CN102931609B - On-load changes the operational method of 10kV fuse switch - Google Patents
On-load changes the operational method of 10kV fuse switch Download PDFInfo
- Publication number
- CN102931609B CN102931609B CN201210324115.7A CN201210324115A CN102931609B CN 102931609 B CN102931609 B CN 102931609B CN 201210324115 A CN201210324115 A CN 201210324115A CN 102931609 B CN102931609 B CN 102931609B
- Authority
- CN
- China
- Prior art keywords
- fuse switch
- wire
- insulation
- bucket
- electrician
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009413 insulation Methods 0.000 claims abstract description 49
- 238000002955 isolation Methods 0.000 claims description 24
- 230000002265 prevention Effects 0.000 claims description 3
- 239000002965 rope Substances 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 4
- 230000001681 protective Effects 0.000 description 2
- 230000018199 S phase Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000010891 electric arc Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- 239000003595 mist Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 231100000817 safety factor Toxicity 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
Abstract
The present invention relates to electrical network distribution line fuse switch field, particularly relate to the operational method that a kind of on-load changes 10kV fuse switch, it is characterized in that, insulation lead wire bypass fuse switch is adopted to shunt at fuse switch two ends to be replaced direct connection, when ensureing to power to based model for load duration, realizing on-load and changing 10kV fuse switch.Compared with prior art, the invention has the beneficial effects as follows: 1) can power to equipment lower end based model for load duration between operational period, utilizing during live line working method hot line maintenance to avoid equipment to throw, throw the time again, shortens work flow, does not affect user power utilization between operational period.2) 10kV primary equipment failure rate can be greatly reduced, accomplish effectively to improve power supply quality.3) adopt insulation lead wire on-load to change fuse switch, operated by double pair of aerial lift device with insulated arm, the operating time is short, uses instrument few, can effective saving resource, and improves power supply reliability.<!--1-->
Description
Technical field
The present invention relates to electrical network distribution line fuse switch field, particularly relate to the operational method that a kind of on-load changes 10kV fuse switch.
Background technology
The method that replacing fuse switch adopted in the past mainly contains two kinds: one is end load under inactive fuse switch, then adopts the method that charged breaking and connecting go between, and after cutting off fuse switch upper end power supply, changes; Another kind directly cuts off fuse switch upper end power supply, carries out power failure and change.Although two kinds of above methods can carry out the replacing of fuse switch, but still need inactive a part of power load; Break down to from fuse switch and restore electricity, during this, still can cause certain social influence and economic loss.
Current fuse switch was not also carried out employing insulation lead wire on-load and was changed, and its main cause is that phase spacing is near, affects safety factor many, requires high to operating personnel's technical merit; Along with increasing of fuse switch use in recent years, if on-load can be carried out change fuse switch, will the huge social value of creation and economic worth.
Summary of the invention
The object of the present invention is to provide a kind of on-load to change the operational method of 10kV fuse switch, adopt insulating gloves working system, when ensureing to power to based model for load duration by bypass fuse switch, realize on-load and change 10kV fuse switch.
For achieving the above object, the present invention is achieved through the following technical solutions:
On-load changes the operational method of 10kV fuse switch, insulation lead wire bypass fuse switch is adopted to shunt at fuse switch two ends to be replaced direct connection, when ensureing to power to based model for load duration, realize on-load and change 10kV fuse switch, its concrete operation step is as follows:
1) in two buckets, electrician operates aerial lift device with insulated arm respectively, enters live line working region;
2) bucket that insulate arrives the proper operation position of the inner edge phase of fuse switch, outside phase and middle phase respectively, carry out insulation masked isolation according to the order of " from the close-by examples to those far off ", " from top to bottom ", " first big after small " to the position may touched in operation, the position of covering and order are followed successively by the earth electrode that fuse switch lead-in wire, fuse switch, wire and setting close on;
3) in bucket, electrician reviews and validate after fuse switch is in closing position, and in two buckets, electricians cooperatively interact installing insulating support and bypass fuse switch;
4) in two buckets, electrician coordinates installing insulating drainage thread, by two end terminals of insulation lead wire with fall prevention rope buckle on wire, untie the insulation masked isolation measure on wire, remove wire oxide layer, installing insulating drainage thread, and then the measure of insulation masked isolation is reset to drainage thread wire clamp place;
5) in bucket electrician with the electric current of current tester test insulation lead wire, confirm through-flow good after, pull open old fuse switch with insulating bar;
6) remove old fuse switch and both sides lead-in wire thereof, more renew fuse switch, and both sides lead-in wire is installed, and then recover to improve the insulation masked isolation measure on lead-in wire, the new earth potential such as fuse switch, cross-arm component;
7) in bucket, electrician tests the electric current on new fuse switch lead-in wire with current tester, determine through-flow good after, to close new fuse switch with insulating bar, remove bypass fuse switch, insulation lead wire and insulating support, during dismounting, two people answer homophase, synchronously carry out, and recover the insulation masked isolation measure on main traverse line in time;
8) according to above-mentioned steps 3)-step 7) changes the old fuse switch of outside phase, middle phase successively;
9) in bucket, electrician shifts insulation bucket and arrives the mesophase spherule of fuse switch both sides, outside phase, the mutually suitable service position of inner edge respectively, to insulate masked isolation measure according to the orderly release contrary with arranging masked isolation measure of insulating, the order of dismounting is followed successively by electrified body, earth electrode, fuse switch switch and the fuse switch lead-in wire that setting closes on;
10) in bucket, electrician withdraws from live line working region, and return to ground, work complete termination work ticket, and shift withdraws operation field.
Compared with prior art, the invention has the beneficial effects as follows:
1) the method on-load of insulation lead wire shunting is adopted to change 10kV fuse switch, can power to equipment lower end based model for load duration between operational period, utilizing during live line working method hot line maintenance to avoid equipment to throw, throw the time again, shorten work flow, between operational period, do not affect user power utilization.
2) 10kV primary equipment failure rate can be greatly reduced, accomplish effectively to improve power supply quality.
3) adopt insulation lead wire on-load to change fuse switch, operated by double pair of aerial lift device with insulated arm, the operating time is short, uses instrument few, can effective saving resource, and improves power supply reliability.
Embodiment
Below in conjunction with embodiment, the invention will be further described:
On-load of the present invention changes the operational method of 10kV fuse switch, being adopt insulating gloves working system, when ensureing to power to based model for load duration, utilizing the charged bypass fuse switch of insulation lead wire, realize on-load and change 10kV fuse switch, its concrete operation step is as follows:
1) operate front neck insulating tool, safety appliance and auxiliary implement, use megohmmeter or insulation tester to carry out segmentation detection to insulating tool, insulation resistance value is not less than 700 megaohms; In two buckets, electrician is after work director license, operates aerial lift device with insulated arm respectively, enters live line working region; The movement of insulation bucket should steadily at the uniform velocity, should without large-amplitude sloshing phenomenon when entering live line working region, and insulation bucket declines, the speed that rises should more than 0.5m/s, and the maximum line velocity at insulation bucket edge should more than 0.5m/s;
2) bucket that insulate arrives the proper operation position of the inner edge phase of fuse switch, outside phase and middle phase respectively, carry out insulation masked isolation according to the order of " from the close-by examples to those far off ", " from top to bottom ", " first big after small " to the position may touched in operation, the position of covering and order are followed successively by the earth electrode that fuse switch lead-in wire, fuse switch, wire and setting close on; When insulation masked isolation measure is set, action should be light and slow, and enough safe distances (being not less than 0.4m) should be had between the earth potential components such as cross-arm, enough safe distances (being not less than 0.6m) should be had with between neighbour's phase, the measure of insulation masked isolation should tightly, firmly, and the overlap distance that combination is covered in insulation must not be less than 15cm;
3) in bucket, electrician reviews and validate after old fuse switch is in closing position, and in two buckets, electricians cooperatively interact installing insulating support and bypass fuse switch;
4) in two buckets, electrician coordinates installing insulating drainage thread, by two end terminals of insulation lead wire with fall prevention rope buckle on wire, untie the insulation masked isolation measure on wire, remove wire oxide layer, installing insulating drainage thread, and then insulated masked isolation again in drainage thread wire clamp place;
5) in bucket electrician with the electric current of current tester test insulation lead wire, confirm through-flow good after, pull open old fuse switch with insulating bar; In bucket, electrician should wear protective ocular, and in bucket, electrician and isolating switch should have enough distances, and the effective insulated lengths of insulating bar should be not less than 0.7m;
6) remove old fuse switch and both sides lead-in wire thereof, be replaced by new fuse switch of good performance, and both sides lead-in wire is installed, and then the insulation masked isolation measure that recovery is improved on the earth potential components such as new fuse switch, cross-arm.
7) in bucket, electrician tests the electric current on new fuse switch lead-in wire with current tester, determine through-flow good after, to close fuse switch with insulating bar, remove insulation lead wire, bypass fuse switch and insulating support, during dismounting, two people answer homophase, synchronously carry out, and should recover the insulation masked isolation measure on main traverse line in time; In bucket, electrician should wear protective ocular, and in bucket, electrician and fuse switch should have enough distances, and the effective insulated lengths of insulating bar should be not less than 0.7m.
8) according to above-mentioned steps 3)-step 7) changes the old fuse switch of outside phase, middle phase successively.
9) in bucket, electrician shifts insulation bucket and arrives the mesophase spherule of fuse switch both sides, outside phase, the mutually suitable service position of inner edge respectively, to insulate masked isolation measure according to the orderly release contrary with arranging masked isolation measure of insulating; The order of removing is followed successively by electrified body, earth electrode, fuse switch switch and the fuse switch lead-in wire that setting closes on; When removing the insulation masked isolation measure on electrified body, action should be light and slow, and should have enough safe distances (being not less than 0.4m) between the earth potential component such as cross-arm, with neighbour mutually between should have enough safe distances (being not less than 0.6m)
10) in bucket, electrician withdraws from live line working region, and return to ground, work complete termination work ticket, and shift withdraws operation field.
Insulating support adds the security activity scope of operating personnel, shorten the activity duration, reduce labour intensity and the difficulty of operating personnel, 10kV bypass fuse switch is connected with adopting insulation lead wire between wire, adopt insulating support to be connected between the grounding apparatuss such as 10kV bypass fuse switch and electric pole, this connected mode avoids the damage to wire and other electric equipment of the electric arc that produces when fuse switch disconnects.Insulation lead wire, bypass fuse switch and insulating support are easy to assembling, avoid the potential safety hazard in many hot line maintenances, significantly reduce the labour intensity of operating personnel.
Insulation lead wire has good insulation property, adopts the hanging point locking type of having insulation sheath to be connected with equipment connection place in operation, swift to operate, and safety flexibly; Bypass fuse switch has self arc function; Insulating support adopts extension type insulating material to make, and has good mechanical performance, is convenient to install.Adopt insulation soft ribbons mode of tightening up to be connected with electric pole, its mechanical strength meets impulsive force requirement during switching manipulation, and its collapsing length meets live-working safety required distance.
Live line working of the present invention should be carried out under good weather.As with thunder and lightning (hear thunder, see lightning), avenge, hail, rain, mist etc., forbidden to carry out live line working.Wind-force is greater than 5 grades, or when humidity is greater than 80%, generally should not carry out live line working.Under special circumstances, when bad weather carries out hot-line repair, the relevant personnel must should be organized to discuss fully and work out necessary safety measure, being in charge of through our unit and producing after leader (chief engineer) ratifies and can carry out.
This operation needs inactive reclosing, prevents because short circuit line reclosing between alternate or phase ground causes secondary electric shock evil.
Claims (1)
1. on-load changes the operational method of 10kV fuse switch, it is characterized in that, insulation lead wire bypass fuse switch is adopted to shunt at fuse switch two ends to be replaced direct connection, when ensureing to power to based model for load duration, realize on-load and change 10kV fuse switch, its concrete operation step is as follows:
1) in two buckets, electrician operates aerial lift device with insulated arm respectively, enters live line working region;
2) bucket that insulate arrives the proper operation position of the inner edge phase of fuse switch, outside phase and middle phase respectively, carry out insulation masked isolation according to the order of " from the close-by examples to those far off ", " from top to bottom ", " first big after small " to the position may touched in operation, the position of covering and order are followed successively by the earth electrode that fuse switch lead-in wire, fuse switch, wire and setting close on;
3) in bucket, electrician reviews and validate after fuse switch is in closing position, and in two buckets, electricians cooperatively interact installing insulating support and bypass fuse switch;
4) in two buckets, electrician coordinates installing insulating drainage thread, by two end terminals of insulation lead wire with fall prevention rope buckle on wire, untie the insulation masked isolation measure on wire, remove wire oxide layer, installing insulating drainage thread, and then the measure of insulation masked isolation is reset to drainage thread wire clamp place;
5) in bucket electrician with the electric current of current tester test insulation lead wire, confirm through-flow good after, pull open old fuse switch with insulating bar;
6) remove old fuse switch and both sides lead-in wire thereof, more renew fuse switch, and both sides lead-in wire is installed, and then recover to improve the insulation masked isolation measure on lead-in wire, new fuse switch, cross-arm earth potential component;
7) in bucket, electrician tests the electric current on new fuse switch lead-in wire with current tester, determine through-flow good after, to close new fuse switch with insulating bar, remove bypass fuse switch, insulation lead wire and insulating support, during dismounting, two people answer homophase, synchronously carry out, and recover the insulation masked isolation measure on main traverse line in time;
8) according to above-mentioned steps 3)-step 7) successively the old fuse switch of outside phase, middle phase is changed;
9) in bucket, electrician shifts insulation bucket and arrives the mesophase spherule of fuse switch both sides, outside phase, the mutually suitable service position of inner edge respectively, to insulate masked isolation measure according to the orderly release contrary with arranging masked isolation measure of insulating, the order of dismounting is followed successively by electrified body, earth electrode, fuse switch switch and the fuse switch lead-in wire that setting closes on;
10) in bucket, electrician withdraws from live line working region, and return to ground, work complete termination work ticket, and shift withdraws operation field.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210324115.7A CN102931609B (en) | 2012-09-03 | 2012-09-03 | On-load changes the operational method of 10kV fuse switch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210324115.7A CN102931609B (en) | 2012-09-03 | 2012-09-03 | On-load changes the operational method of 10kV fuse switch |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102931609A CN102931609A (en) | 2013-02-13 |
CN102931609B true CN102931609B (en) | 2016-01-13 |
Family
ID=47646349
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210324115.7A Active CN102931609B (en) | 2012-09-03 | 2012-09-03 | On-load changes the operational method of 10kV fuse switch |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102931609B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103532047B (en) * | 2013-10-16 | 2016-01-20 | 国家电网公司 | A kind of operational method and device changing fuse switch on 10kV post |
CN103969547A (en) * | 2013-11-19 | 2014-08-06 | 上海诚意电气有限公司 | 10kV drop-out fuse online monitoring system |
CN103746314A (en) * | 2013-12-30 | 2014-04-23 | 江苏省电力公司常州供电公司 | Quick hot-line by-pass jumper removing operation method for 10kV insulated power distribution line |
CN106654808B (en) * | 2017-01-22 | 2018-06-29 | 国网湖南省电力公司带电作业中心 | A kind of electronic wire stripper of cable |
CN106785942B (en) * | 2017-01-25 | 2018-01-05 | 国网山东省电力公司乳山市供电公司 | High-tension fuse operation protecting device and high-tension fuse protection against electric shock operational method |
CN107425471A (en) * | 2017-06-29 | 2017-12-01 | 吉林师范大学 | 10KV is zero load, and charged for replacement becomes the new method of platform fuse switch |
CN115527816A (en) * | 2022-10-12 | 2022-12-27 | 国网江苏省电力有限公司南通供电分公司 | Drop-out fuse fault bypass processing device |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102394484A (en) * | 2011-12-12 | 2012-03-28 | 辽宁省电力有限公司锦州供电公司 | Method for replacing isolating switch with 10kV load |
-
2012
- 2012-09-03 CN CN201210324115.7A patent/CN102931609B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN102931609A (en) | 2013-02-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102931609B (en) | On-load changes the operational method of 10kV fuse switch | |
CN104124783A (en) | Electricity fetching device based on electric transmission line aerial thunder prevention ground wires | |
CN103001142A (en) | Operation method for on-load replacing of 10kV pole-mounted disconnector | |
CN103792468A (en) | Electric power line fault position location conforming method and device | |
CN102545094A (en) | Method for changing tension simulators from live 10kV power supply line | |
CN103532047B (en) | A kind of operational method and device changing fuse switch on 10kV post | |
CN104051180A (en) | 10kV pole-mounted vacuum load switch | |
CN206710519U (en) | A kind of substation safety detection means | |
CN209184242U (en) | It is a kind of to dispatch controllable power network neutral point earthing or grounding means | |
CN207265416U (en) | A kind of 10kV exchanges overhead transmission line arc blowing type lightning protection device | |
CN105048437A (en) | Combined neutral point grounding integrated control device | |
CN205810490U (en) | The voltage-sharing protective device of a kind of extra-high voltage combined insulator and insulator chain | |
CN104917158A (en) | Arc light detection and protection system for switchgear | |
CN204905675U (en) | Outdoor switch box with distribution fault handling function | |
CN210693223U (en) | Voltage transformer isolation combination device applied to uninterrupted operation | |
CN208127843U (en) | A kind of electric power tower high pressure takes electricity gas-insulated transformer substation system | |
CN204068225U (en) | Intelligent distribution network self-healing control system | |
CN201887444U (en) | Electric grounding comprehensive protector for TXHPT | |
CN204794049U (en) | Cubical switchboard arc light detects protection system | |
CN207218239U (en) | A kind of overvoltage protection device | |
CN204258230U (en) | With the overhead transmission line of reclosing breaker | |
CN204694796U (en) | Surge arrester failure indicating device | |
Yokoyama | Lightning protection of overhead power distribution lines—Outage aspects, mitigation methods and future projects | |
CN209561990U (en) | A kind of Outdoor Trusses For Transformer Substation zero sequence current mutual inductor mounting device | |
JP3128368U (en) | High-pressure air switch with optically insulated ground fault protection relay |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |