CN104362746B CN201410597078.6A CN201410597078A CN104362746B CN 104362746 B CN104362746 B CN 104362746B CN 201410597078 A CN201410597078 A CN 201410597078A CN 104362746 B CN104362746 B CN 104362746B
Authority
CN
China
Prior art keywords
mobile phone
information
power grid
control method
grid risk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410597078.6A
Other languages
Chinese (zh)
Other versions
CN104362746A (en
Inventor
任萱
谭晶
李静
刘友春
钱朝春
陈扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Jiangsu Electric Power Information Technology Co Ltd
Zhenjiang Power Supply Co of Jiangsu Electric Power Co
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Jiangsu Electric Power Information Technology Co Ltd
Zhenjiang Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Jiangsu Electric Power Information Technology Co Ltd, Zhenjiang Power Supply Co of Jiangsu Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201410597078.6A priority Critical patent/CN104362746B/en
Publication of CN104362746A publication Critical patent/CN104362746A/en
Application granted granted Critical
Publication of CN104362746B publication Critical patent/CN104362746B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Landscapes

  • Telephone Function (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a kind of power grid risk pre-control method, step includes: 1) configuration obtains chopper operation information, obtains circuit operation information and send three timed tasks of early warning information, and arranges the frequency that timed task performs, bundle nation designated mobile phone;2) call the timed task configured, data parsing in storehouse will be dispatched, preserve to storage facility located at processing plant, and send to designated mobile phone;3) directly directly inquire about details to the todo list page on mobile phone version mobile portal according to the information of SMS prompting, and process in time.The present invention to apparatus of load monitoring and early warning, improves production system power grid risk pre-control level in Substation Station by the way of automatic message early warning.

Description

Power grid risk pre-control method
Technical field
The present invention relates to a kind of power grid risk pre-control method, particularly relate to a kind of by apparatus of load message early warning Carry out power grid risk pre-control method, belong to technical field of electric power.
Background technology
Electric reliability reflects the power industry satisfaction degree to national economy electrical energy demands, is power system The important guarantee of safety and economic operation.Risk Pre-control, as a part for electric reliability, plays of crucial importance Effect.During apparatus of load automatic message early warning is applied to apparatus of load monitoring, it is possible not only to remove from Artificial investigation, improves power grid risk pre-control level, provides safeguard for electric power netting safe running;It can also be electrical network Running and provide foundation, for big data analysis from now on, thus power grid risk is better anticipated, improving electric power can By property.
Apparatus of load automatic early-warning is the emphasis of production management system (PMS) power transformation early warning part, is electric power The important guarantee of security of system economical operation.Teams and groups personnel are reminded in time by apparatus of load automatic early-warning function The carrying out practically situation of power transformation station equipment, this not only reduces the manpower review time one by one to equipment, And can allow teams and groups personnel that equipment does corresponding process more timely, thus improve production to a certain extent System power grid risk pre-control level.
Summary of the invention
It is an object of the invention to provide a kind of power grid risk pre-control method, the method by Unified frame platform, Of fixed place and time sends out apparatus of load early warning information, immediately recognizes corresponding situation, thus make and Time process.And by regularly apparatus of load information, i.e. although it is understood that the operation that all load equipments are recent Situation, to such an extent as to for keeping in repair, purchase accumulation data basis from now on, provide for electric power netting safe running and preferably protect Barrier.
The purpose of the present invention is achieved by the following technical programs:
A kind of power grid risk pre-control method, the method step is as follows:
1) configuration obtains chopper operation information, obtains circuit operation information and send three timings of early warning information Task, and the frequency that timed task performs is set, bundle nation designated mobile phone;
2) call the timed task configured, data parsing in storehouse will be dispatched, preserve to storage facility located at processing plant, and send To designated mobile phone;Specifically include following steps:
21) by timed task, by transformer load information analysis in dispatching patcher to PMS storage facility located at processing plant, will In dispatching patcher, circuit load information resolves to PMS storage facility located at processing plant;
22) by timed task, the transformer load information resolved is analyzed, obtains transformator mistake Carry and the record of heavy duty;
23) by timed task, the line load information resolved is analyzed, obtain circuit overload with The record of heavy duty;
24) by the form of note and todo list, apparatus of load early warning information is sent to designated mobile phone;
3) information according to SMS prompting is directly direct to the todo list page on mobile phone version mobile portal Inquiry details, and make following process in time:
31) transmission todo list is to production system, logs in production system and views this todo list;
32) send note in designated mobile phone, log in mobile terminal of mobile telephone immediately and check concrete fault trip Information;
33) send a message in the wechat of designated mobile phone, in wechat group, scene is made immediately and instruct work;
34) in production system, this todo list is made Processing for removing after having processed.
The purpose of the present invention can also be realized further by techniques below measure:
Aforementioned power grid risk pre-control method, described step 1) be:
11) in production system by the way of bus is registered configuring timing tasks, obtain transformator run letter Breath and the frequency of circuit operation information be five minutes once, the frequency sending early warning information is manually arranged by user, It is defaulted as 12 hours once;
12) set the phone number of appointment person liable, keep mobile communication unobstructed, and guarantee this person liable Mobile phone on be mounted with wechat and mobile terminal.
Aforementioned power grid risk pre-control method, described step 2) transformer load information include transformator title, Affiliated transformer station regional, affiliated, meritorious, idle, capacity and current time;Line load information includes line The title on road, affiliated area, affiliated transformer station, real-time current, rated current and current time.
Aforementioned power grid risk pre-control method, described step 22) in transformer load rate be considered as heavy duty more than 80%, Transformer load rate is considered as overload more than 100%.
Aforementioned power grid risk pre-control method, described step 23) in circuit load factor be considered as heavy duty more than 80%, Line load rate is considered as overload more than 100%.
Compared with prior art, the invention has the beneficial effects as follows: the present invention is by Unified frame platform, fixed point Apparatus of load early warning information being sent out of timing, immediately recognizes corresponding situation, thus makes timely Process.And by regularly apparatus of load information, i.e. although it is understood that the ruuning situation that all load equipments are recent, To such an extent as to for keeping in repair, purchase accumulation data basis from now on, provide for electric power netting safe running and preferably ensure.This Invention to apparatus of load monitoring and early warning, comes in Substation Station by the way of automatic message early warning Improve production system power grid risk pre-control level.
Accompanying drawing explanation
Fig. 1 is the apparatus of load early warning information automatic transmission flow figure of the present invention.
Detailed description of the invention
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
As it is shown in figure 1, power grid risk pre-control method step is as follows:
1) configuration obtains chopper operation information, obtains circuit operation information and send three timings of early warning information Task, and the frequency that timed task performs is set, bundle nation designated mobile phone;Particularly as follows:
11) in production system by the way of bus is registered configuring timing tasks, obtain transformator run letter Breath and the frequency of circuit operation information be five minutes once, the frequency sending early warning information is manually arranged by user, It is defaulted as 12 hours once;
12) set the phone number of appointment person liable, keep mobile communication unobstructed, and guarantee this person liable Mobile phone on be mounted with wechat and mobile terminal.
2) call the timed task configured, data parsing in storehouse will be dispatched, preserve to storage facility located at processing plant, and send To designated mobile phone;Specifically include following steps:
21) by timed task, by transformer load information analysis in dispatching patcher to PMS storage facility located at processing plant, will In dispatching patcher, circuit load information resolves to PMS storage facility located at processing plant;Transformer load information includes the name of transformator Title, affiliated area, affiliated transformer station, meritorious, idle, capacity and current time;Line load information bag The title on vinculum road, affiliated area, affiliated transformer station, real-time current, rated current and current time.
22) by timed task, the transformer load information resolved is analyzed, obtains transformator mistake Carry and the record of heavy duty;Transformer load rate is considered as heavy duty more than 80%, and transformer load rate regards more than 100% For overload.
23) by timed task, the line load information resolved is analyzed, obtain circuit overload with The record of heavy duty;Line load rate is considered as heavy duty more than 80%, and line load rate is considered as overload more than 100%.
24) by the form of note and todo list, apparatus of load early warning information is sent to designated mobile phone;
3) information according to SMS prompting is directly direct to the todo list page on mobile phone version mobile portal Inquiry details, and make following process in time:
31) transmission todo list is to production system, logs in production system and views this todo list;
32) send note in designated mobile phone, log in mobile terminal of mobile telephone immediately and check concrete fault trip Information;
33) send a message in the wechat of designated mobile phone, in wechat group, scene is made immediately and instruct work;
34) in production system, this todo list is made Processing for removing after having processed.
In addition to the implementation, the present invention can also have other embodiments, all employing equivalents or equivalence The technical scheme that conversion is formed, all falls within the protection domain of application claims.

Claims (5)

1. a power grid risk pre-control method, it is characterised in that the method step is as follows:
1) configuration obtains chopper operation information, obtains circuit operation information and send three timings of early warning information Task, and the frequency that timed task performs is set, bundle designated mobile phone;
2) call the timed task configured, data parsing in storehouse will be dispatched, preserve to storage facility located at processing plant, and send To designated mobile phone;Specifically include following steps:
21) by timed task, by transformer load information analysis in dispatching patcher to PMS storage facility located at processing plant, will In dispatching patcher, circuit load information resolves to PMS storage facility located at processing plant;
22) by timed task, the transformer load information resolved is analyzed, obtains transformator mistake Carry and the record of heavy duty;
23) by timed task, the line load information resolved is analyzed, obtain circuit overload with The record of heavy duty;
24) by the form of note and todo list, apparatus of load early warning information is sent to designated mobile phone;
3) information according to SMS prompting is directly direct to the todo list page on mobile phone version mobile portal Inquiry details, and make following process in time:
31) transmission todo list is to production system, logs in production system and views this todo list;
32) send note in designated mobile phone, log in mobile terminal of mobile telephone immediately and check concrete fault trip Information;
33) send a message in the wechat of designated mobile phone, in wechat group, scene is made immediately and instruct work;
34) in production system, this todo list is made Processing for removing after having processed.
2. power grid risk pre-control method as claimed in claim 1, it is characterised in that described step 1) be:
11) in production system by the way of bus is registered configuring timing tasks, obtain transformator run letter Breath and the frequency of circuit operation information be five minutes once, the frequency sending early warning information is manually arranged by user, It is defaulted as 12 hours once;
12) set the phone number of appointment person liable, keep mobile communication unobstructed, and guarantee this person liable Mobile phone on be mounted with wechat and mobile terminal.
3. power grid risk pre-control method as claimed in claim 1, it is characterised in that described step 2) become Depressor load information includes the title of transformator, affiliated area, affiliated transformer station, meritorious, idle, capacity And current time;Line load information includes the title of circuit, affiliated area, affiliated transformer station, in real time electricity Stream, rated current and current time.
4. power grid risk pre-control method as claimed in claim 1, it is characterised in that described step 22) in Transformer load rate is considered as heavy duty more than 80%, and transformer load rate is considered as overload more than 100%.
5. power grid risk pre-control method as claimed in claim 1, it is characterised in that described step 23) in Line load rate is considered as heavy duty more than 80%, and line load rate is considered as overload more than 100%.
CN201410597078.6A 2014-10-30 2014-10-30 Power grid risk pre-control method Active CN104362746B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410597078.6A CN104362746B (en) 2014-10-30 2014-10-30 Power grid risk pre-control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410597078.6A CN104362746B (en) 2014-10-30 2014-10-30 Power grid risk pre-control method

Publications (2)

Publication Number Publication Date
CN104362746A CN104362746A (en) 2015-02-18
CN104362746B true CN104362746B (en) 2016-11-23

Family

ID=52529984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410597078.6A Active CN104362746B (en) 2014-10-30 2014-10-30 Power grid risk pre-control method

Country Status (1)

Country Link
CN (1) CN104362746B (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202353815U (en) * 2011-11-11 2012-07-25 江苏省电力公司南京供电公司 GIS short message power grid service system
CN103414151A (en) * 2013-08-20 2013-11-27 上海艾能电力工程有限公司 Fault alarming device with wechat function

Also Published As

Publication number Publication date
CN104362746A (en) 2015-02-18

Similar Documents

Publication Publication Date Title
CN102769608A (en) Internet of things protocol conversion system and method
CN204022161U (en) A kind of elevator management system for internet of things
CN104392301A (en) Power transformation equipment account real-time inquiring method
CN103366245B (en) Electric network fault information issuing method based on OSB bus and system
CN103530737A (en) State based maintenance method and state based maintenance system of urban rail transit equipment
CN103795052B (en) Data signal line RS-485 intelligent anti-lighting device and method
CN103197200B (en) Method and system for rapidly collecting and transmitting fault ranging information of power grid line
CN102915513B (en) A kind of typhoon risk information processing method of grid equipment
CN104362746B (en) Power grid risk pre-control method
CN103235224B (en) Grid fault analytical method
CN104297679B (en) Early warning method of breaker tripping messages
CN103248519A (en) Fault auxiliary analysis and short message warning system for communication station
CN105321331A (en) Method, device and system for processing electricity meter information
CN102882854B (en) Electric network data cut-in method
CN202815883U (en) Positioning and real-time monitoring system for grounding wire
CN104037648A (en) Operating method of 35kV-overhead-line insulating-glove-method electrified disconnection and connection of zero-load-line lead wire
CN103543730A (en) Fault diagnosis system for chip mounters
CN104701824B (en) A kind of protocol converter, low-voltage network leakage protection system and its intellective protector stipulations automatic switching method
CN203813517U (en) Query monitoring device for power dispatching
CN204190490U (en) A kind of guarantor's level platform power information synthetical collection system
CN105759737A (en) High voltage cable monitoring and control platform and prediction control method thereof
CN205232248U (en) Automatic secondary equipment fault handling device of power dispatching based on GIS
CN205121627U (en) Electric power emergency rescue system
CN102880920A (en) Lightning risk warning information processing method
CN102213731A (en) Overcurrent phase-missing remote alarm for distribution transformer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant