CN104362746B - Power grid risk pre-control method - Google Patents
Power grid risk pre-control method Download PDFInfo
- Publication number
- CN104362746B CN104362746B CN201410597078.6A CN201410597078A CN104362746B CN 104362746 B CN104362746 B CN 104362746B CN 201410597078 A CN201410597078 A CN 201410597078A CN 104362746 B CN104362746 B CN 104362746B
- Authority
- CN
- China
- Prior art keywords
- mobile phone
- information
- power grid
- control method
- grid risk
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 28
- 238000004519 manufacturing process Methods 0.000 claims abstract description 16
- 238000012545 processing Methods 0.000 claims abstract description 13
- 230000005540 biological transmission Effects 0.000 claims description 4
- 238000004458 analytical method Methods 0.000 claims description 3
- 238000010295 mobile communication Methods 0.000 claims description 3
- 230000005611 electricity Effects 0.000 claims 1
- 238000012544 monitoring process Methods 0.000 abstract description 3
- 238000009825 accumulation Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000012552 review Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/126—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission
Landscapes
- Telephone Function (AREA)
- Alarm Systems (AREA)
Abstract
The invention discloses a kind of power grid risk pre-control method, step includes: 1) configuration obtains chopper operation information, obtains circuit operation information and send three timed tasks of early warning information, and arranges the frequency that timed task performs, bundle nation designated mobile phone;2) call the timed task configured, data parsing in storehouse will be dispatched, preserve to storage facility located at processing plant, and send to designated mobile phone;3) directly directly inquire about details to the todo list page on mobile phone version mobile portal according to the information of SMS prompting, and process in time.The present invention to apparatus of load monitoring and early warning, improves production system power grid risk pre-control level in Substation Station by the way of automatic message early warning.
Description
Technical field
The present invention relates to a kind of power grid risk pre-control method, particularly relate to a kind of by apparatus of load message early warning
Carry out power grid risk pre-control method, belong to technical field of electric power.
Background technology
Electric reliability reflects the power industry satisfaction degree to national economy electrical energy demands, is power system
The important guarantee of safety and economic operation.Risk Pre-control, as a part for electric reliability, plays of crucial importance
Effect.During apparatus of load automatic message early warning is applied to apparatus of load monitoring, it is possible not only to remove from
Artificial investigation, improves power grid risk pre-control level, provides safeguard for electric power netting safe running;It can also be electrical network
Running and provide foundation, for big data analysis from now on, thus power grid risk is better anticipated, improving electric power can
By property.
Apparatus of load automatic early-warning is the emphasis of production management system (PMS) power transformation early warning part, is electric power
The important guarantee of security of system economical operation.Teams and groups personnel are reminded in time by apparatus of load automatic early-warning function
The carrying out practically situation of power transformation station equipment, this not only reduces the manpower review time one by one to equipment,
And can allow teams and groups personnel that equipment does corresponding process more timely, thus improve production to a certain extent
System power grid risk pre-control level.
Summary of the invention
It is an object of the invention to provide a kind of power grid risk pre-control method, the method by Unified frame platform,
Of fixed place and time sends out apparatus of load early warning information, immediately recognizes corresponding situation, thus make and
Time process.And by regularly apparatus of load information, i.e. although it is understood that the operation that all load equipments are recent
Situation, to such an extent as to for keeping in repair, purchase accumulation data basis from now on, provide for electric power netting safe running and preferably protect
Barrier.
The purpose of the present invention is achieved by the following technical programs:
A kind of power grid risk pre-control method, the method step is as follows:
1) configuration obtains chopper operation information, obtains circuit operation information and send three timings of early warning information
Task, and the frequency that timed task performs is set, bundle nation designated mobile phone;
2) call the timed task configured, data parsing in storehouse will be dispatched, preserve to storage facility located at processing plant, and send
To designated mobile phone;Specifically include following steps:
21) by timed task, by transformer load information analysis in dispatching patcher to PMS storage facility located at processing plant, will
In dispatching patcher, circuit load information resolves to PMS storage facility located at processing plant;
22) by timed task, the transformer load information resolved is analyzed, obtains transformator mistake
Carry and the record of heavy duty;
23) by timed task, the line load information resolved is analyzed, obtain circuit overload with
The record of heavy duty;
24) by the form of note and todo list, apparatus of load early warning information is sent to designated mobile phone;
3) information according to SMS prompting is directly direct to the todo list page on mobile phone version mobile portal
Inquiry details, and make following process in time:
31) transmission todo list is to production system, logs in production system and views this todo list;
32) send note in designated mobile phone, log in mobile terminal of mobile telephone immediately and check concrete fault trip
Information;
33) send a message in the wechat of designated mobile phone, in wechat group, scene is made immediately and instruct work;
34) in production system, this todo list is made Processing for removing after having processed.
The purpose of the present invention can also be realized further by techniques below measure:
Aforementioned power grid risk pre-control method, described step 1) be:
11) in production system by the way of bus is registered configuring timing tasks, obtain transformator run letter
Breath and the frequency of circuit operation information be five minutes once, the frequency sending early warning information is manually arranged by user,
It is defaulted as 12 hours once;
12) set the phone number of appointment person liable, keep mobile communication unobstructed, and guarantee this person liable
Mobile phone on be mounted with wechat and mobile terminal.
Aforementioned power grid risk pre-control method, described step 2) transformer load information include transformator title,
Affiliated transformer station regional, affiliated, meritorious, idle, capacity and current time;Line load information includes line
The title on road, affiliated area, affiliated transformer station, real-time current, rated current and current time.
Aforementioned power grid risk pre-control method, described step 22) in transformer load rate be considered as heavy duty more than 80%,
Transformer load rate is considered as overload more than 100%.
Aforementioned power grid risk pre-control method, described step 23) in circuit load factor be considered as heavy duty more than 80%,
Line load rate is considered as overload more than 100%.
Compared with prior art, the invention has the beneficial effects as follows: the present invention is by Unified frame platform, fixed point
Apparatus of load early warning information being sent out of timing, immediately recognizes corresponding situation, thus makes timely
Process.And by regularly apparatus of load information, i.e. although it is understood that the ruuning situation that all load equipments are recent,
To such an extent as to for keeping in repair, purchase accumulation data basis from now on, provide for electric power netting safe running and preferably ensure.This
Invention to apparatus of load monitoring and early warning, comes in Substation Station by the way of automatic message early warning
Improve production system power grid risk pre-control level.
Accompanying drawing explanation
Fig. 1 is the apparatus of load early warning information automatic transmission flow figure of the present invention.
Detailed description of the invention
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
As it is shown in figure 1, power grid risk pre-control method step is as follows:
1) configuration obtains chopper operation information, obtains circuit operation information and send three timings of early warning information
Task, and the frequency that timed task performs is set, bundle nation designated mobile phone;Particularly as follows:
11) in production system by the way of bus is registered configuring timing tasks, obtain transformator run letter
Breath and the frequency of circuit operation information be five minutes once, the frequency sending early warning information is manually arranged by user,
It is defaulted as 12 hours once;
12) set the phone number of appointment person liable, keep mobile communication unobstructed, and guarantee this person liable
Mobile phone on be mounted with wechat and mobile terminal.
2) call the timed task configured, data parsing in storehouse will be dispatched, preserve to storage facility located at processing plant, and send
To designated mobile phone;Specifically include following steps:
21) by timed task, by transformer load information analysis in dispatching patcher to PMS storage facility located at processing plant, will
In dispatching patcher, circuit load information resolves to PMS storage facility located at processing plant;Transformer load information includes the name of transformator
Title, affiliated area, affiliated transformer station, meritorious, idle, capacity and current time;Line load information bag
The title on vinculum road, affiliated area, affiliated transformer station, real-time current, rated current and current time.
22) by timed task, the transformer load information resolved is analyzed, obtains transformator mistake
Carry and the record of heavy duty;Transformer load rate is considered as heavy duty more than 80%, and transformer load rate regards more than 100%
For overload.
23) by timed task, the line load information resolved is analyzed, obtain circuit overload with
The record of heavy duty;Line load rate is considered as heavy duty more than 80%, and line load rate is considered as overload more than 100%.
24) by the form of note and todo list, apparatus of load early warning information is sent to designated mobile phone;
3) information according to SMS prompting is directly direct to the todo list page on mobile phone version mobile portal
Inquiry details, and make following process in time:
31) transmission todo list is to production system, logs in production system and views this todo list;
32) send note in designated mobile phone, log in mobile terminal of mobile telephone immediately and check concrete fault trip
Information;
33) send a message in the wechat of designated mobile phone, in wechat group, scene is made immediately and instruct work;
34) in production system, this todo list is made Processing for removing after having processed.
In addition to the implementation, the present invention can also have other embodiments, all employing equivalents or equivalence
The technical scheme that conversion is formed, all falls within the protection domain of application claims.
Claims (5)
1. a power grid risk pre-control method, it is characterised in that the method step is as follows:
1) configuration obtains chopper operation information, obtains circuit operation information and send three timings of early warning information
Task, and the frequency that timed task performs is set, bundle designated mobile phone;
2) call the timed task configured, data parsing in storehouse will be dispatched, preserve to storage facility located at processing plant, and send
To designated mobile phone;Specifically include following steps:
21) by timed task, by transformer load information analysis in dispatching patcher to PMS storage facility located at processing plant, will
In dispatching patcher, circuit load information resolves to PMS storage facility located at processing plant;
22) by timed task, the transformer load information resolved is analyzed, obtains transformator mistake
Carry and the record of heavy duty;
23) by timed task, the line load information resolved is analyzed, obtain circuit overload with
The record of heavy duty;
24) by the form of note and todo list, apparatus of load early warning information is sent to designated mobile phone;
3) information according to SMS prompting is directly direct to the todo list page on mobile phone version mobile portal
Inquiry details, and make following process in time:
31) transmission todo list is to production system, logs in production system and views this todo list;
32) send note in designated mobile phone, log in mobile terminal of mobile telephone immediately and check concrete fault trip
Information;
33) send a message in the wechat of designated mobile phone, in wechat group, scene is made immediately and instruct work;
34) in production system, this todo list is made Processing for removing after having processed.
2. power grid risk pre-control method as claimed in claim 1, it is characterised in that described step 1) be:
11) in production system by the way of bus is registered configuring timing tasks, obtain transformator run letter
Breath and the frequency of circuit operation information be five minutes once, the frequency sending early warning information is manually arranged by user,
It is defaulted as 12 hours once;
12) set the phone number of appointment person liable, keep mobile communication unobstructed, and guarantee this person liable
Mobile phone on be mounted with wechat and mobile terminal.
3. power grid risk pre-control method as claimed in claim 1, it is characterised in that described step 2) become
Depressor load information includes the title of transformator, affiliated area, affiliated transformer station, meritorious, idle, capacity
And current time;Line load information includes the title of circuit, affiliated area, affiliated transformer station, in real time electricity
Stream, rated current and current time.
4. power grid risk pre-control method as claimed in claim 1, it is characterised in that described step 22) in
Transformer load rate is considered as heavy duty more than 80%, and transformer load rate is considered as overload more than 100%.
5. power grid risk pre-control method as claimed in claim 1, it is characterised in that described step 23) in
Line load rate is considered as heavy duty more than 80%, and line load rate is considered as overload more than 100%.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410597078.6A CN104362746B (en) | 2014-10-30 | 2014-10-30 | Power grid risk pre-control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410597078.6A CN104362746B (en) | 2014-10-30 | 2014-10-30 | Power grid risk pre-control method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104362746A CN104362746A (en) | 2015-02-18 |
CN104362746B true CN104362746B (en) | 2016-11-23 |
Family
ID=52529984
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410597078.6A Active CN104362746B (en) | 2014-10-30 | 2014-10-30 | Power grid risk pre-control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104362746B (en) |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202353815U (en) * | 2011-11-11 | 2012-07-25 | 江苏省电力公司南京供电公司 | GIS short message power grid service system |
CN103414151A (en) * | 2013-08-20 | 2013-11-27 | 上海艾能电力工程有限公司 | Fault alarming device with wechat function |
-
2014
- 2014-10-30 CN CN201410597078.6A patent/CN104362746B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104362746A (en) | 2015-02-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102769608A (en) | Internet of things protocol conversion system and method | |
CN204022161U (en) | A kind of elevator management system for internet of things | |
CN104392301A (en) | Power transformation equipment account real-time inquiring method | |
CN103366245B (en) | Electric network fault information issuing method based on OSB bus and system | |
CN103530737A (en) | State based maintenance method and state based maintenance system of urban rail transit equipment | |
CN103795052B (en) | Data signal line RS-485 intelligent anti-lighting device and method | |
CN103197200B (en) | Method and system for rapidly collecting and transmitting fault ranging information of power grid line | |
CN102915513B (en) | A kind of typhoon risk information processing method of grid equipment | |
CN104362746B (en) | Power grid risk pre-control method | |
CN103235224B (en) | Grid fault analytical method | |
CN104297679B (en) | Early warning method of breaker tripping messages | |
CN103248519A (en) | Fault auxiliary analysis and short message warning system for communication station | |
CN105321331A (en) | Method, device and system for processing electricity meter information | |
CN102882854B (en) | Electric network data cut-in method | |
CN202815883U (en) | Positioning and real-time monitoring system for grounding wire | |
CN104037648A (en) | Operating method of 35kV-overhead-line insulating-glove-method electrified disconnection and connection of zero-load-line lead wire | |
CN103543730A (en) | Fault diagnosis system for chip mounters | |
CN104701824B (en) | A kind of protocol converter, low-voltage network leakage protection system and its intellective protector stipulations automatic switching method | |
CN203813517U (en) | Query monitoring device for power dispatching | |
CN204190490U (en) | A kind of guarantor's level platform power information synthetical collection system | |
CN105759737A (en) | High voltage cable monitoring and control platform and prediction control method thereof | |
CN205232248U (en) | Automatic secondary equipment fault handling device of power dispatching based on GIS | |
CN205121627U (en) | Electric power emergency rescue system | |
CN102880920A (en) | Lightning risk warning information processing method | |
CN102213731A (en) | Overcurrent phase-missing remote alarm for distribution transformer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |