CN106356758B - 10KV line insulations bar bypasses charged for replacement on-pole switch operational method indirectly - Google Patents

10KV line insulations bar bypasses charged for replacement on-pole switch operational method indirectly Download PDF

Info

Publication number
CN106356758B
CN106356758B CN201610808186.2A CN201610808186A CN106356758B CN 106356758 B CN106356758 B CN 106356758B CN 201610808186 A CN201610808186 A CN 201610808186A CN 106356758 B CN106356758 B CN 106356758B
Authority
CN
China
Prior art keywords
platform
phase
arm
falling type
operational method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610808186.2A
Other languages
Chinese (zh)
Other versions
CN106356758A (en
Inventor
洪盟忠
徐科
钱晓波
汪大勇
毛仙威
方建明
钱卉
梁生泰
余清琴
方其凤
胡维洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
ChunAn Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
ChunAn Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, ChunAn Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610808186.2A priority Critical patent/CN106356758B/en
Publication of CN106356758A publication Critical patent/CN106356758A/en
Application granted granted Critical
Publication of CN106356758B publication Critical patent/CN106356758B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The invention discloses a kind of 10KV line insulations bar to bypass charged for replacement on-pole switch operational method indirectly, comprises the following steps:S1, set up one-shot job platform;S2, falling type disconnector cross-arm, and fixed bypass cable cross-arm are installed positioned at the top of the one-shot job platform;S3, measurement make three branch line leads per the distance between corresponding wire of the pile crown of phase falling type disconnector, and according to the distance;S4, insulated shielding cover is arranged to both sides phase conductor;S5, by three phase terminals be installed on corresponding to the falling type disconnector pile crown;Phase terminal in S6, overlap joint, and remove the insulated shielding cover;S7, overlap joint both sides phase terminal, and set and fall insulation masking baffle plate.Above-mentioned operational method, production accident can be reduced with normative operation process, improve overhaul efficiency.

Description

10KV line insulations bar bypasses charged for replacement on-pole switch operational method indirectly
Technical field
The present invention relates to transmission line operation technical field, more particularly to a kind of 10KV line insulations bar bypasses powered indirectly Change on-pole switch operational method.
Background technology
With the fast development of China's power construction, 10KV line insulations bar bypasses charged for replacement on-pole switch operation indirectly The specification of method, which seems, to become more and more important.
It is a practical uninterrupted operation technology that bypass operation method, which changes 10kV controller switching equipments on (maintenance) post, and it can Safely solve the branch problem of load current, and the equipment used is easy to carry, and installation and operation are fairly simple, simultaneously Also smaller is invested so as to expeditiously realize the service without power-off of branched line.
The content of the invention
It is an object of the invention to provide a kind of 10KV line insulations bar to bypass charged for replacement on-pole switch operational method indirectly, The operational method can reduce production accident with normative operation process, improve overhaul efficiency.
To achieve the above object, the present invention provides a kind of 10KV line insulations bar and bypasses charged for replacement on-pole switch work indirectly Industry method, comprises the following steps:
S1, set up one-shot job platform;
S2, falling type disconnector cross-arm, and fixed bypass cable cross-arm are installed positioned at the top of the one-shot job platform;
S3, measurement are made per the distance between corresponding wire of the pile crown of phase falling type disconnector, and according to the distance Make three branch line leads;
S4, insulated shielding cover is positioned on the phase conductor of both sides, during avoiding the phase terminal in overlap joint, two sides are mutually led Line is in contact with the middle phase terminal;
S5, by three phase terminals be installed on corresponding to the falling type disconnector pile crown;
Phase terminal in S6, overlap joint, and remove the insulated shielding cover;
S7, overlap joint both sides phase terminal, and set and fall insulation masking baffle plate.
Relative to above-mentioned background technology, operational method provided by the invention, mainly include seven steps;It is first in step S1 First set up one-shot job platform;In step S2, falling type disconnector cross-arm is installed positioned at the top of the one-shot job platform, and it is solid Determine bypass cable cross-arm;Step S3, measure per the distance between corresponding wire of the pile crown of phase falling type disconnector, and according to The distance makes three branch line leads;Step S4, insulated shielding cover is arranged at both sides phase conductor;Step S5, by three couplings Line is installed on the pile crown of the corresponding falling type disconnector;Step S6, phase terminal in overlapping, and remove the insulated shielding cover; Step S7, both sides phase terminal is overlapped, and sets and falls insulation masking baffle plate.Using as above step, load side can be effectively realized The operation process of temporary platform setting, and production accident can be reduced with the operation process of specification load side, improve maintenance effect Rate.
Preferably, it is further comprising the steps of between the step S2 and the step S3:
S21, laying bypass cable;
S22, pressure test is carried out to the bypass cable;
S23, bypass falling type disconnector is installed positioned at mains side, and the bypass cable is fixed on cross-arm rod bottle.
Preferably, the step S22 is specially to bypass cable progress pressure test:
Pressure test, experiment electricity are carried out to the bypass cable using series resonant testing equipment and gasoline engine generator respectively Press 21.8KV;Time is 5 minutes.
Preferably, the step S1 sets up one-shot job platform and is specially:
S11, from setting electric pole be more than or equal to 3 meters at mains side lower section, set up temporary platform;
S12, first layer front and back one first layer platform of each increase in temporary platform, then using U-shaped fixation Three platform column steel pipes are secured and are integrated by fixture screw;
S13, described set up between temporary platform contacts with ground set anti-settling backing plate, set up one-shot job with formation and put down Platform.
Preferably, the step S4 includes:Lap should be greater than 15cm between two masks.
Preferably, the step S6 includes:The middle phase terminal and the side phase conductor keep more than 0.4 meter safely away from From.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this The embodiment of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 bypasses charged for replacement on-pole switch operator indirectly by the 10KV line insulations bar that the embodiment of the present invention provides The flow chart of method.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the accompanying drawings and it is embodied The present invention is described in further detail for mode.
Fig. 1 is refer to, Fig. 1 is bypassed on charged for replacement post indirectly by the 10KV line insulations bar that the embodiment of the present invention provides The flow chart of switching operations method.
10KV line insulations bar provided by the invention bypasses charged for replacement on-pole switch operational method indirectly, main to include such as Step shown in Figure of description 1.
S1, set up one-shot job platform;
S2, falling type disconnector cross-arm, and fixed bypass cable cross-arm are installed positioned at the top of the one-shot job platform;
