CN104037648A CN201410201070.3A CN201410201070A CN104037648A CN 104037648 A CN104037648 A CN 104037648A CN 201410201070 A CN201410201070 A CN 201410201070A CN 104037648 A CN104037648 A CN 104037648A
Authority
CN
China
Prior art keywords
work
lift device
aerial lift
wire
insulated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410201070.3A
Other languages
Chinese (zh)
Inventor
黄旭
刘倞
周文涛
李鹏
杨树成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410201070.3A priority Critical patent/CN104037648A/en
Publication of CN104037648A publication Critical patent/CN104037648A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to an operating method of 35kV-overhead-line insulating-glove-method electrified disconnection and connection of a zero-load-line lead wire. Through an operating method of using an insulating aerial lift truck to carry out electrified disconnection and connection of the lead wire on a zero-load line, the method is cooperatively implemented by three kinds of work personnel: a work leader, bucket electricians and ground electricians. The method mainly includes steps of stop of line reclosing, on-site work instrument detection, insulating shielding and isolating measure taking, work instrument installation, electrified disconnection (connection) of the zero-load-line lead wire, termination of the insulating shielding and isolating measures, evacuation of the work personnel from the site and line reclosing restoring and the like. The beneficial effects of the operating method are that defects of an insulating platform operating method can be compensated, efficient and rapid operation of electrified connection and disconnection of a 35kV zero-load line can be realized, comparatively great economic benefit and social benefit can be generated, the work efficiency of a maintenance work and the safety benefit of the work personnel can be effectively improved and domestic blanks in the field can be filled effectively.

Description

The operational method of the charged breaking and connecting nonloaded line lead-in wire of 35kV overhead transmission line insulating gloves method
Technical field
the present invention relates to 35kV overhead transmission line hotline maintenance operation technique field, be specifically related to the charged breaking and connecting nonloaded line lead-in wire of a kind of 35kV overhead transmission line insulating gloves method operational method.
Background technology
Along with the fast development of national economy, society has higher requirement to the power supply reliability of power supply enterprise and the quality of power supply.35kV overhead transmission line belongs to the important component part of China's electric power networks, because it has that construction cost is low, the construction period is short and radius of electricity supply is widely used in the large and larger areas of radius of electricity supply of some loads of China compared with the advantage such as large.But, because 35kV overhead transmission line exists that equipment is many, insulation level is low and the problem such as direct user oriented, cause easily breaking down under atmospheric over-voltage, filth or other extraneous factor effects, and due to part power supply facilities outmoded aging, equipment perfectness is low, and accident potential is increased.At present, comparatively conventional equal potential working or earth potential working mode in general employing transmission line when the operation of 35kV overhead transmission line hotline maintenance, but earth potential working labour intensity is large, operating efficiency is lower, equal potential working brings more serious potential safety hazard because of the relatively little personal safety to operating personnel in 35kV overhead transmission line shaft tower gap.Existing a kind of operational method that adopts insulated platform to implement the charged breaking and connecting nonloaded line lead-in wire of 35kV overhead transmission line, but there is a lot of weak points in the method, such as not receiving, adapts to the on-the-spot needs of the dissimilar shaft tower such as electric pole and steel tower, cannot be general; Staff's scope of activities on insulated platform is little, easily occurs security risk, need to install in advance and remove insulated platform afterwards during operation, expends a large amount of manpower and materials, and consuming time longer, labour intensity is larger, and efficiency is low.
Summary of the invention
Technical problem to be solved by this invention is, provide a kind of and can be applicable to different shaft towers scene, can save the operational method of the charged breaking and connecting nonloaded line lead-in wire of 35kV overhead transmission line insulating gloves method that at least half activity duration, high, the safe and reliable charged breaking and connecting nonloaded line of efficiency go between simultaneously.
The technical solution adopted in the present invention is: the operational method of the charged breaking and connecting nonloaded line lead-in wire of a kind of 35kV overhead transmission line insulating gloves method, by electrician and ground electrician three class personnel coordinating operations in work director, aerial lift device with insulated arm, take aerial lift device with insulated arm as carrying, adopt insulating gloves working system, comprise the following steps:
(1) work director should contact with scheduling according to live line working work ticket content before work, the inactive respective lines reclosing of application;
(2) work director reads out work ticket, and the task of handing over work, carries out dangerous spot to the member of shift and inform, explanation safety measure and technical measures, confirm that each member of shift knows, check that whether the member of the shift state of mind is good, clearly make division of labor and lines of specialities and safety notice;
(3) before operation, insulating tool is placed on moistureproof tarpaulin, check the whether good also wiped clean of all kinds of safety work Work tool outward appearances, use insulating resistance detecting instrument to check insulating tools such as insulation clothing, insulated target and insulated shielding covers, confirm that its insulating resistance value is not less than 700M Ω otherwise needs replacing;
(4) in aerial lift device with insulated arm, electrician has dressed individual insulating protection apparatus, carries the operation Work tools such as high voltage electroscope and insulated shielding cover, enters in aerial lift device with insulated arm, fastens seat belts.
(5) electrician operates aerial lift device with insulated arm and in position electrified body and earthing component is carried out to electrical verification in aerial lift device with insulated arm, after work director license, enters live line working region;
(6) in aerial lift device with insulated arm electrician according to first electrified body after earth electrode, from the close-by examples to those far off, from down to up, descending order, with wire mask, insulated target and insulated shielding cover philosophy, wire, lead-in wire and insulator etc. are insulated and are covered;
(7) complete insulation cover after, in aerial lift device with insulated arm, under No. 1 electrician No. 2 electricians' in aerial lift device with insulated arm cooperation, open the insulation isolation of lead-in wire parallel groove clamp, extinguishing arc coaster is fixed on mains side wire, extinguishing arc rope is by extinguishing arc coaster, other end extinguishing arc rope is fastened on load side drainage thread, and ground electrician controls insulation stay cord well;
(8) ground electrician strains extinguishing arc rope it is reliably contacted with extinguishing arc coaster on mains side wire, and in aerial lift device with insulated arm, No. 1 electrician director that reports after checking, takes lead-in wire parallel groove clamp apart after agreement, and mains side wire jumper drainage thread is fixed on to strain clamp place;
(9) in aerial lift device with insulated arm, No. 2 electricians operate aerial lift device with insulated arm and 4 meters of above safe distances of drainage thread maintenance, two ground electricians wear goggles, work director commands ground electrician, ground electrician's drawing line traffic control rope making, another ground electrician emits extinguishing arc rope immediately, make load side drainage thread hightail extinguishing arc coaster with extinguishing arc rope, a side line road is out of service;
(10) No. 2 electricians operate aerial lift device with insulated arm and get back to service position pack processing and tie load side wire jumper drainage thread in aerial lift device with insulated arm;
(11) after work director agrees to, remove insulation quarantine measures, aerial lift device with insulated arm commutation, to appropriate location, is disconnected to other two phase terminals by said procedure, if connect nonloaded line lead-in wire, according to above contrary program, carry out;
(12) break or connect after lead-in wire end-of-job, through work director, agree to, in aerial lift device with insulated arm electrician according to first earth electrode after electrified body, draw near, order from top to bottom removes successively insulation and covers, the aerial lift device with insulated arm region of deactivating, in aerial lift device with insulated arm, electrician returns to ground;
(13) work director checks the work after completing comprehensively, after confirming to meet acceptance specification and requiring, records the on the regular payroll and scene of organizing and knocks off and can carry out work comment, then announces end-of-job;
(14) after hours, report traffic control and finish, shift withdraws scene, can recover circuit re-switching.
During live line working, operating personnel should keep neighbour to be no less than mutually 0.8 meter, to be no less than the safe distance of 0.6 meter over the ground, as can not guarantee this apart from time should take corresponding insulation to cover measure.
During charged breaking and connecting nonloaded line, operating personnel should wear goggles, and takes corresponding extinguishing arc measure, forbids on-load breaking and connecting lead-in wire.
Forbid that in aerial lift device with insulated arm, electrician removes live wire and earthy insulation quarantine measures simultaneously; Forbid to contact 2 broken ends of wire access failure or that disconnected simultaneously, in case human body seals in circuit, cause security incident.
The invention has the beneficial effects as follows: owing to utilizing aerial lift device with insulated arm for carrying, adopt the new operational method of insulating gloves working system to the charged breaking and connecting nonloaded line lead-in wire of 35kV overhead transmission line, improved service work personnel's personal safety, promoted upkeep operation efficiency, there is larger economic benefit and social benefit, filled up domestic and utilized aerial lift device with insulated arm to use the blank of insulating gloves to the charged breaking and connecting nonloaded line lead-in wire of 35kV overhead transmission line operation field.The method time and labour saving, can adapt to different shaft tower demands, and in bucket, operating personnel's work activities scope is large, operation safe is reliable, simple and convenient, improve operating personnel's personal safety, promoted service work efficiency, there is larger economic benefit and social benefit.
Embodiment
Below in conjunction with embodiment, the present invention is described in further detail:
1, operating type: utilize aerial lift device with insulated arm, adopt insulating gloves working system, the charged breaking and connecting nonloaded line lead-in wire of 35kV overhead transmission line is changed to operation.
2, operating personnel: need altogether 6 people, the director that wherein works (guardian) 1 people; Electrician 2 people in aerial lift device with insulated arm; Ground electrician 3 people.
3, key operation Work tool
Sequence number Work tool and title material Model Quantity
1 Aerial lift device with insulated arm 35kV 1
2 Rope is transmitted in insulation 35kV Article 1,
3 Insulating cord 35kV Article 2,
4 Insulated target 35kV Some
5 Insulated target folder ? Some
6 Wire insulation mask 35kV 6
7 Rigid insulation mask 35kV 3
8 Insulation tippet 35kV 2 covers
9 Insulation boots 35kV 2 pairs
10 Insulating gloves 35kV 2 pairs
11 Kid gloves 35kV 2 pairs
12 Goggles 35kV 2 pairs
13 Insulating bar 35kV 1
14 Insulation safety cap 35kV 6 tops
15 Insulated safety belt 35kV Article 2,
16 Extinguishing arc coaster 35kV 1
17 Tackle pulley ? 1 cover
18 Extinguishing arc rope ? Article 1,
19 Moistureproof tarpaulin ? 2
20 Protective fence ? 1 cover
21 High voltage electroscope ? 1
22 Insulation tester ? 1
4, concrete job step
(1) work director should contact with scheduling according to live line working work ticket content before work, the inactive respective lines reclosing of application;
(2) work director reads out work ticket, and the task of handing over work, carries out dangerous spot to the member of shift and inform, explanation safety measure and technical measures, confirm that each member of shift knows, check that whether the member of the shift state of mind is good, clearly make division of labor and lines of specialities and safety notice;
(3) before operation, insulating tool is placed on moistureproof tarpaulin, checks the whether good also wiped clean of all kinds of safety work Work tool outward appearances.Use insulating resistance detecting instrument to check insulating tools such as insulation clothing, insulated target and insulated shielding covers, confirm that its insulating resistance value is not less than 700M Ω otherwise needs replacing;
(4) in aerial lift device with insulated arm, electrician has dressed individual insulating protection apparatus, carries the operation Work tools such as high voltage electroscope and insulated shielding cover, enters in operational insulation bucket arm vehicle, fastens seat belts.
(5) electrician operates aerial lift device with insulated arm and in position electrified body and earthing component is carried out to electrical verification in aerial lift device with insulated arm, after work director license, enters live line working region;
(6) in aerial lift device with insulated arm electrician according to first electrified body after earth electrode, from the close-by examples to those far off, from down to up, descending order, with wire mask, insulated target and insulated shielding cover philosophy, wire, lead-in wire and insulator etc. are insulated and are covered;
(7) complete insulation cover after, in aerial lift device with insulated arm, under No. 1 electrician No. 2 electricians' in aerial lift device with insulated arm cooperation, open the insulation isolation of lead-in wire parallel groove clamp, extinguishing arc coaster is fixed on mains side wire, extinguishing arc rope is by extinguishing arc coaster, other end extinguishing arc rope is fastened on load side drainage thread, and ground electrician controls insulation stay cord well;
(8) ground electrician strains extinguishing arc rope it is reliably contacted with extinguishing arc coaster on mains side wire, and in aerial lift device with insulated arm, No. 1 electrician director that reports after checking, takes lead-in wire parallel groove clamp apart after agreement, and mains side wire jumper drainage thread is fixed on to strain clamp place;
(9) in aerial lift device with insulated arm, No. 2 electricians operate aerial lift device with insulated arm and 4 meters of above safe distances of drainage thread maintenance, two ground electricians wear goggles, work director commands ground electrician, ground electrician's drawing line traffic control rope making, another ground electrician emits extinguishing arc rope immediately, make load side drainage thread hightail extinguishing arc coaster with extinguishing arc rope, a side line road is out of service;
(10) No. 2 electricians operate aerial lift device with insulated arm and get back to service position pack processing and tie load side wire jumper drainage thread in aerial lift device with insulated arm;
(11) after work director agrees to, remove insulation quarantine measures, aerial lift device with insulated arm commutation, to appropriate location, is disconnected to other two phase terminals (if connect nonloaded line lead-in wire, carrying out according to above contrary program) by said procedure;
(12) after disconnected (or connecing) lead-in wire end-of-job, through work director, agree to, in aerial lift device with insulated arm electrician according to first earth electrode after electrified body, draw near, order from top to bottom removes successively insulation and covers, the aerial lift device with insulated arm region of deactivating, in aerial lift device with insulated arm, electrician returns to ground;
(13) work director checks the work after completing comprehensively, after confirming to meet acceptance specification and requiring, records the on the regular payroll and scene of organizing and knocks off and can carry out work comment, then announces end-of-job;
(14) after hours, report traffic control and finish, shift withdraws scene, can recover circuit re-switching.
5, safety notice
(1) live line working should be carried out under good weather.In case of thunder and lightning, snow, hail, rain, mist etc. are forbidden to carry out live line working.Wind-force is greater than 5 grades, or humidity is while surpassing 80%, generally should not carry out live line working;
(2), while using the operation of 35kV aerial lift device with insulated arm, the effective insulated lengths of minimum of its insulation arm is 1.5 meters; The effective insulated lengths of insulating bar must not be less than 0.9 meter;
(3) during live line working, operating personnel should keep being no less than over the ground 0.6 meter, adjacent phase conductor is no less than to the safe distance of 0.8 meter, as can not be guaranteed this safe distance time, should adopt other insulation such as insulating barrier to cover measure;
(4) forbid that in aerial lift device with insulated arm, electrician removes live wire and earthy insulation quarantine measures simultaneously; Forbid to contact 2 broken ends of wire access failure or that disconnected, in case human body seals in circuit simultaneously;
(5), during charged breaking and connecting nonloaded line, operating personnel should wear goggles, and takes corresponding extinguishing arc measure.Forbid on-load breaking and connecting lead-in wire.
Finally it should be noted that, protection scope of the present invention is not limited to above-mentioned instantiation mode, as long as those of ordinary skills are without the execution mode that can associate through creative work, all belongs in scope of patent protection of the present invention.

Claims (4)

1. the operational method of the charged breaking and connecting nonloaded line lead-in wire of a 35kV overhead transmission line insulating gloves method, it is characterized in that, by electrician and ground electrician three class personnel coordinating operations in work director, aerial lift device with insulated arm, take aerial lift device with insulated arm as carrying, adopt insulating gloves working system, comprise the following steps:
(1) work director should contact with scheduling according to live line working work ticket content before work, the inactive respective lines reclosing of application;
(2) work director reads out work ticket, and the task of handing over work, carries out dangerous spot to the member of shift and inform, explanation safety measure and technical measures, confirm that each member of shift knows, check that whether the member of the shift state of mind is good, clearly make division of labor and lines of specialities and safety notice;
(3) before operation, insulating tool is placed on moistureproof tarpaulin, check the whether good also wiped clean of all kinds of safety work Work tool outward appearances, use insulating resistance detecting instrument to check insulating tools such as insulation clothing, insulated target and insulated shielding covers, confirm that its insulating resistance value is not less than 700M Ω otherwise needs replacing;
(4) in aerial lift device with insulated arm, electrician has dressed individual insulating protection apparatus, carries the operation Work tools such as high voltage electroscope and insulated shielding cover, enters in aerial lift device with insulated arm, fastens seat belts;
(5) electrician operates aerial lift device with insulated arm and in position electrified body and earthing component is carried out to electrical verification in aerial lift device with insulated arm, after work director license, enters live line working region;
(6) in aerial lift device with insulated arm electrician according to first electrified body after earth electrode, from the close-by examples to those far off, from down to up, descending order, with wire mask, insulated target and insulated shielding cover philosophy, wire, lead-in wire and insulator etc. are insulated and are covered;
(7) complete insulation cover after, in aerial lift device with insulated arm, under No. 1 electrician No. 2 electricians' in aerial lift device with insulated arm cooperation, open the insulation isolation of lead-in wire parallel groove clamp, extinguishing arc coaster is fixed on mains side wire, extinguishing arc rope is by extinguishing arc coaster, other end extinguishing arc rope is fastened on load side drainage thread, and ground electrician controls insulation stay cord well;
(8) ground electrician strains extinguishing arc rope it is reliably contacted with extinguishing arc coaster on mains side wire, and in aerial lift device with insulated arm, No. 1 electrician director that reports after checking, takes lead-in wire parallel groove clamp apart after agreement, and mains side wire jumper drainage thread is fixed on to strain clamp place;
(9) in aerial lift device with insulated arm, No. 2 electricians operate aerial lift device with insulated arm and 4 meters of above safe distances of drainage thread maintenance, two ground electricians wear goggles, work director commands ground electrician, ground electrician's drawing line traffic control rope making, another ground electrician emits extinguishing arc rope immediately, make load side drainage thread hightail extinguishing arc coaster with extinguishing arc rope, a side line road is out of service;
(10) No. 2 electricians operate aerial lift device with insulated arm and get back to service position pack processing and tie load side wire jumper drainage thread in aerial lift device with insulated arm;
(11) after work director agrees to, remove insulation quarantine measures, aerial lift device with insulated arm commutation, to appropriate location, is disconnected to other two phase terminals by said procedure, if connect nonloaded line lead-in wire, according to above contrary program, carry out;
(12) break or connect after lead-in wire end-of-job, through work director, agree to, in aerial lift device with insulated arm electrician according to first earth electrode after electrified body, draw near, order from top to bottom removes successively insulation and covers, the aerial lift device with insulated arm region of deactivating, in aerial lift device with insulated arm, electrician returns to ground;
(13) work director checks the work after completing comprehensively, after confirming to meet acceptance specification and requiring, records the on the regular payroll and scene of organizing and knocks off and can carry out work comment, then announces end-of-job;
(14) after hours, report traffic control and finish, shift withdraws scene, can recover circuit re-switching.
2. the charged breaking and connecting nonloaded line of 35kV overhead transmission line insulating gloves method according to claim 1 lead-in wire operational method, it is characterized in that, during live line working, operating personnel should keep neighbour to be no less than mutually 0.8 meter, to be no less than the safe distance of 0.6 meter over the ground, as can not guarantee this apart from time should take corresponding insulation to cover measure.
3. the charged breaking and connecting nonloaded line of 35kV overhead transmission line insulating gloves method according to claim 1 lead-in wire operational method, it is characterized in that, during charged breaking and connecting nonloaded line, operating personnel should wear goggles, and take corresponding extinguishing arc measure, forbid on-load breaking and connecting lead-in wire.
4. the charged breaking and connecting nonloaded line lead-in wire of 35kV overhead transmission line insulating gloves method according to claim 1 operational method, is characterized in that, forbids that in aerial lift device with insulated arm, electrician removes live wire and earthy insulation quarantine measures simultaneously; Forbid to contact 2 broken ends of wire access failure or that disconnected simultaneously, in case human body seals in circuit, cause security incident.
CN201410201070.3A 2014-05-14 2014-05-14 Operating method of 35kV-overhead-line insulating-glove-method electrified disconnection and connection of zero-load-line lead wire Pending CN104037648A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410201070.3A CN104037648A (en) 2014-05-14 2014-05-14 Operating method of 35kV-overhead-line insulating-glove-method electrified disconnection and connection of zero-load-line lead wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410201070.3A CN104037648A (en) 2014-05-14 2014-05-14 Operating method of 35kV-overhead-line insulating-glove-method electrified disconnection and connection of zero-load-line lead wire

Publications (1)

Publication Number Publication Date
CN104037648A true CN104037648A (en) 2014-09-10

Family

ID=51468317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410201070.3A Pending CN104037648A (en) 2014-05-14 2014-05-14 Operating method of 35kV-overhead-line insulating-glove-method electrified disconnection and connection of zero-load-line lead wire

Country Status (1)

Country Link
CN (1) CN104037648A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109921335A (en) * 2019-03-25 2019-06-21 云南电网有限责任公司昆明供电局 Pylon route uses extinguishing arc rope ground potential breaking and connecting drainage thread working system
CN110797796A (en) * 2019-12-05 2020-02-14 云南电网有限责任公司带电作业分公司 Streamline operation method for breaking or connecting breaker of insulating short rod
CN111817202A (en) * 2020-06-30 2020-10-23 国网上海市电力公司 Arc extinction device and method for live lapping of no-load cable terminal lead of distribution line

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0986893A (en) * 1995-09-28 1997-03-31 Aichi Corp Work stand of high place working truck
KR100293315B1 (en) * 1997-10-02 2001-09-17 이종훈 Installation tool and installation method for live line overhead ground wire
CN101640392A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for cutting off drainage wire for 35kV distribution circuit
CN101640390A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for lapping drainage wire for 35kV distribution circuit
CN101719640A (en) * 2009-11-05 2010-06-02 齐齐哈尔电业局 Operation method of connecting charged lead with by-pass jumper for 10 kV wire multi-loop on same tower
CN103746315A (en) * 2013-12-30 2014-04-23 江苏省电力公司常州供电公司 Quick hot-line by-pass jumper overlapping operation method for 10kV insulated power distribution line
CN103746314A (en) * 2013-12-30 2014-04-23 江苏省电力公司常州供电公司 Quick hot-line by-pass jumper removing operation method for 10kV insulated power distribution line

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0986893A (en) * 1995-09-28 1997-03-31 Aichi Corp Work stand of high place working truck
KR100293315B1 (en) * 1997-10-02 2001-09-17 이종훈 Installation tool and installation method for live line overhead ground wire
CN101640392A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for cutting off drainage wire for 35kV distribution circuit
CN101640390A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for lapping drainage wire for 35kV distribution circuit
CN101719640A (en) * 2009-11-05 2010-06-02 齐齐哈尔电业局 Operation method of connecting charged lead with by-pass jumper for 10 kV wire multi-loop on same tower
CN103746315A (en) * 2013-12-30 2014-04-23 江苏省电力公司常州供电公司 Quick hot-line by-pass jumper overlapping operation method for 10kV insulated power distribution line
CN103746314A (en) * 2013-12-30 2014-04-23 江苏省电力公司常州供电公司 Quick hot-line by-pass jumper removing operation method for 10kV insulated power distribution line

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
国家电网公司组编: "《带电作业操作方法 第2分册 配电线路》", 30 June 2011, 中国电力出版社, article ""接、断引线(带电断、接空载线路)"", pages: 309-314 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109921335A (en) * 2019-03-25 2019-06-21 云南电网有限责任公司昆明供电局 Pylon route uses extinguishing arc rope ground potential breaking and connecting drainage thread working system
CN110797796A (en) * 2019-12-05 2020-02-14 云南电网有限责任公司带电作业分公司 Streamline operation method for breaking or connecting breaker of insulating short rod
CN111817202A (en) * 2020-06-30 2020-10-23 国网上海市电力公司 Arc extinction device and method for live lapping of no-load cable terminal lead of distribution line
CN111817202B (en) * 2020-06-30 2021-12-14 国网上海市电力公司 Arc extinction device and method for live lapping of no-load cable terminal lead of distribution line

Similar Documents

Publication Publication Date Title
CN103618252A (en) Operation method for replacing tension insulator for 35kV overhead line in electrified mode
CN101640391B (en) Live-wire operation method for replacing insulator for 35kV distribution circuit
CN103746315A (en) Quick hot-line by-pass jumper overlapping operation method for 10kV insulated power distribution line
CN102931609B (en) On-load changes the operational method of 10kV fuse switch
CN102545094A (en) Method for changing tension simulators from live 10kV power supply line
CN110120643B (en) Uninterrupted power operation method for power line of ground potential distribution network
CN106771874B (en) Power transmission line lightning shielding fault location monitoring system and monitoring method
CN101640392A (en) Live-wire operation method for cutting off drainage wire for 35kV distribution circuit
CN103618249A (en) technology for electrified overhaul of +-500kV double-circuit direct-current power transmission lines on same tower
CN103001142A (en) Operation method for on-load replacing of 10kV pole-mounted disconnector
CN103746314A (en) Quick hot-line by-pass jumper removing operation method for 10kV insulated power distribution line
CN102136693A (en) Method and device for realizing long-distance equal electric potential access of winch hanging basket guide rail
CN104037648A (en) Operating method of 35kV-overhead-line insulating-glove-method electrified disconnection and connection of zero-load-line lead wire
CN203445539U (en) Line laying corner pulley rack
CN106026388A (en) Substation fault information automatic publishing and processing system
CN103001141A (en) Method for mounting anti-waving spacers on 66-kilovolt power transmission hot-line
CN104113007A (en) Operation method for replacing strain insulator of 35kV overhead distribution line in live state
CN105506645A (en) Anticorrosion device and anticorrosion method of ground wire
CN103178469A (en) Operating method for replacing suspension type porcelain bottle of straight line pole for 35-kV overhead distribution line in electrified manner
CN205882560U (en) Special circulation cord rack device of distribution live working earth potential
CN104071036B (en) Urban rail transit contact rail traction system
CN102937690A (en) Lightning stroke failure disconnection positioning method based on information interaction
CN206685794U (en) A kind of device of 10kV circuits earth potential live replacing tension-resistant rod insulator
CN103474903A (en) Method for entering 500kV common-tower double-circuit vertically-arranged compact transmission line equipotential
CN204185573U (en) A kind of corrosion-resisting device of grounding wire

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140910