CN106410674A - Hot-line work method for 10-kV distribution line and equipment - Google Patents

Hot-line work method for 10-kV distribution line and equipment Download PDF

Info

Publication number
CN106410674A
CN106410674A CN201611005664.2A CN201611005664A CN106410674A CN 106410674 A CN106410674 A CN 106410674A CN 201611005664 A CN201611005664 A CN 201611005664A CN 106410674 A CN106410674 A CN 106410674A
Authority
CN
China
Prior art keywords
insulation
insulating
ground
equipment
distribution line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611005664.2A
Other languages
Chinese (zh)
Inventor
戢小明
柯向阳
张侃君
黄光咸
喻兵
陶诗
何业伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hubei Electric Power Co Ltd
Xianning Power Supply Co of State Grid Hubei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hubei Electric Power Co Ltd
Xianning Power Supply Co of State Grid Hubei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hubei Electric Power Co Ltd, Xianning Power Supply Co of State Grid Hubei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611005664.2A priority Critical patent/CN106410674A/en
Publication of CN106410674A publication Critical patent/CN106410674A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明涉及一种应用于作业空间狭小的10kV配电线路及设备的带电作业方法,属于配电带电作业技术领域。包括如下步骤:作业人员使用绝缘操作杆将绝缘遮蔽用具安放在左侧带电导体及接地体上,按照同样的方法安装右侧带电导体及接地体的绝缘遮蔽用具;之后作业人员返回地面,移动绝缘人字梯到作业位置对应地面;作业人员再次蹬上绝缘人字梯,靠近作业位置,使用绝缘操作杆进行带电作业;所述作业过程中,作业人员与带电体保持至少0.6米的最小安全距离,对地保持至少0.4米的最小安全距离;作业的全过程需专人监护。本发明可以适用于狭小空间内的10kV配电线路及设备带电作业,可以在确保作业人员安全的前提下,在10kV配电线路及设备不停电情况下,实施高效作业。

The invention relates to a live working method applied to 10kV power distribution lines and equipment with narrow working space, and belongs to the technical field of power distribution live work. It includes the following steps: the operator uses the insulation operating rod to place the insulation shielding appliance on the left live conductor and the grounding body, and installs the insulation shielding appliance for the right live conductor and the grounding body in the same way; after that, the operator returns to the ground and moves the insulation The ladder to the working position corresponds to the ground; the operator steps on the insulated ladder again, approaches the working position, and uses the insulating operating rod to carry out live work; during the operation process, the operator and the electrified body maintain a minimum safe distance of at least 0.6 meters , Keep a minimum safety distance of at least 0.4 meters from the ground; the whole process of operation needs special supervision. The present invention can be applied to live operation of 10kV power distribution lines and equipment in a narrow space, and can implement high-efficiency operation under the premise of ensuring the safety of operators and without power failure of 10kV power distribution lines and equipment.

Description

一种10kV配电线路及设备带电作业方法A 10kV power distribution line and live working method for equipment

技术领域technical field

本发明涉及一种应用于作业空间狭小的10kV配电线路及设备的带电作业方法,属于配电带电作业技术领域。The invention relates to a live working method applied to 10kV power distribution lines and equipment with narrow working space, and belongs to the technical field of power distribution live work.

背景技术Background technique

10kV配电线路及设备是我国电网的重要组成部分,进行10kV配电线路带电作业是减少配网停电时间、提高配网供电可靠性和优质服务水平的重要手段之一。目前,配电带电作业在国内已经广泛开展,主要采用绝缘斗臂车实施带电作业。10kV绝缘斗臂车实施带电作业时,其作业高度不得低于3.5米;而实际工作环境中,部分10kV配电线路及设备检修作业的高度只有3米甚至更低,并且由于作业空间狭窄,导致10kV绝缘斗臂车无法实施作业。10kV distribution lines and equipment are an important part of my country's power grid. Live work on 10kV distribution lines is one of the important means to reduce the power outage time of the distribution network and improve the reliability of power supply and high-quality service levels of the distribution network. At present, the live work of power distribution has been widely carried out in China, and the live work is mainly carried out by insulated bucket trucks. When the 10kV insulated bucket arm truck performs live work, its working height shall not be lower than 3.5 meters; in the actual working environment, the height of some 10kV power distribution lines and equipment maintenance operations is only 3 meters or even lower, and due to the narrow working space, resulting in The 10kV insulated arm truck cannot perform operations.

针对以上因作业高度、空间限制,导致10kV绝缘斗臂车无法有效开展带电作业的难题,需要提供一种针对作业空间狭小的10kV配电线路及设备的带电作业方法,确保作业安全、有效实施。In view of the above problems that 10kV insulated bucket trucks cannot effectively carry out live work due to the limitation of working height and space, it is necessary to provide a live working method for 10kV power distribution lines and equipment with narrow working space to ensure safe and effective implementation of the work.

发明内容Contents of the invention

本发明的目的是提供一种10kV配电线路及设备带电作业方法,可以适用于狭小空间内的10kV配电线路及设备带电作业,可以在确保作业人员安全的前提下,在10kV配电线路及设备不停电情况下,实施高效作业。The purpose of the present invention is to provide a 10kV power distribution line and equipment live working method, which can be applied to 10kV power distribution lines and equipment live work in a narrow space, and can be used on 10kV power distribution lines and equipment under the premise of ensuring the safety of operators. Implement efficient operation without power failure of equipment.

为实现上述目的,本发明所采取的技术方案是:一种10kV配电线路及设备带电作业方法,其特征在于包括如下步骤:In order to achieve the above object, the technical solution adopted by the present invention is: a 10kV power distribution line and equipment live working method, which is characterized in that it includes the following steps:

步骤1:制定施工作业方案,所述方案包括作业线路的名称、杆号、绝缘遮蔽用具的数量、绝缘人字梯的安装位置、绝缘绳索的固定位置;Step 1: Formulate a construction operation plan, which includes the name of the operation line, pole number, the number of insulating and shielding appliances, the installation position of the insulating ladder, and the fixed position of the insulating rope;

步骤2:开工前准备,得到工作许可后,根据作业方案开班前会、进行人员分工、现场安全措施布置;Step 2: Prepare before the start of work. After obtaining the work permit, conduct a pre-start meeting, division of labor, and layout of on-site safety measures according to the operation plan;

步骤3:安装绝缘人字梯并系好绝缘绳索,将绝缘绳索固定在牢固的构件上,使绝缘人字梯稳固,并派人扶持绝缘人字梯;Step 3: Install the insulating ladder and fasten the insulating rope, fix the insulating rope on a firm component, make the insulating ladder stable, and send someone to support the insulating ladder;

步骤4:作业人员穿戴好个人绝缘防护用具,经工作负责人许可后,蹬上绝缘人字梯,系好安全带,靠近作业位置;Step 4: The operator wears personal insulating protective equipment, and after being approved by the person in charge of the work, steps on the insulating ladder, fastens the seat belt, and approaches the working position;

步骤5:作业人员使用绝缘操作杆将绝缘遮蔽用具安放在左侧带电导体及接地体上,确保有效的绝缘遮蔽,确保带电体各相之间不会被绝缘操作杆短接;之后作业人员返回地面,移动绝缘人字梯到右侧相带电体位置对应地面,按照同样的方法安装右侧带电导体及接地体的绝缘遮蔽用具;Step 5: The operator uses the insulating operating rod to place the insulating shielding device on the live conductor and the grounding body on the left to ensure effective insulation shielding and ensure that the phases of the charged body will not be short-circuited by the insulating operating rod; then the operator returns On the ground, move the insulating ladder to the position of the phase charged body on the right corresponding to the ground, and install the insulation and shielding equipment for the live conductor and the grounding body on the right side in the same way;

步骤6:之后作业人员返回地面,移动绝缘人字梯到作业位置对应地面;经工作负责人许可后,作业人员再次蹬上绝缘人字梯,系好安全带,靠近作业位置,使用绝缘操作杆进行带电作业;所述作业过程中,作业人员与带电体保持至少0.6米的最小安全距离,对地保持至少0.4米的最小安全距离;作业的全过程需专人监护;Step 6: After that, the operator returns to the ground, and moves the insulating ladder to the corresponding ground at the working position; after the permission of the person in charge of the work, the operator steps on the insulating ladder again, fastens the safety belt, approaches the working position, and uses the insulating operating rod Carry out live work; during the operation process, the operator shall maintain a minimum safe distance of at least 0.6 meters from the live body, and a minimum safe distance of at least 0.4 meters from the ground; the whole process of the operation shall be supervised by a special person;

步骤7:作业完成后,由作业人员检查作业区域有无影响安全的因素,高空有无遗留物;拆除所有绝缘遮蔽用具,返回地面;Step 7: After the operation is completed, the operator checks whether there are factors affecting safety in the operation area and whether there are any leftovers at high altitude; remove all insulating and shielding appliances, and return to the ground;

步骤8:清点人数,清理现场。Step 8: Count the number of people and clean up the scene.

所述10kV配电线路及设备包括10kV配电线路的针式瓷瓶、横担、螺丝、线夹、导线(母线)等中的一种或多种。The 10kV power distribution line and equipment include one or more of needle-type ceramic bottles, cross-arms, screws, clamps, wires (busbars) and the like of the 10kV power distribution line.

所述绝缘人字梯的有效绝缘长度不得小于1米,其整梯长度可为1-3米。The effective insulation length of the insulating ladder should not be less than 1 meter, and the whole ladder length can be 1-3 meters.

所述绝缘绳索的有效绝缘长度不得小于0.4米,其全长可为1-5米。The effective insulating length of the insulating rope shall not be less than 0.4 meters, and its total length may be 1-5 meters.

所述绝缘操作杆的最小有效绝缘长度保持为不小于0.7m,操作杆全长可达2米,绝缘操作杆的绝缘电阻不得小于700MΩ。The minimum effective insulation length of the insulating operating rod is maintained at not less than 0.7m, the total length of the operating rod can reach 2 meters, and the insulation resistance of the insulating operating rod is not less than 700MΩ.

所述个人绝缘防护用具包括:10kV绝缘帽、绝缘服、绝缘手套、绝缘鞋。The personal insulating protective equipment includes: 10kV insulating cap, insulating clothing, insulating gloves, and insulating shoes.

所述绝缘遮蔽用具,当多个绝缘遮蔽用具共同使用且绝缘遮蔽区域发生重叠时,重叠部分不小于0.15m。As for the insulating shielding appliance, when multiple insulating shielding appliances are used together and the insulating shielding areas overlap, the overlapping portion shall not be less than 0.15m.

所述带电体是指带电的导线(母线)、线夹。The charged body refers to a charged wire (bus bar) and wire clamp.

所述步骤6中带电作业就是作业人员穿戴好个人绝缘防护用具后,利用绝缘杆对目标进行带电作业,目标可以是针式瓷瓶、横担、螺丝、线夹。The live work in the step 6 is that after the operator puts on the personal insulating protective equipment, he uses the insulating rod to carry out the live work on the target.

本发明的有效果是:可解决对作业空间狭小(指高度低于3.5米)的10kV配电线路和设备实施带电作业的技术难题,可以在保证作业人员安全的情况下,实现10kV配电线路和设备带电作业,避免因作业导致配电系统停电,减少作业对用户正常用电的不利影响。The invention has the effect that: it can solve the technical problem of carrying out live work on 10kV power distribution lines and equipment with a narrow working space (referring to height less than 3.5 meters), and can realize 10kV power distribution lines under the condition of ensuring the safety of operators And equipment live work, to avoid power outages in the power distribution system caused by the work, and reduce the adverse impact of the work on the normal power consumption of users.

附图说明Description of drawings

图1是本发明所涉及的10kV配电线路及设备使用绝缘操作杆实施带电作业的方法实施的示意图。Fig. 1 is a schematic diagram of the implementation of the method for implementing live work using an insulated operating rod for 10kV distribution lines and equipment involved in the present invention.

具体实施方式detailed description

下面结合附图和具体实施例对本发明作进一步说明,以使本领域的技术人员可以更好地理解本发明并能予以实施,但所举实施例不作为对本发明的限定。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, so that those skilled in the art can better understand the present invention and implement it, but the examples given are not intended to limit the present invention.

本发明所述10kV配电线路及设备包括10kV配电线路的针式瓷瓶、横担、螺丝、线夹、导线(母线)等。The 10kV power distribution line and equipment of the present invention include needle-type porcelain vases, cross arms, screws, wire clips, wires (busbars) and the like of the 10kV power distribution line.

如图1所示,一种10kV配电线路及设备带电作业方法,包括如下步骤:As shown in Figure 1, a live working method for 10kV power distribution lines and equipment includes the following steps:

步骤1:制定最优化的施工作业方案,所述方案包括作业线路的名称、杆号、绝缘遮蔽用具2的数量、绝缘人字梯1的安装位置、绝缘绳索7的固定位置等;并根据带电作业的规程要求,编写作业指导书、卡;Step 1: Formulate an optimized construction operation plan, which includes the name of the operation line, pole number, the number of insulating and shielding appliances 2, the installation position of the insulating ladder 1, the fixed position of the insulating rope 7, etc.; Prepare operation instructions and cards according to the requirements of the operation procedures;

步骤2:开工前准备,得到工作许可后,根据作业方案(作业指导书)开班前会、进行人员分工、现场安全措施布置等;检测所有工器具、材料是否符合安全要求,绝缘操作杆6绝缘电阻值不得低于700MΩ。Step 2: Prepare before starting work. After obtaining the work permit, according to the operation plan (operation instruction book), carry out the pre-shift meeting, carry out personnel division, on-site safety measures arrangement, etc.; check whether all tools and materials meet the safety requirements, and insulate the operating rod 6 The insulation resistance value shall not be lower than 700MΩ.

步骤3:选择适当位置安装绝缘人字梯1并系好绝缘绳索7,将绝缘绳索7固定在牢固的构件(牢固构件)上,使绝缘人字梯1稳固,并派人扶持;绝缘人字梯1的有效绝缘长度不得小于1米,其整梯长度可为1-3米,绝缘人字梯应具备承重能力),绝缘绳索7的有效绝缘长度不得小于0.4米,其全长可为1-5米;Step 3: Choose an appropriate location to install the insulating ladder 1 and fasten the insulating rope 7, fix the insulating rope 7 on a firm member (firm member), make the insulating ladder 1 stable, and send someone to support it; The effective insulation length of ladder 1 must not be less than 1 meter, and its whole ladder length can be 1-3 meters, and the insulating herringbone ladder should have load-bearing capacity), the effective insulation length of insulating rope 7 must not be less than 0.4 meters, and its total length can be 1 -5 meters;

步骤4:作业人员4穿戴好个人绝缘防护用具,经工作负责人许可后,蹬上绝缘人字梯1,系好安全带,靠近作业位置;Step 4: The operator 4 wears personal insulating protective equipment, and after being approved by the person in charge of the work, steps on the insulating ladder 1, fastens the seat belt, and approaches the working position;

步骤5:作业人员4使用绝缘操作杆6将绝缘遮蔽用具2安放在左侧带电导体3及接地体上,确保有效的绝缘遮蔽,确保带电体各相之间不会被绝缘操作杆6短接;之后作业人员4返回地面,移动绝缘人字梯1到右侧相带电体位置对应地面,按照同样的方法安装右侧带电导体3及接地体的绝缘遮蔽用具2;遮蔽用具2的作用是为了使人体、绝缘操作杆与带电导体和接地体保持良好的绝缘关系,确保人体不发生触电事故;Step 5: The operator 4 uses the insulating operating rod 6 to place the insulating shielding tool 2 on the left live conductor 3 and the grounding body to ensure effective insulating shielding and ensure that the phases of the charged body will not be short-circuited by the insulating operating rod 6 Afterwards, the operator 4 returns to the ground, moves the insulating ladder 1 to the corresponding ground of the phase charged body position on the right side, and installs the insulating shielding appliance 2 of the live conductor 3 and the grounding body on the right side according to the same method; the effect of the shielding appliance 2 is to Keep the human body, the insulating operating rod, the live conductor and the grounding body in a good insulation relationship to ensure that the human body does not suffer from electric shock accidents;

带电体3是指:带电的导线、线夹{既带电的导体(部位)};左侧相,就是指左侧的一相,以中相为参照物说的,可以理解为左侧;Charged body 3 refers to: charged wires, wire clips {both charged conductors (parts)}; the left phase refers to the left phase, which can be understood as the left side when the middle phase is used as a reference;

步骤6:之后作业人员4返回地面,移动绝缘人字梯1到作业位置对应地面;经工作负责人许可后,作业人员4再次蹬上绝缘人字梯,系好安全带,靠近作业位置,使用绝缘操作杆6进行带电作业;所述作业过程中,作业人员与带电体保持至少0.6米的最小安全距离5,对地保持至少0.4米的最小安全距离;作业的全过程需专人监护;Step 6: Afterwards, the operator 4 returns to the ground, moves the insulating ladder 1 to the corresponding ground at the working position; after being approved by the person in charge of the work, the operator 4 steps on the insulating ladder again, fastens the safety belt, approaches the working position, and uses The insulated operating rod 6 is used for live work; during the operation process, the operator shall keep a minimum safe distance 5 of at least 0.6 meters from the electrified body, and a minimum safe distance of at least 0.4 meters from the ground; the whole process of the operation shall be supervised by a special person;

带电作业就是作业人员穿戴好个人绝缘防护用具后,利用绝缘杆对目标进行带电作业,目标可以是针式瓷瓶、横担、螺丝、线夹、导线(母线)等(还可包括柱上开关、电压互感器);Live work means that after the operator wears personal insulating protective equipment, he uses an insulating rod to perform live work on the target. The target can be a needle type porcelain bottle, a cross arm, a screw, a clamp, a wire (bus bar), etc. voltage transformer);

步骤7:作业完成后,由作业人员4检查作业区域有无影响安全的因素,高空有无遗留物;经工作负责人同意后,拆除所有绝缘遮蔽用具2(与安装步骤相反的顺序拆除),返回地面;Step 7: After the operation is completed, the operator 4 checks whether there are factors affecting safety in the operation area and whether there are any leftovers at high altitude; after the consent of the person in charge of the work, remove all insulating and shielding appliances 2 (remove in the reverse order of the installation steps), return to the ground;

步骤8:清点人数,清理现场,开班后会,文明施工,完成工作终结手续。Step 8: Count the number of people, clean up the site, hold a meeting after the start of work, conduct civilized construction, and complete the work termination procedures.

绝缘操作杆6的最小有效绝缘长度保持为不小于0.7m,操作杆全长可达2米,其绝缘电阻不得小于700MΩ。10kV配电线路最大工作电压幅值为11.5kV,线路可能产生的最大操作过电压幅值按44kV考虑。为了保证作业人员4的安全,在系统最大工作电压及最大操作过电压的作用下,绝缘操作杆6应能够耐受住电压确保作业人员安全,其性能应满足《国家电网公司规程电力安全工作规程(线路部分)》规定:10kV绝缘操作杆的工频耐压试验电压等级为45kV/1min。The minimum effective insulation length of the insulating operating rod 6 is kept at not less than 0.7m, the total length of the operating rod can reach 2 meters, and its insulation resistance is not less than 700MΩ. The maximum operating voltage amplitude of the 10kV distribution line is 11.5kV, and the maximum operating overvoltage amplitude that may be generated by the line is considered as 44kV. In order to ensure the safety of the operators 4, under the action of the maximum operating voltage and the maximum operating overvoltage of the system, the insulating operating rod 6 should be able to withstand the voltage to ensure the safety of the operators, and its performance should meet the "State Grid Corporation Regulations Electricity Safety Work Regulations" (Line part)" stipulates that the power frequency withstand voltage test voltage level of the 10kV insulating operating rod is 45kV/1min.

个人绝缘防护用具,包括:10kV绝缘帽、绝缘服、绝缘手套、绝缘鞋。作业人员4必须穿戴10kV绝缘帽、绝缘鞋、绝缘服、绝缘手套;扶持绝缘人字梯的人员必须穿戴10kV绝缘帽、绝缘鞋、绝缘服、绝缘手套并站在绝缘垫上。其他人员不得碰触扶梯人员及绝缘人字梯1上作业人员。Personal insulating protective equipment, including: 10kV insulating cap, insulating clothing, insulating gloves, insulating shoes. Operator 4 must wear 10kV insulating caps, insulating shoes, insulating clothing, and insulating gloves; personnel supporting insulating ladders must wear 10kV insulating caps, insulating shoes, insulating clothing, and insulating gloves and stand on insulating mats. Other personnel are not allowed to touch the escalator personnel and the operators on the insulated ladder 1.

绝缘遮蔽用具,当多个绝缘遮蔽用具2共同使用且绝缘遮蔽区域发生重叠时,重叠部分不小于0.15m。For insulating shielding appliances, when multiple insulating shielding appliances 2 are used together and the insulating shielding areas overlap, the overlapping part shall not be less than 0.15m.

在高海拔地区,应当根据10kV配电线路带电作业间隙和绝缘工具以及安全防护用具的实际情况,应当采用相对气压修正方法对安全距离进行校正以确保作业人员的安全。本发明可以在因作业空间狭小导致带电作业车辆无法进入,或不便于停放的10kV配电区域开展带电作业。In high-altitude areas, the relative air pressure correction method should be used to correct the safety distance according to the actual situation of the 10kV distribution line live working gap and the insulation tools and safety protection equipment to ensure the safety of the workers. The invention can carry out live work in the 10kV power distribution area where live work vehicles cannot enter due to the narrow working space, or where it is inconvenient to park.

以上所述实施例仅是为充分说明本发明而所举的较佳的实施例,本发明的保护范围不限于此。本技术领域的技术人员在本发明基础上所作的等同替代或变换,均在本发明的保护范围之内。本发明的保护范围以权利要求书为准。The above-mentioned embodiments are only preferred embodiments for fully illustrating the present invention, and the protection scope of the present invention is not limited thereto. Equivalent substitutions or transformations made by those skilled in the art on the basis of the present invention are all within the protection scope of the present invention. The protection scope of the present invention shall be determined by the claims.

Claims (8)

1. a kind of 10kV distribution line and equipment live operational method are it is characterised in that comprise the steps:
Step 1:Formulate construction operation scheme, described scheme includes the title of service line, bar number, the number of insulation masking apparatus Amount, the installation site of insulation double ladder, the fixed position of insulation ropes;
Step 2:Prepare before going into operation, after obtaining work permit, open pre-shift meeting, enter administrative staff's division of labor, scene peace according to operation scheme Full measure arrangement;
Step 3:Insulation double ladder is installed and fastens insulation ropes, insulation ropes is fixed on firm component, makes insulation people Word ladder is firm, and sends someone to help insulation double ladder;
Step 4:Operating personnel dresses good individual's insulating protection apparatus, after work director's license, pedals insulation double ladder, is Good seat belt, near job position;
Step 5:Operating personnel using insulating bar, the masking apparatus that insulate is placed on left side energized conductor and grounding body, really Protect effectively insulation masking it is ensured that will not be by insulating bar short circuit between each phase of electrical body;Operating personnel returns to ground afterwards, Mobile insulation double ladder, to the mutually powered body position in right side corresponding ground, installs right side energized conductor and ground connection after the same method The insulation masking apparatus of body;
Step 6:Operating personnel returns to ground afterwards, and mobile insulation double ladder is to job position corresponding ground;Through the director that works After license, operating personnel pedals insulation double ladder again, fastens seat belts, and near job position, is carried out using insulating bar Livewire work;In described operation process, operating personnel keeps at least 0.6 meter of minimum safe distance with electrical body, keeps over the ground At least 0.4 meter of minimum safe distance;The overall process of operation needs special messenger to guard;
Step 7:After the completion of operation, had or not the factor of impact safety by operating personnel's Inspection region, high-altitude has or not legacy; Remove all insulation masking apparatus, return to ground;
Step 8:Check the number of people, site clearing.
2. a kind of 10kV distribution line according to claim 1 and equipment live operational method it is characterised in that described absolutely Effective insulated lengths of edge double ladder cannot be less than 1 meter.
3. a kind of 10kV distribution line according to claim 1 and equipment live operational method it is characterised in that described absolutely Effective insulated lengths of edge rope cannot be less than 0.4 meter.
4. a kind of 10kV distribution line according to claim 1 and equipment live operational method it is characterised in that described absolutely The minimum effectively insulated lengths of edge action bars remain not less than 0.7m, and the insulation resistance of insulating bar cannot be less than 700M Ω.
5. a kind of 10kV distribution line according to claim 1 and equipment live operational method are it is characterised in that described People's insulating protection apparatus includes:10kV insulator cap, insulation clothing, insulating glove, insulated shoes.
6. a kind of 10kV distribution line according to claim 1 and equipment live operational method it is characterised in that described absolutely Edge covers apparatus, and when multiple insulation masking apparatus are used in conjunction with and the shaded areas that insulate overlap, lap is not less than 0.15m.
7. a kind of 10kV distribution line according to claim 1 and equipment live operational method are it is characterised in that described band Electric body refers to powered wire, wire clamp.
8. a kind of 10kV distribution line according to claim 1 and equipment live operational method are it is characterised in that described step In rapid 6, livewire work is exactly, after operating personnel dresses good individual's insulating protection apparatus, to carry out powered work using insulating bar to target Industry, target can be needle porcelain bottle, cross-arm, screw, wire clamp.
CN201611005664.2A 2016-11-13 2016-11-13 Hot-line work method for 10-kV distribution line and equipment Pending CN106410674A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611005664.2A CN106410674A (en) 2016-11-13 2016-11-13 Hot-line work method for 10-kV distribution line and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611005664.2A CN106410674A (en) 2016-11-13 2016-11-13 Hot-line work method for 10-kV distribution line and equipment

Publications (1)

Publication Number Publication Date
CN106410674A true CN106410674A (en) 2017-02-15

Family

ID=59230782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611005664.2A Pending CN106410674A (en) 2016-11-13 2016-11-13 Hot-line work method for 10-kV distribution line and equipment

Country Status (1)

Country Link
CN (1) CN106410674A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107946997A (en) * 2017-12-21 2018-04-20 国网山东省电力公司烟台供电公司 A kind of insulating bar method on-load isolates the operational method of switch in replacing
CN107941273A (en) * 2017-11-15 2018-04-20 国网湖南省电力公司检修公司 A kind of live-working safety method for early warning and device
CN115102089A (en) * 2022-06-24 2022-09-23 国网江苏省电力有限公司南京供电分公司 Calibration method of air movement area for uninterrupted operators

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101640391A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for replacing insulator for 35kV distribution circuit
CN101852062A (en) * 2009-11-11 2010-10-06 江苏省电力公司宜兴市供电公司 Insulated lift maintaining platform ladder
CN202333603U (en) * 2011-11-18 2012-07-11 华北电力科学研究院有限责任公司 Lead wire screening cover for distribution line indirect hot-line work and screening assembly
CN102664358A (en) * 2012-04-23 2012-09-12 辽宁省电力有限公司鞍山供电公司 Live replacement method for static contact of 220 kV flexible busbar
CN103618252A (en) * 2013-11-28 2014-03-05 国家电网公司 Operation method for replacing tension insulator for 35kV overhead line in electrified mode
JP2015019482A (en) * 2013-07-10 2015-01-29 中国電力株式会社 Aerial work vehicle and column construction method using aerial work vehicle
CN105207123A (en) * 2015-10-13 2015-12-30 国网辽宁省电力有限公司丹东供电公司 Equipotential operation method of tubular bus

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101640391A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for replacing insulator for 35kV distribution circuit
CN101852062A (en) * 2009-11-11 2010-10-06 江苏省电力公司宜兴市供电公司 Insulated lift maintaining platform ladder
CN202333603U (en) * 2011-11-18 2012-07-11 华北电力科学研究院有限责任公司 Lead wire screening cover for distribution line indirect hot-line work and screening assembly
CN102664358A (en) * 2012-04-23 2012-09-12 辽宁省电力有限公司鞍山供电公司 Live replacement method for static contact of 220 kV flexible busbar
JP2015019482A (en) * 2013-07-10 2015-01-29 中国電力株式会社 Aerial work vehicle and column construction method using aerial work vehicle
CN103618252A (en) * 2013-11-28 2014-03-05 国家电网公司 Operation method for replacing tension insulator for 35kV overhead line in electrified mode
CN105207123A (en) * 2015-10-13 2015-12-30 国网辽宁省电力有限公司丹东供电公司 Equipotential operation method of tubular bus

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国南方电网有限责任公司: "《10kV配电线路带电作业指南》", 30 June 2015 *
全国电力职业教育教材编审委员会: "《输配电线路运行与检修》", 30 November 2014 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107941273A (en) * 2017-11-15 2018-04-20 国网湖南省电力公司检修公司 A kind of live-working safety method for early warning and device
CN107941273B (en) * 2017-11-15 2022-01-18 国网湖南省电力公司检修公司 Live working safety early warning method and device
CN107946997A (en) * 2017-12-21 2018-04-20 国网山东省电力公司烟台供电公司 A kind of insulating bar method on-load isolates the operational method of switch in replacing
CN107946997B (en) * 2017-12-21 2019-07-19 国网山东省电力公司烟台供电公司 An operating method for replacing a middle-phase isolating switch with load by an insulating rod method
CN115102089A (en) * 2022-06-24 2022-09-23 国网江苏省电力有限公司南京供电分公司 Calibration method of air movement area for uninterrupted operators
CN115102089B (en) * 2022-06-24 2023-09-15 国网江苏省电力有限公司南京供电分公司 Method for calibrating air movement area of uninterrupted power worker

Similar Documents

Publication Publication Date Title
CN103746315A (en) Quick hot-line by-pass jumper overlapping operation method for 10kV insulated power distribution line
CN102931609B (en) On-load changes the operational method of 10kV fuse switch
CN106410674A (en) Hot-line work method for 10-kV distribution line and equipment
CN101640391A (en) Live-wire operation method for replacing insulator for 35kV distribution circuit
CN110120643B (en) A method for uninterrupted operation of ground potential distribution network power lines
CN101277002A (en) Construction Method of Concrete Pole for 10kV Double Circuit Distribution Line
CN107482535A (en) The Method of Installing Segment Switch on Straight Rod of 10KV Line with Load Breaking
CN103474909B (en) Drainage thread supports the method for expansion live-line replacing multiloop strain insulator string
CN108963875A (en) The method of on-load migration 10KV overhead transmission line
CN106356758B (en) 10KV line insulations bar bypasses charged for replacement on-pole switch operational method indirectly
CN102403672B (en) Super/ultrahigh voltage alternating and direct-current mixed compression line live-line work equipotential transfer safety method
CN104113007A (en) Operation method for replacing strain insulator of 35kV overhead distribution line in live state
CN210866095U (en) A special shunt device for replacing drop fuse with load
CN104538888B (en) A kind of distribution line straight line pole cross-arm charged for replacement method
CN104597357A (en) Tester for arrester on 66kV tower and testing method thereof
CN104037648A (en) Operating method of 35kV-overhead-line insulating-glove-method electrified disconnection and connection of zero-load-line lead wire
CN206211062U (en) A kind of circlip type binding clip for ground wire group
CN104314352A (en) Compact composite material power transmission line tower
CN208522109U (en) A kind of puncture grounding rod
CN104332929A (en) Single-ground wire ice melting method
CN104113006A (en) Operation method for replacing linear rod angle steel cross arm of 35kV overhead distribution line in live state
CN207183201U (en) Drop-out fuse shunt device for live work
CN105305311A (en) Safety protection method for distribution line live work
CN105977861A (en) Charged work method for distribution line in high altitude area
CN205646197U (en) Novel high pressure bonding device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 437100 30 hot spring road, Wenquan, Xianning, Hubei

Applicant after: State Grid Hubei Electric Power Co., Ltd. Xianning power supply company

Applicant after: State Grid Corporation of China

Applicant after: State Grid Hubei Electric Power Company Electric Power Technology Research Institute

Address before: 437100 30 hot spring road, Wenquan, Xianning, Hubei

Applicant before: Xianning Power Supply Company, State Grid Hubei Electric Power Company

Applicant before: State Grid Corporation of China

Applicant before: State Grid Hubei Electric Power Company Electric Power Technology Research Institute

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215

RJ01 Rejection of invention patent application after publication