S3, measurement are made per the distance between corresponding wire of the pile crown of phase falling type disconnector, and according to the distance Make three branch line leads;
S4, insulated shielding cover is arranged to both sides phase conductor;
S5, by three phase terminals be installed on corresponding to the falling type disconnector pile crown;
Phase terminal in S6, overlap joint, and remove the insulated shielding cover;
S7, overlap joint both sides phase terminal, and set and fall insulation masking baffle plate.
Specifically, when carrying out load side temporary platform setting operation process, step S1 is carried out first:Set up interim Job platform;Below mains side, temporary platform, i.e. step are being set up using portable combined frame at 3 meters from setting electric pole S11;Operating personnel wants proper use of safety belt on platform.When setting up to a distance from 5 meters from live wire or so, operating personnel on platform Insulating glove is worn, with plane on ranging rod measuring table and the distance of live wire, is calculated when keeping 1.5 meters of safe distance also Need to increase several layers of portable combined framves, also need increased several layers of to continue to set up (to increase interim make by regulation according to calculating The more stability of industry platform, when ground type is preferable, platform reinforcement means:In the respectively increase by one of temporary platform first layer front and back Individual first layer platform, then three platform column steel pipes are secured using U-shaped stationary fixture screw and are integrated, be i.e. step S12.When local type is poor, another method can be used:Under at the top of the temporary platform at 2 meters, 4 temporary guy, and use Take-up instrument connects together with iron stake, then tightens up spooler, and bracing wire should be greater than 30 degree with temporary platform angle).One-shot job In electric pole side one-shot job table top installation falling type disconnector cross-arm and the fixed bypass cable cross-arm of keeping to the side after putting up platform is complete. When the superiors' platform is installed, it should be noted that table top keeps enough safe distances with live wire.Temporary platform connects with ground To add anti-settling backing plate between touching, carrying out one-shot job platform prevents sinking measure, such as step S13.
In step S2, falling type disconnector cross-arm, and fixed bypass cable are installed positioned at the top of the one-shot job platform Cross-arm;Specifically, after the completion of one-shot job platform, keeping to the side, electric pole side one-shot job table top installation falling type disconnector is horizontal Load and falling type disconnector and fixed bypass cable cross-arm and rod bottle.When falling type disconnector installment work terminates on one-shot job platform Afterwards, whether operating personnel operates falling type disconnector by mutually examination on platform, checks whether its device meets code requirement, and safely can Lean on.Operating personnel removes the three-phase disconnecting link of falling type disconnector and meets at another operating personnel on bar and be hung to ground using insulating cord on bar Face.In this course, the materials such as horizontal smooth, gold utensil are transmitted on bar to use and transmitted above and below insulating cord, and prevent high-altitude junk.
In step s3, insulated ranging rod is passed to operating personnel on platform by ground electrician using insulated working rope, on platform Another operating personnel measures on every phase falling type disconnector pile crown to the wire length between respective wire with insulated ranging rod.That is, After insulated ranging rod should move position to, can measure away from (as it is leaded in order to keep safe distance using porcelain pole arm fix, Porcelain pole arm need to be measured to the wire length between respective wire), and ground operation personnel makes three according to measured length Branch line lead.It should be noted that all tin-coated copper joint models will match with lead model, it should contact at crimping and well may be used Lean on.
In step S4 and step S5, ground operation personnel will insulation fork arm action bars, insulation masking using insulated working rope Cover is transferred to operating personnel on platform successively, and insulated shielding cover is arranged on by another operating personnel using insulation fork arm action bars on platform Insulation masking is carried out on the phase conductor of both sides.Three phase terminals are arranged on corresponding drop type by operating personnel under cooperation on two platforms On disconnecting link on pile crown.
In above process, insulating cord should be used by transmitting Work tool up and down;Operating personnel sets insulation masking measure on platform When should wear insulating glove;Enough safe distances (being more than 0.4m) are kept with electrical body, the effective insulated lengths for the fork arm that insulate should More than 0.7m;Insulation masking should be tight, firm, and lap should be greater than 15cm between wire mask, and should prevent placement in height Thing.
Certainly, when being more than 0.7 meter with wire wire spacing such as middle phase terminal, both sides phase conductor can not have to set insulation to hide Cover.It is certain during phase terminal it is noted that lead is remained above more than 0.4 meter of safe distance with side wire in overlap joint.
Step S7 is then carried out, ground operation personnel grasps insulating clamp action bars, insulated lock lever action bars, insulating sleeve Make bar and pass to operating personnel on platform successively;Another operating personnel adjusts good position on platform, and side is pinned with insulated lock lever action bars The free end of phase terminal, carry out examination in Bian Xiang main traverse lines lap-joint and take, watch lead whether enough it is long (after phase terminal examination in both sides is taken, As lead is partially long, the length of both sides phase terminal need to be adjusted).
The first operating personnel should wear insulating glove when examination is taken on platform;Enough safe distances (are more than with electrical body holding 0.4m), effective insulated lengths of insulated lock lever should be greater than 0.7m;And both sides phase terminal should avoid middle phase to lowering outside device After gage lap, take side phase terminal safe distance inadequate.
First operating personnel and phase terminal in the second operating personnel mutual cooperation overlap joint on platform on platform:The installation 1 per phase terminal Only special-shaped wire clamp (or wearing spine wire clamp);The distance between lead and lead should be greater than 30cm;Specific bridging method is as follows;
First, the free end of phase terminal during the first operating personnel is pinned with insulated lock lever on platform, in middle mutually powered main traverse line Lap-joint carries out examination and taken.(such as middle phase terminal is partially long, need to adjust the length of both sides phase terminal).
Secondly, special-shaped wire clamp (or wearing spine wire clamp) is arranged on middle phase by the second operating personnel with insulating clamp action bars on platform Main traverse line lap-joint, middle phase terminal free end is penetrated special-shaped wire clamp with insulated lock lever and (or wears spine line by the first operating personnel on bar Folder) in.
Then, the second operating personnel transfers the insulating clamp action bars in hand on bar the first operating personnel on platform;
Finally, bar appear on the stage upper second operating personnel with insulating sleeve operating rod by each spiral shell of special-shaped wire clamp (or wearing spine wire clamp) Bolt is tightened, and checks whether connection is solid and reliable.
In this course, operating personnel when overlapping lead, should wear insulating glove on platform;Kept enough with electrical body Safe distance (is more than 0.4m), and effective insulated lengths of insulating bar should be greater than 0.7m, and prevent high-altitude junk;If desired Using penetrating cable clamp, then require that the main line end of penetrating cable clamp is connected with main traverse line, branch line end is connected with branch line (to be paid attention to:Puncture line Pressing from both sides main line end can not be mixed with branch line end, must distinguish one from the other during use);Special-shaped line is clipped in installation process, and work director The compressed steel of wire clamp is watched using telescope and whether square washer is rectified, and such as finds that skew will command correction in time.
When carrying out step S7, the first operating personnel and the second operating personnel mutual cooperation on platform successively overlap edge phase on platform Lead, 1 special-shaped wire clamp (or wearing spine wire clamp) is installed per phase terminal, the distance between lead and electric pole should be greater than 30cm:Overlap joint Method is specific as follows;
First, the first operating personnel pins the free end of side phase terminal with insulated lock lever on platform;
Secondly, special-shaped wire clamp (or wearing spine wire clamp) is arranged on side phase by the second operating personnel with insulating clamp action bars on platform Main traverse line lap-joint, side phase terminal free end is penetrated special-shaped wire clamp with insulated lock lever and (or wears spine line by the first operating personnel on bar Folder) in.
Then, the second operating personnel transfers the insulating clamp action bars in hand on bar the first operating personnel on platform
Finally, the second operating personnel is twisted each bolt of special-shaped wire clamp (or wearing spine wire clamp) with insulating sleeve operating rod on platform Tightly, and check whether connection is solid and reliable.
And in this course, the first operating personnel cooperates by above-mentioned identical with the second operating personnel on platform on platform Operational method overlap joint another side phase terminal:After three-phase gage lap, to check whether phase spacing meets specification, work Director checks the fastened by screw situation of special-shaped wire clamp or penetrating cable clamp with telescope, and whether device meets specification.Overlap lead After hours, bar appears on the stage upper second operating personnel successively by insulating clamp action bars, insulated lock lever, insulating sleeve operating rod use Insulated working rope is passed back to ground.The first operating personnel is cooperated with the second operating personnel on platform and hung using insulating cord on platform Upper first is fallen insulation masking baffle plate.The first operating personnel wears insulating glove on platform, will fall insulated shielding cover installation and sets Put on the lower shirt rim of side phase fuse switch.The second operating personnel is used in conjunction with each other insulation with ground operation personnel on platform Rope hangs on second insulation masking baffle plate, and the first operating personnel, which by second falls masking baffle plate and is mounted on middle phase, on bar falls On the lower shirt rim of formula fuse.The second operating personnel cooperates with ground operation personnel and hangs on the 3rd using insulating cord on platform Only masking baffle plate, the first operating personnel will cover baffle plate and be mounted on the lower shirt rim of another side phase fuse switch on bar On;Equipment safety is reliable on the comprehensive inspection bar of operating personnel on platform, and after determining on bar without legacy, descends one-shot job to put down successively Platform.
Operating personnel should wear insulating glove when overlapping lead on platform;Enough safe distances (are more than with electrical body holding 0.4m), effective insulated lengths of insulating bar should be greater than 0.7m;Prevent high-altitude junk;If using penetrating cable clamp, it is required that The main line end of penetrating cable clamp is connected with main traverse line, and branch line end is connected with branch line (to be paid attention to:Penetrating cable clamp main line end and branch line end can not It is mixed, must distinguish one from the other during use).Special-shaped line is clipped in installation process, and work director watches wire clamp using telescope Whether compressed steel and square washer are rectified, and such as find that skew will command correction in time.
The operation process of load side temporary platform setting is above described, and is made for mains side temporary platform setting Industry process, its key step is similar as described above, and difference is, following step is also included between above-mentioned steps S2 and step S3 Suddenly:
S21, laying bypass cable;
S22, pressure test is carried out to the bypass cable;
S23, bypass falling type disconnector is installed positioned at mains side, and the bypass cable is fixed on cross-arm rod bottle.
Specifically, can be by the way of manually laying when carrying out step S21:First before bypass cable is unfolded Cable outward appearance should be checked, determine that oversheath does not have defect;Then at turning turning of cable radius should meet specification will Ask:Single-core cable is 15 times of the outside diameter of cable., must not be crowded and the personnel of laying should be uniformly distributed, and slowly walk about, prevent from damaging Cable.
During cabling, when such as using pulley, hand is not placed on front side of pulley and stroke cable, avoid hand from getting into Pulley;In addition, laying personnel must not arbitrarily move operation cable and trample on hanging operation cable;In cable corner, operation Personnel should stand in outside;Pickaback the people of cable should reasonably distribute in cable the same side and pickaback put distance, forbids, cable is put Draw on the ground;And " having electric dangerous, pedestrian please don't be close " can be set by the bypass cable of laying to warning sign.
It is first that end surface wipes are clean when carrying out step S22, in order to avoid cause test error.Then by testing Librarian use HPSR-F series resonant testing equipments and portable gasoline generator carry out pressure test, examination to bypass cable respectively Electrical verification presses 21.8 kilovolts;Time is 5 minutes, no breakdown, discharge off phenomenon.After pass the test, cable is substantially discharged;Finally Carry out by phase study, record reading.
Test lead must not use bifilar insulated wire or twisted wire, separately be connected using single cord;In test process, to keep away Exempt to shock by electricity, test lead and cable must not be touched, must not equally be touched after test.
When carrying out step S23, insulation single pulley is fixed on drop type by the first operating personnel using insulation rope sling on platform On cross-arm near disconnecting link installation place, insulated working rope one end is fastened at lower 1 meter of cable the end of a thread by the single pulley that insulate, ground Operating personnel tightens up the other end of insulated working rope, and cable the end of a thread is promoted under falling type disconnector at stake side, first on platform, Two operating personnels, which coordinate, is fixed on end under falling type disconnector on pile crown.Then by bypass cable with binding colligation in fixation On the rod bottle of cross-arm.End installs under the fuse when on pile crown phase flag and line Phases phase it is noted that on end Symbol.I.e. A phases are yellow;B phases are green;C phases are red, it is impossible to it is wrongly installed, to be checked again after end connection;And on bar The warning sign of " having electric danger to climb " can be hung on bypass cable.
In step S23, the first operating personnel puts the instruments such as insulating glove, protective gloves, Insulation spanner, cutting knife on platform Backed on the body in Special tool bag and climb up one-shot job platform.The second operating personnel puts insulating glove, protective gloves on platform Backed on the body in Special tool bag and carry insulating cord and gone up on the stage.
It should be noted that in this manual, such as first and second etc relational terms are used merely to one Entity makes a distinction with other several entities, and not necessarily require or imply between these entities exist it is any this actual Relation or order.
Charged for replacement on-pole switch operational method is bypassed indirectly to 10KV line insulations bar provided by the present invention above to enter Go and be discussed in detail.Specific case used herein is set forth to the principle and embodiment of the present invention, and the above is implemented The explanation of example is only intended to help the method and its core concept for understanding the present invention.It should be pointed out that for the general of the art For logical technical staff, under the premise without departing from the principles of the invention, some improvement and modification can also be carried out to the present invention, this A little improvement and modification are also fallen into the protection domain of the claims in the present invention.

Claims (5)

1. a kind of 10KV line insulations bar bypasses charged for replacement on-pole switch operational method indirectly, it is characterised in that including following Step:
S1, set up one-shot job platform;
S2, falling type disconnector cross-arm, and fixed bypass cable cross-arm are installed positioned at the top of the one-shot job platform;
S3, measurement make three per the distance between corresponding wire of the pile crown of phase falling type disconnector, and according to the distance Root branch line lead;
S4, insulated shielding cover is positioned on the phase conductor of both sides, during avoiding the phase terminal in overlap joint, the two side phase conductors with The middle phase terminal is in contact;
S5, by three phase terminals be installed on corresponding to the falling type disconnector pile crown;
Phase terminal in S6, overlap joint, and remove the insulated shielding cover;
S7, overlap joint both sides phase terminal, and set and fall insulation masking baffle plate;
Wherein:Above-mentioned steps S1 is specially:
S11, from setting electric pole be more than or equal to 3 meters at mains side lower section, set up temporary platform;Set up to from band conductance 5 meters or so of line apart from when, operating personnel wears insulating glove on platform, with plane on ranging rod measuring table and live wire away from From, calculate and keep also needing to increase several layers of portable combined framves during 1.5 meters of safe distance, according to calculate also need it is increased several Layer is continued to set up by regulation;
S12, first layer front and back one first layer platform of each increase in temporary platform, then using U-shaped stationary fixture Three platform column steel pipes are secured and are integrated by screw;When local type is poor, at the top of the temporary platform under at 2 meters, 4 Temporary guy, and connected together using take-up instrument and iron stake, spooler is then tightened up, bracing wire should be greater than with temporary platform angle 30 degree;
S13, described set up set anti-settling backing plate between temporary platform contacts with ground, are being kept to the side after one-shot job putting up platform is complete One-shot job table top in electric pole side installs falling type disconnector cross-arm and fixed bypass cable cross-arm;When the superiors' platform is installed, Table top keeps enough safe distances with live wire, and one-shot job platform is set up to be formed.
2. operational method according to claim 1, it is characterised in that also include between the step S2 and the step S3 Following steps:
S21, laying bypass cable;
S22, pressure test is carried out to the bypass cable;
S23, bypass falling type disconnector is installed positioned at mains side, and the bypass cable is fixed on cross-arm rod bottle.
3. operational method according to claim 2, it is characterised in that the step S22 carries out resistance to the bypass cable Pressure experiment be specially:
Pressure test, test voltage are carried out to the bypass cable using series resonant testing equipment and gasoline engine generator respectively 21.8KV;Time is 5 minutes.
4. operational method according to claim 3, it is characterised in that the step S4 includes:Between two masks Lap should be greater than 15cm.
5. operational method according to claim 4, it is characterised in that the step S6 includes:The middle phase terminal and institute State the safe distance that side phase conductor is kept for more than 0.4 meter.
CN201610808186.2A 2016-09-07 2016-09-07 10KV line insulations bar bypasses charged for replacement on-pole switch operational method indirectly Active CN106356758B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610808186.2A CN106356758B (en) 2016-09-07 2016-09-07 10KV line insulations bar bypasses charged for replacement on-pole switch operational method indirectly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610808186.2A CN106356758B (en) 2016-09-07 2016-09-07 10KV line insulations bar bypasses charged for replacement on-pole switch operational method indirectly

Publications (2)

Publication Number Publication Date
CN106356758A CN106356758A (en) 2017-01-25
CN106356758B true CN106356758B (en) 2018-04-10

Family

ID=57858960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610808186.2A Active CN106356758B (en) 2016-09-07 2016-09-07 10KV line insulations bar bypasses charged for replacement on-pole switch operational method indirectly

Country Status (1)

Country Link
CN (1) CN106356758B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109473905A (en) * 2018-11-07 2019-03-15 国网浙江桐乡市供电有限公司 Distribution uninterrupted operation " 3+1 " insulating bar working system
CN109586206B (en) * 2018-11-27 2020-11-06 国网福建省电力有限公司 Zigbee wireless remote control network for live-line work
CN109449858A (en) * 2018-12-04 2019-03-08 国网上海市电力公司 A kind of mobile interim electricity getting device of 10KV overhead transmission line
CN110120643B (en) * 2019-04-19 2020-10-27 国网浙江淳安县供电有限公司 Uninterrupted power operation method for power line of ground potential distribution network

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102403779A (en) * 2011-12-08 2012-04-04 河南省电力公司郑州供电公司 Power supply system for bypass to operate without power failure
CN105186338A (en) * 2015-08-04 2015-12-23 国家电网公司 Construction method of employing insulation bucket arm vehicle insulating gloves with load to change pole top switch device
KR101650926B1 (en) * 2016-01-19 2016-09-05 (주)동명전기 Method for exchanging the pole with distribution line in the status of on line

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102403779A (en) * 2011-12-08 2012-04-04 河南省电力公司郑州供电公司 Power supply system for bypass to operate without power failure
CN105186338A (en) * 2015-08-04 2015-12-23 国家电网公司 Construction method of employing insulation bucket arm vehicle insulating gloves with load to change pole top switch device
KR101650926B1 (en) * 2016-01-19 2016-09-05 (주)동명전기 Method for exchanging the pole with distribution line in the status of on line

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
10kV架空配电线路不停电作业的应用探讨;刘建;《贵州省电机工程学会2010年优秀论文集》;第166-169页;20101231;全文 *
10kV架空配电线路综合不停电作业法的电气试验;陈伟明;《电世界》;20101031(第10期);全文 *
10kV电缆旁路不停电作业技术应用;祝晓辉;《电工技术》;20140331(第3期);全文 *
带负荷更换10kV线路柱上开关的作业方法;杨晓翔;《湖州师范学院学报》;20090228;第31卷;第149、150页 *
引流线旁路带电作业法在配电检修工作中的应用及其扩展;何鸿远;《科技创新与应用》;20120229(第4期);全文 *
旁路作业法更换(检修)柱上10kV配电设备;魏力强;《河南电力》;20120331(第1期);全文 *

Also Published As

Publication number Publication date
CN106356758A (en) 2017-01-25

Similar Documents

Publication Publication Date Title
CN106356758B (en) 10KV line insulations bar bypasses charged for replacement on-pole switch operational method indirectly
CN109217151A (en) Electric substation's installation engineering method
CN105449392B (en) A kind of 10kV circuits band electrical bonding and dismounting drainage thread apparatus for work and method
CN104868403A (en) Portable 120-to-400mm2 aluminum conductor steel reinforced cable shunting clamp and use method thereof
CN101640391B (en) Live-wire operation method for replacing insulator for 35kV distribution circuit
CN110120643B (en) Uninterrupted power operation method for power line of ground potential distribution network
CN201327509Y (en) High-voltage transmission line parameter measuring device and system thereof
CN101640392A (en) Live-wire operation method for cutting off drainage wire for 35kV distribution circuit
CN101403779A (en) Parameter measuring apparatus and system for high tension power line
CN103323751A (en) High-voltage short-cable insulation terminal partial discharge testing device and using method
CN101640390A (en) Live-wire operation method for lapping drainage wire for 35kV distribution circuit
CN103746315A (en) Quick hot-line by-pass jumper overlapping operation method for 10kV insulated power distribution line
CN110957658A (en) Rack transformer for 10kV distribution network overhead line and installation method thereof
CN105186338A (en) Construction method of employing insulation bucket arm vehicle insulating gloves with load to change pole top switch device
CN104505763B (en) UHVDC Transmission Lines charged for replacement duplex V string composite insulator operational methods
CN205985893U (en) Electrified column switch professional equipment that changes of indirect bypass of 10kV circuit insulator spindle
CN207218125U (en) A kind of high-voltage line ground wire lowering or hoisting gear
CN207586254U (en) A kind of comprehensive take-up and pay-off device of multifunction power high-potting
CN206516974U (en) A kind of arc-extinguishing grounding device
CN215267389U (en) Earth potential all-terrain load operation special tool
CN113328374A (en) Earth potential all-terrain on-load operation method
CN109473905A (en) Distribution uninterrupted operation " 3+1 " insulating bar working system
CN208366201U (en) A kind of arcing horn special measurement tool for overhead transmission line
CN208955223U (en) A kind of safe attaching/detaching apparatus of transformer grounding pole
CN206400166U (en) Cable fitting more than a kind of double cable OPGW of transformer station's single pole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant