CN101640392A CN200910304372A CN200910304372A CN101640392A CN 101640392 A CN101640392 A CN 101640392A CN 200910304372 A CN200910304372 A CN 200910304372A CN 200910304372 A CN200910304372 A CN 200910304372A CN 101640392 A CN101640392 A CN 101640392A
Authority
CN
China
Prior art keywords
insulation
operation electrician
electrician
platform
insulated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910304372A
Other languages
Chinese (zh)
Inventor
请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN CREDIT ELECTRIC POWER TECHNOLOGY Co Ltd
Original Assignee
WUHAN CREDIT ELECTRIC POWER TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN CREDIT ELECTRIC POWER TECHNOLOGY Co Ltd filed Critical WUHAN CREDIT ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN200910304372A priority Critical patent/CN101640392A/en
Publication of CN101640392A publication Critical patent/CN101640392A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to the technical field of live-wire operation of a 35kV distribution circuit, and provides an intermediate potential live-wire operation method for cutting of a drainage wire fora 35kV distribution circuit by using an insulating platform. Four types of operating personnel, including work managers, platform operating electricians, pole operating electricians and ground operating electricians coordinate with each other for operation. The operation method of the invention comprises the steps of on-site inspection of appliances, insulation shielding, cutting-off operation ofthe drainage wire, shield removing, and the like. The operation method of the invention is used for live-wire operation of emergency repair and maintenance for the 35kV distribution circuit, improvesthe power distribution reliability of a distribution network and fills the internal blank in the field of live-wire operation of the 35kV distribution circuit.

Description

The operational method of 35kV distribution line live working cutting off drainage wire
Technical field
The present invention relates to 35kV distribution line live working technical field.
Background technology
Distribution network is direct power infrastructures towards large size industrial enterprise, the plurality of advantages that the 35kV distribution line is low because of its construction cost, the construction period is short, radius of electricity supply is bigger, and extensively adopt in each oil field at home.But because the distribution network insulation level is low, under atmospheric over-voltage, filth or other extraneous factor effect, easily break down, and because some areas power supply facilities is outmoded aging, equipment perfectness is low, and accident potential is increased.For improving the power supply reliability of distribution network, just must carry out charged repairing and upkeep operation to distribution network.
At present, domestic ongoing live line working concentrates on equal potential working mode on 110kV and the above power transmission sequence and two zones of medial potential working mode on 10kV and the following distribution line.And, the live line working technology of 35kV distribution line is not comprised that as yet technology such as charged cutting off drainage wire carries out application study because the wire pitch of 35kV distribution line is little, electric pressure is high, transmission capacity is big.
Summary of the invention
Technical problem to be solved by this invention provides the operational method of the charged cutting off drainage wire of a kind of 35kV distribution line, it is used for charged repairing and upkeep operation to the 35kV distribution line, improved the power supply reliability of distribution network, filled up domestic blank in this field.
For solving the problems of the technologies described above, the invention provides a kind of operational method of utilizing insulated platform to 35kV distribution line live working cutting off drainage wire, it is characterized in that, by the work director, platform operation electrician, operation electrician on the bar, Ground Operation electrician four class operating personnel coordinating operations, adopt intermediate point position method operation, may further comprise the steps:
Step 1, team enter the job site, and described work director reads out work ticket, the task that hands over work to one's successor, explanation safety notice and clarification in certain roles;
Do step 2, described operating personnel check whether the outward appearance of operating apparatus, safety protective tools excellent? if have breakage, then changed; Adopt megohmmeter to the carrying out insulation property respectively along face and shake survey of the insulation clothing in the described safety protective tools, insulated target, insulation resistance is qualified greater than 700 megaohms, otherwise is changed; The operation electrician puts on insulation clothing, insulation boots, insulating gloves, insulation safety cap respectively on described platform operation electrician, the bar, and described insulation clothing, insulation boots, insulating gloves, insulation safety cap all satisfy the requirement of 35KV circuit homework;
Step 3, described work director check the circuit situation, and after reclosing is stopped using in the application of power scheduling department, and after obtaining confirming, order begins to step on bar work;
Step 4, described platform operation electrician carry insulation transmission rope and climb up electric pole to the suitable operating position that is not less than 1m from the electrified body safe distance, fasten seat belts, and hang up properly the insulation coaster;
Step 5, described Ground Operation electrician cooperate described platform operation electrician that insulated platform is fixed on the position of being convenient to described platform operation electrician operation, and described platform operation electrician is transferred on the described insulated platform;
Step 6, described Ground Operation electrician utilize insulation to transmit rope high voltage electroscope, cross-arm mask, insulated target, insulated target folder, lead mask are passed to described platform operation electrician one by one;
Step 7, described platform operation electrician are according to first electrified body, the principle of back earth electrode, from the near to the remote, order from top to bottom adopts described lead mask, described insulated target, insulated target folder, described cross-arm mask lead, insulator, cross-arm to be insulated cover respectively;
Step 8, described platform operation electrician open desire operation one mutually insulation cover, the operation electrician locks the limit drainage thread with the insulation locking bar on the described bar, described platform operation electrician removes drainage thread and this lap joint of main line mutually, the operation electrician uses the insulation locking bar with described drainage thread and this main line disengaging mutually on the described bar, and cooperate described platform operation electrician will take described drainage thread apart to return on the lead line that is bind to this drainage thread, recover immediately then the insulation of this phase is covered;
Operation electrician and described platform operation electrician work in coordination insulated platform are transferred to certain fit job position on one side on step 9, the described bar, and described platform operation electrician is transferred on the insulated platform, and 8 described methods are carried out the cutting off drainage wire operation set by step;
Step 10, repeating step 9 carry out the cutting off drainage wire operation to all the other limit phase conductors;
Step 11, described platform operation electrician are covered by the orderly release insulation of covering reversed in order with step 7 and to be comprised and are transferred to mask and insulated target on the electric pole then under operation electrician on the described bar cooperates;
Step 12, described operating personnel work in coordination and remove described insulated platform and pass ground back, and the operation electrician turns back to ground respectively on described then platform operation electrician, the bar;
After step 13, described work director inspect for acceptance comprehensively, report to power scheduling department, work finishes, and recovers this circuit reclosing.
The invention provides a kind of operational method of charged cutting off drainage wire of 35kV distribution line, it is used for charged repairing and upkeep operation to the 35kV distribution line, improved the power supply reliability of distribution network, filled up domestic blank in the charged cutting off drainage wire operation of 35kV distribution line field.
Embodiment
This embodiment is utilized insulated platform, adopts the intermediate potential method that the three-wire system distribution line is carried out the cutting off drainage wire operation.
1, personnel's combination
The operating personnel comprises: work director 1 people, platform operation electrician 1 people, operation electrician 1 people on the bar, Ground Operation electrician 4 people.
2, key operation utensil
1 pair of insulated platform
6 of lead masks
3 of rubber-covered blankets
6 of insulation resin blankets
1 of high voltage electroscope
2 in rope is transmitted in insulation
Insulating bar 1 pair
Insulation locking bar 1 pair
5 on insulated target folder
3, safety device
Insulation clothing 1 cover
Insulation safety cap 2 tops
2 pairs of insulating glovess
2 pairs of insulated shoes
2 pairs of kid gloves
2 pairs of sweat-absorbing gloves
2 pairs on insulation safety band
4, concrete job step
4.1, the operating personnel enters the job site, the work director reads out work ticket, the task that hands over work to one's successor, explanation safety notice and clarification in certain roles.
4.2, check whether the outward appearance of operating apparatus, safety protective tools excellent? if have breakage, then changed; Adopt megohmmeter to the carrying out insulation property respectively along face and shake survey of the insulation clothing in the described safety protective tools, insulated target, insulation resistance is qualified greater than 700 megaohms, otherwise is changed; The operation electrician puts on insulation clothing, insulation boots, insulating gloves, insulation safety cap respectively on described platform operation electrician, the bar, and described insulation clothing, insulation boots, insulating gloves, insulation safety cap all satisfy the requirement of 35KV circuit homework;
4.3, described work director checks the circuit situation, after reclosing is stopped using in the application of power scheduling department, and after obtaining confirming, order begins to step on bar work;
4.4, described platform operation electrician carries insulation and transmits rope and climb up electric pole to the correct position that is not less than 1m from the electrified body safe distance, fastens seat belts, and hangs up properly the insulation coaster;
4.5, described Ground Operation electrician cooperates described platform operation electrician that insulated platform is fixed on the position of being convenient to described platform operation electrician operation, described platform operation electrician is transferred on the insulated platform;
4.6, described Ground Operation electrician utilizes insulation to transmit rope high voltage electroscope, cross-arm mask, insulated target, insulated target folder, lead mask are passed to described platform operation electrician one by one;
4.7, described platform operation electrician is according to first electrified body, the principle of back earth electrode, from the near to the remote, order from top to bottom adopts described lead mask, described insulated target, insulated target folder, described cross-arm mask lead, insulator, cross-arm to be insulated cover respectively;
4.8, platform operation electrician open desire operation one mutually insulation cover, the operation electrician locks the limit drainage thread with the insulation locking bar on the bar, platform operation electrician removes the wiring or the parallel groove clamp of drainage thread and main line disconnecting place, the operation electrician uses the insulation locking bar that drainage thread and main line are broken away from the bar, and cooperate platform operation electrician will remove drainage thread to return and be bind on the dismounting phase circuit main line, and cover;
4.9, operation electrician and platform operation electrician work in coordination insulated platform are transferred to another side fit job position on the bar, platform operation electrician is transferred on the insulated platform, 4.8 described methods are carried out the cutting off drainage wire operation to this phase drainage thread set by step;
4.10, the operation electrician cooperates platform operation electrician as stated above other phase conductor to be carried out operation on the bar,
4.11, platform operation electrician by with the described orderly release mask and insulated target that covers reversed in order of step 4.7 after, be transferred on the bar.
4.12, the operating personnel works in coordination and removes insulated platform and pass ground back, and successively turn back to ground.
4.13, work is after the director inspects for acceptance comprehensively, reports to power scheduling department, work finishes, and recovers this circuit reclosing.
5, safety notice
Before the operation, the work director tackles site work environment investigation, and the person in charge of the technology aspect tells somebody what one's real intentions are according to field condition establishment " standardized work guiding book " and to the operating personnel.
In the operation process, the work director should confirm each operating procedure according to the requirement of " standardized work guiding book ", and unsafe operation behavior is in time prevented.
Forbid the on-load cutting off drainage wire.
During operation, the operating personnel is to the clearance distance of adjacent electrified body, and effective insulated lengths of power tool should satisfy the requirement of " electrical safe working order ", " distribution line live working technology guide rule ".
All electrified bodies, the earthing component in the zone that the operating personnel should may touch human body by insulating bar insulate and cover.
It should be noted last that, above embodiment is only unrestricted in order to technical scheme of the present invention to be described, although the present invention is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can make amendment or be equal to replacement technical scheme of the present invention, and not breaking away from the spirit and scope of technical solution of the present invention, it all should be encompassed in the middle of the claim scope of the present invention.

Claims (1)

1. the operational method of a 35kV distribution line live working cutting off drainage wire is characterized in that, by the work director, platform operation electrician, operation electrician on the bar, Ground Operation electrician four class operating personnel coordinating operations, adopt intermediate point position method operation, may further comprise the steps:
Step 1, team enter the job site, and described work director reads out work ticket, the task that hands over work to one's successor, explanation safety notice and clarification in certain roles;
Do step 2, described operating personnel check whether the outward appearance of operating apparatus, safety protective tools excellent? if have breakage, then changed; Adopt megohmmeter to the carrying out insulation property respectively along face and shake survey of the insulation clothing in the described safety protective tools, insulated target, insulation resistance is qualified greater than 700 megaohms, otherwise is changed; The operation electrician puts on insulation clothing, insulation boots, insulating gloves, insulation safety cap respectively on described platform operation electrician, the bar, and described insulation clothing, insulation boots, insulating gloves, insulation safety cap all satisfy the requirement of 35KV circuit homework;
Step 3, described work director check the circuit situation, and after reclosing is stopped using in the application of power scheduling department, and after obtaining confirming, order begins to step on bar work;
Step 4, described platform operation electrician carry insulation transmission rope and climb up electric pole to the suitable operating position that is not less than 1m from the electrified body safe distance, fasten seat belts, and hang up properly the insulation coaster;
Step 5, described Ground Operation electrician cooperate described platform operation electrician that insulated platform is fixed on the position of being convenient to described platform operation electrician operation, and described platform operation electrician is transferred on the described insulated platform;
Step 6, described Ground Operation electrician utilize insulation to transmit rope high voltage electroscope, cross-arm mask, insulated target, insulated target folder, lead mask are passed to described platform operation electrician one by one;
Step 7, described platform operation electrician are according to first electrified body, the principle of back earth electrode, from the near to the remote, order from top to bottom adopts described lead mask, described insulated target, insulated target folder, described cross-arm mask lead, insulator, cross-arm to be insulated cover respectively;
Step 8, described platform operation electrician open desire operation one mutually insulation cover, the operation electrician locks the limit drainage thread with the insulation locking bar on the described bar, described platform operation electrician removes drainage thread and this lap joint of main line mutually, the operation electrician uses the insulation locking bar with described drainage thread and this main line disengaging mutually on the described bar, and cooperate described platform operation electrician will take described drainage thread apart to return on the lead line that is bind to this drainage thread, recover immediately then the insulation of this phase is covered;
Operation electrician and described platform operation electrician work in coordination insulated platform are transferred to certain fit job position on one side on step 9, the described bar, and described platform operation electrician is transferred on the insulated platform, and 8 described methods are carried out the cutting off drainage wire operation set by step;
Step 10, repeating step 9 carry out the cutting off drainage wire operation to all the other limit phase conductors;
Step 11, described platform operation electrician are covered by the orderly release insulation of covering reversed in order with step 7 and to be comprised and are transferred to mask and insulated target on the electric pole then under operation electrician on the described bar cooperates;
Step 12, described operating personnel work in coordination and remove described insulated platform and pass ground back, and the operation electrician turns back to ground respectively on described then platform operation electrician, the bar;
After step 13, described work director inspect for acceptance comprehensively, report to power scheduling department, work finishes, and recovers this circuit reclosing.
CN200910304372A 2009-07-15 2009-07-15 Live-wire operation method for cutting off drainage wire for 35kV distribution circuit Pending CN101640392A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910304372A CN101640392A (en) 2009-07-15 2009-07-15 Live-wire operation method for cutting off drainage wire for 35kV distribution circuit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910304372A CN101640392A (en) 2009-07-15 2009-07-15 Live-wire operation method for cutting off drainage wire for 35kV distribution circuit

Publications (1)

Publication Number Publication Date
CN101640392A true CN101640392A (en) 2010-02-03

Family

ID=41615246

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910304372A Pending CN101640392A (en) 2009-07-15 2009-07-15 Live-wire operation method for cutting off drainage wire for 35kV distribution circuit

Country Status (1)

Country Link
CN (1) CN101640392A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102842867A (en) * 2012-08-31 2012-12-26 辽宁省电力有限公司鞍山供电公司 Method for electrically disconnecting or connecting disconnector with drainage wire between buses
CN103746314A (en) * 2013-12-30 2014-04-23 江苏省电力公司常州供电公司 Quick hot-line by-pass jumper removing operation method for 10kV insulated power distribution line
CN104037648A (en) * 2014-05-14 2014-09-10 国家电网公司 Operating method of 35kV-overhead-line insulating-glove-method electrified disconnection and connection of zero-load-line lead wire
CN105162005A (en) * 2015-06-30 2015-12-16 国网浙江省电力公司金华供电公司 Safety method for reaching equipotential of +/-800 kilovolt converter station in live-line manner
CN105449392A (en) * 2015-10-23 2016-03-30 云南电网有限责任公司临沧供电局 Live-line overlap joint and drainage wire dismounting work apparatus for 10-kV line and method thereof
CN104143786B (en) * 2014-07-18 2016-08-24 国家电网公司 10kV multiplex drainage thread insulation retainer and use the operational method of this device
KR101788658B1 (en) * 2013-06-08 2017-10-20 체지앙 용닝 파마슈티컬 컴퍼니 리미티드 New hydroxysafflor yellow a salt for pharmaceutical formulation
KR101801700B1 (en) * 2013-02-07 2017-11-27 체지앙 용닝 파마슈티컬 컴퍼니 리미티드 Hydroxysafflor yellow a sodium and preparation as well as application thereof
CN110752549A (en) * 2019-12-04 2020-02-04 云南电网有限责任公司带电作业分公司 Operation method for breaking or connecting 10kV strain rod drainage wire of insulating short rod
CN110797795A (en) * 2019-12-04 2020-02-14 云南电网有限责任公司带电作业分公司 Operation method for breaking or connecting 10kV insulated wire line branch line drainage wire by insulating short rod

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102842867A (en) * 2012-08-31 2012-12-26 辽宁省电力有限公司鞍山供电公司 Method for electrically disconnecting or connecting disconnector with drainage wire between buses
KR101801700B1 (en) * 2013-02-07 2017-11-27 체지앙 용닝 파마슈티컬 컴퍼니 리미티드 Hydroxysafflor yellow a sodium and preparation as well as application thereof
KR101788658B1 (en) * 2013-06-08 2017-10-20 체지앙 용닝 파마슈티컬 컴퍼니 리미티드 New hydroxysafflor yellow a salt for pharmaceutical formulation
CN103746314A (en) * 2013-12-30 2014-04-23 江苏省电力公司常州供电公司 Quick hot-line by-pass jumper removing operation method for 10kV insulated power distribution line
CN104037648A (en) * 2014-05-14 2014-09-10 国家电网公司 Operating method of 35kV-overhead-line insulating-glove-method electrified disconnection and connection of zero-load-line lead wire
CN104143786B (en) * 2014-07-18 2016-08-24 国家电网公司 10kV multiplex drainage thread insulation retainer and use the operational method of this device
CN105162005A (en) * 2015-06-30 2015-12-16 国网浙江省电力公司金华供电公司 Safety method for reaching equipotential of +/-800 kilovolt converter station in live-line manner
CN105449392A (en) * 2015-10-23 2016-03-30 云南电网有限责任公司临沧供电局 Live-line overlap joint and drainage wire dismounting work apparatus for 10-kV line and method thereof
CN110752549A (en) * 2019-12-04 2020-02-04 云南电网有限责任公司带电作业分公司 Operation method for breaking or connecting 10kV strain rod drainage wire of insulating short rod
CN110797795A (en) * 2019-12-04 2020-02-14 云南电网有限责任公司带电作业分公司 Operation method for breaking or connecting 10kV insulated wire line branch line drainage wire by insulating short rod

Similar Documents

Publication Publication Date Title
CN101640392A (en) Live-wire operation method for cutting off drainage wire for 35kV distribution circuit
CN101640391B (en) Live-wire operation method for replacing insulator for 35kV distribution circuit
CN101640390A (en) Live-wire operation method for lapping drainage wire for 35kV distribution circuit
CN109217151A (en) Electric substation's installation engineering method
CN104868403A (en) Portable 120-to-400mm2 aluminum conductor steel reinforced cable shunting clamp and use method thereof
CN110120643B (en) Uninterrupted power operation method for power line of ground potential distribution network
CN103746315A (en) Quick hot-line by-pass jumper overlapping operation method for 10kV insulated power distribution line
CN103618249A (en) technology for electrified overhaul of +-500kV double-circuit direct-current power transmission lines on same tower
CN103746314A (en) Quick hot-line by-pass jumper removing operation method for 10kV insulated power distribution line
CN106356758B (en) 10KV line insulations bar bypasses charged for replacement on-pole switch operational method indirectly
CN106410674A (en) Hot-line work method for 10-kV distribution line and equipment
CN107913479B (en) Inclined rope bridge type rescue method for trapped people on high-voltage transmission line lead tower
CN205882560U (en) Special circulation cord rack device of distribution live working earth potential
CN104037648A (en) Operating method of 35kV-overhead-line insulating-glove-method electrified disconnection and connection of zero-load-line lead wire
Lubicki et al. Eighty years of Polish experiences in technology of live-line working and impressions from all 10 ICOLIM conferences
CN203645104U (en) Special-purpose grounding wire of low voltage breaker
CN107276032A (en) A kind of transformer neutral point earth protection device
CN210779509U (en) Low-voltage side switch insulation baffle plate of box-type substation
CN103606842A (en) 220 KV linear same-tower double-loop live-line operation method
CN203895834U (en) Multifunctional high-voltage cable grounding device
CN203415969U (en) Arc extinguishing and overvoltage protection apparatus for transformer station
CN116260073B (en) Operation method for live replacement of 35kV linear insulator string
CN203895833U (en) Switching instrument of cable grounding box in grounding protective mode
CN203895836U (en) Switching device of cross-connected high-voltage cable grounding system
CN203895835U (en) Switching device of high-voltage cable protective system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20100203