defined as starting current peak value, as the I0 in figure, the current peak of the second time interval is defined as running current peak value, as the I 1 in figure, wherein T is total duration of amplitude envelope curve, the span of x is 5 ~ 15, the value of x is generally determined according to the version of high voltage isolator and the output power of drive motor, generally, high voltage isolator version is simpler, drive motor output power is larger, drive motor is shorter for start-up time, then x value should suitably reduce,
(2-4) be worth as reference according to above-mentioned starting current peak value and running current peak value, setting threshold value is as follows: starting current peak value × (1.2 ~ 1.5) are starting current peak value demand value, starting current peak value × (2 ~ 3) are starting current peak value exceptional value, running current peak value × (1.2 ~ 1.5) are running current peak value demand value, running current peak value × (2 ~ 3) are running current peak value exceptional value, the setting ratio value of above-mentioned threshold value relative reference value, determine according to testing the drive motor working current value that records under common model high voltage isolator simulation bite and tripping defect situation, for specific model high voltage isolator, should determine according to actual tests test value,
(3) the drive motor working current curve of current high voltage isolator sub-switching operation corresponding with step (1) or the drive motor working current curve of current high voltage isolator closing operation is obtained;
(4) repeat step (2-1) ~ step (2-3), the working current curve of step (3) is processed, obtains the current starting current peak value of high voltage isolator and current running current peak value;
(5) the current starting current peak value of above-mentioned high voltage isolator and current running current peak value are compared with four threshold values of step (2-4) respectively, judge the machine performance that high voltage isolator is current and defect type, as shown in Figure 2, concrete decision rule is as follows:
If current starting current peak I 0 < starting current peak value demand value, and current running current peak I 1 < running current peak value demand value, the machine performance that then high voltage isolator is current is normal condition, and defect type is nothing;
If current starting current peak I 0 < starting current peak value demand value, and running current peak value demand value≤current running current peak I 1 < running current peak value exceptional value, the machine performance that then high voltage isolator is current is attention state, and defect type is slight bite;
If current starting current peak I 0 < starting current peak value demand value, and current running current peak I 1 >=running current peak value exceptional value, then the machine performance that high voltage isolator is current is abnormality, and defect type is serious bite;
If starting current peak value demand value≤current starting current peak I 0 < starting current peak value exceptional value, and current running current peak I 1 < running current peak value demand value, the machine performance that then high voltage isolator is current is attention state, and defect type is slight bite;
If starting current peak value demand value≤current starting current peak I 0 < starting current peak value exceptional value, and running current peak value demand value≤current running current peak I 1 < running current peak value exceptional value, the machine performance that then high voltage isolator is current is attention state, and defect type is slight bite;
If starting current peak value demand value≤current starting current peak I 0 < starting current peak value exceptional value, and current running current peak I 1 >=running current peak value exceptional value, the machine performance that then high voltage isolator is current is abnormality, and defect type is serious bite;
If current starting current peak I 0 >=starting current peak value exceptional value, and current running current peak I 1 < running current peak value demand value, then the machine performance that high voltage isolator is current is abnormality, and defect type is tripping;
If current starting current peak I 0 >=starting current peak value exceptional value, and running current peak value demand value≤current running current peak I 1 < running current peak value exceptional value, the machine performance that then high voltage isolator is current is abnormality, and defect type is tripping;
If current starting current peak I 0 >=starting current peak value exceptional value, and current running current peak I 1 >=running current peak value exceptional value, then the machine performance that high voltage isolator is current is abnormality, and defect type is tripping;
(6) by machine performance current for above-mentioned high voltage isolator and defect type result of determination write into Databasce, and result of determination be attention state or abnormality time, machine performance and defect type result of determination are exported as alarm signal, if high voltage isolator belongs to equipment in intelligent substation, usually above-mentioned alarm signal need be outputted to transformer station's comprehensive monitoring system so that IEC61850 Standards Code is long-range.

Claims (1)

1. the monitoring of high voltage isolator machine performance and a method for early warning, is characterized in that the method comprises the following steps:
(1) run working current according to the drive motor of high voltage isolator, obtain the working current curve of drive motor when the working current curve of drive motor during high voltage isolator normal sub-switching operation or normal closing operation;
(2) carry out process conversion to above-mentioned working current curve, obtain decision threshold, detailed process comprises the following steps:
(2-1) utilize low-pass filtering method, denoising is carried out to above-mentioned working current curve;
(2-2) Hilbert transform is carried out to the working current curve after above-mentioned denoising, obtain the amplitude envelope curve of working current curve;
(2-3) above-mentioned amplitude envelope curve is divided into two time intervals, wherein very first time length of an interval degree is x% × T, the length of the second time interval is then (100-x) % × T, current peak is extracted respectively from two time intervals, and the current peak in very first time interval is defined as starting current peak value, the current peak of the second time interval is defined as running current peak value, and wherein T is total duration of amplitude envelope curve, and the span of x is 5 ~ 15;
(2-4) be worth as reference according to above-mentioned starting current peak value and running current peak value, setting threshold value is as follows: starting current peak value × (1.2 ~ 1.5) are starting current peak value demand value, starting current peak value × (2 ~ 3) are starting current peak value exceptional value, running current peak value × (1.2 ~ 1.5) are running current peak value demand value, and running current peak value × (2 ~ 3) are running current peak value exceptional value;
(3) the drive motor working current curve of current high voltage isolator sub-switching operation corresponding with step (1) or the drive motor working current curve of current high voltage isolator closing operation is obtained;
(4) repeat step (2-1) ~ step (2-3), the working current curve of step (3) is processed, obtains the current starting current peak value of high voltage isolator and current running current peak value;
(5) the current starting current peak value of above-mentioned high voltage isolator and current running current peak value are compared with four threshold values of step (2-4) respectively, judge the machine performance that high voltage isolator is current and defect type, concrete decision rule is as follows:
If current starting current peak L EssT.LTssT.LT starting current peak value demand value, and current running current peak L EssT.LTssT.LT running current peak value demand value, then the machine performance that high voltage isolator is current is normal condition, and defect type is nothing;
If current starting current peak L EssT.LTssT.LT starting current peak value demand value, and running current peak value demand value≤current running current peak L EssT.LTssT.LT running current peak value exceptional value, the machine performance that then high voltage isolator is current is attention state, and defect type is slight bite;
If current starting current peak L EssT.LTssT.LT starting current peak value demand value, and current running current peak value >=running current peak value exceptional value, then the machine performance that high voltage isolator is current is abnormality, and defect type is serious bite;
If starting current peak value demand value≤current starting current peak L EssT.LTssT.LT starting current peak value exceptional value, and current running current peak L EssT.LTssT.LT running current peak value demand value, the machine performance that then high voltage isolator is current is attention state, and defect type is slight bite;
If starting current peak value demand value≤current starting current peak L EssT.LTssT.LT starting current peak value exceptional value, and running current peak value demand value≤current running current peak L EssT.LTssT.LT running current peak value exceptional value, the machine performance that then high voltage isolator is current is attention state, and defect type is slight bite;
If starting current peak value demand value≤current starting current peak L EssT.LTssT.LT starting current peak value exceptional value, and current running current peak value >=running current peak value exceptional value, the machine performance that then high voltage isolator is current is abnormality, and defect type is serious bite;
If current starting current peak value >=starting current peak value exceptional value, and current running current peak L EssT.LTssT.LT running current peak value demand value, then the machine performance that high voltage isolator is current is abnormality, and defect type is tripping;
If current starting current peak value >=starting current peak value exceptional value, and running current peak value demand value≤current running current peak L EssT.LTssT.LT running current peak value exceptional value, the machine performance that then high voltage isolator is current is abnormality, and defect type is tripping;
If current starting current peak value >=starting current peak value exceptional value, and current running current peak value >=running current peak value exceptional value, then the machine performance that high voltage isolator is current is abnormality, and defect type is tripping;
(6) by machine performance current for above-mentioned high voltage isolator and defect type result of determination write into Databasce, and result of determination be attention state or abnormality time, machine performance and defect type result of determination are exported as alarm signal.
CN201410676399.5A 2014-11-21 2014-11-21 A kind of high voltage isolator machine performance monitoring and method for early warning Expired - Fee Related CN104407286B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410676399.5A CN104407286B (en) 2014-11-21 2014-11-21 A kind of high voltage isolator machine performance monitoring and method for early warning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410676399.5A CN104407286B (en) 2014-11-21 2014-11-21 A kind of high voltage isolator machine performance monitoring and method for early warning

Publications (2)

Publication Number Publication Date
CN104407286A true CN104407286A (en) 2015-03-11
CN104407286B CN104407286B (en) 2017-03-15

Family

ID=52644931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410676399.5A Expired - Fee Related CN104407286B (en) 2014-11-21 2014-11-21 A kind of high voltage isolator machine performance monitoring and method for early warning

Country Status (1)

Country Link
CN (1) CN104407286B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105067997A (en) * 2015-08-06 2015-11-18 平高集团有限公司 Switchgear spring operating mechanism fault diagnostic method
CN105548876A (en) * 2016-01-28 2016-05-04 国网北京市电力公司 Method and device for detection of mechanical features of disconnection switch
CN105572581A (en) * 2016-02-26 2016-05-11 北京永安美电气科技有限公司 Online detection system and online detection method for isolating switch
CN105606997A (en) * 2016-02-26 2016-05-25 国家电网公司 Mechanical fault diagnosis method of high voltage breaker operation mechanism for electric power system
CN105865769A (en) * 2016-04-26 2016-08-17 国网河南省电力公司商丘供电公司 Detection device and method for mechanical parameters of electric isolation disconnecting link
CN106680700A (en) * 2016-11-25 2017-05-17 云南电网有限责任公司电力科学研究院 Isolation switch intelligence diagnosis system and method thereof
CN106771999A (en) * 2016-11-24 2017-05-31 云南电网有限责任公司电力科学研究院 A kind of high voltage isolator mechanical fault detection device and detection method
CN106849007A (en) * 2015-11-17 2017-06-13 西门子公司 Method and protection device for monitoring the power switch in electrical power net
EP3306329A1 (en) * 2016-10-07 2018-04-11 Technische Universität Graz Method for central monitoring of changes in state of a number of components for high voltage systems from 1 kv upwards
CN108716988A (en) * 2018-05-29 2018-10-30 北京平高清大科技发展有限公司 A kind of high-tension switch gear machine performance monitoring method and device
CN111382809A (en) * 2020-06-01 2020-07-07 国网江西省电力有限公司电力科学研究院 Isolating switch mechanical fault diagnosis method based on motor output power
CN111679184A (en) * 2020-07-06 2020-09-18 国家电网有限公司 Method for evaluating performance of isolating switch through motor current
CN112557895A (en) * 2020-12-16 2021-03-26 国网江苏省电力有限公司检修分公司 GIS disconnecting switch fault diagnosis method based on multiple characteristic quantities
CN112731131A (en) * 2020-12-22 2021-04-30 珠海万谱科技有限公司 Fault diagnosis method and device for electric direct-current isolating switch
CN114244866A (en) * 2021-12-02 2022-03-25 浙商银行股份有限公司 Production equipment supervisory systems based on thing networking
CN116184182A (en) * 2022-12-15 2023-05-30 国网安徽省电力有限公司电力科学研究院 GIS isolating switch mechanical state identification method based on curve similarity

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6169405B1 (en) * 1995-07-26 2001-01-02 Siemens Ag Functional test process for a mechanical switching element
CN1667429A (en) * 2005-04-08 2005-09-14 苏盛 Primary cut-out state monitoring method
CN201402192Y (en) * 2009-03-30 2010-02-10 湖南长高高压开关集团股份公司 Torque force on-line detection device used for high-voltage isolation switch
CN101701881A (en) * 2009-11-10 2010-05-05 广州锐翔电力工程设备有限公司 Mechanical property state monitor of circuit breaker
CN103308292A (en) * 2013-05-16 2013-09-18 国家电网公司 Vacuum breaker mechanical state detecting method based on vibration signal analysis
CN103323771A (en) * 2013-06-07 2013-09-25 济南大学 High-voltage breaker mechanical characteristic fault probability monitoring method and system based on on-line monitoring

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6169405B1 (en) * 1995-07-26 2001-01-02 Siemens Ag Functional test process for a mechanical switching element
CN1667429A (en) * 2005-04-08 2005-09-14 苏盛 Primary cut-out state monitoring method
CN201402192Y (en) * 2009-03-30 2010-02-10 湖南长高高压开关集团股份公司 Torque force on-line detection device used for high-voltage isolation switch
CN101701881A (en) * 2009-11-10 2010-05-05 广州锐翔电力工程设备有限公司 Mechanical property state monitor of circuit breaker
CN103308292A (en) * 2013-05-16 2013-09-18 国家电网公司 Vacuum breaker mechanical state detecting method based on vibration signal analysis
CN103323771A (en) * 2013-06-07 2013-09-25 济南大学 High-voltage breaker mechanical characteristic fault probability monitoring method and system based on on-line monitoring

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王黎明,何建明: "电动隔离开关机械故障状态监测的设想", 《浙江电力》 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105067997A (en) * 2015-08-06 2015-11-18 平高集团有限公司 Switchgear spring operating mechanism fault diagnostic method
CN105067997B (en) * 2015-08-06 2018-06-08 平高集团有限公司 A kind of switchgear spring operating mechanism method for diagnosing faults
US10777992B2 (en) 2015-11-17 2020-09-15 Siemens Aktiengesellschaft Method and protection device for monitoring circuit breaker in an electrical power supply network
CN106849007A (en) * 2015-11-17 2017-06-13 西门子公司 Method and protection device for monitoring the power switch in electrical power net
CN105548876A (en) * 2016-01-28 2016-05-04 国网北京市电力公司 Method and device for detection of mechanical features of disconnection switch
CN105548876B (en) * 2016-01-28 2018-07-27 国网北京市电力公司 A kind of disconnecting switch mechanical property detection method and device
CN105572581A (en) * 2016-02-26 2016-05-11 北京永安美电气科技有限公司 Online detection system and online detection method for isolating switch
CN105606997A (en) * 2016-02-26 2016-05-25 国家电网公司 Mechanical fault diagnosis method of high voltage breaker operation mechanism for electric power system
CN105606997B (en) * 2016-02-26 2018-04-24 国家电网公司 Mechanical failure diagnostic method for the high-voltage breaker operation mechanism of electric system
CN105865769A (en) * 2016-04-26 2016-08-17 国网河南省电力公司商丘供电公司 Detection device and method for mechanical parameters of electric isolation disconnecting link
EP3306329A1 (en) * 2016-10-07 2018-04-11 Technische Universität Graz Method for central monitoring of changes in state of a number of components for high voltage systems from 1 kv upwards
CN106771999A (en) * 2016-11-24 2017-05-31 云南电网有限责任公司电力科学研究院 A kind of high voltage isolator mechanical fault detection device and detection method
CN106680700A (en) * 2016-11-25 2017-05-17 云南电网有限责任公司电力科学研究院 Isolation switch intelligence diagnosis system and method thereof
CN108716988A (en) * 2018-05-29 2018-10-30 北京平高清大科技发展有限公司 A kind of high-tension switch gear machine performance monitoring method and device
CN111382809A (en) * 2020-06-01 2020-07-07 国网江西省电力有限公司电力科学研究院 Isolating switch mechanical fault diagnosis method based on motor output power
CN111679184A (en) * 2020-07-06 2020-09-18 国家电网有限公司 Method for evaluating performance of isolating switch through motor current
CN112557895A (en) * 2020-12-16 2021-03-26 国网江苏省电力有限公司检修分公司 GIS disconnecting switch fault diagnosis method based on multiple characteristic quantities
CN112557895B (en) * 2020-12-16 2023-12-22 国网江苏省电力有限公司检修分公司 GIS isolating switch fault diagnosis method based on multiple characteristic quantities
CN112731131A (en) * 2020-12-22 2021-04-30 珠海万谱科技有限公司 Fault diagnosis method and device for electric direct-current isolating switch
CN114244866A (en) * 2021-12-02 2022-03-25 浙商银行股份有限公司 Production equipment supervisory systems based on thing networking
CN116184182A (en) * 2022-12-15 2023-05-30 国网安徽省电力有限公司电力科学研究院 GIS isolating switch mechanical state identification method based on curve similarity
CN116184182B (en) * 2022-12-15 2024-04-12 国网安徽省电力有限公司电力科学研究院 GIS isolating switch mechanical state identification method based on curve similarity

Also Published As

Publication number Publication date
CN104407286B (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN104407286A (en) Method for monitoring mechanical states of high-voltage isolating switches and emitting warning
CN202837494U (en) Contactor state inspection device
CN103454580B (en) A kind of circuit-breaker switching on-off coil characteristics proving installation
CN104538233A (en) State monitoring and early warning system and method for electric disconnecting link of transformer substation
CN103412217A (en) Box-type substation intelligent online failure diagnosis system
CN201611384U (en) Motor status monitoring and failure diagnosis system
CN105092058A (en) On-line temperature monitoring system for high tension switchgear, and monitoring method thereof
CN104833885A (en) Fault prediction method of power transformation primary equipment
CN101699306A (en) Method for monitoring current acquisition circuit of electric power secondary system
CN103454488A (en) System and method for measuring motor current of motor-driven operating mechanism of high voltage isolating switch
CN204881871U (en) High tension switchgear&#39;s temperature on -line monitoring system
CN204256059U (en) A kind of 10kV shunt reactor switching service test system
CN105699889A (en) Method of evaluating intelligent substation circuit breaker electrical life loss and arc extinguishing ability
CN104076245A (en) On-line monitoring device for contact network insulation
CN114113995B (en) Method and system for detecting mechanical faults of isolating switch for GIS
Cipriani et al. Electrical distribution substation remote diagnosis and control system
CN113917323B (en) Intelligent on-column switch monitoring system and method
CN104578430A (en) Online monitoring device for circuit breaker operating mechanism
CN203825144U (en) Circuit for identifying broken line area of switch control circuit
CN202650951U (en) Medium-voltage circuit breaker having mechanical characteristic on-line monitoring function
CN102169769A (en) Conductive contact surface performance online diagnosing and repairing system and using method thereof
CN201637830U (en) Online motor insulation monitor
CN105223892A (en) Intelligent transformer
CN104076222A (en) System for evaluating state of electric transmission and transformation equipment based on tree topological structure
CN203839960U (en) Reactive compensation intelligent combination switch having current detection function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170315

Termination date: 20171121