CN103248519A - Fault auxiliary analysis and short message warning system for communication station - Google Patents

Fault auxiliary analysis and short message warning system for communication station Download PDF

Info

Publication number
CN103248519A
CN103248519A CN2013101513058A CN201310151305A CN103248519A CN 103248519 A CN103248519 A CN 103248519A CN 2013101513058 A CN2013101513058 A CN 2013101513058A CN 201310151305 A CN201310151305 A CN 201310151305A CN 103248519 A CN103248519 A CN 103248519A
Authority
CN
China
Prior art keywords
module
result
analysis
communication
alarm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101513058A
Other languages
Chinese (zh)
Inventor
刘蒙
齐昕
孙贻龙
祖敏
李玉进
王刚
吴雅楠
齐志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tianjin Electric Power Corp
Original Assignee
State Grid Corp of China SGCC
Tianjin Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tianjin Electric Power Corp filed Critical State Grid Corp of China SGCC
Priority to CN2013101513058A priority Critical patent/CN103248519A/en
Publication of CN103248519A publication Critical patent/CN103248519A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention relates to a fault auxiliary analysis and short message warning system for a communication station. The system comprises a communication transmission network management, a communication business network management, an automatic SCADA (supervisory control and data acquisition) system, a warning acquisition module and a short message module, wherein the communication transmission network management platform, the communication business network management platform and the automatic SCADA system are remotely connected to the warning acquisition module which is connected with the short message module; and a fault auxiliary analysis system is connected between the warning acquisition module and the short message module, and comprises an analytic strategy module, a communication resource management module and a fault information generating module which are connected sequentially. The system provided by the invention can improve fault processing speed and efficiency by a professional worker greatly, save fault processing time, and improve the stable and reliable operating level of a power system.

Description

A kind of communication factory station failure assistant analysis and short message alarm system
Technical field
The invention belongs to the power system telecommunications technology field, be applicable to fault assistant analysis and the processing of electric power communication device, especially a kind of communication factory station failure assistant analysis and short message alarm system.
Background technology
At present, Automation of Electric Systems factory station is withdrawed from accident analysis and is mainly judged in conjunction with experience according to network management alarm information and equipment ruuning situation by automation and communication speciality personnel.Judge that the time that obtains the result is long, efficient is low, and it is stronger to be subjected to artificial subjectivity factor affecting, can not reach unified standard, be unfavorable for the fast processing fault, existing short message alarm platform can only be unified to send the factory station and withdraw from information, can't therefrom know concrete fault message.
Summary of the invention
The objective of the invention is to overcome the deficiencies in the prior art part, a kind of communication factory station failure assistant analysis and short message alarm system are provided.
The present invention solves its technical problem and takes following technical scheme to realize:
A kind of communication factory station failure assistant analysis and short message alarm system, comprise the communications network management, the communication service network management, automation SCADA system, alarm collection module and SMS module, described defeated network management platform, the traffic network network management platform, automation SCADA system is the long-range alarm collection module that is connected to respectively, alarm collection module connects SMS module, it is characterized in that: be connected with a fault assistant analysis system between described alarm collection module and the SMS module, this fault assistant analysis system comprises the analysis strategy module that is linked in sequence successively, communication resource management module and fault message generation module.
And the concrete analysis step of described analysis strategy module is as follows:
⑴ contrast the warning information that obtains at the alarm data library inquiry, obtain the warning information data value;
⑵ judge whether that according to the warning information data value SCADA factory station withdraws from warning information, if then carry out analytical procedure ⑶, if for otherwise directly carry out step and analyze ⑷;
⑶ transmission network management resource isolation alarm, if judged result then obtains the warning information result and takes off pipe for network element for being, factory's station communication disruption, the work of analysis strategy module is finished and is given the communication resource management module with result transmission; If judged result is then carried out step and is analyzed ⑷ for not;
⑷ the alarm of transmission network management light mouth is then to carry out the clamp fault warning if analysis result is judged as:
If a clamp fault warning result then is judged as the tabula rasa fault for being, the work of analysis strategy module is finished and is given the communication resource management module with result transmission;
If b clamp fault warning result is for denying, then carry out the analysis of tabula rasa ais alarm, if tabula rasa ais alarm analysis result is for being, then judged result installs or the circuit lost route for the tabula rasa business configuration, and the work of analysis strategy module is finished and given the communication resource management module with result transmission; If tabula rasa ais alarm analysis result is that then judged result is not Cable's Fault, the work of analysis strategy module is finished and is given the communication resource management module with result transmission;
If transmission network management light mouth alarm judged result is then carried out analytical procedure ⑸ for not;
⑸ transmission network management 2M alarm is then to carry out the clamp fault warning if analysis result is judged as:
If a clamp fault warning result then is judged as 2M plate fault for being, the work of analysis strategy module is finished and is given the communication resource management module with result transmission;
If b clamp fault warning result is for denying, then carry out the analysis of 2M plate ais alarm, if 2M plate ais alarm analysis result then is judged to be 2M plate business configuration fault or circuit lost route for being, the work of analysis strategy module is finished and is given the communication resource management module with result transmission; If 2M plate ais alarm analysis result is that then judged result is not 2M cable fault, the work of analysis strategy module is finished and is given the communication resource management module with result transmission;
⑹ PCM network management alarm, if PCM network management alarm analysis result is for being, then the result is judged to be the PCM webmaster, the work of analysis strategy module is finished and is given the communication resource management module with result transmission; If PCM network management alarm analysis result is that then the result is not judged to be automation equipment or other faults, the work of analysis strategy module is finished and is given the communication resource management module with result transmission.
And, the communication resource management module comprises the subscriber administration interface interface, the database manipulation module, the cable resource module, the circuit routing module, communication equipment account module, Wiring module, log management module, communication module, authority management module and warning information database, described database manipulation module, the cable resource module, the circuit routing module, communication equipment account module, Wiring module, log management module and communication module connect successively smoothly, this database manipulation module, the cable resource module, the circuit routing module, communication equipment account module, Wiring module, log management module and communication module all are connected to the subscriber administration interface interface, this database manipulation module, the cable resource module, the circuit routing module, communication equipment account module, Wiring module, log management module and communication module also are connected respectively to authority management module, and this authority management module is connected with the warning information database.
Advantage of the present invention and good effect are:
1, native system is according to every service conditions of equipment, optical cable routing iinformation, relevant network management platform and the support of communication system, in conjunction with communication network management platform, automation SCADA system, relevant information when business is broken down is carried out assistant analysis, and in time the analysis situation is sent SMS message to related personnel's communication terminal.
2, the present invention can improve speed and the efficient of professional's handling failure greatly, after passing through fault assistant analysis system in the actual production, amount to fault warning 200 times, correct judgement 158 times, the preliminary correct judgment rate of fault is about 80%, the handling failure time foreshortened to 2 hours by original average 3.5 hours, had saved the time of troubleshooting greatly, had improved the reliable and stable operation level of electric power system.
Description of drawings
Fig. 1 is structure master's block diagram of the present invention;
Fig. 2 is the fault assistant analysis system module schematic diagram among Fig. 1;
Fig. 3 is a kind of concrete work embodiment of analysis strategy module among Fig. 2;
Fig. 4 is the communication resource management inside modules module diagram among Fig. 2.
Embodiment
The invention will be further described below in conjunction with accompanying drawing and by specific embodiment, and following examples are descriptive, are not determinate, can not limit protection scope of the present invention with this.
A kind of communication factory station failure assistant analysis and short message alarm system, comprise communications network management, communication service network management, automation SCADA system, alarm collection module, fault assistant analysis system and SMS module, described defeated network management platform, traffic network network management platform, automation SCADA system are connected to alarm collection module by netting twine or wireless network remote centralized respectively, the object information that this alarm collection module connects SMS module also will be needed to alarm is sent to SMS module, and SMS module sends to the professional with warning information.
Innovative point of the present invention is:
Be connected with a fault assistant analysis system by circuit between described alarm collection module and the SMS module, alarm collection module is sent to fault assistant analysis system with the warning information that collects, this fault assistant analysis system carries out fault assistant analysis system according to the optical line at each factory station by information such as connection, network element, circuit, connects SMS module by fault assistant analysis system by netting twine again.
Above-mentioned fault assistant analysis system concrete structure comprises analysis strategy module, communication resource management module and fault message generation module, analysis strategy module, communication resource management module and fault message generation module are linked in sequence and the sequential delivery data successively, and wherein the analysis strategy module is set according to the communication network management situation by the professional.
Be a kind of embodiment of analysis strategy module as shown in Figure 3, the various warning information that alarm collection module will collect are sent to the analysis strategy module in the fault assistant analysis system, inquire about at first whether warning information is withdrawed from SCADA factory station, then take a decision as to whether transmission network tabula rasa fault, Cable's Fault, 2M plate fault or business configuration fault successively respectively, its concrete analysis step is as follows:
⑴ contrast the warning information that obtains at the alarm data library inquiry, obtain the warning information data value;
⑵ judge whether that according to the warning information data value SCADA factory station withdraws from warning information, if then carry out analytical procedure ⑶, if for otherwise directly carry out step and analyze ⑷;
⑶ transmission network management resource isolation alarm, if judged result then obtains the warning information result and takes off pipe for network element for being, factory's station communication disruption, the work of analysis strategy module is finished and is given the communication resource management module with result transmission; If judged result is then carried out step and is analyzed ⑷ for not;
⑷ the alarm of transmission network management light mouth is then to carry out the clamp fault warning if analysis result is judged as:
If a clamp fault warning result then is judged as the tabula rasa fault for being, the work of analysis strategy module is finished and is given the communication resource management module with result transmission;
If b clamp fault warning result is for denying, then carry out the analysis of tabula rasa ais alarm, if tabula rasa ais alarm analysis result is for being, then judged result installs or the circuit lost route for the tabula rasa business configuration, and the work of analysis strategy module is finished and given the communication resource management module with result transmission; If tabula rasa ais alarm analysis result is that then judged result is not Cable's Fault, the work of analysis strategy module is finished and is given the communication resource management module with result transmission;
If transmission network management light mouth alarm judged result is then carried out analytical procedure ⑸ for not;
⑸ transmission network management 2M alarm is then to carry out the clamp fault warning if analysis result is judged as:
If a clamp fault warning result then is judged as 2M plate fault for being, the work of analysis strategy module is finished and is given the communication resource management module with result transmission;
If b clamp fault warning result is for denying, then carry out the analysis of 2M plate ais alarm, if 2M plate ais alarm analysis result then is judged to be 2M plate business configuration fault or circuit lost route for being, the work of analysis strategy module is finished and is given the communication resource management module with result transmission; If 2M plate ais alarm analysis result is that then judged result is not 2M cable fault, the work of analysis strategy module is finished and is given the communication resource management module with result transmission;
⑹ PCM network management alarm, if PCM network management alarm analysis result is for being, then the result is judged to be the PCM webmaster, the work of analysis strategy module is finished and is given the communication resource management module with result transmission;
If PCM network management alarm analysis result is that then the result is not judged to be automation equipment or other faults, the work of analysis strategy module is finished and is given the communication resource management module with result transmission.
Communication resource management module shown in Figure 4 comprises the subscriber administration interface interface, the database manipulation module, the cable resource module, the circuit routing module, communication equipment account module, Wiring module, log management module, communication module, authority management module and warning information database, described database manipulation module, the cable resource module, the circuit routing module, communication equipment account module, Wiring module, log management module and communication module connect successively smoothly, this database manipulation module, the cable resource module, the circuit routing module, communication equipment account module, Wiring module, log management module and communication module all are connected to the subscriber administration interface interface and can be manually set by this subscriber administration interface interface, this database manipulation module, the cable resource module, the circuit routing module, communication equipment account module, Wiring module, log management module and communication module also are connected respectively to authority management module, and this authority management module is connected with the warning information database.
Fault warning information is by the analysis strategy module, generate corresponding fault message and carry out the daily record record by the communication resource management module again, fault message transfers to the fault message generation module then, and then the fault message generation module is sent to relevant speciality personnel by SMS module with the accident analysis result with information.
Although disclose embodiments of the invention and accompanying drawing for the purpose of illustration, but it will be appreciated by those skilled in the art that: in the spirit and scope that do not break away from the present invention and claims, various replacements, variation and modification all are possible, therefore, scope of the present invention is not limited to embodiment and the disclosed content of accompanying drawing.

Claims (3)

1. a communication factory station failure assistant analysis and short message alarm system, comprise the communications network management, the communication service network management, automation SCADA system, alarm collection module and SMS module, described defeated network management platform, the traffic network network management platform, automation SCADA system is the long-range alarm collection module that is connected to respectively, alarm collection module connects SMS module, it is characterized in that: be connected with a fault assistant analysis system between described alarm collection module and the SMS module, this fault assistant analysis system comprises the analysis strategy module that is linked in sequence successively, communication resource management module and fault message generation module.
2. according to the communication factory station failure assistant analysis described in the claim 1 and short message alarm system, it is characterized in that: the concrete analysis step of described analysis strategy module is as follows:
⑴ contrast the warning information that obtains at the alarm data library inquiry, obtain the warning information data value;
⑵ judge whether that according to the warning information data value SCADA factory station withdraws from warning information, if then carry out analytical procedure ⑶, if for otherwise directly carry out step and analyze ⑷;
⑶ transmission network management resource isolation alarm, if judged result then obtains the warning information result and takes off pipe for network element for being, factory's station communication disruption, the work of analysis strategy module is finished and is given the communication resource management module with result transmission; If judged result is then carried out step and is analyzed ⑷ for not;
⑷ the alarm of transmission network management light mouth is then to carry out the clamp fault warning if analysis result is judged as:
If a clamp fault warning result then is judged as the tabula rasa fault for being, the work of analysis strategy module is finished and is given the communication resource management module with result transmission;
If b clamp fault warning result is for denying, then carry out the analysis of tabula rasa ais alarm, if tabula rasa ais alarm analysis result is for being, then judged result installs or the circuit lost route for the tabula rasa business configuration, and the work of analysis strategy module is finished and given the communication resource management module with result transmission; If tabula rasa ais alarm analysis result is that then judged result is not Cable's Fault, the work of analysis strategy module is finished and is given the communication resource management module with result transmission;
If transmission network management light mouth alarm judged result is then carried out analytical procedure ⑸ for not;
⑸ transmission network management 2M alarm is then to carry out the clamp fault warning if analysis result is judged as:
If a clamp fault warning result then is judged as 2M plate fault for being, the work of analysis strategy module is finished and is given the communication resource management module with result transmission;
If b clamp fault warning result is for denying, then carry out the analysis of 2M plate ais alarm, if 2M plate ais alarm analysis result then is judged to be 2M plate business configuration fault or circuit lost route for being, the work of analysis strategy module is finished and is given the communication resource management module with result transmission; If 2M plate ais alarm analysis result is that then judged result is not 2M cable fault, the work of analysis strategy module is finished and is given the communication resource management module with result transmission;
⑹ PCM network management alarm, if PCM network management alarm analysis result is for being, then the result is judged to be the PCM webmaster, the work of analysis strategy module is finished and is given the communication resource management module with result transmission; If PCM network management alarm analysis result is that then the result is not judged to be automation equipment or other faults, the work of analysis strategy module is finished and is given the communication resource management module with result transmission.
3. according to the communication factory station failure assistant analysis described in the claim 1 and short message alarm system, it is characterized in that: the communication resource management module comprises the subscriber administration interface interface, the database manipulation module, the cable resource module, the circuit routing module, communication equipment account module, Wiring module, log management module, communication module, authority management module and warning information database, described database manipulation module, the cable resource module, the circuit routing module, communication equipment account module, Wiring module, log management module and communication module connect successively smoothly, this database manipulation module, the cable resource module, the circuit routing module, communication equipment account module, Wiring module, log management module and communication module all are connected to the subscriber administration interface interface, this database manipulation module, the cable resource module, the circuit routing module, communication equipment account module, Wiring module, log management module and communication module also are connected respectively to authority management module, and this authority management module is connected with the warning information database.
CN2013101513058A 2013-04-27 2013-04-27 Fault auxiliary analysis and short message warning system for communication station Pending CN103248519A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101513058A CN103248519A (en) 2013-04-27 2013-04-27 Fault auxiliary analysis and short message warning system for communication station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101513058A CN103248519A (en) 2013-04-27 2013-04-27 Fault auxiliary analysis and short message warning system for communication station

Publications (1)

Publication Number Publication Date
CN103248519A true CN103248519A (en) 2013-08-14

Family

ID=48927751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101513058A Pending CN103248519A (en) 2013-04-27 2013-04-27 Fault auxiliary analysis and short message warning system for communication station

Country Status (1)

Country Link
CN (1) CN103248519A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103763687A (en) * 2014-01-13 2014-04-30 国家电网公司 Intelligent information receiving and sending method and system special for electric power with encryption function
CN104407581A (en) * 2014-11-05 2015-03-11 国家电网公司 Optical cable fault monitoring method
CN104977887A (en) * 2015-07-02 2015-10-14 华润水泥技术研发有限公司 SCADA system-based information monitoring system and monitoring method thereof
CN107317720A (en) * 2017-08-16 2017-11-03 广东电网有限责任公司揭阳供电局 System for checking uplink communication of station terminal

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202798762U (en) * 2012-09-10 2013-03-13 中国电力科学研究院 Alarm device for power communication failure information analysis
CN103023695A (en) * 2012-11-28 2013-04-03 绍兴电力局 Master station system monitoring model based on power dispatching automation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202798762U (en) * 2012-09-10 2013-03-13 中国电力科学研究院 Alarm device for power communication failure information analysis
CN103023695A (en) * 2012-11-28 2013-04-03 绍兴电力局 Master station system monitoring model based on power dispatching automation

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103763687A (en) * 2014-01-13 2014-04-30 国家电网公司 Intelligent information receiving and sending method and system special for electric power with encryption function
CN103763687B (en) * 2014-01-13 2017-01-25 国家电网公司 Intelligent information receiving and sending method and system special for electric power with encryption function
CN104407581A (en) * 2014-11-05 2015-03-11 国家电网公司 Optical cable fault monitoring method
CN104977887A (en) * 2015-07-02 2015-10-14 华润水泥技术研发有限公司 SCADA system-based information monitoring system and monitoring method thereof
CN107317720A (en) * 2017-08-16 2017-11-03 广东电网有限责任公司揭阳供电局 System for checking uplink communication of station terminal
CN107317720B (en) * 2017-08-16 2024-01-09 广东电网有限责任公司揭阳供电局 System for checking up uplink communication of station terminal

Similar Documents

Publication Publication Date Title
CN105871466B (en) Wide-area stable communication device and method with intelligent identification function
CN105099364A (en) Photovoltaic power station remote monitoring system
CN103683511A (en) Method and system for processing fault of integrated monitoring platform based on power distribution network
CN104601383A (en) Segmented power telecommunication network analysis method
CN103684733A (en) Automatic verification method and special-purpose equipment for clock synchronization
CN103248519A (en) Fault auxiliary analysis and short message warning system for communication station
CN104794870A (en) Electric power optical cable maintenance pre-warning system and method
CN103366245A (en) OSB (operation sevice bus)-based power grid fault information distribution method and system
CN103812688A (en) Alarm determining method and device
CN105978138A (en) Electric power automation system data emergency transmission method and device
CN102624092A (en) Leakage current abnormal remote alarm device for lightning arrester of distribution transformer station zone
CN103973495A (en) Terminal access network interface adapter and data transmission method thereof
CN103957153A (en) Dispatching exchange network interface adapter and data transmission method thereof
CN105007174A (en) Automatic checking method for dispatching automatic main station downlink command
CN103543730A (en) Fault diagnosis system for chip mounters
CN203435026U (en) Wind power plant comprehensive monitoring system
CN203406900U (en) Routing backup device based on TD-LTE network and optical fiber network
CN102856980A (en) Method for comprehensively managing power distribution communication network
CN102611103A (en) Method for automatically transforming outside-the-station electric topology to tidal topology of power distribution network
CN105978157A (en) Integrated switch cabinet monitoring terminal
CN113259919A (en) Photovoltaic module data communication method and system and photovoltaic module device
CN104092301A (en) Remote centralized online monitoring system and method for storage battery of power distribution equipment
CN104297679A (en) Early warning method of breaker tripping messages
CN220823297U (en) 5G electric power virtual private network management system
CN103957126A (en) Synchronous clock network interface adaptor and data transmission method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130814