CN105207123A - Equipotential operation method of tubular bus - Google Patents

Equipotential operation method of tubular bus Download PDF

Info

Publication number
CN105207123A
CN105207123A CN201510668664.XA CN201510668664A CN105207123A CN 105207123 A CN105207123 A CN 105207123A CN 201510668664 A CN201510668664 A CN 201510668664A CN 105207123 A CN105207123 A CN 105207123A
Authority
CN
China
Prior art keywords
electrician
equipotential
arc
rope
ground potential
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510668664.XA
Other languages
Chinese (zh)
Inventor
刘明慧
李晨明
叶丽军
胡玉涛
李林
张孝强
王昌春
回嵩杉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510668664.XA priority Critical patent/CN105207123A/en
Publication of CN105207123A publication Critical patent/CN105207123A/en
Pending legal-status Critical Current

Links

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

本发明涉及一种管状母线等电位作业的方法,其包括以下步骤:步骤1、地电位电工将消弧滑车安装在管状母线上;步骤2、等电位电工沿绝缘梯进入电场;步骤3、等电位电工将消弧绳一端系在引流板下方;地电位电工配合控制消弧绳;步骤4、电位电工卸下引流板上的螺栓;步骤5、等电位电工在地面控制引流线摆动,地电位电工将引流线断开;步骤6、地电位电工将断开引流线固定后,拆除安装在管状母线上的消弧滑车及消弧绳,此相断引工作结束;步骤7、从复上面步骤1至步骤6作业项目完成三相断引工作任务。本发明通过使用绝缘梯进入电场,来开展等电位带电作业,此方法简便灵活,可大大减轻作业人员的劳动强度,推进变电带电作业的普遍开展。

The invention relates to a method for equipotential operation of a tubular busbar, which comprises the following steps: step 1, the ground potential electrician installs the arc suppression block on the tubular busbar; step 2, the equipotential electrician enters the electric field along the insulating ladder; step 3, etc. The potential electrician tie one end of the arc suppression rope under the drain plate; the ground potential electrician cooperates to control the arc suppression rope; step 4, the potential electrician removes the bolts on the drain plate; step 5, the equipotential electrician controls the swing of the drain line on the ground, and the ground potential electrician The electrician disconnects the drain wire; step 6, after the ground potential electrician fixes the disconnected drain wire, remove the arc suppression block and arc suppression rope installed on the tubular busbar, and the work of disconnection of this phase is completed; step 7, repeat the above steps From 1 to step 6, the task of three-phase disconnection is completed. The invention uses an insulating ladder to enter the electric field to carry out equipotential live work. This method is simple and flexible, can greatly reduce the labor intensity of operators, and promotes the general development of electric substation work.

Description

一种管状母线等电位作业的方法A method for equipotential operation of tubular bus

技术领域 technical field

本发明涉及变电检修作业领域,具体涉及一种针对管状母线等电位作业的方法。 The invention relates to the field of substation maintenance operations, in particular to a method for equipotential operation of tubular busbars.

技术背景 technical background

在电力系统中,线路及配网领域的带电作业技术已十分成熟,变电站内带电作业的安全性、稳定性也受到越来越多的关注。随着系统对供电可靠性的要求不断提高,管状母线逐步替代原有的导线母线。由于支持管状母线的瓷柱绝缘子无法承受过量的纵向载荷,原有悬挂绝缘软梯进行带电作业的方式无法在管状母线上开展,这就给变电站内带电作业带来了新的问题。 In the power system, the technology of live work in the field of line and distribution network has been very mature, and the safety and stability of live work in substations have also received more and more attention. With the continuous improvement of the system's requirements for power supply reliability, the tubular busbar gradually replaces the original wire busbar. Since the porcelain post insulators supporting the tubular busbar cannot withstand excessive longitudinal loads, the original method of hanging insulating ladders for live work cannot be carried out on the tubular busbar, which brings new problems to live work in substations.

发明内容 Contents of the invention

针对现有技术中存在的不足,本发明根据管母的自身无法使用悬挂绝缘软梯等常规带电作业的特点,来提出了一种管状母线等电位作业的方法。本方法通过使用绝缘梯进入电场,来开展等电位带电作业,此方法简便灵活,可大大减轻作业人员的劳动强度,增强作业的安全性和舒适性,推进变电带电作业的普遍开展。 Aiming at the deficiencies in the prior art, the present invention proposes a method for equipotential operation of tubular busbars based on the fact that the tube mother itself cannot be used for conventional live work such as hanging insulating ladders. This method uses an insulating ladder to enter the electric field to carry out equipotential live work. This method is simple and flexible, can greatly reduce the labor intensity of operators, enhance the safety and comfort of work, and promote the widespread development of live work in substations.

本发明的目的是通过以下技术方案来实现的: The purpose of the present invention is achieved through the following technical solutions:

一种管状母线等电位作业的方法,其包括以下步骤: A method for equipotential operation of a tubular busbar, comprising the following steps:

步骤1、地电位电工将绝缘梯搭好,并挂好保护绳,地电位电工再利用绝缘杆将消弧滑车安装在管状母线上; Step 1. The ground potential electrician builds the insulating ladder and hangs the protective rope, and the ground potential electrician installs the arc suppression block on the tubular busbar with the insulating rod;

步骤2、等电位电工穿好屏蔽服、导电鞋后,将消弧绳放入工具袋后背在身上,沿绝缘梯进入电场; Step 2. After the equipotential electrician puts on the shielding suit and conductive shoes, put the arc suppression rope into the tool bag and put it on his back, and enter the electric field along the insulation ladder;

步骤3、等电位电工将消弧绳放入消弧滑车中,将消弧绳一端系在需要断开的引流线的引流板下方;再由地电位电工配合控制消弧绳,使消弧绳的两端具有张力; Step 3. The equipotential electrician puts the arc-suppression rope into the arc-suppression tackle, and ties one end of the arc-suppression rope under the drain plate of the drainage line to be disconnected; Both ends have tension;

步骤4、等电位电工卸下引流板上的螺栓后,沿绝缘梯退出电场回到地面; Step 4. After the equipotential electrician removes the bolts on the drain plate, exit the electric field along the insulation ladder and return to the ground;

步骤5、等电位电工在地面上使用绝缘杆控制引流线摆动,在工作负责人的指挥下,地电位电工一拉一松通过消弧绳将引流线断开; Step 5. The equipotential electrician uses an insulating rod on the ground to control the swing of the drain wire. Under the command of the person in charge, the ground potential electrician pulls and loosens the drain wire through the arc suppression rope;

步骤6、地电位电工将断开引流线固定后,使用绝缘杆拆除安装在管状母线上的消弧滑车及消弧绳,收好绝缘梯,此相断引工作结束; Step 6. After the ground potential electrician fixes the disconnected drain wire, use the insulating rod to remove the arc suppressing block and arc suppressing rope installed on the tubular busbar, put away the insulating ladder, and the disconnection of this phase is completed;

步骤7、从复上面步骤1至步骤6作业项目完成断开其余两相引流线作业任务; Step 7. Complete the task of disconnecting the remaining two-phase drainage lines from step 1 to step 6 above;

步骤8、完成三相断引工作任务后,整理现场,按流程结束工作。 Step 8. After completing the task of disconnecting the three-phase leads, tidy up the site and end the work according to the process.

所述的管状母线为镁铝合金管状母线。 The tubular busbar is a magnesium-aluminum alloy tubular busbar.

所述的一种管状母线等电位作业的方法适用于:66kV电压的变电站内,等级型号为6063-150/136型的镁铝合金管状母线的等电位作业。 The method for equipotential operation of a tubular busbar is suitable for equipotential operation of magnesium-aluminum alloy tubular busbars with a grade model of 6063-150/136 in a 66kV substation.

与现有技术相比,本发明的有益效果。 Compared with the prior art, the present invention has beneficial effects.

(1)在无法悬挂绝缘软梯的情况下,针对管状母线开展等电位带电作业。 (1) When the insulating ladder cannot be suspended, carry out equipotential live work on the tubular busbar.

(2)带电作业保障电力供应,节约能源,提高效益的作用。 (2) Live work guarantees power supply, saves energy, and improves efficiency.

(3)方便省力、作业人员需要较少,便于指挥和监护,提高了作业人员安全系数。 (3) It is convenient and labor-saving, requires fewer operators, is convenient for command and monitoring, and improves the safety factor of operators.

附图说明 Description of drawings

图1是本发明实例性实施例的一种管状母线等电位作业的方法的现场作业示意图; Fig. 1 is a schematic diagram of on-site operation of a method for equipotential operation of a tubular busbar according to an exemplary embodiment of the present invention;

1-管状母线,2-引流线,3-等电位电工,4-地电位电工,5-绝缘梯,6-消弧滑车,7消弧绳。 1-tubular busbar, 2-drainage wire, 3-equal potential electrician, 4-ground potential electrician, 5-insulation ladder, 6-arc suppression block, 7 arc suppression rope.

具体实施方式 Detailed ways

下面结合附图和具体实施方式对本发明的内容做进一步详细说明。 The content of the present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.

实施例 Example

一种管状母线等电位作业的方法,其包括以下步骤: A method for equipotential operation of a tubular busbar, comprising the following steps:

步骤1、地电位电工4将绝缘梯5搭好,并挂好保护绳,地电位电工4再利用绝缘杆将消弧滑车6安装在镁铝合金管状母线1上; Step 1. The ground potential electrician 4 sets up the insulating ladder 5 and hangs the protective rope. The ground potential electrician 4 installs the arc suppression block 6 on the magnesium-aluminum alloy tubular busbar 1 by using the insulating rod;

步骤2、等电位电工3穿好屏蔽服、导电鞋后,将消弧绳7放入工具袋后背在身上,沿绝缘梯5进入电场; Step 2. After the equipotential electrician 3 puts on the shielding suit and conductive shoes, put the arc suppression rope 7 into the tool bag and put it on his back, and enter the electric field along the insulation ladder 5;

步骤3、等电位电工3将消弧绳7放入消弧滑车6中,将消弧绳7一端系在需要断开的引流线2的引流板下方;再由地电位电工4配合控制消弧绳7,使消弧绳7的两端具有张力; Step 3. The equipotential electrician 3 puts the arc-suppression rope 7 into the arc-suppression tackle 6, and tie one end of the arc-suppression rope 7 under the drain plate of the drainage line 2 that needs to be disconnected; then the ground potential electrician 4 cooperates to control the arc-suppression Rope 7, so that the two ends of the arc suppression rope 7 have tension;

步骤4、等电位电工3卸下引流板上的螺栓后,沿绝缘梯5退出电场回到地面; Step 4. After the equipotential electrician 3 removes the bolts on the drain plate, exit the electric field along the insulation ladder 5 and return to the ground;

步骤5、等电位电工3在地面上使用绝缘杆控制引流线2摆动,在工作负责人的指挥下,地电位电工4一拉一松通过消弧绳7将引流线断开; Step 5. The equipotential electrician 3 uses an insulating rod on the ground to control the swing of the drain wire 2. Under the command of the person in charge, the ground potential electrician 4 pulls and loosens the arc suppression rope 7 to disconnect the drain wire;

步骤6、地电位电工4将断开引流线2固定后,使用绝缘杆拆除安装在镁铝合金管状母线1上的消弧滑车6及消弧绳7,收好绝缘梯5,此相断引工作结束; Step 6. After the ground potential electrician 4 fixes the disconnected drain wire 2, use an insulating rod to remove the arc suppression block 6 and arc suppression rope 7 installed on the magnesium-aluminum alloy tubular busbar 1, and put away the insulation ladder 5. End of work;

步骤7、从复上面步骤1至步骤6作业项目完成断开其余两相引流线7作业任务; Step 7. Complete the task of disconnecting the remaining two-phase drainage lines 7 from the above steps 1 to 6;

步骤8、完成三相断引工作任务后,整理现场,按流程结束工作。 Step 8. After completing the task of disconnecting the three-phase leads, tidy up the site and end the work according to the process.

所述的一种管状母线等电位作业的方法适用于:66kV电压的变电站内,等级型号为6063-150/136型的镁铝合金管状母线的等电位作业。 The method for equipotential operation of a tubular busbar is suitable for equipotential operation of magnesium-aluminum alloy tubular busbars with a grade model of 6063-150/136 in a 66kV substation.

以上所述仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。本实施例未述部分与现有技术相同。 The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection of the present invention. within range. The parts not described in this embodiment are the same as the prior art.

Claims (3)

1.一种管状母线等电位作业的方法,其特征在于:包括以下步骤: 1. A method for equipotential operation of tubular busbar, characterized in that: comprise the following steps: 步骤1、地电位电工将绝缘梯搭好,并挂好保护绳,地电位电工再利用绝缘杆将消弧滑车安装在管状母线上; Step 1. The ground potential electrician builds the insulating ladder and hangs the protective rope, and the ground potential electrician installs the arc suppression block on the tubular busbar with the insulating rod; 步骤2、等电位电工穿好屏蔽服、导电鞋后,将消弧绳放入工具袋后背在身上,沿绝缘梯进入电场; Step 2. After the equipotential electrician puts on the shielding suit and conductive shoes, put the arc suppression rope into the tool bag and put it on his back, and enter the electric field along the insulation ladder; 步骤3、等电位电工将消弧绳放入消弧滑车中,将消弧绳一端系在需要断开的引流线的引流板下方;再由地电位电工配合控制消弧绳,使消弧绳的两端具有张力; Step 3. The equipotential electrician puts the arc-suppression rope into the arc-suppression tackle, and ties one end of the arc-suppression rope under the drain plate of the drainage line to be disconnected; Both ends have tension; 步骤4、等电位电工卸下引流板上的螺栓后,沿绝缘梯退出电场回到地面; Step 4. After the equipotential electrician removes the bolts on the drain plate, exit the electric field along the insulation ladder and return to the ground; 步骤5、等电位电工在地面上使用绝缘杆控制引流线摆动,在工作负责人的指挥下,地电位电工一拉一松通过消弧绳将引流线断开; Step 5. The equipotential electrician uses an insulating rod on the ground to control the swing of the drain wire. Under the command of the person in charge, the ground potential electrician pulls and loosens the drain wire through the arc suppression rope; 步骤6、地电位电工将断开引流线固定后,使用绝缘杆拆除安装在管状母线上的消弧滑车及消弧绳,收好绝缘梯,此相断引工作结束; Step 6. After the ground potential electrician fixes the disconnected drain wire, use the insulating rod to remove the arc suppressing block and arc suppressing rope installed on the tubular busbar, put away the insulating ladder, and the disconnection of this phase is completed; 步骤7、从复上面步骤1至步骤6作业项目完成断开其余两相引流线作业任务; Step 7. Complete the task of disconnecting the remaining two-phase drainage lines from step 1 to step 6 above; 步骤8、完成三相断引工作任务后,整理现场,按流程结束工作。 Step 8. After completing the task of disconnecting the three-phase leads, tidy up the site and end the work according to the process. 2.根据权利要求1所述的一种管状母线等电位作业的方法,其特征在于:所述的管状母线为镁铝合金管状母线。 2. A method for equipotential operation of tubular busbars according to claim 1, characterized in that: said tubular busbars are magnesium-aluminum alloy tubular busbars. 3.根据权利1所述的一种管状母线等电位作业的方法,其特征在于:所述一种管状母线等电位作业的方法适用于:66kV电压的变电站内,等级型号为6063-150/136型的镁铝合金管状母线的等电位作业。 3. A method for equipotential operation of tubular busbars according to claim 1, characterized in that: the method for equipotential operation of tubular busbars is suitable for: 66kV voltage substations, the grade model is 6063-150/136 The equipotential operation of the magnesium-aluminum alloy tubular busbar.
CN201510668664.XA 2015-10-13 2015-10-13 Equipotential operation method of tubular bus Pending CN105207123A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510668664.XA CN105207123A (en) 2015-10-13 2015-10-13 Equipotential operation method of tubular bus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510668664.XA CN105207123A (en) 2015-10-13 2015-10-13 Equipotential operation method of tubular bus

Publications (1)

Publication Number Publication Date
CN105207123A true CN105207123A (en) 2015-12-30

Family

ID=54954636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510668664.XA Pending CN105207123A (en) 2015-10-13 2015-10-13 Equipotential operation method of tubular bus

Country Status (1)

Country Link
CN (1) CN105207123A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105870844A (en) * 2016-04-01 2016-08-17 云南电网有限责任公司临沧供电局 Arc extinction apparatus used for drainage wire electrified disconnection-connection operation of 35kV substation equipment and use method
CN106410674A (en) * 2016-11-13 2017-02-15 国网湖北省电力公司咸宁供电公司 Hot-line work method for 10-kV distribution line and equipment
CN107104397A (en) * 2017-05-26 2017-08-29 华北电力科学研究院有限责任公司 The method of bus isolating switch disconnecting lead
CN109406930A (en) * 2018-10-24 2019-03-01 云南电网有限责任公司电力科学研究院 A kind of method that U-shaped short-circuit test device is installed in livewire work
CN112909822A (en) * 2021-03-10 2021-06-04 国网河南省电力公司社旗县供电公司 Unmanned aerial vehicle-assisted uninterrupted power supply operation system and method for power distribution network
CN114614397A (en) * 2022-04-25 2022-06-10 国网山东省电力公司烟台供电公司 Live working robot capable of eliminating heating defect of overhead transmission line drainage plate through intermediate potential and operation method of live working robot

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102185266A (en) * 2011-05-13 2011-09-14 辽宁省电力有限公司辽阳供电公司 Charged disconnecting and connecting method for large-section conducting wire of 66kV power transmission line
CN102185267A (en) * 2011-05-13 2011-09-14 辽宁省电力有限公司辽阳供电公司 66KV ground potential hot-line make-and-break bypassing method
CN102664358A (en) * 2012-04-23 2012-09-12 辽宁省电力有限公司鞍山供电公司 Live replacement method for static contact of 220 kV flexible busbar
CN202611568U (en) * 2012-04-23 2012-12-19 辽宁省电力有限公司鞍山供电公司 Insulation trestle ladder
CN102842867A (en) * 2012-08-31 2012-12-26 辽宁省电力有限公司鞍山供电公司 Method for electrically disconnecting or connecting disconnector with drainage wire between buses
CN102916357A (en) * 2012-10-16 2013-02-06 中国电力科学研究院 Determination method for guaranteeing hot line work safety by additionally arranging insulation board at interphase of busbars of transformer substation
CN202759171U (en) * 2012-04-28 2013-02-27 辽宁省电力有限公司锦州供电公司 Tubular bus disconnected lead insulated operation platform
CN103500966A (en) * 2013-06-20 2014-01-08 国家电网公司 Electrified power disconnecting method for leading wire from 66kv disconnecting switch to pipe busbar
CN104051979A (en) * 2014-06-06 2014-09-17 国家电网公司 Insulation device and method for articulated 66kV tubular busbar live disconnection lead

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102185266A (en) * 2011-05-13 2011-09-14 辽宁省电力有限公司辽阳供电公司 Charged disconnecting and connecting method for large-section conducting wire of 66kV power transmission line
CN102185267A (en) * 2011-05-13 2011-09-14 辽宁省电力有限公司辽阳供电公司 66KV ground potential hot-line make-and-break bypassing method
CN102664358A (en) * 2012-04-23 2012-09-12 辽宁省电力有限公司鞍山供电公司 Live replacement method for static contact of 220 kV flexible busbar
CN202611568U (en) * 2012-04-23 2012-12-19 辽宁省电力有限公司鞍山供电公司 Insulation trestle ladder
CN202759171U (en) * 2012-04-28 2013-02-27 辽宁省电力有限公司锦州供电公司 Tubular bus disconnected lead insulated operation platform
CN102842867A (en) * 2012-08-31 2012-12-26 辽宁省电力有限公司鞍山供电公司 Method for electrically disconnecting or connecting disconnector with drainage wire between buses
CN102916357A (en) * 2012-10-16 2013-02-06 中国电力科学研究院 Determination method for guaranteeing hot line work safety by additionally arranging insulation board at interphase of busbars of transformer substation
CN103500966A (en) * 2013-06-20 2014-01-08 国家电网公司 Electrified power disconnecting method for leading wire from 66kv disconnecting switch to pipe busbar
CN104051979A (en) * 2014-06-06 2014-09-17 国家电网公司 Insulation device and method for articulated 66kV tubular busbar live disconnection lead

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105870844A (en) * 2016-04-01 2016-08-17 云南电网有限责任公司临沧供电局 Arc extinction apparatus used for drainage wire electrified disconnection-connection operation of 35kV substation equipment and use method
CN105870844B (en) * 2016-04-01 2018-09-28 云南电网有限责任公司临沧供电局 The operational method of the arc-extinction device of disconnecting operation is charged for 35kV substation equipment drainage threads
CN106410674A (en) * 2016-11-13 2017-02-15 国网湖北省电力公司咸宁供电公司 Hot-line work method for 10-kV distribution line and equipment
CN107104397A (en) * 2017-05-26 2017-08-29 华北电力科学研究院有限责任公司 The method of bus isolating switch disconnecting lead
CN107104397B (en) * 2017-05-26 2018-11-20 华北电力科学研究院有限责任公司 The method of bus isolating switch disconnecting lead
CN109406930A (en) * 2018-10-24 2019-03-01 云南电网有限责任公司电力科学研究院 A kind of method that U-shaped short-circuit test device is installed in livewire work
CN112909822A (en) * 2021-03-10 2021-06-04 国网河南省电力公司社旗县供电公司 Unmanned aerial vehicle-assisted uninterrupted power supply operation system and method for power distribution network
CN112909822B (en) * 2021-03-10 2022-08-30 国网河南省电力公司社旗县供电公司 Unmanned aerial vehicle-assisted uninterrupted power supply operation system and method for power distribution network
CN114614397A (en) * 2022-04-25 2022-06-10 国网山东省电力公司烟台供电公司 Live working robot capable of eliminating heating defect of overhead transmission line drainage plate through intermediate potential and operation method of live working robot

Similar Documents

Publication Publication Date Title
CN105207123A (en) Equipotential operation method of tubular bus
CN104701770B (en) An insulating support for fixing drain wires
CN203734209U (en) Live working device for cable bypass
CN102185266B (en) Charged disconnecting and connecting method for large-section conducting wire of 66kV power transmission line
CN103532047B (en) A kind of operational method and device changing fuse switch on 10kV post
CN208078525U (en) Three-phase conducting wire for distribution network live line work upright bar struts insulating frame
CN101728787A (en) Equipotential access method of 500kV same-tower four-circuit transmission line tangent tower live-wire work
CN103001142A (en) Operation method for on-load replacing of 10kV pole-mounted disconnector
CN106207885B (en) The short circuit fixture and method of charged for replacement 220kV pipe bus telescoping wire clamps
CN103500966B (en) 66kv disconnecting switch is to pipe bus charged disconnecting lead-in wire method
CN104538889A (en) Live-line replacing method of straight pole insulator of distribution network line
CN203151004U (en) Temporary supporting insulator for 10kV distribution live working lead
CN104880620A (en) Test platform of super-high voltage bundled sub-conductor ice-melting
CN210866095U (en) A special shunt device for replacing drop fuse with load
CN104538888B (en) A kind of distribution line straight line pole cross-arm charged for replacement method
CN205985993U (en) Change short circuit fixture that 220kV pipe generating line line stretcher pressed from both sides with electricity
CN204571441U (en) Special superhigh voltage DC is with tower mixed pressure steel tower tower head
CN209562011U (en) Vertical arrangement of 10kV overhead lines with load to replace switchgear on pole
CN204651846U (en) Tower platform stepped on by wind power plant's cable
CN204497627U (en) A kind of insulating support for fixing drainage thread
CN203039273U (en) Transformer station tubular busbar double-clamp grounding device
CN205565709U (en) Intelligence remote control prevents built on stilts insulation protection device
CN204011797U (en) A kind of earthing wire clip
CN104332929A (en) Single-ground wire ice melting method
CN204741223U (en) A pole-mounted switch bird's nest removal device based on insulating rods

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151230