CN102842867A CN2012103185180A CN201210318518A CN102842867A CN 102842867 A CN102842867 A CN 102842867A CN 2012103185180 A CN2012103185180 A CN 2012103185180A CN 201210318518 A CN201210318518 A CN 201210318518A CN 102842867 A CN102842867 A CN 102842867A
Authority
CN
China
Prior art keywords
drainage thread
electrician
bus
ground
equipotential
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103185180A
Other languages
Chinese (zh)
Inventor
王枫
刘伟
丁涛
何忠伟
战宝华
赵岩
刘君
于潇
杜明亮
张建
王晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN2012103185180A priority Critical patent/CN102842867A/en
Publication of CN102842867A publication Critical patent/CN102842867A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Measurement Of Resistance Or Impedance (AREA)

Abstract

The invention relates to the electrification maintenance field of a 66kV disconnector, in particular to a method for electrically disconnecting or connecting a disconnector with a drainage wire between buses. The method is characterized in that an equipotential electrician is lifted to a flexible busbar along an insulated hanging ladder, potentials are transmitted in the equipotential method, and people on the floor can realize disconnection and connection of the drainage wire by virtue of arc extinction pulleys and haulage ropes of the drainage wire. The method specifically comprises an electrically disconnection step and an electrically connection step. Compared with the prior art, the method provided by the invention has the beneficial effects that the equipotential electrician adopts the equipotential operating method, and the disconnection and the connection of the drainage wire with electricity can be realized on an aerial flexible bus bar, so that defects or hidden dangers can be eliminated, operating times of power outage and switching of operators can be reduced, reliability of power distribution of a power grid can be ensured, and a safe operation of electrical equipment can be guaranteed.

Description

The method of charged breaking and connecting isolating switch to drainage thread between bus
Technical field
The present invention relates to 66kV isolating switch power-on serving field, relate in particular to the method for a kind of charged breaking and connecting isolating switch to drainage thread between bus.
Background technology
Live line working means a kind of special operation mode of on the electric equipment of operation, overhauling and transform; Be to guarantee power grid security, economy, reliability service and to a kind of effective technological means of user's uninterrupted power supply; Simultaneously can reduce operations staff's workload, avoid the accident of misoperation to take place.
Transformer station adopts double bus scheme usually; During maintenance 66kV isolating switch, the substation operation personnel can only take down the mode of bus, with electric load be switched on another bus or with bypass for giving; Owing to need do tens to up to a hundred operations; Program is complicated, occurs misoperation fault easily, increases operations staff's security risk probability.
Adopt charged breaking and connecting isolating switch to drainage thread mode between bus, can reduce operations staff's grid switching operation, reduce the security risk probability.Owing to shortened equipment running time in spite of illness, reduce even avoided accident interruption, improve the stability of a system, in addition, create the loop clearance space of a safety inspection, maintenance to the maintainer.
Summary of the invention
The method that the purpose of this invention is to provide a kind of charged breaking and connecting isolating switch to drainage thread between bus; Overcome the deficiency of prior art; Charged dismounting drainage thread on aerial soft bus is eliminated defective or hidden danger, reduces to have a power failure and operations staff's grid switching operation number of times; Guarantee the mains supply reliability, ensure the electric equipment safe operation.
For solving the problems of the technologies described above, the technical scheme of the utility model is:
The method of charged breaking and connecting isolating switch to drainage thread between bus; Equipotential electrician rises under the soft bus along insulated hook ladder; Adopt idiostatic method to shift current potential; The ground staff by extinguishing arc coaster and drainage thread pull rope realize drainage thread disconnected draw and connect draw, specifically comprise and chargedly disconnectedly draw step and charged connecing drawn step, wherein:
One) the charged disconnected step of drawing is following:
1) the assembling insulated hook ladder on ground; Equipotential electrician puts on screening clothing; With insulation resistance meter the insulating tool segmentation is detected; Resistance should be not less than 700 megaohms, and the specific responsibility guardian checks that whether screening clothing outward appearance, each one connect good, measures the screening clothing D.C. resistance with insulation resistance meter and should be not more than 20 ohm;
2) insulated hook ladder is hung on the bus of setting, the insulated hook ladder height should be less than the height of bus apart from ground, and moving process will prevent to swing excessive, injures surrounding devices by a crashing object, causes short trouble;
3) during charged disconnected drawing, from away from isolating switch one mutually successively to nearer two-phase in addition, by the length of drainage thread, in, short order carries out;
4) the equipotential electrician takes the extinguishing arc coaster and the drainage thread pull rope is climbed up insulated hook ladder, and the ground electrician controls the insulated hook ladder afterbody, prevents the hanging ladder swing; Equipotential electrician climbs to setting; Shift current potential with hand and get into highfield, fasten the equipotential safety belt, guarantee that facial exposed part and electrified body are not less than 0.2m when shifting current potential; At the A of bus phase, C the phase spacing that insulation control rope increases bus is installed respectively mutually, is guaranteed that phase spacing is not less than 0.9m;
5) the equipotential electrician installs the extinguishing arc coaster on bus, and drainage thread pull rope one end passes the extinguishing arc coaster and ties up to the drainage thread wire clamp place that need disconnected draw, and the drainage thread pull rope other end is strained by the ground electrician;
6) during charged disconnected drawing, the ground electrician strains the drainage thread pull rope, and equipotential electrician removes the screw that is connected between drainage thread and bus, when the ground electrician unclasps drainage thread, cooperates with insulating support rod, is put on the ground until drainage thread; Unclasp to observe at any time in the lead process with pilot over the ground or to the combinational gap of adjacent electrified body, drainage thread breaks away from bus moment, equipotential electrician will face to opposite side;
7) the equipotential electrician removes safety belt, takes the extinguishing arc coaster and withdraws from highfield with hand transfer current potential, notices guaranteeing that facial exposed part and electrified body are not less than 0.2m;
Two) chargedly connect that to draw step following:
1) the assembling insulated hook ladder on ground; Equipotential electrician puts on screening clothing; With insulation resistance meter the insulating tool segmentation is detected; Resistance should be not less than 700 megaohms, and the specific responsibility guardian checks whether screening clothing outward appearance, each one connect good, measures the screening clothing D.C. resistance with insulation resistance meter and should be not more than 20 Europe mother;
2) insulated hook ladder is hung on the bus of setting, the hanging ladder height should be less than the height of bus apart from ground, and moving process will prevent to swing excessive, injures surrounding devices by a crashing object, causes short trouble;
3) charged connecing when drawing, from from isolating switch nearest one mutually successively to two-phase in addition far away, by the length of drainage thread, in, short order carries out;
4) the equipotential electrician takes the extinguishing arc coaster and the drainage thread pull rope is pedaled insulated hook ladder, and the ground electrician controls the insulated hook ladder afterbody, prevents the hanging ladder swing; Equipotential electrician climbs to setting; Shift current potential with hand and get into highfield, fasten the equipotential safety belt, guarantee that facial exposed part and electrified body are not less than 0.2m when shifting current potential; At the A of bus phase, C the phase spacing that insulation control rope increases bus is installed respectively mutually, is guaranteed that phase spacing is not less than 0.9m;
5) the equipotential electrician installs the extinguishing arc coaster on bus, and drainage thread pull rope one end passes the extinguishing arc coaster and ties up to and need meet the drainage thread wire clamp place of drawing, and the drainage thread pull rope other end is strained by the ground electrician;
6) the ground electrician drainage thread wire clamp contact-making surface of polishing, and smear neutral vaseline; Equipotential electrician's bus bar side contact-making surface of polishing exposes metallic luster, smears neutral vaseline;
7) charged connecing when drawing; The ground electrician cooperates with insulating support rod and is promoted to drainage thread and the bus junction; Contact moment equipotential electrician will face to opposite side, in the drainage thread lifting process, observe at any time with pilot over the ground or to the combinational gap of adjacent electrified body; After drainage thread was in place, equipotential electrician installed the screw that is connected between drainage thread and bus;
8) the equipotential electrician removes safety belt, takes the extinguishing arc coaster and withdraws from highfield with hand transfer current potential, notices guaranteeing that facial exposed part and electrified body are not less than 0.2m.
Compared with prior art; The invention has the beneficial effects as follows: equipotential electrician adopts the equal potential working method, and by insulated hook ladder and ground electrician's compounding practice, charged realization drainage thread disconnected drawn and connect and draw on aerial soft bus; Eliminate defective or hidden danger; Reduce and have a power failure and operations staff's grid switching operation number of times assurance mains supply reliability, the safe operation of guarantee electric equipment.
Description of drawings
Fig. 1 is the disconnected work operations status architecture sketch map that draws of the present invention;
Fig. 2 is that the present invention connects and draws work operations status architecture sketch map.
Among the figure: 1-equipotential electrician 2-extinguishing arc coaster 3-drainage thread pull rope 4-bus 5-drainage thread 6-hanging ladder control rope 7-ground electrician 8-insulating support rod 9-isolating switch 10-specific responsibility guardian 11-insulated hook ladder 12-work director
Embodiment
Be described further below in conjunction with the accompanying drawing specific embodiments of the invention:
The method of the charged breaking and connecting isolating switch of the present invention to drainage thread between bus; Be to rise to bus 4 times along insulated hook ladder 11 by equipotential electrician 1; Adopt the idiostatic method operation; Ground staff 7 by extinguishing arc coaster 2, drainage thread pull rope 3 and insulating support rod 8 realize drainage threads 5 disconnected draw and connect draw, specifically comprise and chargedly disconnectedly draw step and charged connecing drawn step, wherein:
One) see Fig. 1, the charged disconnected step of drawing is following:
1) equipotential electrician 1 puts on screening clothing; Assembling insulated hook ladder 11 detects the insulating tool segmentation with insulation resistance meter on ground, and resistance should be not less than 700 megaohms; Whether specific responsibility guardian 10 inspection screening clothing outward appearances, each one connect good; Measure the screening clothing D.C. resistance with insulation resistance meter and be not more than 20 ohm, otherwise, change;
2) insulated hook ladder 11 is hung on the bus 4 of setting, the ground electrician holds hanging ladder control rope 6, and the hanging ladder height should be less than the height of bus apart from ground; The hanging ladder afterbody must not touch ground; The moving process personnel want energy to concentrate, and accept work director 12 unified commands, prevent to swing excessive; Injure surrounding devices by a crashing object, cause short trouble;
3) during charged disconnected drawing, from away from isolating switch 9 one mutually successively to nearer two-phase in addition, by the length of drainage thread, in, short order carries out;
4) equipotential electrician 1 takes extinguishing arc coaster 2 and climbs up hanging ladder 11 with drainage thread pull rope 3, and the ground electrician controls the hanging ladder afterbody, prevents the hanging ladder swing; Equipotential electrician climbs hanging ladder to setting, shifts current potential with hand and gets into highfield, and the equipotential safety belt is hung on the bus; As having satisfied not " State Grid Corporation of China's electric power safety working regulation (power transformation part) " when phase spacing regulation 66kV is not less than 0.9m; In the time of can adopting the equipotential electrician along hanging ladder passage forward and back highfield should according to " health pastes, and back line is hung, vertical on; vertically down; outreach tiltedly once " method, be not less than 0.9m in the phase spacing gap that A, the C of bus install insulation control rope increase bus mutually respectively simultaneously, guarantee that facial exposed part and electrified body are not less than 0.2m;
5) equipotential electrician 1 installs extinguishing arc coaster 2 on bus 4 appropriate locations, and drainage thread pull rope 3 one ends pass extinguishing arc coaster 2 and tie up to the drainage thread 5 wire clamp places that need disconnected draw, and drainage thread pull rope 3 other ends are by ground electrician 7 tensions;
6) charged breaking when drawing, the ground electrician strains drainage thread pull rope 3, the yoke plate connecting bolt that equipotential electrician's 1 dismounting drainage thread 5 and bus are 4, drainage thread breaks off moment equipotential electrician will face to opposite side; A ground electrician 7 utilizes drainage thread pull rope 3 and another ground electrician to hold insulating support rod 8 and cooperatively interacts, be put on the ground until drainage thread; Unclasp to observe at any time in the lead process with pilot over the ground or to the combinational gap of adjacent electrified body;
7) the equipotential electrician removes safety belt, takes the extinguishing arc coaster and withdraws from highfield with hand transfer current potential, notices guaranteeing that facial exposed part and electrified body are not less than 0.2m.
Two) see Fig. 2, chargedly connect that to draw step following:
1) charged connecing when drawing, inspection isolating switch are assembled insulated hook ladder on ground after opening position, no ground connection; With insulation resistance meter the insulating tool segmentation is detected, resistance should be not less than 700 megaohms, and equipotential electrician puts on screening clothing; The specific responsibility guardian checks whether good screening clothing outward appearance, each one connect; Measure the screening clothing D.C. resistance with insulation resistance meter and should be not more than 20 ohm, otherwise, change;
2) insulated hook ladder is hung on the bus of setting, the hanging ladder height should be less than the height of bus apart from ground, and the hanging ladder afterbody must not touch ground; The moving process personnel want energy to concentrate, and 12 people unified command is responsible in the work of accepting, and prevents to swing excessive; Injure surrounding devices by a crashing object, cause short trouble;
3) charged connecing when drawing, from from isolating switch nearest one mutually successively to two-phase in addition far away, by the weak point of drainage thread, in, Changshun preface carries out;
4) the equipotential electrician takes the extinguishing arc coaster and the drainage thread pull rope is climbed up hanging ladder, and the ground electrician controls the hanging ladder afterbody, prevents the hanging ladder swing; Equipotential electrician climbs hanging ladder to setting, shifts current potential with hand and gets into highfield, and the equipotential safety belt is hung on the bus; As having satisfied not " State Grid Corporation of China's electric power safety working regulation (power transformation part) " when phase spacing regulation 66kV is not less than 0.9m; In the time of can adopting the equipotential electrician along hanging ladder passage forward and back highfield should according to " health pastes, and back line is hung, vertical on; vertically down; outreach tiltedly once " method, be not less than 0.9m in the phase spacing gap that A, the C of bus install insulation control rope increase bus mutually respectively simultaneously, guarantee that facial exposed part and electrified body are not less than 0.2m;
5) the equipotential electrician installs the extinguishing arc coaster on the bus appropriate location, and drainage thread pull rope one end passes the extinguishing arc coaster and ties up to and need meet the drainage thread wire clamp place of drawing, and the drainage thread pull rope other end is strained by the ground electrician;
6) the ground electrician handles drainage thread wire clamp contact-making surface and is coated with neutral vaseline, and equipotential electrician handles clean bus bar side contact-making surface, exposes metallic luster, evenly smears neutral vaseline;
7) charged connecing when drawing; A ground electrician 7 utilizes drainage thread pull rope 3 and another ground electrician to hold insulating support rod 8 and cooperatively interacts; Drainage thread is promoted to and the bus junction; Contact moment equipotential electrician will face to opposite side, promote to observe at any time in the lead process with pilot over the ground or to the combinational gap of adjacent electrified body; Connecting bolt between fastening drainage thread wire clamp of equipotential electrician and bus;
8) the equipotential electrician removes safety belt, takes the extinguishing arc coaster and withdraws from highfield, shifts current potential with hand when withdrawing from highfield, and guarantees that facial exposed part and electrified body are not less than 0.2m.

Claims (1)

1. the method for charged breaking and connecting isolating switch to drainage thread between bus; It is characterized in that; Equipotential electrician rises under the soft bus along insulated hook ladder, adopts idiostatic method to shift current potential, and the ground staff draws and connects by extinguishing arc coaster and drainage thread pull rope realization drainage thread disconnected and draws; Specifically comprise and chargedly disconnected draw step and charged connecing drawn step, wherein:
One) the charged disconnected step of drawing is following:
1) the assembling insulated hook ladder on ground; Equipotential electrician puts on screening clothing; With insulation resistance meter the insulating tool segmentation is detected; Resistance should be not less than 700 megaohms, and the specific responsibility guardian checks that whether screening clothing outward appearance, each one connect good, measures the screening clothing D.C. resistance with insulation resistance meter and should be not more than 20 ohm;
2) insulated hook ladder is hung on the bus of setting, the insulated hook ladder height should be less than the height of bus apart from ground, and moving process will prevent to swing excessive, injures surrounding devices by a crashing object, causes short trouble;
3) during charged disconnected drawing, from away from isolating switch one mutually successively to nearer two-phase in addition, by the length of drainage thread, in, short order carries out;
4) the equipotential electrician takes the extinguishing arc coaster and the drainage thread pull rope is climbed up insulated hook ladder, and the ground electrician controls the insulated hook ladder afterbody, prevents the hanging ladder swing; Equipotential electrician climbs to setting; Shift current potential with hand and get into highfield, fasten the equipotential safety belt, guarantee that facial exposed part and electrified body are not less than 0.2m when shifting current potential; At the A of bus phase, C the phase spacing that insulation control rope increases bus is installed respectively mutually, is guaranteed that phase spacing is not less than 0.9m;
5) the equipotential electrician installs the extinguishing arc coaster on bus, and drainage thread pull rope one end passes the extinguishing arc coaster and ties up to the drainage thread wire clamp place that need disconnected draw, and the drainage thread pull rope other end is strained by the ground electrician;
6) during charged disconnected drawing, the ground electrician strains the drainage thread pull rope, and equipotential electrician removes the screw that is connected between drainage thread and bus, when the ground electrician unclasps drainage thread, cooperates with insulating support rod, is put on the ground until drainage thread; Unclasp to observe at any time in the lead process with pilot over the ground or to the combinational gap of adjacent electrified body, drainage thread breaks away from bus moment, equipotential electrician will face to opposite side;
7) the equipotential electrician removes safety belt, takes the extinguishing arc coaster and withdraws from highfield with hand transfer current potential, notices guaranteeing that facial exposed part and electrified body are not less than 0.2m;
Two) chargedly connect that to draw step following:
1) the assembling insulated hook ladder on ground; Equipotential electrician puts on screening clothing; With insulation resistance meter the insulating tool segmentation is detected; Resistance should be not less than 700 megaohms, and the specific responsibility guardian checks whether screening clothing outward appearance, each one connect good, measures the screening clothing D.C. resistance with insulation resistance meter and should be not more than 20 Europe mother;
2) insulated hook ladder is hung on the bus of setting, the hanging ladder height should be less than the height of bus apart from ground, and moving process will prevent to swing excessive, injures surrounding devices by a crashing object, causes short trouble;
3) charged connecing when drawing, from from isolating switch nearest one mutually successively to two-phase in addition far away, by the length of drainage thread, in, short order carries out;
4) the equipotential electrician takes the extinguishing arc coaster and the drainage thread pull rope is pedaled insulated hook ladder, and the ground electrician controls the insulated hook ladder afterbody, prevents the hanging ladder swing; Equipotential electrician climbs to setting; Shift current potential with hand and get into highfield, fasten the equipotential safety belt, guarantee that facial exposed part and electrified body are not less than 0.2m when shifting current potential; At the A of bus phase, C the phase spacing that insulation control rope increases bus is installed respectively mutually, is guaranteed that phase spacing is not less than 0.9m;
5) the equipotential electrician installs the extinguishing arc coaster on bus, and drainage thread pull rope one end passes the extinguishing arc coaster and ties up to and need meet the drainage thread wire clamp place of drawing, and the drainage thread pull rope other end is strained by the ground electrician;
6) the ground electrician drainage thread wire clamp contact-making surface of polishing, and smear neutral vaseline; Equipotential electrician's bus bar side contact-making surface of polishing exposes metallic luster, smears neutral vaseline;
7) charged connecing when drawing; The ground electrician cooperates with insulating support rod and is promoted to drainage thread and the bus junction; Contact moment equipotential electrician will face to opposite side, in the drainage thread lifting process, observe at any time with pilot over the ground or to the combinational gap of adjacent electrified body; After drainage thread was in place, equipotential electrician installed the screw that is connected between drainage thread and bus;
8) the equipotential electrician removes safety belt, takes the extinguishing arc coaster and withdraws from highfield with hand transfer current potential, notices guaranteeing that facial exposed part and electrified body are not less than 0.2m.
CN2012103185180A 2012-08-31 2012-08-31 Method for electrically disconnecting or connecting disconnector with drainage wire between buses Pending CN102842867A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103185180A CN102842867A (en) 2012-08-31 2012-08-31 Method for electrically disconnecting or connecting disconnector with drainage wire between buses

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103185180A CN102842867A (en) 2012-08-31 2012-08-31 Method for electrically disconnecting or connecting disconnector with drainage wire between buses

Publications (1)

Publication Number Publication Date
CN102842867A true CN102842867A (en) 2012-12-26

Family

ID=47370011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103185180A Pending CN102842867A (en) 2012-08-31 2012-08-31 Method for electrically disconnecting or connecting disconnector with drainage wire between buses

Country Status (1)

Country Link
CN (1) CN102842867A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103500966A (en) * 2013-06-20 2014-01-08 国家电网公司 Electrified power disconnecting method for leading wire from 66kv disconnecting switch to pipe busbar
CN103618249A (en) * 2013-11-27 2014-03-05 国家电网公司 technology for electrified overhaul of +-500kV double-circuit direct-current power transmission lines on same tower
CN105207123A (en) * 2015-10-13 2015-12-30 国网辽宁省电力有限公司丹东供电公司 Equipotential operation method of tubular bus
CN106887808A (en) * 2017-04-10 2017-06-23 国网辽宁省电力有限公司辽阳供电公司 A kind of insulation docking machine for the powered drainage in both sides of furthering
CN109212361A (en) * 2018-10-24 2019-01-15 云南电网有限责任公司电力科学研究院 A kind of power transmission line phase fault test method and system
CN109921335A (en) * 2019-03-25 2019-06-21 云南电网有限责任公司昆明供电局 Pylon route uses extinguishing arc rope ground potential breaking and connecting drainage thread working system
CN110120643A (en) * 2019-04-19 2019-08-13 国网浙江淳安县供电有限公司 A kind of ground potential distribution power circuit uninterrupted operation method
CN113612160A (en) * 2021-09-10 2021-11-05 亿嘉和科技股份有限公司 Winch working tool for bypass cable lap joint and operation method thereof
CN113964718A (en) * 2021-11-22 2022-01-21 国网辽宁省电力有限公司鞍山供电公司 Method for processing heating fault of conducting wire in electrified mode
CN114825167A (en) * 2022-04-22 2022-07-29 贵州西电电力股份有限公司黔北发电厂 Optimization method for diversion wire reconnection

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005022714A2 (en) * 2003-08-29 2005-03-10 Quanta Services Live conductor stringing and splicing method and apparatus
CN101640390A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for lapping drainage wire for 35kV distribution circuit
CN101640392A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for cutting off drainage wire for 35kV distribution circuit
CN102185266A (en) * 2011-05-13 2011-09-14 辽宁省电力有限公司辽阳供电公司 Charged disconnecting and connecting method for large-section conducting wire of 66kV power transmission line

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005022714A2 (en) * 2003-08-29 2005-03-10 Quanta Services Live conductor stringing and splicing method and apparatus
WO2005022714A3 (en) * 2003-08-29 2005-09-01 Quanta Services Live conductor stringing and splicing method and apparatus
CN101640390A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for lapping drainage wire for 35kV distribution circuit
CN101640392A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for cutting off drainage wire for 35kV distribution circuit
CN102185266A (en) * 2011-05-13 2011-09-14 辽宁省电力有限公司辽阳供电公司 Charged disconnecting and connecting method for large-section conducting wire of 66kV power transmission line

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
HXF148232: "《辽宁省电力有限公司变电站带电作业标准化指导书(试行)》", 8 December 2011, 百度文库 *
国家电网公司组: "《带电作业操作方法 第3分册 变电站》", 30 June 2011, 中国电力出版社 *
孙兵等: "纪营110kV变电站5号母线带电接引", 《华北电力技术》 *
朱艳红: "带电断、接变电站500kV母线上的引线", 《电力建设》 *
胡毅: "《配电线路带电作业技术》", 31 January 2002, 中国电力出版社 *
袁利红等: "《输电线路标准化作业操作导则》", 30 April 2007, 中国电力出版社 *
黄礼平等: "《高压带电检修技术问答》", 31 December 2004, 中国电力出版社 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103500966A (en) * 2013-06-20 2014-01-08 国家电网公司 Electrified power disconnecting method for leading wire from 66kv disconnecting switch to pipe busbar
CN103500966B (en) * 2013-06-20 2016-08-17 国家电网公司 66kv disconnecting switch is to pipe bus charged disconnecting lead-in wire method
CN103618249A (en) * 2013-11-27 2014-03-05 国家电网公司 technology for electrified overhaul of +-500kV double-circuit direct-current power transmission lines on same tower
WO2015078195A1 (en) * 2013-11-27 2015-06-04 国家电网公司 Live overhaul process for ± 500 kv double-loop dc power transmission line on same tower
CN103618249B (en) * 2013-11-27 2017-03-15 国家电网公司 ± 500kV common-tower double-return DC power transmission line hotline maintenance techniques
CN105207123A (en) * 2015-10-13 2015-12-30 国网辽宁省电力有限公司丹东供电公司 Equipotential operation method of tubular bus
CN106887808A (en) * 2017-04-10 2017-06-23 国网辽宁省电力有限公司辽阳供电公司 A kind of insulation docking machine for the powered drainage in both sides of furthering
CN109212361A (en) * 2018-10-24 2019-01-15 云南电网有限责任公司电力科学研究院 A kind of power transmission line phase fault test method and system
CN109921335A (en) * 2019-03-25 2019-06-21 云南电网有限责任公司昆明供电局 Pylon route uses extinguishing arc rope ground potential breaking and connecting drainage thread working system
CN110120643A (en) * 2019-04-19 2019-08-13 国网浙江淳安县供电有限公司 A kind of ground potential distribution power circuit uninterrupted operation method
CN110120643B (en) * 2019-04-19 2020-10-27 国网浙江淳安县供电有限公司 Uninterrupted power operation method for power line of ground potential distribution network
CN113612160A (en) * 2021-09-10 2021-11-05 亿嘉和科技股份有限公司 Winch working tool for bypass cable lap joint and operation method thereof
CN113964718A (en) * 2021-11-22 2022-01-21 国网辽宁省电力有限公司鞍山供电公司 Method for processing heating fault of conducting wire in electrified mode
CN114825167A (en) * 2022-04-22 2022-07-29 贵州西电电力股份有限公司黔北发电厂 Optimization method for diversion wire reconnection
CN114825167B (en) * 2022-04-22 2023-09-05 贵州西电电力股份有限公司黔北发电厂 Optimization method for drainage wire reconnection

Similar Documents

Publication Publication Date Title
CN102842867A (en) Method for electrically disconnecting or connecting disconnector with drainage wire between buses
CN110071406B (en) Distribution network electrified automatic wiring tool set and robot
CN103532047B (en) A kind of operational method and device changing fuse switch on 10kV post
CN102664358B (en) Live replacement method for static contact of 220 kV flexible busbar
CN103001142A (en) Operation method for on-load replacing of 10kV pole-mounted disconnector
CN102931609A (en) Operation method for replacing 10kV drop-out fuse in on-load manner
CN104898018A (en) Automatic pull trial detection and control device for single-phase earth fault of power distribution network
CN202712801U (en) Power transmission device capable of solving loss of overhead ground wire and melting ice
CN203645325U (en) Double-circuit power supply intelligent communication controller
CN207338666U (en) A kind of cable elbow-shaped head ground wire
CN204927967U (en) Bypass operation drainage line fixing device
CN202034330U (en) Bypass fuse
CN205039128U (en) Take high -tension drop type fuse of ground connection link
CN201717670U (en) Dual-power-supply switching device with overvoltage protection
CN205282901U (en) Box high tension switchgear
CN203850693U (en) Five-fault preventing interlocked control circuit for maintaining grounded vehicle
CN210404354U (en) 35kV bypass bus device of oil field transformer substation
CN204012388U (en) Busbar grounding cart device
CN203588874U (en) Apparatus used for preventing line grounding and switch misoperation
CN208027965U (en) A kind of 10kV circuit breakings power-off protection apparatus
CN207624939U (en) Temporary grounding link of 35kV or less the portables with warning function
CN203026397U (en) Grounding hook
CN203398351U (en) Live part verification prompting device for hitched ground wire
CN204680989U (en) A kind of damping flying car for overhauling overhead ground wire
CN205194876U (en) Test electricity and touch ring

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121226