CN102664358B - Live replacement method for static contact of 220 kV flexible busbar - Google Patents
Live replacement method for static contact of 220 kV flexible busbar Download PDFInfo
- Publication number
- CN102664358B CN102664358B CN201210120939.2A CN201210120939A CN102664358B CN 102664358 B CN102664358 B CN 102664358B CN 201210120939 A CN201210120939 A CN 201210120939A CN 102664358 B CN102664358 B CN 102664358B
- Authority
- CN
- China
- Prior art keywords
- ladder
- rope
- ground
- electrician
- insulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ladders (AREA)
Abstract
本发明涉及电网220kV变电站内软母线GW6系列交流高压隔离开关领域,特别涉及一种带电更换220kV软母线静触头的方法,其特征在于,作业人员沿绝缘人字梯升至软母线下,采用等电位法转移电位,带电更换软母线静触头,包括拆卸步骤和安装步骤。与现有技术相比,本发明的有益效果是:1)经绝缘人字梯作为绝缘载人平台,满足等电位操作法的要求,体积小,可在软母线下升降,适用于220kV软母线GW6系列单柱、双柱垂直开启式隔离开关静触头的带电更换作业。2)促进了科学技术进步,具有显著的社会效益和经济效益。3)填补了隔离开关静触头带电更换项目的空白,在国家电网系统内具有广泛的应用前景和推广价值。
The invention relates to the field of GW6 series AC high-voltage isolating switches for soft busbars in 220kV substations of power grids, and in particular to a method for replacing static contacts of 220kV soft busbars with electricity. The equipotential method transfers the potential, and replaces the static contact of the flexible busbar with electricity, including the steps of disassembly and installation. Compared with the prior art, the beneficial effects of the present invention are: 1) The insulated ladder is used as an insulated manned platform, which meets the requirements of the equipotential operation method, is small in size, can be lifted and lowered under the soft bus, and is suitable for 220kV soft bus Live replacement of static contacts of GW6 series single-column and double-column vertical opening type disconnectors. 2) It promotes the progress of science and technology and has remarkable social and economic benefits. 3) It fills the blank of the live replacement project of the static contact of the isolating switch, and has broad application prospects and promotion value in the national grid system.
Description
技术领域 technical field
本发明涉及电网220kV变电站内软母线GW6系列交流高压隔离开关领域,特别涉及一种带电更换220kV软母线静触头的方法。The invention relates to the field of GW6 series AC high-voltage isolating switches for flexible buses in 220kV substations of a power grid, in particular to a method for replacing static contacts of 220kV flexible buses with electricity.
背景技术 Background technique
GW6系列单柱、双柱垂直开启式隔离开关一般安装在220kV变电站的架空软母线下,有检修与分段隔离、根据需要换接线路、分合空载线路、自动快速隔离等用途,具有电气隔离断口,分合状态清晰,有利于巡视的优点,除节省占地面积外,还可减少引接导线,减少电站投资,因此,在国内220kV变电站中比较常见。GW6 series single-column and double-column vertical opening type disconnectors are generally installed under the overhead soft busbars of 220kV substations. They are used for maintenance and section isolation, switching lines according to needs, splitting and closing no-load lines, and automatic fast isolation. Isolation of the fracture, clear separation and closing state, and the advantages of inspection. In addition to saving the floor area, it can also reduce the lead wires and reduce the investment of the power station. Therefore, it is more common in domestic 220kV substations.
正常运行的变电站有双母线和单母线两种接线方式,由于接线方式不同,当隔离开关的动触头或软母线上的静触头发生缺陷或隐患时,处理的方法是不一样的。Substations in normal operation have two wiring methods: double busbar and single busbar. Due to the different wiring methods, when the moving contact of the disconnector or the static contact on the soft busbar has defects or hidden dangers, the handling methods are different.
双母线接线时,变电站运行人员只能采取倒母线的方式,将电力负荷倒换到另一条母线上或者用旁路代送,由于需要做几十至上百项操作,程序复杂,容易出现误操作事故,增加运行人员安全风险几率。When connecting double busbars, the operator of the substation can only take the method of inverting the busbars, switching the power load to another busbar or sending it by bypass. Since dozens to hundreds of operations need to be done, the procedures are complicated and misoperation accidents are prone to occur , increasing the probability of operating personnel safety risks.
而单母线接线方式时,变电站运行人员只能采取用旁路代送。由于该回路间隔的开关动触头距软母线静触头净空距离只有2.56米,吊车距软母线安全距离低于电力安全规程标准,吊车无法吊装操作,检修人员无法检修作业,该变电站220kV单母线只能全部停电,才能检修或更换,影响系统安全供电可靠率。In the case of single-bus connection, substation operators can only use the bypass to deliver. Since the distance between the moving contact of the switch and the static contact of the soft bus is only 2.56 meters, the safety distance between the crane and the soft bus is lower than the standard of electric safety regulations, the crane cannot be hoisted, and the maintenance personnel cannot perform maintenance work. The 220kV single bus of the substation Repair or replacement can only be done if all the power is cut off, which affects the reliability of the system's safe power supply.
发明内容 Contents of the invention
本发明的目的是提供一种带电更换220kV软母线静触头的方法,克服现有技术的不足,使用专用的绝缘人字梯,采用等电位法和地电工配合操作,在架空软母线上带电拆除与安装静触头,消除缺陷或隐患,减少停电及运行人员倒闸操作次数,保证电网供电可靠性,保障电气设备安全运行。The purpose of the present invention is to provide a method for replacing the static contacts of 220kV soft busbar with electricity, which overcomes the deficiencies of the prior art, uses a special insulating ladder, adopts the equipotential method and cooperates with the ground electrician, and electrifies the overhead soft busbar Remove and install static contacts, eliminate defects or hidden dangers, reduce power outages and switching operations by operating personnel, ensure the reliability of power grid power supply, and ensure the safe operation of electrical equipment.
为解决上述技术问题,本发明的技术方案是:In order to solve the problems of the technologies described above, the technical solution of the present invention is:
带电更换220kV软母线静触头的方法,其特征在于,作业人员沿绝缘人字梯升至软母线下,采用等电位法转移电位,带电更换软母线静触头,包括拆卸步骤和安装步骤,具体操作步骤如下:The method for replacing the static contact of the 220kV soft busbar with electricity is characterized in that the operator ascends to the bottom of the soft busbar along the insulating ladder, uses the equipotential method to transfer the potential, and replaces the static contact of the soft busbar with electricity, including disassembly steps and installation steps, The specific operation steps are as follows:
一、拆卸步骤:1. Disassembly steps:
1)绝缘人字梯提升前准备:先在绝缘人字梯顶部吊挂一个闭锁式滑车,在闭锁式滑车上穿一条绝缘保护绳;在梯头两端各分别设置绝缘控制绳两条;在两侧梯身之间由上至下设置开距控制绳三条,预留合适长度,开距控制绳的一端与一侧梯身系活结,开距控制绳的另一端与另一侧梯身系紧;两侧梯体分别设置防梯身塌腰的绝缘牵引绳各两条;在一侧梯身的梯脚上设置梯脚固定器,将梯脚固定器钉于地下;1) Preparations before lifting the insulated ladder: first hang a closed tackle on the top of the insulated ladder, and thread an insulating protective rope on the locked tackle; set two insulating control ropes at both ends of the ladder head; Three open-distance control ropes are arranged from top to bottom between the two sides of the ladder, and an appropriate length is reserved. One end of the open-distance control rope is tied to one side of the ladder body, and the other end of the open-distance control rope is tied to the other side of the ladder body. The ladder bodies on both sides are respectively provided with two insulated traction ropes to prevent the waist of the ladder body from collapsing; a ladder foot holder is installed on the ladder foot of one side of the ladder body, and the ladder foot holder is nailed to the ground;
2)绝缘人字梯提升:在工作负责人的指挥和专责监护人的监护下,将梯身一侧地面电工分两组,每组各牵引一根绝缘牵引绳,梯身另一侧一名地面电工牵拉绝缘保护绳,防止提升过度发生倒梯;两名地面电工用脚踏住梯脚固定器,并双手配合提升,直到绝缘人字梯呈人字形直立于地面上;2) Hoisting of the insulating ladder: Under the command of the person in charge and the supervision of the responsible guardian, divide the ground electricians on one side of the ladder body into two groups, each group pulls an insulating traction rope, and a ground electrician on the other side of the ladder body The electrician pulls the insulating protective rope to prevent the ladder from falling due to excessive lifting; two ground electricians step on the ladder foot holder with their feet, and lift with both hands until the insulating herringbone ladder stands upright on the ground in a herringbone shape;
3)将绝缘人字梯就位:在四名地面电工分别拉住绝缘控制绳的条件下,脱掉梯脚固定器;地面电工分两组把绝缘人字梯平稳移送至第一个作业点(同档运行回路侧),梯头比软母线高出1.6-0.8m,软母线距离梯身100-150mm;3) Put the insulating ladder in place: Under the condition that four ground electricians hold the insulating control rope respectively, take off the ladder foot holder; the ground electricians are divided into two groups to move the insulating ladder to the first operation point smoothly (On the side of the running circuit at the same gear), the ladder head is 1.6-0.8m higher than the soft busbar, and the soft busbar is 100-150mm away from the ladder body;
4)固定绝缘人字梯:将梯头两端的绝缘控制绳分别沿梯头的两侧延长线方向拉紧固定,其中一侧至少在一根绝缘控制绳上用紧线器,使绳子张紧力不少于1KN;4) Fix the insulated herringbone ladder: tighten the insulating control ropes at both ends of the ladder head along the direction of the extension lines on both sides of the ladder head, and use a tensioner on at least one of the insulating control ropes on one side to make the rope tension The force is not less than 1KN;
将梯身两侧的绝缘牵引绳拉紧,分别系在地锚上固定,使两侧梯身略向外侧突起;Tighten the insulated traction ropes on both sides of the ladder body, and tie them to the ground anchors respectively, so that the ladder bodies on both sides protrude slightly outward;
5)登梯前准备:等电位电工身穿全套合格屏蔽服,戴护目镜,由专责监护人检查屏蔽服外观是否良好、各部分连接是否可靠,保护绳扣是否正确,合格后允许登梯;5) Preparations before climbing the ladder: the equipotential electrician wears a full set of qualified shielding clothing and goggles, and the dedicated guardian checks whether the appearance of the shielding clothing is good, whether the connections of each part are reliable, and whether the protective rope buckle is correct. After passing the qualification, he is allowed to climb the ladder;
6)登梯操作:两名地面电工各扶一侧梯身,另两名地面电工牵拉绝缘保护绳,等电位电工沿一侧梯身登梯,攀登过程中保证组合间隙大于2.1m、相间距离大于2.5m,途中依次把三条开距控制绳系牢,直至作业位置,系好安全带,转移电位,进入强电场,人体裸露部分应保持0.3m的安全距离,等电位电工将屏蔽均压线挂在软母线和屏蔽服之间,确保在双手离开带电体的情况下,也始终保持等电位;6) Ladder climbing operation: two ground electricians each support one side of the ladder body, the other two ground electricians pull the insulating protection rope, and the equipotential electrician climbs the ladder along one side of the ladder body. During the climbing process, ensure that the combined gap is greater than 2.1m If the distance is greater than 2.5m, fasten the three distance control ropes one by one until the working position, fasten the safety belt, transfer the potential, and enter the strong electric field. The exposed parts of the human body should keep a safe distance of 0.3m, and the equipotential electrician will shield The line is hung between the soft busbar and the shielding suit to ensure that the equipotential is always maintained when the hands are away from the charged body;
7)固定软母线:等电位电工在一侧梯身上安装两组导线固定臂,使软母线被导线固定臂托起,用铜线把软母线捆扎在导线固定臂上,防止软母线摆动;7) Fix the soft busbar: the equipotential electrician installs two sets of wire fixing arms on one side of the ladder, so that the soft busbar is held up by the wire fixing arm, and the soft busbar is bound on the wire fixing arm with copper wires to prevent the soft busbar from swinging;
8)拆除静触头:将消弧滑车挂在软母线上,消弧绳一头穿过消弧滑车的滑轮绑扎在静触头一侧T形线夹底部,使静触头有不少于100mm的提升空间,消弧绳绳尾由一名地面电工控制;在略高于软母线的梯阶上用无极绳套系一个闭锁滑车,绝缘绳一头穿过闭锁滑车的滑轮绑在静触头另一侧T形线夹底部,绝缘绳绳尾由一名地面电工控制;在静触头上绑扎一条下落控制绝缘绳,下落控制绝缘绳绳尾由另一名地面电工控制;8) Remove the static contact: Hang the arc-suppression tackle on the soft busbar, pass one end of the arc-suppression rope through the pulley of the arc-suppression tackle and tie it to the bottom of the T-shaped clamp on the side of the static contact, so that the static contact has a gap of no less than 100mm The tail of the arc-suppression rope is controlled by a ground electrician; on the step slightly higher than the soft busbar, a locking tackle is tied with a non-polar rope sleeve, and one end of the insulating rope passes through the pulley of the locking tackle and is tied to the static contact. At the bottom of the T-shaped clamp on one side, the tail of the insulating rope is controlled by a ground electrician; a drop control insulating rope is tied on the static contact, and the tail of the falling control insulating rope is controlled by another ground electrician;
等电位电工先卸下静触头T型线夹一侧的螺栓,再卸下另一侧的螺栓,操作过程中,控制消弧绳和绝缘绳绳尾的两名地面电工,配合拉紧绳尾;The equipotential electrician first removes the bolts on one side of the T-shaped clamp of the static contact, and then removes the bolts on the other side. During the operation, the two ground electricians who control the ends of the arc suppression rope and the insulating rope cooperate with the tensioning rope tail;
9)降下静触头:在工作负责人的指挥下,两名地面电工分别控制消弧绳和绝缘绳开始松绳,另一名地面电工控制下落控制绝缘绳角度,使静触头脱离软母线缓慢下落到地面上;9) Lower the static contact: Under the command of the person in charge of the work, two ground electricians control the arc suppression rope and the insulating rope to loosen the rope respectively, and the other ground electrician controls the falling and controls the angle of the insulating rope to make the static contact separate from the soft busbar slowly fall to the ground;
10)操作结束退出:等电位电工拆除缠绕在软母线上的铝包布,将导线固定臂上的固定软母线的铜线打开,经工作负责人允许,等电位电工拆除屏蔽均压线,转移电位,退出等电位状态,人体裸露部分保持0.3m的安全距离,打开安全带,沿梯返回地面;10) Exit at the end of the operation: the equipotential electrician removes the aluminum wrapping cloth wrapped around the soft busbar, opens the copper wire fixed on the soft busbar on the wire fixing arm, and with the permission of the person in charge, the equipotential electrician removes the shielding equalizing line and transfers Potential, exit the equipotential state, keep a safe distance of 0.3m from the exposed parts of the human body, open the seat belt, and return to the ground along the ladder;
11)转移绝缘人字梯:打开所有固定梯身的绳索,使整梯向软母线外侧移动1m以外后,控制梯身上的绳索使绝缘人字梯缓慢倾斜下落,当梯头低于软母线0.5m以上时,两组地面电工将绝缘人字梯从软母线下方移至下个作业点,重复步骤1)到步骤10)带电拆除静触头;11) Transfer the insulating ladder: open all the ropes that fix the ladder body, and move the whole ladder to the outside of the soft busbar for 1m, then control the ropes on the ladder body to make the insulating ladder fall slowly. When the ladder head is lower than the soft busbar 0.5 When it is more than m, two groups of ground electricians move the insulating ladder from the bottom of the soft busbar to the next operation point, and repeat steps 1) to 10) to remove the static contact when it is live;
12)重复拆卸步骤中的步骤1)到步骤11),直至三相软母线上静触头全部拆卸完毕;12) Repeat steps 1) to 11) in the disassembly steps until all the static contacts on the three-phase flexible busbar are disassembled;
二、安装步骤:2. Installation steps:
1)绝缘人字梯提升前准备:先在绝缘人字梯顶部吊挂一个闭锁式滑车,在闭锁式滑车上穿一条绝缘保护绳;在梯头两端各分别设置绝缘控制绳两条;在两侧梯身之间由上至下设置开距控制绳三条,预留合适长度,开距控制绳的一端与一侧梯身系活结,开距控制绳的另一端与另一侧梯身系紧;两侧梯体分别设置防梯身塌腰的绝缘牵引绳各两条;在一侧梯身的梯脚上设置梯脚固定器,将梯脚固定器钉于地下;在距梯头40-80cm处两侧梯身上分别安装横担底座,横担与横担底座活动连接;1) Preparations before lifting the insulated ladder: first hang a closed tackle on the top of the insulated ladder, and thread an insulating protective rope on the locked tackle; set two insulating control ropes at both ends of the ladder head; Three open-distance control ropes are arranged from top to bottom between the two sides of the ladder, and an appropriate length is reserved. One end of the open-distance control rope is tied to one side of the ladder body, and the other end of the open-distance control rope is tied to the other side of the ladder body. Tight; two ladder bodies on both sides are respectively provided with two insulated traction ropes to prevent the waist of the ladder body from collapsing; a ladder foot holder is installed on the ladder foot of one side of the ladder body, and the ladder foot holder is nailed to the ground; The cross-arm bases are respectively installed on both sides of the ladder at -80cm, and the cross-arms are movably connected with the cross-arm bases;
2)绝缘人字梯提升:在工作负责人的指挥和专责监护人的监护下,将梯身一侧地面电工分两组,每组各牵引一根绝缘牵引绳,梯身另一侧一名地面电工牵拉绝缘保护绳,防止提升过度发生倒梯;两名地面电工用脚踏住梯脚固定器,并双手配合提升,至到绝缘人字梯呈人字形直立于地面上;2) Hoisting of the insulating ladder: Under the command of the person in charge and the supervision of the responsible guardian, divide the ground electricians on one side of the ladder body into two groups, each group pulls an insulating traction rope, and a ground electrician on the other side of the ladder body The electrician pulls the insulating protection rope to prevent the ladder from falling due to over-lifting; two ground electricians step on the ladder foot holder with their feet, and lift with both hands until the insulated herringbone ladder stands upright on the ground in a herringbone shape;
3)将绝缘人字梯就位:在四名地面电工分别拉住绝缘控制绳的条件下,脱掉梯脚固定器;地面电工分两组把绝缘人字梯平稳移送至第一个作业点(同档运行回路侧),梯头比软母线高出1.6-0.8m,软母线距离梯身100-150mm;3) Put the insulating ladder in place: Under the condition that four ground electricians hold the insulating control rope respectively, take off the ladder foot holder; the ground electricians are divided into two groups to move the insulating ladder to the first operation point smoothly (On the side of the running circuit at the same gear), the ladder head is 1.6-0.8m higher than the soft busbar, and the soft busbar is 100-150mm away from the ladder body;
4)固定绝缘人字梯:将梯头两端的绝缘控制绳分别沿梯头的两侧延长线方向拉紧固定,其中一侧至少在一根绝缘控制绳上用紧线器,使绳子张紧力不少于1KN;将梯身两侧的绝缘牵引绳拉紧,分别系在地锚上,使两侧梯身略向外侧突起;4) Fix the insulated herringbone ladder: tighten the insulating control ropes at both ends of the ladder head along the direction of the extension lines on both sides of the ladder head, and use a tensioner on at least one of the insulating control ropes on one side to make the rope tension The force is not less than 1KN; tighten the insulated traction ropes on both sides of the ladder body, and tie them to the ground anchors respectively, so that the ladder body on both sides protrudes slightly outward;
5)登梯前准备:等电位电工身穿全套合格屏蔽服,戴护目镜,由专责监护人检查屏蔽服外观是否良好、各部分连接是否可靠,保护绳扣是否正确,合格后允许登梯;5) Preparations before climbing the ladder: the equipotential electrician wears a full set of qualified shielding clothing and goggles, and the dedicated guardian checks whether the appearance of the shielding clothing is good, whether the connections of each part are reliable, and whether the protective rope buckle is correct. After passing the qualification, he is allowed to climb the ladder;
6)登梯操作:两名地面电工各扶一侧梯身,另两名地面电工牵拉绝缘保护绳,等电位电工沿一侧梯身登梯,攀登过程中保证组合间隙大于2.1m、相间距离大于2.5m,途中依次把三条开距控制绳系牢,直至作业位置,系好安全带,转移电位,进入强电场,人体裸露部分应保持0.3m的安全距离,等电位电工将屏蔽均压线挂在软母线和屏蔽服之间,确保在双手离开带电体的情况下,也始终保持等电位;6) Ladder climbing operation: two ground electricians each support one side of the ladder body, the other two ground electricians pull the insulating protection rope, and the equipotential electrician climbs the ladder along one side of the ladder body. During the climbing process, ensure that the combined gap is greater than 2.1m If the distance is greater than 2.5m, fasten the three distance control ropes one by one until the working position, fasten the safety belt, transfer the potential, and enter the strong electric field. The exposed parts of the human body should keep a safe distance of 0.3m, and the equipotential electrician will shield The line is hung between the soft busbar and the shielding suit to ensure that the equipotential is always maintained when the hands are away from the charged body;
7)固定软母线:等电位电工在一侧梯身上安装两组导线固定臂,使软母线被导线固定臂托起,用铜绑线把软母捆扎在导线固定臂上,防止软母线摆动;等电位电工将绝缘小抱杆担在槽担上用绝缘绳捆牢,绝缘小抱杆的尾部用绝缘绳与梯阶捆牢,使绝缘小抱杆端部的固定挂环置于软母线外侧,绝缘小抱杆上的活动挂环位于软母线内侧,两挂环之间距离以略大于新静触头宽度;7) Fix the soft busbar: the equipotential electrician installs two sets of wire fixing arms on one side of the ladder, so that the soft busbar is held up by the wire fixing arm, and the soft busbar is bound on the wire fixing arm with copper binding wires to prevent the soft busbar from swinging; The equipotential electrician puts the insulating small holding pole on the slot shoulder and binds it with insulating rope, and the tail of the insulating small holding pole is tied with the insulating rope and the ladder, so that the fixed hanging ring at the end of the insulating small holding pole is placed outside the soft busbar , the movable hanging ring on the insulating small pole is located inside the soft busbar, and the distance between the two hanging rings should be slightly larger than the width of the new static contact;
8)新静触头安装前准备:等电位电工在绝缘小抱杆端部的固定挂环内挂好闭锁滑车,在绝缘小抱杆上的活动挂环内穿入一根消弧绳,在消弧滑车至软母线间连接一条消弧线;一名地面电工把绝缘杆测尺金属挂钩挂在软母线上,测尺尾部至于地面,测尺中部担在哑铃型动触头中间,形成三点一线,找准软母线静触头的中心挂点,等电位电工用记号笔做出静触头与软母线接触部分宽度记号后,用钢丝刷在记号宽度内,把导线处理干净,均匀涂上中性凡士林;8) Preparations before the installation of the new static contact: the equipotential electrician hangs the locking block in the fixed hanging ring at the end of the small insulating pole, and inserts an arc-suppressing rope into the movable hanging ring on the small insulating pole. An arc suppression line is connected between the arc suppression tackle and the soft busbar; a ground electrician hangs the metal hook of the measuring ruler on the insulating rod on the soft busbar, the tail of the measuring ruler is placed on the ground, and the middle part of the measuring ruler is placed in the middle of the dumbbell-shaped moving contact, forming a three-dimensional Point a line, find the central hanging point of the static contact of the soft busbar, and the equipotential electrician uses a marker to mark the width of the contact part between the static contact and the soft busbar, and then uses a steel wire brush within the width of the mark to clean the wires evenly. Apply neutral Vaseline;
地面电工除去组装好的静触头连板及并沟线夹上的油漆和脏污,涂好中性凡士林,抬至作业地点下方,按照静触头大小侧系在绝缘小抱杆垂下的绝缘拉绳和消弧绳尾部,在静触头底部再系一条提升控制绳;The ground electrician removes the paint and dirt on the assembled static contact connecting plate and parallel ditch clamps, applies neutral Vaseline, lifts it to the bottom of the work site, and ties the insulation on the small insulating pole according to the size of the static contact. At the end of the pull rope and the arc suppression rope, tie a lifting control rope at the bottom of the static contact;
9)安装静触头:在工作负责人的指挥下,两名地面电工分别牵拉绝缘拉绳和消弧绳的绳头,一名地面电工牵拉提升控制绳,使静触头缓慢接近软母线,等电位电工把头部转向拉弧相反侧,避免弧光产生的高温灼伤;9) Install the static contact: Under the command of the person in charge of the work, two ground electricians pull the ends of the insulating pull rope and the arc suppression rope respectively, and one ground electrician pulls the lifting control rope to make the static contact slowly approach the soft For the busbar, the equipotential electrician turns his head to the opposite side of the arc to avoid high-temperature burns caused by the arc;
当静触头平稳停在软母线下方50-60mm处时,等电位电工拆下静触头连板上并沟线夹螺栓,把并沟线夹上部扣在软母线上,两名地面电工继续提升静触头,当静触头连板上并沟线夹下部与上部合缝时,停止提升,等电位电工安装并沟线夹螺栓,地面电工用绝缘杆测尺校核软母线静触头中心符合标准后,等电位电工把并沟线夹螺栓拧紧;When the static contact stops stably at 50-60mm below the soft busbar, the equipotential electrician removes the bolts of the parallel groove clamp on the static contact connecting plate, buckles the upper part of the parallel groove clamp on the soft busbar, and the two ground electricians continue Lift the static contact, stop lifting when the lower part of the parallel groove line clamp on the static contact plate is connected with the upper part, the equipotential electrician installs the parallel groove line clamp bolt, and the ground electrician checks the soft busbar static contact with an insulating rod measuring ruler After the center meets the standard, the equipotential electrician tightens the bolts of the parallel trench clamp;
10)操作结束退出:等电位电工拆除绑扎在静触头上的提升控制绳、消弧绳和绝缘拉绳;拆除两组导线固定臂;经工作负责人允许,等电位电工拆除屏蔽均压线,转移电位,退出等电位状态,人体裸露部分保持0.3m的安全距离后,打开安全带,沿梯通道返回地面;10) Exit at the end of the operation: the equipotential electrician removes the lifting control rope, arc suppression rope and insulating pull rope bound on the static contact; removes the two sets of wire fixing arms; with the permission of the person in charge, the equipotential electrician removes the shielded voltage equalizing line , transfer the potential, exit the equipotential state, keep the exposed part of the human body at a safe distance of 0.3m, open the seat belt, and return to the ground along the ladder passage;
11)转移绝缘人字梯:打开所有固定梯身的绳索,使整梯向软母线外侧移动1m以外后,控制梯身上的绳索使绝缘人字梯缓慢倾斜下落,当梯头低于软母线0.5m以上时,两组地面电工将绝缘人字梯从软母线下方移至下一个作业点,重复步骤1)到步骤10)带电拆除静触头;11) Transfer the insulating ladder: open all the ropes that fix the ladder body, and move the whole ladder to the outside of the soft busbar for 1m, then control the ropes on the ladder body to make the insulating ladder fall slowly. When the ladder head is lower than the soft busbar 0.5 When it is above m, two groups of ground electricians move the insulating ladder from the bottom of the soft busbar to the next operating point, and repeat steps 1) to 10) to remove the static contact while it is live;
12)重复安装步骤中的步骤1)到步骤11),直至三相软母线上的静触头全部拆卸完毕。12) Repeat steps 1) to 11) in the installation steps until all the static contacts on the three-phase soft bus are disassembled.
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
1)借助绝缘人字梯作为绝缘载人平台,满足等电位操作法的要求,体积小,可在软母线下升降,适用于220kV软母线GW6系列单柱、双柱垂直开启式隔离开关静触头的带电更换作业。1) With the help of an insulating ladder as an insulating manned platform, it meets the requirements of the equipotential operation method. It is small in size and can be lifted and lowered under the soft busbar. It is suitable for the static contact of single-column and double-column vertical opening type disconnectors of 220kV soft busbar GW6 series The live replacement operation of the head.
2)避免了因静触头发热、烧损、老化等问题而造成母线故障;为制定设备检修计划创造条件,完善了带电检修项目;减少了运行人员的倒闸操作次数,防止因误操作造成的电网事故,减少了停电次数与停电时间。2) Avoid busbar failures caused by static contact heating, burning, aging and other problems; create conditions for formulating equipment maintenance plans, improve live maintenance items; reduce the number of switching operations of operators, and prevent accidents caused by misoperation Power grid accidents, reducing the number of power outages and power outage time.
3)促进了科学技术进步,提高了供电可靠率,消除了安全生产隐患、保证了安全供电,具有显著的社会效益和经济效益。3) It promotes scientific and technological progress, improves the reliability of power supply, eliminates hidden dangers in production safety, and ensures safe power supply, which has significant social and economic benefits.
4)填补了220kV软母线GW6系列隔离开关静触头,带电拆除与安装项目的空白,在国家电网系统内具有广泛的应用前景和推广价值。4) It fills the blank of the static contact of 220kV soft busbar GW6 series isolating switch, live removal and installation projects, and has broad application prospects and promotion value in the national grid system.
附图说明 Description of drawings
图1是本发明绝缘人字梯实施例工作状态结构示意图;Fig. 1 is a schematic diagram of the structure of the working state of the embodiment of the insulating ladder of the present invention;
图2是图1的侧视图。FIG. 2 is a side view of FIG. 1 .
图中:1-梯头 2-梯身 3-梯柱 4-梯阶 5-吊耳 6-绝缘控制绳 7-闭锁式滑车8-绝缘保护绳 9-导线固定臂 10-开距控制绳 11-绝缘牵引绳 12-地锚 13-横担底座 14-横担 15-绝缘小抱杆 16-固定挂环 17-活动挂环In the figure: 1-ladder head 2-ladder body 3-ladder column 4-ladder 5-hanging lug 6-insulation control rope 7-locking tackle 8-insulation protection rope 9-wire fixing arm 10-spacing control rope 11 -Insulated traction rope 12-Ground anchor 13-Cross arm base 14-Cross arm 15-Insulated small pole 16-Fixed hanging ring 17-Active hanging ring
具体实施方式 Detailed ways
下面结合附图对本发明的具体实施方式作进一步说明:The specific embodiment of the present invention will be further described below in conjunction with accompanying drawing:
见图1、图2,是本发明绝缘人字梯实施例工作状态结构示意图,包括梯头1和两片由梯柱3、梯阶4组成的梯身2,梯柱3长度为10.5-12.5米;梯头1两端分别设有吊耳5,每个吊耳5上拴有两根绝缘控制绳6,闭锁式滑车7挂在其中一个吊耳5上,闭锁式滑车的滑轮上穿一条绝缘保护绳8;一侧梯身上设有导线固定臂9,导线固定臂9距梯头1.6-0.8m;两片梯身2之间由上至下设置开距控制绳10三条;两片梯身外侧分别设置防梯身塌腰的绝缘牵引绳11各两条,绝缘控制绳6与绝缘牵引绳11的绳尾分别与地锚12相连。See Figure 1 and Figure 2, which are schematic diagrams of the working state structure of the embodiment of the insulating ladder of the present invention, including a ladder head 1 and two ladder bodies 2 composed of ladder columns 3 and steps 4, and the length of the ladder columns 3 is 10.5-12.5 Two ends of the ladder head 1 are respectively provided with lifting lugs 5, and each lifting lug 5 is tied with two insulating control ropes 6, and the locking block 7 is hung on one of the lifting lugs 5, and a pulley of the locking block is threaded on the pulley. Insulated protective rope 8; one side of the ladder body is provided with a wire fixing arm 9, and the wire fixing arm 9 is 1.6-0.8m away from the ladder head; three distance control ropes 10 are set between the two ladder bodies 2 from top to bottom; two ladders Body outside is provided with respectively two insulation traction ropes 11 of anti-ladder body collapse waist, and the rope tail of insulation control rope 6 and insulation traction rope 11 links to each other with ground anchor 12 respectively.
两片梯身2的同侧分别设有横担底座13,横担14分别与两个横担底座13相连接,横担14位于距梯头40-80cm处,在横担14与一片梯身的梯阶之间设有绝缘小抱杆15,使绝缘小抱杆15头部朝向操作侧翘起,绝缘小抱杆15端部设有固定挂环16,绝缘小抱杆中段设有活动挂环17。The same sides of the two ladder bodies 2 are respectively provided with a cross arm base 13, and the cross arm 14 is respectively connected with the two cross arm bases 13, and the cross arm 14 is located at a distance of 40-80 cm from the ladder head. Insulated small holding rods 15 are provided between the steps, so that the head of the insulating small holding rods 15 is tilted toward the operating side, the end of the insulating small holding rods 15 is provided with a fixed hanging ring 16, and the middle section of the insulating small holding rods is provided with a movable hanging Ring 17.
本发明带电更换220kV软母线静触头的方法操作时,作业人员沿绝缘人字梯升至软母线下,采用等电位法转移电位,带电更换软母线静触头,包括拆卸步骤和安装步骤,具体操作步骤如下:During the operation of the method for replacing the static contact of the 220kV soft busbar with electricity, the operator ascends to the bottom of the soft busbar along the insulating ladder, uses the equipotential method to transfer the potential, and replaces the static contact of the soft busbar with electricity, including the steps of disassembly and installation. The specific operation steps are as follows:
一、拆卸步骤:1. Disassembly steps:
1)绝缘人字梯提升前准备:先在绝缘人字梯顶部吊挂一个闭锁式滑车,在闭锁式滑车上穿一条绝缘保护绳;在梯头两端各分别设置绝缘控制绳两条,其中两条为八字型向外牵拉,另两条为X字型交叉后向外牵拉;在两侧梯身之间由上至下(分别是距梯头3m、6m、9m处)设置开距控制绳三条,预留合适长度,开距控制绳的一端与一侧梯身系活结,开距控制绳的另一端与另一侧梯身系紧;两侧梯体分别设置防梯身塌腰的绝缘牵引绳各两条,分别距梯头3m、6m处,为保证受力均匀,一条绝缘牵引绳的两端绳头分别系在两侧梯柱上,牵拉中段;在一侧梯身的梯脚上设置梯脚固定器,将梯脚固定器钉于地下;1) Preparations before lifting the insulated ladder: first hang a closed tackle on the top of the insulated ladder, and thread an insulating protection rope on the locked tackle; set two insulating control ropes at both ends of the ladder head, of which Two are pulled outwards in a figure-eight shape, and the other two are pulled outwards after crossing in an X-shape; between the ladder bodies on both sides from top to bottom (3m, 6m, and 9m away from the ladder head) There are three distance control ropes, reserve a suitable length, one end of the distance control rope is tied with a slipknot on one side of the ladder body, and the other end of the distance control rope is fastened to the other side of the ladder body; There are two insulated traction ropes at the waist, 3m and 6m away from the ladder head respectively. In order to ensure uniform force, the two ends of an insulated traction rope are respectively tied to the ladder columns on both sides to pull the middle section; Set the ladder foot holder on the ladder foot of the body, and nail the ladder foot holder to the ground;
2)绝缘人字梯提升:在工作负责人的指挥和专责监护人的监护下,将梯身一侧地面电工分两组,每组各牵引一根绝缘牵引绳,梯身另一侧一名地面电工牵拉绝缘保护绳,防止提升过度发生倒梯;两名地面电工用脚踏住梯脚固定器,并双手配合提升,至到绝缘人字梯呈人字形直立于地面上;2) Hoisting of the insulating ladder: Under the command of the person in charge and the supervision of the responsible guardian, divide the ground electricians on one side of the ladder body into two groups, each group pulls an insulating traction rope, and a ground electrician on the other side of the ladder body The electrician pulls the insulating protection rope to prevent the ladder from falling due to over-lifting; two ground electricians step on the ladder foot holder with their feet, and lift with both hands until the insulated herringbone ladder stands upright on the ground in a herringbone shape;
3)将绝缘人字梯就位:在四名地面电工分别拉住绝缘控制绳的条件下,脱掉梯脚固定器;地面电工分两组把绝缘人字梯平稳移送至第一个作业点(同档运行回路侧),梯头比软母线高出1.6-0.8m(因相位与驰度不同而有差异),软母线距离梯身100-150mm;移动过程中人员要精力集中,水平窜动不宜过大,听从工作负责人统一指挥,严禁梯身触碰母线、倒梯,砸伤周围运行设备,防止母线故障发生;3) Put the insulating ladder in place: Under the condition that four ground electricians hold the insulating control rope respectively, take off the ladder foot holder; the ground electricians are divided into two groups to move the insulating ladder to the first operation point smoothly (On the side of the running circuit at the same gear), the ladder head is 1.6-0.8m higher than the soft busbar (due to the difference in phase and latitude), and the soft busbar is 100-150mm away from the ladder body; during the movement, the personnel must concentrate and move horizontally The movement should not be too large, follow the unified command of the person in charge of the work, and it is strictly forbidden for the ladder body to touch the busbar, reverse the ladder, and damage the surrounding operating equipment to prevent busbar failure;
4)固定绝缘人字梯:将梯脚固定于隔离开关水泥柱上,将梯头两端的绝缘控制绳分别沿梯头的两侧延长线方向拉紧固定在固定物上或地锚上,其中一侧至少在一根绳子上用紧线器,使绳子张紧力不少于1KN;将梯身两侧的绝缘牵引绳拉紧,分别系在地锚上固定,使两侧梯身略向外侧突起为宜,所有剩余的绝缘绳要放在专用兜子内,防止脏污、受潮,降低绝缘强度;4) Fixed insulating herringbone ladder: fix the ladder feet on the cement column of the isolation switch, and tighten the insulating control ropes at both ends of the ladder head along the direction of the extension lines on both sides of the ladder head and fix them on the fixed object or the ground anchor. Use a wire tensioner on at least one rope on one side to make the tension of the rope not less than 1KN; tighten the insulated traction ropes on both sides of the ladder body, and tie them to the ground anchors respectively, so that the ladder bodies on both sides are slightly It is advisable to protrude on the outside, and all remaining insulating ropes should be placed in special pockets to prevent dirt and moisture from reducing the insulation strength;
5)登梯前准备:等电位电工身穿全套合格屏蔽服,戴护目镜,由专责监护人检查屏蔽服外观是否良好、各部分连接是否可靠,保护绳扣是否正确,合格后允许登梯;5) Preparations before climbing the ladder: the equipotential electrician wears a full set of qualified shielding clothing and goggles, and the dedicated guardian checks whether the appearance of the shielding clothing is good, whether the connections of each part are reliable, and whether the protective rope buckle is correct. After passing the qualification, he is allowed to climb the ladder;
6)登梯操作:两名地面电工各扶一侧梯身,另两名地面电工牵拉绝缘保护绳,等电位电工沿一侧梯身登梯,攀登过程中保证组合间隙大于2.1m、相间距离大于2.5m,途中依次把三条开距控制绳系牢,直至作业位置,系好安全带,转移电位,进入强电场,人体裸露部分应保持0.3m的安全距离,等电位电工将屏蔽均压线挂在软母线和屏蔽服之间,确保在双手离开带电体的情况下,也始终保持等电位,在等电位电工没有系好安全带之前,两名地面电工始终牵引绝缘保护绳,保护等电位电工安全登梯;6) Ladder climbing operation: two ground electricians each support one side of the ladder body, the other two ground electricians pull the insulating protection rope, and the equipotential electrician climbs the ladder along one side of the ladder body. During the climbing process, ensure that the combined gap is greater than 2.1m If the distance is greater than 2.5m, fasten the three distance control ropes one by one until the working position, fasten the safety belt, transfer the potential, and enter the strong electric field. The exposed parts of the human body should keep a safe distance of 0.3m, and the equipotential electrician will shield The line is hung between the soft busbar and the shielding suit to ensure that the equipotential is always maintained even when the hands are away from the charged body. Before the equipotential electrician is not fastened with a seat belt, the two ground electricians always pull the insulating protection rope to protect etc. Potential electrician safety climbing ladder;
7)固定软母线:等电位电工在一侧梯身上安装两组导线固定臂,使软母线被导线固定臂托起,用400~450mm长2.52铜线把软母线捆扎在导线固定臂上,缠绕绑扎圈数不得少于3圈,防止软母线摆动;7) Fix the soft busbar: the equipotential electrician installs two sets of wire fixing arms on one side of the ladder, so that the soft busbar is held up by the wire fixing arm, and the soft busbar is bound on the wire fixing arm with a 400-450mm long 2.5 2 copper wire. The number of winding and binding circles shall not be less than 3 to prevent the soft busbar from swinging;
8)拆除静触头:将消弧滑车挂在软母线上,消弧绳一头穿过消弧滑车的滑轮绑扎在静触头一侧T形线夹底部,使静触头有不少于100mm的提升空间,消弧绳绳尾由一名地面电工控制;在略高于软母线的梯阶上用无极绳套系挂好一个闭锁滑车,绝缘牵引绳一头穿过闭锁滑车的滑轮绑在静触头另一侧T形线夹底部,绝缘牵引绳绳尾由一名地面电工控制;在静触头上再绑扎一条下落控制绝缘绳,下落控制绝缘绳绳尾由另一名地面电工控制;8) Remove the static contact: Hang the arc-suppression tackle on the soft busbar, pass one end of the arc-suppression rope through the pulley of the arc-suppression tackle and tie it to the bottom of the T-shaped clamp on the side of the static contact, so that the static contact has a gap of no less than 100mm The tail of the arc-suppression rope is controlled by a ground electrician; on the step slightly higher than the soft bus bar, a locking tackle is hung with a non-polar rope sleeve, and one end of the insulated traction rope passes through the pulley of the locking tackle and is tied to the static At the bottom of the T-shaped clamp on the other side of the contact, the tail of the insulated traction rope is controlled by a ground electrician; another drop control insulating rope is tied on the static contact, and the tail of the fall control insulating rope is controlled by another ground electrician;
等电位电工先卸下静触头T型线夹一侧的φ12mm螺栓,再卸下另一侧的螺栓;操作过程中,控制消弧绳和绝缘牵引绳绳尾的两名地面电工,配合拉紧绳索;The equipotential electrician first removes the φ12mm bolt on one side of the T-shaped clamp of the static contact, and then removes the bolt on the other side; tight rope;
如拆除软母线静触头回路中,有母线接地刀引流线时,先按照省公司颁布的220kV带电断接引标准化作业指导书带电拆除引流线,进行危险点分析及安全控制措施,这里不做阐述说明。If there is a busbar grounding knife drain wire in the static contact circuit of the soft busbar, first remove the drain wire according to the 220kV Live Disconnection Standardization Work Guide issued by the provincial company, and carry out dangerous point analysis and safety control measures, which will not be done here Explain.
9)降下静触头:在工作负责人的指挥下,等电位电工要把头部转向拉弧相反侧,避免弧光产生的高温灼伤,两名地面电工分别控制消弧绳和绝缘绳开始松绳,一名地面电工控制静触头下落控制绝缘绳,使静触头脱离软母线缓慢下落到地面上,避免静触头撞击隔离开关动触头和绝缘支持柱,导致设备损坏发生;9) Lower the static contact: Under the command of the person in charge of the work, the equipotential electrician should turn his head to the opposite side of the arc to avoid high-temperature burns caused by the arc. Two ground electricians control the arc suppression rope and the insulating rope to loosen the rope respectively. , a ground electrician controls the falling of the static contact and controls the insulating rope, so that the static contact is separated from the soft busbar and slowly falls to the ground, so as to avoid the static contact hitting the moving contact of the isolation switch and the insulating support column, resulting in equipment damage;
10)操作结束退出:等电位电工拆除缠绕在软母线上的铝包布,将导线固定臂上的固定软母线的铜线打开,经工作负责人允许,等电位电工拆除屏蔽均压线,转移电位,退出等电位状态,人体裸露部分保持0.3m的安全距离,打开安全带,沿梯返回地面;10) Exit at the end of the operation: the equipotential electrician removes the aluminum wrapping cloth wrapped around the soft busbar, opens the copper wire fixed on the soft busbar on the wire fixing arm, and with the permission of the person in charge, the equipotential electrician removes the shielding equalizing line and transfers Potential, exit the equipotential state, keep a safe distance of 0.3m from the exposed parts of the human body, open the seat belt, and return to the ground along the ladder;
11)转移绝缘人字梯:打开所有固定梯身的绳索,使整梯向软母线外侧移动1m以外后,控制梯身上的绳索使绝缘人字梯缓慢倾斜下落,当梯头低于软母线0.5m以上时,两组地面电工一组三人抬梯,另一组原地不动,交替移动,将绝缘人字梯从软母线下方移至下个作业点,重复步骤1)到步骤10)带电拆除静触头,如出现危急人身和设备情况,应立即停止作业;当地面有铺设的电缆沟槽,影响绝缘人字梯摆放时,一是可采取硬质物品垫平,二是放长梯身的开距控制绳,加大梯身角度,跨越铺设的电缆沟槽,把绝缘人字梯摆放最佳作业位置;11) Transfer the insulating ladder: open all the ropes that fix the ladder body, and move the whole ladder to the outside of the soft busbar for 1m, then control the ropes on the ladder body to make the insulating ladder fall slowly. When the ladder head is lower than the soft busbar 0.5 When it is more than m, two groups of ground electricians lift the ladder with one group of three people, and the other group does not move at the same place, and moves alternately to move the insulating ladder from the bottom of the soft busbar to the next operating point, repeating steps 1) to 10) Remove the static contacts while live, and stop working immediately if there is a danger of personal injury or equipment. The distance control rope of the long ladder body increases the angle of the ladder body, spans the laid cable trench, and places the insulated herringbone ladder at the best working position;
12)重复拆卸步骤中的步骤1)到步骤11),直至三相软母线上静触头全部拆卸完毕,方可由电力维修人员开始其他工作。12) Repeat steps 1) to 11) in the disassembly steps until all the static contacts on the three-phase soft bus are disassembled, and then the electric maintenance personnel can start other work.
二、安装步骤:2. Installation steps:
1)绝缘人字梯提升前准备:先在绝缘人字梯顶部吊挂一个闭锁式滑车,在闭锁式滑车上穿一条绝缘保护绳;在梯头两端各分别设置绝缘控制绳两条,其中两条为八字型向外牵拉,另两条为X字型交叉后向外牵拉;在两侧梯身之间由上至下(分别是距梯头3m、6m、9m处)设置开距控制绳三条,预留合适长度,开距控制绳的一端与一侧梯身系活结,开距控制绳的另一端与另一侧梯身系紧;两侧梯体分别设置防梯身塌腰的绝缘牵引绳各两条,分别距梯头3m、6m处,为保证受力均匀,一条绝缘牵引绳的两端绳头分别系在两侧梯柱上,牵拉中段;在一侧梯身的梯脚上设置梯脚固定器,将梯脚固定器钉于地下;在距梯头40-80cm处两侧梯身上分别安装横担底座,横担与横担底座活动连接,横担与横担底座上的螺丝不拧紧,保持螺杆在横担槽孔内自由无障碍滑动;1) Preparations before lifting the insulated ladder: first hang a closed tackle on the top of the insulated ladder, and thread an insulating protection rope on the locked tackle; set two insulating control ropes at both ends of the ladder head, of which Two are pulled outwards in a figure-eight shape, and the other two are pulled outwards after crossing in an X-shape; between the ladder bodies on both sides from top to bottom (3m, 6m, and 9m away from the ladder head) There are three distance control ropes, reserve a suitable length, one end of the distance control rope is tied with a slipknot on one side of the ladder body, and the other end of the distance control rope is fastened to the other side of the ladder body; There are two insulated traction ropes at the waist, 3m and 6m away from the ladder head respectively. In order to ensure uniform force, the two ends of an insulated traction rope are respectively tied to the ladder columns on both sides to pull the middle section; Set the ladder foot holder on the ladder foot of the ladder body, and nail the ladder foot holder underground; install the cross-arm base on the ladder body on both sides at a distance of 40-80cm from the ladder head, and the cross-arm and the cross-arm base are flexibly connected. The screws on the cross-arm base are not tightened, keep the screw freely sliding in the cross-arm slot;
2)绝缘人字梯提升:在工作负责人的指挥和专责监护人的监护下,将梯身一侧地面电工分两组,每组各牵引一根绝缘牵引绳,梯身另一侧一名地面电工牵拉绝缘保护绳,防止提升过度发生倒梯;两名地面电工用脚踏住梯脚固定器,并双手配合提升,至到绝缘人字梯呈人字形直立于地面上;2) Hoisting of the insulating ladder: Under the command of the person in charge and the supervision of the responsible guardian, divide the ground electricians on one side of the ladder body into two groups, each group pulls an insulating traction rope, and a ground electrician on the other side of the ladder body The electrician pulls the insulating protection rope to prevent the ladder from falling due to over-lifting; two ground electricians step on the ladder foot holder with their feet, and lift with both hands until the insulated herringbone ladder stands upright on the ground in a herringbone shape;
3)将绝缘人字梯就位:在四名地面电工分别拉住绝缘控制绳的条件下,脱掉梯脚固定器;地面电工分两组,每组三人,把绝缘人字梯交替平稳移送至第一个作业点(同档运行回路侧),梯头比软母线高出1.6-0.8m(因相位与驰度不同而有差异),软母线距离梯身100-150mm;梯尾部用绝缘绳固定于隔离开关水泥柱上;移动过程中人员要精力集中,水平窜动不宜过大,听从工作负责人统一指挥,严禁梯身触碰母线、倒梯,砸伤周围运行设备,防止母线故障发生。3) Put the insulating ladder in place: Under the condition that four ground electricians hold the insulating control rope respectively, take off the ladder foot holder; the ground electricians are divided into two groups, three people in each group, and the insulating ladder is alternately and smoothly Transfer to the first operation point (running circuit side of the same gear), the ladder head is 1.6-0.8m higher than the soft busbar (due to the difference in phase and latitude), the soft busbar is 100-150mm away from the ladder body; The insulating rope is fixed on the cement column of the isolation switch; during the movement, the personnel must concentrate on the movement, and the horizontal movement should not be too large, and follow the unified command of the person in charge of the work. Failure occurs.
4)固定绝缘人字梯:将梯头两端的绝缘控制绳分别沿梯头的两侧延长线方向拉紧固定,其中一侧至少在一根绝缘控制绳上用紧线器,检查紧线器卡簧固定位置是否正确,使绳子张紧力不少于1KN;将梯身两侧的绝缘牵引绳拉紧,分别系在地锚上,使两侧梯身略向外侧突起为宜,在免人上去后梯身塌腰,所有剩余的绝缘绳头放在专用兜子内,防止脏污、受潮,降低绝缘强度;4) Fix the insulated herringbone ladder: tighten the insulation control ropes at both ends of the ladder head along the direction of the extension lines on both sides of the ladder head, and use a wire tightener on at least one of the insulation control ropes on one side, and check the wire tensioner Whether the fixed position of the circlip is correct, so that the tension of the rope is not less than 1KN; tighten the insulated traction ropes on both sides of the ladder body, and tie them to the ground anchors respectively, so that the ladder body on both sides protrudes slightly to the outside. When people go up, the ladder collapses at the waist, and all the remaining insulating rope ends are placed in special pockets to prevent dirt and moisture from reducing the insulation strength;
5)登梯前准备:等电位电工身穿全套合格屏蔽服,戴护目镜,由专责监护人检查屏蔽服外观是否良好、各部分连接是否可靠,保护绳扣是否正确,合格后允许登梯;5) Preparations before climbing the ladder: the equipotential electrician wears a full set of qualified shielding clothing and goggles, and the dedicated guardian checks whether the appearance of the shielding clothing is good, whether the connections of each part are reliable, and whether the protective rope buckle is correct. After passing the qualification, he is allowed to climb the ladder;
6)登梯操作:两名地面电工各扶一侧梯身,另两名地面电工牵拉绝缘保护绳,等电位电工沿一侧梯身登梯,攀登过程中保证组合间隙大于2.1m、相间距离大于2.5m,途中依次把三条开距控制绳系牢,直至作业位置,系好安全带,转移电位,进入强电场,人体裸露部分应保持0.3m的安全距离,等电位电工将屏蔽均压线挂在软母线和屏蔽服之间,确保在双手离开带电体的情况下,也始终保持等电位,在等电位电工没有系好安全带之前,两名地面电工始终牵引绝缘保护绳,保护等电位电工登梯的安全;6) Ladder climbing operation: two ground electricians each support one side of the ladder body, the other two ground electricians pull the insulating protection rope, and the equipotential electrician climbs the ladder along one side of the ladder body. During the climbing process, ensure that the combined gap is greater than 2.1m If the distance is greater than 2.5m, fasten the three distance control ropes one by one until the working position, fasten the safety belt, transfer the potential, and enter the strong electric field. The exposed parts of the human body should keep a safe distance of 0.3m, and the equipotential electrician will shield The line is hung between the soft busbar and the shielding suit to ensure that the equipotential is always maintained even when the hands are away from the charged body. Before the equipotential electrician is not fastened with a seat belt, the two ground electricians always pull the insulating protection rope to protect etc. The safety of potential electricians on ladders;
7)固定软母线:等电位电工在一侧梯身上安装两组导线固定臂,使软母线被导线固定臂托起,用400~450mm长2.52的铜绑线把软母捆扎在导线固定臂上,缠绕绑扎圈数不得少于3圈,防止软母线摆动;等电位电工将绝缘小抱杆担在槽担上用绝缘绳捆牢,绝缘小抱杆的尾部用绝缘绳与梯阶捆牢,杆头略高于杆尾,使绝缘小抱杆端部的固定挂环置于软母线外侧50mm,绝缘小抱杆上的活动挂环位于软母线内侧50mm,两挂环之间距离以略大于新静触头宽度为宜;7) Fix the soft busbar: the equipotential electrician installs two sets of wire fixing arms on one side of the ladder, so that the soft busbar is held up by the wire fixing arm, and the soft busbar is tied to the wire fixing arm with a 400-450mm long 2.5 2 copper binding wire The number of winding and binding circles shall not be less than 3 to prevent the soft busbar from swinging; the equipotential electrician shall place the insulating small holding pole on the groove shoulder and tie it up with an insulating rope, and the tail of the insulating small holding pole shall be tied up with the ladder with an insulating rope , the rod head is slightly higher than the rod tail, so that the fixed hanging ring at the end of the insulating small holding rod is placed 50mm outside the soft busbar, and the movable hanging ring on the insulating small holding rod is located 50mm inside the soft busbar, and the distance between the two hanging rings is about It is advisable to be larger than the width of the new static contact;
8)新静触头安装前准备:等电位电工在绝缘小抱杆端部的固定挂环内挂好闭锁滑车,滑轮上穿过的绝缘拉绳两头均在地面工具兜内,在绝缘小抱杆上的活动挂环内挂好消弧滑车,滑轮上穿过的消弧绳两头均在地面工具兜内,消弧滑车至软母线间连接一条消弧线;一名地面电工把绝缘杆测尺金属挂钩挂在软母线上,测尺尾部至于地面,测尺中部担在哑铃型动触头中间,形成三点一线,找准软母线静触头的中心挂点,等电位电工用记号笔做出静触头与软母线接触部分宽度记号后,用钢丝刷在记号宽度内,把导线处理干净,均匀涂上中性凡士林;8) Preparations before the installation of the new static contact: the equipotential electrician hangs the locking pulley in the fixed hanging ring at the end of the small insulating pole. The arc-suppression block is hung in the movable hanging ring on the pole, and both ends of the arc-suppression rope passing through the pulley are in the ground tool pocket, and an arc-suppression block is connected to the soft busbar; a ground electrician measures the insulating rod The metal hook of the ruler is hung on the soft busbar, the tail of the measuring ruler is placed on the ground, and the middle part of the measuring ruler is placed in the middle of the dumbbell-shaped moving contact to form a three-point line. Find the center hanging point of the static contact of the soft busbar. It is a mark for equipotential electricians After marking the width of the contact part between the static contact and the soft bus bar with a pen, use a steel wire brush to clean the wire within the width of the mark, and evenly coat the neutral Vaseline;
地面电工除去组装好的静触头连板及并沟线夹上的油漆和脏污,涂好中性凡士林,抬至作业地点下方,按照静触头大小侧分别系好绝缘小抱杆垂下的绝缘拉绳和消弧绳头部,在静触头再系一条提升控制绳;The ground electrician removes the paint and dirt on the assembled static contact connecting plate and the ditch clamp, applies neutral Vaseline, lifts it to the bottom of the work site, and fastens the small insulating poles hanging down according to the size of the static contact. Insulated pull rope and arc suppression rope head, and a lifting control rope tied to the static contact;
9)安装静触头:在工作负责人的指挥下,两名地面电工分别牵拉绝缘拉绳和消弧绳的绳头,一名地面电工牵拉提升控制绳,使静触头越过地面垂直开启式隔离开关缓慢接近软母线,避免静触头撞击隔离开关动触头和绝缘支持柱,导致设备损坏发生,等电位电工把头部转向拉弧相反侧,避免弧光产生的高温灼伤;9) Install the static contact: Under the command of the person in charge of the work, two ground electricians pull the ends of the insulating pull rope and the arc suppression rope respectively, and one ground electrician pulls the lifting control rope to make the static contact cross the ground vertically The open disconnector slowly approaches the soft busbar to avoid the static contact hitting the movable contact of the disconnector and the insulating support column, resulting in equipment damage. The equipotential electrician turns his head to the opposite side of the arc to avoid high-temperature burns caused by the arc;
当静触头平稳停在软母线下方50-60mm处时,等电位电工拆下静触头连板上并沟线夹螺栓,把并沟线夹上部扣在软母线上,两名地面电工继续提升静触头,当静触头连板上并沟线夹下部与上部合缝时,停止提升,等电位电工安装并沟线夹螺栓,地面电工用绝缘杆测尺校核软母线静触头中心符合标准后,等电位电工把并沟线夹螺栓拧紧;When the static contact stops stably at 50-60mm below the soft busbar, the equipotential electrician removes the bolts of the parallel groove clamp on the static contact connecting plate, buckles the upper part of the parallel groove clamp on the soft busbar, and the two ground electricians continue Lift the static contact, stop lifting when the lower part of the parallel groove line clamp on the static contact plate is connected with the upper part, the equipotential electrician installs the parallel groove line clamp bolt, and the ground electrician checks the soft busbar static contact with an insulating rod measuring ruler After the center meets the standard, the equipotential electrician tightens the bolts of the parallel trench clamp;
10)操作结束退出:等电位电工拆除绑扎在静触头上的提升控制绳、消弧绳和绝缘拉绳;拆除两组导线固定臂;经工作负责人允许,等电位电工拆除屏蔽均压线,转移电位,退出等电位状态,人体裸露部分保持0.3m的安全距离后,打开安全带,沿梯通道返回地面;10) Exit at the end of the operation: the equipotential electrician removes the lifting control rope, arc suppression rope and insulating pull rope bound on the static contact; removes the two sets of wire fixing arms; with the permission of the person in charge, the equipotential electrician removes the shielded voltage equalizing line , transfer the potential, exit the equipotential state, keep the exposed part of the human body at a safe distance of 0.3m, open the seat belt, and return to the ground along the ladder passage;
11)转移绝缘人字梯:打开所有固定梯身的绳索,使整梯向软母线外侧移动1m以外后,控制梯身上的绳索使绝缘人字梯缓慢倾斜下落,当梯头低于软母线0.5m以上时,两组地面电工将绝缘人字梯从软母线下方移至下一个作业点,重复步骤1)到步骤10)带电拆除静触头;11) Transfer the insulating ladder: open all the ropes that fix the ladder body, and move the whole ladder to the outside of the soft busbar for 1m, then control the ropes on the ladder body to make the insulating ladder fall slowly. When the ladder head is lower than the soft busbar 0.5 When it is above m, two groups of ground electricians move the insulating ladder from the bottom of the soft busbar to the next operating point, and repeat steps 1) to 10) to remove the static contact while it is live;
12)重复安装步骤中的步骤1)到步骤11),直至三相软母线上的静触头全部拆卸完毕,现场全部作业完成后,拆除绝缘人字梯,整理工器具,撤离现场,工作负责人办理工作票,结束工作。12) Repeat steps 1) to 11) in the installation steps until all the static contacts on the three-phase flexible busbar are disassembled. The person handles the work ticket and ends the work.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210120939.2A CN102664358B (en) | 2012-04-23 | 2012-04-23 | Live replacement method for static contact of 220 kV flexible busbar |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210120939.2A CN102664358B (en) | 2012-04-23 | 2012-04-23 | Live replacement method for static contact of 220 kV flexible busbar |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102664358A CN102664358A (en) | 2012-09-12 |
| CN102664358B true CN102664358B (en) | 2014-11-05 |
Family
ID=46773801
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210120939.2A Active CN102664358B (en) | 2012-04-23 | 2012-04-23 | Live replacement method for static contact of 220 kV flexible busbar |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102664358B (en) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103219658A (en) * | 2013-02-19 | 2013-07-24 | 辽宁省电力有限公司鞍山供电公司 | GW5 isolating switch one-side power failure operation method |
| CN104016283B (en) * | 2014-06-19 | 2016-08-24 | 国家电网公司 | A kind of converting equipment special hoisting bar |
| CN105207123A (en) * | 2015-10-13 | 2015-12-30 | 国网辽宁省电力有限公司丹东供电公司 | Equipotential operation method of tubular bus |
| CN106207885B (en) * | 2016-07-22 | 2017-11-07 | 国网辽宁省电力有限公司鞍山供电公司 | The short circuit fixture and method of charged for replacement 220kV pipe bus telescoping wire clamps |
| CN106410674A (en) * | 2016-11-13 | 2017-02-15 | 国网湖北省电力公司咸宁供电公司 | Hot-line work method for 10-kV distribution line and equipment |
| CN110542772A (en) * | 2019-09-06 | 2019-12-06 | 国网黑龙江省电力有限公司鹤岗供电公司 | Nondestructive replacement device and method for electric energy meter |
| CN112429153B (en) * | 2020-11-12 | 2021-12-31 | 三峡机电工程技术有限公司 | Bridge arm reactor and marine transportation device thereof |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU694925A1 (en) * | 1978-06-12 | 1979-10-30 | Главное Управление Энергетики И Электрификации При Совете Министров Молдавской Сср "Молдглавэнерго" | Device for replacing insulators of overhead high-voltage power transmission lines |
| KR20080024840A (en) * | 2006-09-15 | 2008-03-19 | 한국전기공사협회 | Rogue internship replacement method of suspension internship in 765 kilovolt two line transmission line |
| CN101345399A (en) * | 2008-08-18 | 2009-01-14 | 国网武汉高压研究院 | Safety protection methods for live working on distribution lines |
| CN101469599A (en) * | 2007-12-28 | 2009-07-01 | 安徽省电力公司蚌埠供电公司 | Insulating combined ladder and combined erecting method thereof |
| CN101771252A (en) * | 2009-01-05 | 2010-07-07 | 华北电力科学研究院有限责任公司 | Device and method for electriferous replacement of phase-to-phase insulators of 220 KV compact line |
-
2012
- 2012-04-23 CN CN201210120939.2A patent/CN102664358B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU694925A1 (en) * | 1978-06-12 | 1979-10-30 | Главное Управление Энергетики И Электрификации При Совете Министров Молдавской Сср "Молдглавэнерго" | Device for replacing insulators of overhead high-voltage power transmission lines |
| KR20080024840A (en) * | 2006-09-15 | 2008-03-19 | 한국전기공사협회 | Rogue internship replacement method of suspension internship in 765 kilovolt two line transmission line |
| CN101469599A (en) * | 2007-12-28 | 2009-07-01 | 安徽省电力公司蚌埠供电公司 | Insulating combined ladder and combined erecting method thereof |
| CN101345399A (en) * | 2008-08-18 | 2009-01-14 | 国网武汉高压研究院 | Safety protection methods for live working on distribution lines |
| CN101771252A (en) * | 2009-01-05 | 2010-07-07 | 华北电力科学研究院有限责任公司 | Device and method for electriferous replacement of phase-to-phase insulators of 220 KV compact line |
Non-Patent Citations (4)
| Title |
|---|
| 500 kV 线路带电更换四联串耐张绝缘子;裴江淮等;《华东电力》;20040131;第32卷(第1期);第26-28页 * |
| 胡毅等.配电线路带电作业方式及安全防护.《高电压技术》.2000,第26卷(第5期),第34-36页. * |
| 裴江淮等.500 kV 线路带电更换四联串耐张绝缘子.《华东电力》.2004,第32卷(第1期),第26-28页. * |
| 配电线路带电作业方式及安全防护;胡毅等;《高电压技术》;20001031;第26卷(第5期);第34-36页 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102664358A (en) | 2012-09-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102664358B (en) | Live replacement method for static contact of 220 kV flexible busbar | |
| CN102290742B (en) | Tension stringing construction technology | |
| CN105375395B (en) | ± 800kV DC lines hotline maintenance turns ladder and operational method with insulation | |
| CN101894701B (en) | 220KV vertical opening type isolating switch shunting device and method thereof | |
| WO2015078279A1 (en) | Live overhaul process for ±800 kv ultra-high voltage dc power transmission line | |
| CN103227431A (en) | Method for replacing insulator chains in 220 kV long-span high tower in live working | |
| CN101640391A (en) | Live-wire operation method for replacing insulator for 35kV distribution circuit | |
| WO2016023141A1 (en) | Process for live replacement of tension hard-tube bus-bar jumper insulator of +/- 800kv ultra-high-voltage dc transmission line | |
| CN104299489B (en) | Super-pressure and extra-high voltage hybrid multifunctional transmission line of electricity training set | |
| CN106409085A (en) | Power transmission and transformation live working practical-training simulation stand | |
| CN102842867A (en) | Method for electrically disconnecting or connecting disconnector with drainage wire between buses | |
| CN103175998A (en) | Portable test tower for transmission line insulator string high-voltage performance test | |
| CN101277002B (en) | Method for construction of charged assembling 10kV bi-gyrus distribution line concrete lever | |
| CN202611568U (en) | Insulation trestle ladder | |
| CN105932601A (en) | Method for repairing break strand of overhead ground wire | |
| CN109256721A (en) | A kind of helicopter live-line maintenance operation hanging basket | |
| CN110120643A (en) | A kind of ground potential distribution power circuit uninterrupted operation method | |
| CN201717173U (en) | 220KV vertically-opened disconnecting switch shunt device | |
| CN106356758B (en) | 10KV line insulations bar bypasses charged for replacement on-pole switch operational method indirectly | |
| CN205681012U (en) | Live working platform for overhead transmission line | |
| CN106207885B (en) | The short circuit fixture and method of charged for replacement 220kV pipe bus telescoping wire clamps | |
| CN106373467A (en) | Power transmission and transformation live line work training simulation platform training method | |
| CN104113007A (en) | Operation method for replacing strain insulator of 35kV overhead distribution line in live state | |
| CN103500966A (en) | Electrified power disconnecting method for leading wire from 66kv disconnecting switch to pipe busbar | |
| CN107769080B (en) | A kind of transmission line wire pulley crossing rescue method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Effective date: 20121023 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20121023 Address after: 114002 Anshan South Road, Tiedong District, Liaoning, Shengli Road, No. 33 Applicant after: Anshan Power Supply Company, Liaoning Electric Power Co., Ltd. Applicant after: State Grid Corporation of China Address before: 114002 Anshan South Road, Tiedong District, Liaoning, Shengli Road, No. 33 Applicant before: Anshan Power Supply Company, Liaoning Electric Power Co., Ltd. |
|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |